Category:Letter
MONTHYEARIR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML24026A2962024-01-26026 January 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . ML24004A0342024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0026 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000352/20234012023-12-21021 December 2023 Cybersecurity Inspection Report 05000352/2023401 and 05000353/2023401 ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23333A2182023-11-29029 November 2023 Operator Licensing Examination Approval ML23325A2062023-11-21021 November 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23313A0432023-11-13013 November 2023 Summary of Regulatory Audit in Support of Amendment Request for Control Room Air Conditioning Technical Specifications ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23276A5162023-10-0303 October 2023 Federal Emergency Management Agency Level 1 Finding from 2023 Evaluated Emergency Preparedness Exercise ML23275A1082023-09-29029 September 2023 FEMA Level 1 Findings Limerick NPP- Boyertown/Colebrookdale ML23241A9452023-09-27027 September 2023 Generation Station, Units 1 and 2 Regulatory Audit Plan Supporting Review of the Equipment Qualification Portion of Limerick Digital Instrumentation and Controls License Amendment Request ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 ML23255A0952023-09-12012 September 2023 Resubmittal of License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) to Address ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A1002023-09-0606 September 2023 Requalification Program Inspection IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) ML23248A2082023-08-31031 August 2023 UFSAR Cover Page ML23242A2172023-08-30030 August 2023 Response to Request for Additional Information for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification Changes NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23228A0942023-08-16016 August 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . IR 05000352/20230022023-08-14014 August 2023 Integrated Inspection Report 05000352/2023002 and 05000353/2023002 ML23220A0182023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212B2362023-07-31031 July 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC Documents ML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML23202A2192023-07-21021 July 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . ML23193B0122023-07-20020 July 2023 Audit Plan in Support of Review of License Amendment Request and Exemption Request for Digital Instrumentation and Controls Installation Support (Epids L-2023-LLA-0025 and L-2023-LLE-0005) ML23187A0962023-07-19019 July 2023 Generation Station, Unit Nos. 1 and 2 - Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23208A1522023-07-0606 July 2023 PEMA Letter Dated 7-6-23 Re Limerick Exercise 9-26-23 ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . ML23145A1972023-06-23023 June 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 255, 256, 257, 258, 259, and 260 2024-02-02
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20233012023-01-26026 January 2023 Initial Operator Licensing Examination Report 05000352/2023301 and 05000353/2023301 IR 05000352/20213012021-09-16016 September 2021 Initial Operator Licensing Examination Report 05000352/2021301 and 05000353/2021301 IR 05000352/20193012020-01-21021 January 2020 Initial Operator Licensing Examination Report 05000352/2019301 and 05000353/2019301 IR 05000352/20183012019-02-0707 February 2019 NRC Initial Operator Licensing Examination Report 05000352/2018301; 05000353/20182301 IR 05000352/20173022018-03-0101 March 2018 Initial Operator Licensing Examination Report Er 05000352-2017302 and 05000353-2017302 IR 05000352/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 IR 05000352/20163012016-03-21021 March 2016 Er 05000352/2016301 and 05000353/2016301; January 19 to 29, 2016; Limerick Generating Station, Units 1 and 2; Initial Operator Licensing Examination Report RS-14-164, (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-05-29029 May 2014 (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000352/20123012012-11-29029 November 2012 Er 05000352-12-301 and 05000353-12-301, on October 9 - 19, 2012, Limerick Generating Station Units 1 and 2, Initial Operator Licensing Examination Report IR 05000352/20103012010-11-0101 November 2010 Er 05000352-10-301, 05000353-10-301, on 10/04/10 - 10/15/10, Limerick Generating Station Units 1 and 2, Initial Operator Licensing Examination Report IR 05000277/20103012010-09-0303 September 2010 Er 05000352/2010301, 05000353/2010301, 05000277/2010301, 05000278/2010301; July 21-29, 2010; Limerick Generating Station, Units 1 and 2, and Peach Bottom Atomic Power Station, Units 2 and 3; Initial Operator Licensing Examination Report ML1024602512010-09-0303 September 2010 Er 05000352/2010301, 05000353/2010301, 05000277/2010301, 05000278/2010301; July 21-29, 2010; Limerick Generating Station, Units 1 and 2, and Peach Bottom Atomic Power Station, Units 2 and 3; Initial Operator Licensing Examination Report 2024-02-02
[Table view] Category:License-Operator
MONTHYEARML23249A1002023-09-0606 September 2023 Requalification Program Inspection RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23017A1122022-12-0505 December 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21307A2872021-11-0303 November 2021 September 8, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21231A1052021-08-19019 August 2021 Requalification Program Inspection ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) ML21105A5352021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1472020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML18323A3152018-11-19019 November 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18116A0542018-04-25025 April 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18079A8122018-03-27027 March 2018 Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) ML18079A5462018-03-27027 March 2018 Final Qa/Related Forms (Folder 1) ML18067A4302018-03-27027 March 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18088A6622018-03-27027 March 2018 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18088A6642018-03-27027 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18067A4162018-03-0808 March 2018 Draft Written Examination (Folder 2) ML18067A4172018-03-0808 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18038B4102018-02-0606 February 2018 Final Operating Test (Sections a, B, and C) (Folder 3) ML18038B4362018-02-0606 February 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17346A0492017-12-14014 December 2017 Operator Licensing Examination Approval ML17277A0752017-10-0303 October 2017 September 6, 2017 NRC Generic Fundamentals Examination Results for Limerick Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17242A0082017-08-29029 August 2017 Requalification Program Inspection - Limerick, Units 1 and 2 ML17151A9802017-05-31031 May 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000352/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 ML17090A3652017-02-22022 February 2017 Final Qa/Related Forms (Folder 1) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17090A3662017-01-17017 January 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17069A4182017-01-16016 January 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) 2023-09-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23017A1122022-12-0505 December 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML18323A3152018-11-19019 November 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18116A0542018-04-25025 April 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18088A6622018-03-27027 March 2018 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18088A6642018-03-27027 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18079A5462018-03-27027 March 2018 Final Qa/Related Forms (Folder 1) ML18079A8122018-03-27027 March 2018 Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) ML18067A4302018-03-27027 March 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18067A4162018-03-0808 March 2018 Draft Written Examination (Folder 2) ML18067A4172018-03-0808 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18038B4102018-02-0606 February 2018 Final Operating Test (Sections a, B, and C) (Folder 3) ML18038B4362018-02-0606 February 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17346A0492017-12-14014 December 2017 Operator Licensing Examination Approval ML17277A0752017-10-0303 October 2017 September 6, 2017 NRC Generic Fundamentals Examination Results for Limerick Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17242A0082017-08-29029 August 2017 Requalification Program Inspection - Limerick, Units 1 and 2 ML17151A9802017-05-31031 May 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000352/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 ML17090A3652017-02-22022 February 2017 Final Qa/Related Forms (Folder 1) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17090A3662017-01-17017 January 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17069A4202017-01-16016 January 2017 Draft Written Exam ML17075A3822017-01-16016 January 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17075A3832017-01-16016 January 2017 Handouts to Applicants, Limerick (Folder 3) ML17069A4182017-01-16016 January 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17069A4172017-01-16016 January 2017 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17075A3842017-01-16016 January 2017 Final Operating Test (Sections a, B and C) (Folder 3) 2023-06-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406-2713 March 13, 2017 Mr. Bryan Hanson Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.
Warrenville, IL 60555 SUBJECT: LIMERICK GENERATING STATION, UNITS 1 AND 2 - INITIAL OPERATOR LICENSING EXAMINATION REPORT 05000352/2017301 AND 05000353/2017301
Dear Mr. Hanson:
On January 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Limerick Generating Station, Units 1 and 2. The enclosed examination report documents the examination results, which were discussed on February 23, 2017, with Messrs. David Lewis, Keith Kemper, and other members of your staff.
The examination included the evaluation of five applicants for reactor operator licenses, four applicants for instant senior reactor operator licenses, and one applicant for upgrade senior reactor operator license. The written and operating examinations were developed using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10.
The license examiners determined that all ten of the ten applicants satisfied the requirements of 10 CFR Part 55, and the appropriate license were issued on February 23, 2017.
No findings were identified during this examination.
In accordance with Title 10 of Code of Federal Regulation (CFR), 10 CFR 2.390 of the NRC's
"Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC Agencywide Documents Access Management System (ADAMS).
ADAMS is accessible from the NRCs website http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85 Enclosure:
Examination Report 05000352 and 05000353/2017301 w/Attachment Supplementary Information cc w/encl: Distribution via ListServ
SUMMARY
ER 05000352/2017301 05000353/2017301; January 17-27, 2017; Limerick Generating Station,
Units 1 and 2; Initial Operator Licensing Examination Report NRC examiners evaluated the competency of five applicants for reactor operator licenses; four applicants for instant senior reactor operator licenses and one applicant for upgrade senior reactor operator license at Limerick Generating Station, Units 1 and 2. The facility licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The written examination was administered by the facility on January 27, 2017. NRC examiners administered the operating tests on January 17-24, 2017.
The NRC examiners determined that all ten of the ten applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
NRC-Identified and Self-Revealing Findings
No findings were identified.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
The examiners reviewed all ten license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, Personal Qualification Statement, and NRC Form 396, Certification of Medical Examination by Facility Licensee. The examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Operator Knowledge and Performance
a. Examination Scope
On January 27, 2017, the licensee proctored the administration of the written examinations to all ten applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on February 3, 2017.
The NRC examination team administered the various portions of the operating examination to all ten applicants on January 17-24, 2017. The five applicants for reactor operator licenses participated in two or three dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of 11 system tasks, and an administrative test consisting of four administrative tasks. The four applicants seeking an instant senior reactor operator license participated in two or three dynamic simulator scenarios, a control room and facilities walkthrough test consisting of ten system tasks, and an administrative test consisting of five administrative tasks. The one applicant for an upgrade senior reactor operator license participated in one dynamic simulator scenario, a control room and facilities walkthrough test consisting of five system tasks, and an administrative test consisting of five administrative tasks.
b. Findings
All ten of the applicants passed all parts of the operating test. For the written examinations, the reactor operator applicants average score was 85.06 percent and ranged from 80.00 to 88.00 percent, the senior operator applicants average score was 86.66 percent and ranged from 80.80 to 93.93 percent. The overall written examination average was 85.87 percent.
The NRC examiners completed the final grading of the written examination on February 23, 2017, and conducted a review of each missed question to determine the accuracy and validity of the examination questions. Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this performance analysis for 13 questions that met these criteria and submitted the analysis to the chief examiner.
The licensee submitted two post-examination question comments on February 3, 2017.
The NRC reviewed the facilitys post-exam comment submittal package and accepted the facility recommendation on one of the two questions.
- For Q5, the facility recommended and the NRC accepted two answers, Choices B and C, for the question.
- For Q92, the facility recommended accepting two correct answers (both B and D). The NRC did not agree and instead deleted Q92 from the exam.
The text of the examination questions, the licensees examination analysis, and the licensees post-examination comments with the NRC resolutions may be accessed in the ADAMS system under the accession numbers noted in the Attachment 1.
In accordance with current NRC policy, the release of this written examination will be delayed for two years.
.3 Initial Licensing Examination Development
a. Examination Scope
The facility licensee developed the examinations in accordance with NUREG-1021, Revision 10. All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The facility licensee submitted both the written and operating examination outlines on October 18, 2016.
The chief examiner reviewed the outlines against the requirements of NUREG-1021, and provided comments to the licensee. The facility licensee submitted the draft examination package on November 17, 2016. The chief examiner reviewed the draft examination package against the requirements of NUREG-1021, and provided comments to the licensee on the examination on December 5, 2016 and December 19, 2016. The NRC conducted an onsite validation of the operating examinations and provided comments during the week of December 5, 2016. The licensee satisfactorily completed comment resolution on January 13, 2017.
b. Findings
The NRC approved the initial examination outline and advised the licensee to proceed with the operating examination development.
The examiners determined that the written and operating examinations initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
No findings were identified.
.4 Simulation Facility Performance
a. Examination Scope
The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Examination Scope
The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG-1021, Revision 10 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the examination results to Mr. David Lewis, Plant Manager, and other members of the licensee's management staff on February 23, 2017. The licensee acknowledged the findings presented.
The licensee did not identify any information or materials used during the examination as proprietary.
4OA7 Licensee-Identified Violations
No findings were identified.
ATTACHMENTS:
SUPPLEMENTARY INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- D. Semeter, Operations Training Manager
- B. Devine, Facility Exam Representative
- T. Byers, Exam Developer
- R. Forst, Exam Developer
- F. Bruns, Corporate Exam Representative
- T. Brennan, Initial License Training Lead
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
NONE
Opened and Closed
NONE
Closed
NONE
Discussed
NONE
ADAMS DOCUMENTS REFERENCED