Pages that link to "RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI"
Jump to navigation
Jump to search
The following pages link to RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI:
Displayed 50 items.
- RA-16-012, Request to Consolidate 10 CFR Part 71 Quality Assurance Program Approvals for Radioactive Material Packages at Exelon Generation Company, LLC Nuclear Power Plants (← links)
- RA-13-014, Duke Energy Progress, Inc., and Duke Energy, Florida, Inc.; Response to NRC Request for Additional Information Regarding the 2013 Biennial Decommissioning Financial Assurance Report (← links)
- RA-13-011, Transmittal of Fleet Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 6 (← links)
- RA-13-006, H. B. Robinson, Unit 2, Brunswick, Units 1 and 2, Shearon Harris, Unit 1, and Crystal River, Unit 3, Submittal of Biennial Decommissioning Financial Assurance Reports (← links)
- RA-13-001, Brunswick, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1, H.B. Robinson, Unit 2, Carolina Power & Light Company'S and Florida Power Corporation'S Response to the March 12, 2012, Request for Information, Enclosure 2, Recommenda (← links)
- RA-12-031, Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones (← links)
- RA-12-035, Transmittal of Fleet Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 5 (← links)
- RA-12-028, Progress Energy - 120-Day Response to the March 12, 2012, Recommendation 2.3: Seismic (← links)
- RA-12-022, Carolina Power & Light Company and Florida Power Corporation'S 60-Day Response to the March 12, 2012, Request for Information Regarding Enclosure 5, Recommendation 9.3: Emergency Preparedness (← links)
- RA-12-017, Carolina Power & Light Company and Florida Power Corporation - 30-Day Response to March 12, 2012, Information Request (← links)
- RA-12-017, Brunswick, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1, H.B. Robinson, Unit 2, Carolina Power & Light Company and Florida Power Corporation'S 30-Day Response to March 12, 2012, Information Request (← links)
- RA-12-001, Progress Energy Transmittal of Fleet Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 4 (← links)
- RA-11-025, Response to Request for Additional Information Regarding Application for NRC Consent to Indirect License Transfer for the Proposed Merger of Duke Energy Corporation and Progress Energy Inc (← links)
- RA-11-008, Progress Energy - Evidence of Guarantee of Payment of Deferred Premiums (← links)
- RA-11-010, Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.50 (← links)
- RA-11-011, Progress Energy - Response to Industry Generic Request for Additional Information on Carolina Power & Light Company and Florida Power Corporation Cyber Security Plant, Rev. 0 (← links)
- RA-11-004, Brunswick Unit 1 & 2, Crystal River Unit 3, Shearon Unit 1, and H.B. Robinson Unit 2, Biennial Decommissioning Funding Status Report (← links)
- RA-11-005, Brunswick, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2 - Response to Request for Additional Information on the Carolina Power and Light Company and Florida Power Corporation Cyber Security Plan, Re (← links)
- RA-10-015, Transmittal of Fleet Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installations Security Program, Revision 1 (← links)
- RA-10-008, Progress Energy - Transmittal of Consolidated Fleet Physical Security Plan, Security Training & Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program (← links)
- RA-10-005, Progress Energy - Evidence Guarantee of Payment Deferred Premiums (← links)
- RA-10-003, Progress Energy Carolinas, Inc., and Progress Energy Florida, Inc., Annual 10 CFR 26 Fitness for Duty Program Performance Data for Period of January 1, 2009 Through December 31, 2009 (← links)
- RA-09-018, Shearon Harris, Unit 1, Request for Exemptions from Physical Security Requirements (← links)
- RA-09-001, Brunswick, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2- Semiannual 10 CFR 26 Fitness for Duty Program Data for the Period of July 1, 2008 Through December 31, 2008 (← links)
- RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (← links)
- RA-17-0052, Transmittal of Duke Energy Progress (DEP) Physical Security Plan Revision 12 (← links)
- RA-17-0051, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating (← links)
- RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses (← links)
- RA-17-0042, Transmittal of Duke Energy Progress Physical Security Plan, Revision 10 (← links)
- RA-17-0012, Withholding of Proprietary Information in DPC-NE-3008 - Request for Additional Information (RAI) (← links)
- RA-17-0041, Duke Energy - Transmittal of Cyber Security Plan, Revision 1 (← links)
- RA-16-0033, Duke Energy - Regulatory Commitment Change Related to Loss of Coolant Accident Reanalysis to Address Fuel Pellet Thermal Conductivity Degradation (← links)
- RA-16-0032, Duke Energy Regulatory Commitment Change Related to Loss of Coolant Accident Reanalysis to Address Fuel Pellet Thermal Conductivity Degradation (← links)
- RA-15-0030, Duke Energy Carolinas, LLC (Duke Energy): 10 CFR 50.46 - Annual Report for 2014 for Oconee Nuclear Station, Units 1, 2, and 3 (← links)
- RA-14-0018, Request for Renewal of Quality Assurance Program Approval for Radioactive Material Packages (← links)
- RA-14-0015, Duke Energy Carolinas, LLC (Duke Energy): 10 CFR 50.46 - Annual Report for 2013 for Catawba and McGuire Nuclear Stations (← links)
- RA-14-0014, Duke Energy Carolinas, LLC (Duke Energy): 10 CFR 50.46 - Annual Report for 2013 for Oconee Nuclear Station, Units 1, 2 and 3 (← links)
- RA-18-0094, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating (← links)
- RA-18-0114, License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (← links)
- RA-13-018, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Site (← links)
- RA-13-016, Duke Energy Progress, Inc., First Six-Month Status Reports in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- RA-13-009, Duke Energy Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- RA-13-0022, Carolina Power and Light Company'S Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirement for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12 (← links)
- RA-12-039, Carolina Power & Light Company & Florida Power Corporation'S Initial Status Report in Response to March 12,2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Eve (← links)
- RA-11-028, Withdrawal of Request for Withholding of Information in RAI Response Application for NRC Consent to Indirect License Transfer for the Proposed Merger of Duke Energy Corporation and Progress Energy Inc (← links)
- RA-18-0136, License Amendment Request Proposing a Revised Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, ... (← links)
- RA-18-0204, Transmittal of Technical Specification Bases (← links)
- RA-18-0221, 10 CFR 50.54(q) Evaluation (← links)
- RA-18-0175, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors. (← links)
- RA-18-0201, Corrected Technical Specification Page Regarding License Amendment Request to Self Perform Core Reload Design and Safety Analyses (← links)