RA-17-0052, Transmittal of Duke Energy Progress (DEP) Physical Security Plan Revision 12

From kanterella
Jump to navigation Jump to search
Transmittal of Duke Energy Progress (DEP) Physical Security Plan Revision 12
ML17353A482
Person / Time
Site: Harris, Brunswick, Robinson, 07200006, 07200003, 07200060  Duke Energy icon.png
Issue date: 12/14/2017
From: Catherine Nolan
Duke Energy Carolinas
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
RA-17-0052
Download: ML17353A482 (5)


Text

M. Christopher Nolan tf,DUKE SAFEGUARDS INFORMATION 526 South Church Street Charlotte, NC.28202

~;ENERGY@. When separated, this page is decontrolled.

Mailing Address:

Mail Code EC2ZF /P.O: Box 1006 Charlotte, NC 28201-1006 704-382-7426 10 CFR 50.4 10 CFR 50.54(p) 10 CFR 72.44( e) 10 CFR 72.186(b)

Serial: RA-17-0052 December 14, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk _

Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / RENEWED LICENSE NOS. DPR-71 AND DPR-62 BRUNSWICK INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 H. 8. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 /RENEWED LICENSE NO. DPR-23 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 I LICENSE NO. SNM-2502 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-60 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT N0.1 DOCKET NO. 50::400 / RENl=WED LICENSE NO. NPF-63

Subject:

TRANSMITTAL OF DUKE ENERGY PROGRESS (DEP) PHYSICAL SECURITY PLAN REVISION 12 .

In accordance with 10 CFR 50.4{b)(4)(iii), 10 CFR 50.54(p)(2) and 10 CFR 72.44(e), Duke Energy provides notification that Brunswick Steam Electric Plant, Units 1 and 2, H. B. Robinson Steam Electric Plant Unit 2 and Shearon Harris Nuclear Power Plant, Unit 1, Physical Security Plans, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Programs have been revised. The effective date of implementation for Revision 12, was October 16, 2017.

SoDJ SAFEGUARDS INFORMATION tvAA s s zlp When separated, this page is decontrolled.

/V~(c_

Jvfv{SS

SAFEGUARDS INFORMATION When separated; this page is decontrolled.

U.S. Nuclear Regulatory Commission RA-17-0052 Page 2 of 4 An evaluation of the plan revision in accordance with 10 CFR 50.54(p)(2), and 10 CFR 72.44(e)

  • has determined that the changes incorporated do not decrease the overall level of physical protection programs and security organization performance objectives and requirements as described in paragraphs (b) through (k) and (m) through (q) of 10 CFR 73.55 and 10 CFR 72.212(b){9).

This letter includes three enclosures which contain Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disclosure in accordance with 10 CFR 73.21. Enclosure 1 contains a summary description of the Physical Security Plan revision changes. Enclosure 2 contains a copy of the Duke Energy Progress - Brunswick, Harris and Robinson Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency.Plan and Independent Spent Fuel Storage Installation Security Program. Enclosure 3 contains the 10 CFR 50.54(p) Evaluations.

This document contains no new regulatory commitments. Piease refer any questions regarding this submittal to Mr. Art Zaremba at 980-373-2062.

Sincerely, M. Christopher Nolan Director - Nuclear Regulatory Affairs

Enclosures:

1. Summary Description of Changes [SAFEGUARDS INFORMATION]
2. Copy of the Duke Energy Progress - Brunswick, Harris and Robinson Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program

[SAFEGUARDS INFORMATION]

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION )

When separated, this page is decontrolled.*

U.S. Nuclear Regulatory Commission RA-17-0052 3 of 4 xc: (w/ Enclosures) [SAFEGUARDS INFORMATION]

C. Haney, Regional Administrator U.S. NuclearRegulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., .NE Suite 1200 Atlanta, GA 30303-1257 xc: (w/o Enclosures)

A.L. Hon, Project Manager (BSEP)

U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 M.C. Barillas, Project Manager (SHNPP)

U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 D.J. Galvin, Project Manager (HBRSEP, Unit 2)

U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 G. Smith NRC Senior Resident Inspector Brunswick Steam Electric Plant, Unit Nos. 1 and 2 G.R. Eatmon NRC Senior Resident Inspector H.B. Robinson Steam Electric Plant, Unit No. 2 Mark Riches NRC Senior Resident Inspector Shearon Harris Nuclear Power Plant, Unit 1 SAFEGUARDS INFORMATION

. When separated, this page is decontrolled.

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

U.S. Nuclear Regulatory Commission RA-17-0052 Page 4 of4 bxc: (w/out enclosures):

Lee Grzeck Bill Murray (For BSEP Licensing/Nuclear Records) 8.K. Jones J.N. Robertson Christine Magner (For SHNPP Licensing/Nuclear Records)

C. Sherman

. T. Pila Heidi Walters (For HBRSEP Licensing/Nuclear Records)

M.C. Nolan A.H. Zaremba E.T. O'Neil T.W. King T.J. Wadsworth A. Young ELL File: (Corporate)

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

U.S. Nuclear Regulatory Commission RA-17-0052 Enclosure 1 Summary Description of Changes SAFEGUARDS INFORMATION When separated, this page is decontrolled.