Brunswick, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1, H.B. Robinson, Unit 2, Carolina Power & Light Company'S and Florida Power Corporation'S Response to the March 12, 2012, Request for Information, Enclosure 2, RecommendatML13032A071 |
Person / Time |
---|
Site: |
Harris, Brunswick, Crystal River, Robinson ![Duke Energy icon.png](/w/images/7/75/Duke_Energy_icon.png) |
---|
Issue date: |
01/29/2013 |
---|
From: |
Waldrep B C Duke Energy Carolinas |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
RA-13-001 |
Download: ML13032A071 (3) |
|
|
---|
Category:Letter type:RA
MONTHYEARRA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2024-02-0505 February 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RA-24-0015, Submittal of 2023 Sea Turtle Annual Report2024-01-10010 January 2024 Submittal of 2023 Sea Turtle Annual Report RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-24-0006, 10 CFR 50.54(q) Evaluation2024-01-0404 January 2024 10 CFR 50.54(q) Evaluation RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific2023-11-0606 November 2023 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2023-09-21021 September 2023 Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2023-08-22022 August 2023 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)2023-07-20020 July 2023 Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 RA-23-0145, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks2023-06-15015 June 2023 Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0139, Registration for Use of General License Spent Fuel Casks2023-06-0606 June 2023 Registration for Use of General License Spent Fuel Casks RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval2023-04-24024 April 2023 Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0098, Annual Environmental (Nonradiological) Operating Report2023-04-19019 April 2023 Annual Environmental (Nonradiological) Operating Report RA-23-0096, Post Accident Monitoring (PAM) Instrumentation Report2023-04-12012 April 2023 Post Accident Monitoring (PAM) Instrumentation Report RA-23-0063, Notification of Deviation from BWRVIP Guidelines2023-04-11011 April 2023 Notification of Deviation from BWRVIP Guidelines RA-23-0080, Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube2023-04-0505 April 2023 Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube RA-23-0043, Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations2023-03-30030 March 2023 Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0055, Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 22023-03-24024 March 2023 Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 2 RA-23-0021, Unit 2 Cycle 26 Core Operating Limits Report (COLR)2023-02-22022 February 2023 Unit 2 Cycle 26 Core Operating Limits Report (COLR) RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-23-0015, Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-02-0909 February 2023 Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications2023-02-0707 February 2023 License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-23-0029, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2023-01-30030 January 2023 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) 2024-02-05
[Table view] |
Text
BDuke enjamin C. Waldrep Energyo 526 South Church Street Charlotte, NC 28202 Mailing Address: Mail Code ECOTHI P.O. Box 1006 Charlotte, NC 28201-1006 704-382-8162 704-382-4541 fax 10 CFR 50.4 10 CFR 50.54(f)Serial: RA-13-001 January 29, 2013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 / RENEWED LICENSE NOS. DPR-71 AND DPR-62 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 / LICENSE NO. DPR-72 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23
SUBJECT:
CAROLINA POWER & LIGHT COMPANY'S AND FLORIDA POWER CORPORATION'S RESPONSE TO THE MARCH 12, 20112, REQUEST FOR INFORMATION, ENCLOSURE 2, RECOMMENDATION 2.1, FLOODING, REQUIRED RESPONSE 1, INTEGRATED ASSESSMENT APPROACH
REFERENCES:
- 1. NRC Letter, E.J. Leeds (NRC) to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred status, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, dated March 12, 2012, Accession No. ML1 2053A340 2. NRC Japan Lessons-Learned Project Directorate, JLD-ISG-2012-05, Guidance for Performing the Integrated Assessment for External Flooding, Interim Staff Guidance, Revision 0, dated November 30, 2012, Accession No. ML1231 1A214 3. NRC Letter, D.L. Skeen (NRC) to J.E. Pollock (NEI), Trigger Conditions for Performing an Integrated Assessment and Due Date for Response, dated December 3, 2012, Accession No. ML12326A912 Ladies and Gentlemen:
On March 12, 2012, the NRC issued Reference 1 to request information associated with Near-Term Task Force (NTTF) Recommendation 2.1 for Flooding.
One of the Required Responses in this letter directed licensees to submit an approach for developing an IntegratedAssessment Report, including criteria for identifying vulnerabilities, within 60 days after issuance of the NRC's guidance on the subject (i.e., Reference 2). The following is Carolina Power & Light Company's (CP&L) and Florida Power Corporation's (FPC) 60-day response.www.duke-energy com AcoI United States Nuclear Regulatory Commission RA-1 3-001 Page 2 On November 30, 2012, the NRC issued the Reference 2 Interim Staff Guidance.
CP&L and FPC will adopt the Reference 2 guidance as the approach for developing the NTTF 2.1 Flooding Integrated Assessment Report for those plant sites listed above if the reevaluated flooding hazard is not bounded by the current design basis flood evaluation.
CP&L and FPC also will adopt the guidance of Reference 3 regarding the trigger conditions and scope of any required Integrated Assessment.
This letter contains new Regulatory Commitments as identified in the attachment.
If you have any questions or require additional information, please contact Donna Alexander, Manager -Nuclear Regulatory Affairs, at (919) 546-5357.I declare under the penalty of perjury that the foregoing is true and correct. Executed on the 29t day of January, 2013.Sincerely, Benja in C. aldrep Vice Pi orporate Governance
&Operations Support Attachment
-List of Regulatory Commitments cc: USNRC Region II, Regional Administrator USNRC Resident Inspector-BSEP, Unit Nos. 1 and 2 USNRC Resident Inspector
-CR3 USNRC Resident Inspector
-SHNPP, Unit No. 1 USNRC Resident Inspector
-HBRSEP, Unit No. 2 C. Gratton, NRR Project Manager -BSEP, Unit Nos. 1 and 2; CR3 A. T. Billoch Col6n, NRR Project Manager- SHNPP, Unit No. 1; HBRSEP, Unit No. 2 United States Nuclear Regulatory Commission RA-13-001 Attachment Page 1 of 1 List of Regulatory Commitments The following table identifies the actions in this document to which Carolina Power & Light Company (CP&L) and Florida Power Corporation (FPC) have committed.
Statements in this submittal, with the exception of those in the table below, are provided for information purposes and are not considered commitments.
Please direct questions regarding these commitments to Donna Alexander, Manager -Nuclear Regulatory Affairs, at (919) 546-5357.Cormmitment Scheduled Completion Date*Brunswick Steam Electric Plant, Unit Nos. 1 and 2: If an integrated assessment is triggered based on the guidance in the NRC Letter from D. L.Skeen (NRC) to J.E. Pollock (NEI), Trigger Conditions for Performing an Integrated Assessment and Due Date for Response, dated December 3, 2012, Accession No. ML12326A912, CP&L will utilize the guidance contained in JLD- March 12, 2017 ISG-2012-05, Guidance for Performing the Integrated Assessment for External Flooding, Interim Staff Guidance, Revision 0, dated November 30, 2012, Accession No. ML12311A214, to perform the assessment.
Crystal River Unit 3 Nuclear Generating Plant: If an integrated assessment is triggered based on the guidance in the NRC Letter from D. L. Skeen (NRC) to J.E. Pollock (NEI), Trigger Conditions for Performing an Integrated Assessment and Due Date for Response, dated December 3, 2012, Accession No.ML12326A912, FPC will utilize the guidance contained in JLD-ISG-2012-05, Guidance for Performing the Integrated Assessment for External Flooding, Interim Staff Guidance, Revision 0, dated November 30, 2012, Accession No. ML12311A214, to perform the assessment.
Shearon Harris Nuclear Power Plant, Unit No. 1: If an integrated assessment is triggered based on the guidance in the NRC Letter from D. L. Skeen (NRC) to J.E. Pollock (NEI), Trigger Conditions for Performing an Integrated Assessment and Due Date for Response, dated December 3, 2012, Accession No.ML12326A912, CP&L will utilize the guidance contained in JLD-ISG-2012-05, Guidance for Performing the Integrated Assessment for External Flooding, Interim Staff Guidance, Revision 0, dated November 30, 2012, Accession No. ML12311A214, to perform the assessment.
H. B. Robinson Steam Electric Plant, Unit No. 2: If an integrated assessment is triggered based on the guidance in the NRC Letter from D. L. Skeen (NRC) to J.E. Pollock (NEI), Trigger Conditions for Performing an Integrated Assessment and Due Date for Response, dated December 3, 2012, Accession No.ML12326A912, CP&L will utilize the guidance contained in JLD-ISG-2012-05, Guidance for Performing the Integrated Assessment for External Flooding, Interim Staff Guidance, Revision 0, dated November 30, 2012, Accession No. ML12311A214, to perform the assessment.
- Scheduled completion dates are consistent with the Integrated Assessment completion date as specified in Reference 1 based on the site priorities specified in NRC letter, Prioritization of Response Due Dates for Request For Information Pursuant to Title 10 of the Code Of Federal Regulations 50.54(o Regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights From the Fukushima Dai-lchi Accident, dated May 11, 2012.