Text
(~ DUKE ENERGY~
M. CHRISTOPHER NOLAN Director Nuclear Regulatory Affairs 526 South Church Street, EC-2ZF Charlotte, NC 28202 980-382-7426 Chris.Nolan@duke-energy.com SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURES 1 AND 2 THIS LETTER IS UNCONTROLLED Serial: RA-17-0041 August 29, 2017 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 10 CFR 50.54(p)
DOCKET NOS. 50-325, 50-324 I RENEWED LICENSE NOS. DPR-71 AND DPR-62 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 I RENEWED LICENSE NO. DPR-23 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 I RENEWED LICENSE NO. NPF-63
SUBJECT:
TRANSMITTAL OF DUKE ENERGY PROGRESS, LLC CYBER SECURITY PLAN, REVISION 1 Ladies and Gentlemen:
Pursuant to 10 CFR 50.54(p)(2), Duke Energy Progress, LLC (Duke Energy), formerly known as Carolina Power & Light Company and Florida Power Corporation, is submitting Revision 1 to the Cyber Security Plan (CSP) for the Harris, Robinson, and Brunswick Nuclear Plants. The effective date of implementation for Revision 1 was June 30, 2017. Duke Energy has evaluated Revision 1 in accordance with 10 CFR 50.54(p) and determined that it does not constitute a reduction in effectiveness. Enclosure 1 contains a description of the changes and Enclosure 2 contains a copy of the Cyber Security Plan, Revision 1.
This submittal contains no new regulatory commitments. If you have questions concerning this request, please contact Art Zaremba, Manager, Fleet Licensing, at (980) 373-2062.
Sinceral~2-M. Christopher Nolan Director - Nuclear Regulatory Affairs
Enclosures:
- 1. Description of CSP, Revision 1 Changes
- 2. Copy of Duke Energy Progress, LLC Cyber Security Plan, Revision 1 SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURES 1 AND 2 THIS LETTER IS UNCONTROLLED
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURES 1 AND 2 THIS LETTER IS UNCONTROLLED U.S. Nuclear Regulatory Commission RA-17-0041 Page 2 SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 UPON REMOVAL OF ENCLOSURES 1 AND 2 THIS LETTER IS UNCONTROLLED cc:
(all with Enclosure unless otherwise noted)
C. Haney, Regional Administrator USNRC Region II M. P. Catts, USNRC Resident Inspector - BNP R. Patterson, USNRC Resident Inspector - HNP J. Zeiler, USNRC Resident Inspector - RNP A. L. Hon, NRR Project Manager - BNP M. C. Barillas, NRR Project Manager - HNP D. Galvin, NRR Project Manager - RNP