Pages that link to "L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation"
Jump to navigation
Jump to search
The following pages link to L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation:
Displayed 50 items.
- ML16335A195 (← links)
- ML16132A188 (← links)
- ML16013A472 (← links)
- ML18037A829 (← links)
- ML18037A828 (← links)
- ML18037A824 (← links)
- ML15054A037 (← links)
- ML14338A555 (← links)
- ML14338A554 (← links)
- ML14029A252 (← links)
- ML14002A160 (← links)
- ML13213A190 (← links)
- ML13095A196 (← links)
- ML12234A751 (← links)
- ML112280501 (← links)
- ML112280292 (← links)
- ML11195A147 (← links)
- ML111930587 (← links)
- ML18053A137 (← links)
- EPID:L-2018-RNW-0002 (← links)
- ML18038A691 (← links)
- ML18074A252 (← links)
- ML18113A145 (← links)
- ML18113A142 (← links)
- ML18113A141 (← links)
- ML18113A134 (← links)
- ML18087A433 (← links)
- ML18086A705 (← links)
- ML15142A650 (← links)
- ML18130A466 (← links)
- L-2018-082, Turkey Point, Units 3 and 4 - Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version) (← links)
- L-2018-004, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) (← links)
- L-2016-128, Turkey Point Nuclear Plant, Units 3 and 4 - License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps (← links)
- L-2014-250, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 2, and Response to Request for Additional Information (RAI-5 and BOP RAIs 5 and 5.1) (← links)
- L-2014-235, License Amendment Request No. 231, Application to Revise Ultimate Heat Sink Temperature Limit - Supplement 1, and Response to Request for Additional Information (← links)
- ML18173A087 (← links)
- ML17360A054 (← links)
- ML14252A417 (← links)
- L-2012-248, Turkey Point, Units 3 and 4, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone Change (← links)
- L-2011-190, WCAP-17070-NP, Revision 1, Westinghouse Setpoint Methodology for Protection Systems, Turkey Point, Units 3 & 4 (Power Uprate to 2644 Mwt - Core Power), Attachment 2 to L-2011-190 (← links)
- L-2011-032, WCAP-17094-NP, Rev 3, Turkey Point, Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 to L-2011-032 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports (← links)
- ML103560184 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report (← links)
- ML103560183 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments (← links)
- ML103560182 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms (← links)
- ML103560180 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods (← links)