RA-17-0042, Transmittal of Duke Energy Progress Physical Security Plan, Revision 10

From kanterella
Jump to navigation Jump to search
Transmittal of Duke Energy Progress Physical Security Plan, Revision 10
ML17244A495
Person / Time
Site: Harris, Brunswick, Robinson, 07200006, 07200003, 07200060  Duke Energy icon.png
Issue date: 08/30/2017
From: Nolan M
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
RA-17-0042
Download: ML17244A495 (6)


Text

M. Christopher Nolan e_f,DUKE SAFEGUARDS INFORMATION 526 South Church Street Charlotte, NC 28202

~ii} ENERGY When separated, this page is decontrolled.

Mailing Address:

Mail Code EC2ZF /P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426 10 CFR'S0.4 10 CFR 50.54(p) 10 CFR 72.44.(e)

. 10 CFR 72.186(b)

August 30, 2017 RA-17-0042 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 DOCKET NOS. 50-325, 50-324 I LICENSE NOS. DPR-71, DPR-62 BRUNSWICK INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-6 H.B. ROBINSON STEAM E~ECTRIC PLANT, UNIT 2 DOCKET NO. 50-261 I LICENSE NO. DPR-23 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NO. 72-3 I LICENSE NO. SNM-2502 H.B. ROBINSON INDEPENDENT SPENT FUEL STORAGE INSTALLATION -

DOCKET NO. 72-60 SHEARON HARRIS NUCLEAR POWEfl PLANT, UNIT 1

.DOCKET NO. 50-400 I LICENSE NO. NPF-63

SUBJECT:

TRANSMITTAL OF DUKE ENERGY PROGRESS PHYSICAL SECURITY PLAN, REVISION 10 In accordance with 10 CFR 50.4(b)(4)(iii), 10 CFR S0.54(p)(2) and 10 CFR 72.44(e), Duke*

Energy Progress provides notification that the Duke Energy Progress - Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program has been revised. The effective date of implementation for Revision 1O is August 21, 2017.

An evaluation of the plan revision in accordance with 10 .CFR 50.54(p)(2) and 10 CFR 72.44(e) has determined that the changes incorporated do not decrease the overall level of physical protection programs and security organization performance objectives and requirements as described in paragraphs (b) through (k) and (m) through (q) of 10 CFR 73.55 and 10 CFR 72.21_2(b)(9).

.Soo I SAFEGUARDS INFORMATION When separated, this page is decontrolled. /JfVI s5 2- (o

{lf((/L

µf'-1~$

SAFEGUARDS INFORMATION When separated; this page is decontrolled.

U.S .. Nuclear Regulatory Commission RA-17-0042 Page2

. This letter includes three enclosures which contain-Safeguards Information as defined in 10 CFR 73.2 and must be protected from unauthorized disclosure in accordance with 10 CFR 73.-21. Enclosure 1 contains a summary description of the Physical Security Plan revision changes. Enclosure 2 contains a copy of the Duke Energy Progress - Brunswick,*

Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program. Enclosure 3 contains the evaluation of the the changes to the Security Plan that was performed in accordance with 10 CFR 50.54(p) in order to.ensure compliance whll governing commitments and regulations.

There are no new *regulatory commitments made in this submittal. Should there be any questions* regarding this submittal, please contact Art Zaremba at (980) 373-2062'.

. I Sincerefi~

M. Christopher Nolan, Director Nuclear Regulatory Affairs * *

Enclosures:

1. Summary Description of Changes [SAFEGUARDS INFORMATION]
2. Copy of Duke Energy Progress - Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Training and Qualification Plan, Safeguards
  • Contingency Plan and Independent Spent Fuel Storage Installation Security Program (composite) [SAFEGUARDS INFORMATION]
3. 10 CFR 50.54(p) Evaluation [SAFEGUARDS INFORMATION]

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION When separated, this page is decontrolled.*

U.S. Nuclear Regulatory Commission RA-17-0042 .

Page 3 xc: (w/ enclosures) [SAFEGUARDS INFORMATION]

C. Haney U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 xc: (w/o enclosures)

M.C. Barillas, Project Manager (SHNPP)

U. S. Nuclear Regulatory Commission Orie White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 A.L. Hon, Project Manager (BSEP)

U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 D.J. Galvin, Project Manager (HBRSEP, Unit 2)

U.S. Nuclear. Regulatory Commission One White Flint North, Mail Stop 8G9A 11555 Rockville Pike Rockville, MD 20852-2738 M.P. Catts NRG Senior Resident Inspector Brunswick Steam Electric Plant, Unit Nos. 1 and 2 J. Rotton NRG Senior Resident Inspector H.B. Robinson Steam Electric Plant, Unit No. 2 D. Retterer NRG Senior Resident lnspeictor Shearon Harris Nuclear Power Plant, Unit 1 SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

U.S. Nuclear Regulatory Commission RA~17-0042 Page 4 bxc: (w/o enclosures)

E.T. O'Neil T.W. King M.C. Nolan A.H. Zaremba T.J. Wadsworth J.L. Vaughan ELL File: (Corporate)

J.M Remick T. Pilo C. Caudell (For RNP Licensing/Nuclear Records)

. S.D. West L. Grzeck W.R. Murray (For BNP Licensing/Nuclear Records)

L. Faulk J. Robertson C. Magn-er (For HNP Licensing/Nuclear Records)

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION l

When separated, this page is .decontrolled.

U.S. Nuclear Regulatory Commission RA-17-0042 Enclosure 1 Summary Description of ~hanges SAFEGUARDS INFORMATION When separated, this page is decontrolled.

SAFEGUARDS INFORMATION When separated, this page is decontrolled.

U.S. Nuclear Regulatory Commission RA-17~0042 Enclosure 2 Copy of Duke Energy Progress - Brunswick, Robinson and Harris Nuclear Plants Physical Security Plan, Security Traiqing and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program (composite)

SAFEGUARDS INFORMATION When separate_d, this page is decontrolled.