Pages that link to "PNO-I-87-012, on 870213,NRC Notified of Apparent Hand Overexposure to Contract Worker.Worker Received 29.6 Rems to Fingers of Right Hand During Underwater Cutting of Dry Tubes.Cutting Operations Suspended Pending Investigation"
Jump to navigation
Jump to search
The following pages link to PNO-I-87-012, on 870213,NRC Notified of Apparent Hand Overexposure to Contract Worker.Worker Received 29.6 Rems to Fingers of Right Hand During Underwater Cutting of Dry Tubes.Cutting Operations Suspended Pending Investigation:
Displayed 23 items.
- PNO-I-97-008, 970123,manual Reactor Scram Initiated at FitzPatrick Nuclear Plant,When Decreasing Lake Intake Water Level Indication Noted.All Rods Inserted & Sys Functioned as Required (← links)
- PNO-I-93-005, on 930123,plant Tied to Grid Officially Ending 13 Month Shutdown.Design Deficiency in Core Spray Sys Containment Isolation Logic Caused Plant Shutdown on 911127. Technical & Performance Issues Resolved on 921229 (← links)
- PNO-I-88-079, on 880729,senior Reactor Operator Tested Positive for Drug Use.Pending Results of Second Test, Individual Site Access Denied (← links)
- PNO-I-88-122, on 881202,commencement of Reactor Shutdown to Support Main Turbine Generator Detuning Planned to Correct Resonant Frequency at Normal Operating Speed of Low Pressure Turbine Rotor.Rotor Will Be Detuned (← links)
- PNO-I-99-003, on 990114,NY Power Authority Declared Unusual Event at Plant Due to Fire at Onsite Hydrogen Storage Facility.No Attempt Made to Isolate Hydrogen Supply to Fire for Personnel Safety Reasons.Region I Responded to Event (← links)
- PNO-I-80-095, on 800624,Home Transportation Co tractor- Trailer Carrying Low Level Radwaste from Oswego,Ny to Barnwell,Sc Developed Air Suspension Sys & Axle Trouble on Route 81 South of Syracuse,Ny (← links)
- PNO-I-89-044, on 890612,two Workers Received Exposures of 570 & 280 Millirem W/Total Quarterly Doses of 1,240 & 960 Millirem,Respectively,While Working Around Refueling Pool. Caused by Hot Particle.Licensee Trying to Capture Source (← links)
- PNO-I-87-085, on 870907,reactor Trip Occurred When Both 345 Kv Generator Output Breakers Tripped.Cause Undetermined. Troubleshooting & Analysis of Field Windings & Ground Detection Circuit Continuing.Trip Also Occurred on 870828 (← links)
- ML20249C815 (← links)
- ML20249C812 (← links)
- ML20249B938 (← links)
- ML20249B894 (← links)
- ML20249B506 (← links)
- ML20249B241 (← links)
- ML20249B235 (← links)
- ML20249A129 (← links)
- ML20246G251 (← links)
- PNO-I-98-035, on 980803:automatic Reactor Scram Occurred Due to Low Reactor Vessel Water Level.Licensee Elected to Enter Cold Shutdown to Complete Several Maint Items.Licensee Issued Press Release (← links)
- ML20236U045 (← links)
- ML20211Q482 (redirect page) (← links)
- PNO-I-87-012 (redirect page) (← links)
- PNO-I-90-090, on 901009,presumptive Positive Drug Test for on-shift Senior Reactor Operator Occurred.Operator Taken Off Shift & Denied Access to Protected Area for 14 Days (← links)
- PNO-I-90-067, on 900821,reactor Shutdown to Resolve Calculational Concerns in Eops.Shut Down Voluntary Action by Util.Util Estimated That Initial Results of Revised Calculations Will Be Available by 900823 (← links)