Nuclear Regulatory Commission Integrated Inspection Report 05000413/2018002; 05000414/2018002; 05000413/2018502 and 05000414/2018502
ML18205A390
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/24/2018
From: Frank Ehrhardt
NRC/RGN-II/DRP/RPB1
To: Simril T
Duke Energy Corp
References
IR 2018002, IR 2018502
Download: ML18205A390 (29)


See also: IR 05000413/2018002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

July 24, 2018

Mr. Tom Simril

Site Vice President

Duke Energy Corporation

Catawba Nuclear Station

4800 Concord Road

York, SC 29745-9635

SUBJECT: CATAWBA NUCLEAR STATION - NUCLEAR REGULATORY COMMISSION

INTEGRATED INSPECTION REPORT 05000413/2018002; 05000414/2018002;

05000413/2018502 AND 05000414/2018502

Dear Mr. Simril:

On June 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at

your Catawba Nuclear Station Units 1 and 2. On July 23, 2018, the NRC inspectors discussed

the results of this inspection with Mr. Clark Curry and other members of your staff. The results

of this inspection are documented in the enclosed report.

NRC inspectors documented two findings of very low safety significance (Green) in this report.

These findings involved violations of NRC requirements. The NRC is treating these violations

as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violations or significance of these NCVs, you should provide a response within

30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with

copies to the Regional Administrator, Region II; the Director, Office of Enforcement; and the

NRC resident inspector at Catawba Nuclear Station. If you disagree with the cross-cutting

aspect assignment in this report, you should provide a response within 30 days of the date of

this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory

Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the

Regional Administrator, Region II; and the NRC resident inspector at the Catawba Nuclear

Station.

T. Simril 2

This letter, its enclosure, and your response (if any) will be made available for public

inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC

Public Document Room in accordance with 10 CFR 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA/

Frank Ehrhardt, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Docket Nos.: 50-413, 50-414

License Nos.: NPF-35, NPF-52

Enclosure:

IR 05000413/2018002, 05000414/2018002,

05000413/2018502, AND 05000414/2018502

cc: Distribution via ListServ

ML18205A390

OFFICE RII:DRP RII:DRP RII:DRS RII:DRS RII:DRS RII:DRPS RII:DRP

NAME JAustin CScott WLoo ANielsen WPursley JRivera MToth

DATE 7/24/2018 7/24/2018 7/19/2018 7/19/2018 7/19/2018 7/19/2018 7/24/2018

OFFICE RII: DRP RII:DRP

NAME JWorosilo FEhrhardt

DATE 7/20/2018 7/24/2018

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Numbers: 50-413, 50-414

License Numbers: NPF-35, NPF-52

Report Numbers: 05000413/2018002; 05000414/2018002;

05000413/2018502, and 05000414/2018502

Enterprise Identifier: I-2018-002-0034

I-2018-502-0003

Licensee: Duke Energy Carolinas, LLC

Facility: Catawba Nuclear Station, Units 1 and 2

Location: York, SC

Inspection Dates: April 1, 2018 to June 30, 2018

Inspectors: J. Austin, Senior Resident Inspector

C. Scott, Resident Inspector

W. Loo, Senior Health Physicist

A. Nielsen, Senior Health Physicist

W. Pursley, Health Physicist

J. Rivera, Health Physicist

S. Sanchez, Sr. Emergency Preparedness Inspector

C. Fontana, Emergency Preparedness Inspector

J. Viera, Operations Engineer

A. Hutto, Senior Resident Inspector (McGuire)

Approved By: F. Ehrhardt, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring licensees

performance by conducting a quarterly baseline inspection at Catawba Units 1 and 2 in

accordance with the Reactor Oversight Process. The Reactor Oversight Process is the

NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC

and self-revealed findings, violations, and additional items are summarized in the table

below.

List of Findings and Violations

Failure to Identify and Correct CAQ Associated with Failure of the 2B Seal Water Injection Filter

O-ring

Cornerstone Significance Cross-cutting Aspect Report Section

Initiating Events Green NCV [P.2] - Evaluation 71111.12 - 05000414/2018002-01 Maintenance

Closed Effectiveness

A self-revealed Green NCV of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action,

was identified for the licensees failure to promptly identify and correct a condition adverse to

quality associated with the failure of 2B seal water injection filter (SWIF) O-ring on May 13,

2018. Specifically, the licensees failure to implement corrective actions for the first failure of

the O-ring on 2B SWIF on March 12, 2018, led to a second failure of 2B SWIF O-ring on May

13, 2018.

Failure to Promptly Identify and Correct a Condition Adverse to Quality

Cornerstone Significance Cross-cutting Aspect Report Section

Mitigating Green NCV [P.2] - Evaluation 71111.15 -

Systems05000413/2018002-02 Operability

Closed Determinations

and Functionality

Assessments

The inspectors identified a Green NCV of 10 CFR Part 50, Appendix B, Criterion XVI,

Corrective Action, for the licensees failure to promptly identify and correct a condition

adverse to quality associated with low resistance readings for core exit thermocouples (CET)

identified during testing on January 30, 2018. Specifically, the licensee failed to declare two

CETs inoperable when resistance readings were outside of the acceptance criteria until April

9, 2018.

2

Additional Tracking Items

Type Issue number Title Report Section Status

URI 05000414/2018002-03 Notice of Enforcement 71153 - Follow-up Open

Discretion Granted from of Events and

Technical Specifications Notices of

Related to the Failure of the Enforcement

2A EDG During Post- Discretion

Maintenance Test

3

PLANT STATUS

Unit 1 operated at or near 100 percent rated thermal power (RTP) for the entire inspection

period.

Unit 2 began the inspection period in refueling outage 2EOC22 and returned to 100

percent RTP on April 17, 2018. On May 10, 2018, power was reduced to approximately

50 percent RTP due to a turbine runback. Power was returned to 100 percent RTP on

May 11, 2018.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures

(IPs) in effect at the beginning of the inspection unless otherwise noted. Currently

approved IPs with their attached revision histories are located on the public website at

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-

procedure/index.html. Samples were declared complete when the IP requirements most

appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The

inspectors reviewed selected procedures and records, observed activities, and

interviewed personnel to assess licensee performance and compliance with Commission

rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Summer Readiness (1 Sample)

The inspectors evaluated summer readiness of offsite and alternate alternating current

(AC) power systems on June 28, 2018.

Impending Severe Weather (2 Samples)

The inspectors evaluated readiness for impending adverse weather conditions for a

tornado warning and watch on April 15, 2018, when the licensee entered RP/07,

Natural Disaster and Earthquake for both Units.

The inspectors evaluated readiness for impending adverse weather conditions for a

tornado warning on May 30, 2018.

71111.04 - Equipment Alignment

Partial Walkdown (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the

following systems/trains:

4

(1) Unit 2, 2B emergency diesel generator (EDG) with 2A EDG out of service (OOS)

for maintenance on April 19, 2018

(2) Unit 1, 1A safety injection (NI) pump on May 22, 2018

(3) Unit 1, 1A EDG with 1B OOS for leak on EDG engine cooling water (KD) on

May 29, 2018

Complete Walkdown (1 Sample)

The inspectors evaluated system configurations during a complete walkdown of the

2B EDG lube oil system on June 27, 2018.

71111.05AQ - Fire Protection Annual/Quarterly

Quarterly Inspection (4 Samples)

The inspectors evaluated fire protection program implementation in the following

selected areas:

(1) Fire Area 5: Unit 2 electrical penetration room, elevation 560 on May 16, 2018

(2) Fire Area 16 and 17: Unit 1 and 2 cable room on May 17, 2018

(3) Fire Area 14: Unit 2 A train essential switchgear room on May 22, 2018

(4) Fire Area 2: Unit 2 CA (auxiliary feedwater) pump and motor driven CA pump pits

on May 24, 2018

71111.06 - Flood Protection Measures

Internal Flooding (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the Unit 1 auxiliary

feedwater pump room on June 1, 2018.

71111.07 - Heat Sink Performance

Heat Sink (1 Sample)

The inspectors evaluated the 2A component cooling water heat exchanger

performance on April 2, 2018.

71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance

Operator Requalification (1 Sample)

The inspectors observed and evaluated reactor operator simulator training on June 21,

2018.

5

Operator Performance (1 Sample)

The inspectors observed and evaluated abnormal procedure response to a loss of power

to A vital bus on May 16, 2018.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness (2 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated

with the following equipment and/or safety significant functions:

(1) Condition Report (CR) 2190684, 2B seal water injection filter top O-ring failure,

March 12 and May 13, 2018

(2) CR 2208504, 2EMF-49, reactor coolant system (RCS) activity on May 23, 2018

71111.13 - Maintenance Risk Assessments and Emergent Work Control (4 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent

work activities:

(1) Equipment protection plan when 2SV-7 (2C SG PORV) was declared inoperable

due to failed nitrogen leakage test on April 5, 2018

(2) Equipment protection plan for calibration of 2NCP5121 (Loop B NC Pressure) with

the safe shutdown facility diesel OOS on April 20, 2018

(3) Equipment protection plan for the loss of Unit 1 vital inverter IEIC with 1B EDG

OOS on May 15, 2018

(4) Equipment protection plan for loss of the 48VDC power supply from 1ERPC and

1B solid state protection system (SSPS) failure on May 15, 2018

71111.15 - Operability Determinations and Functionality Assessments (5 Samples)

The inspectors evaluated the following operability determinations and functionality

assessments:

(1) CR 2191418, Non-conservative dose analysis/protracted cooldown rates on

March 14, 2018

(2) CR 2191912, Steam leak on Unit 1 turbine driven auxiliary feedwater greater than

limit in prompt determination of operability, on March 15, 2018

(3) CR 2204792, Two core exit thermocouples (CETs) with unacceptable resistance

readings were declared inoperable on April 9, 2018

(4) CR 22083558, New information related to previous Part 21 evaluation CR

1561969, on May 15, 2018

(5) CR 2211000, 1B EDG annunciator failed to start, on June 5, 2018

6

71111.18 - Plant Modifications (1 Sample)

The inspectors evaluated the following temporary or permanent modification:

(1) Engineering change 412844, Defeat low pressure lube oil trip for 2B EDG on

June 28, 2018

71111.19 - Post Maintenance Testing (5 Samples)

The inspectors evaluated the following post maintenance tests:

(1) IP/1/A/3222/014 Q, Steam generator narrow range level protection channel 3

(LT-548), Loop D (1CFLT5590), after repair of 1D steam generator narrow range

level channel failing low, on April 16, 2018

(2) PT/2/A/4600/003 A, Monthly Surveillance, after repair of 2NCP5151 Loop B NC

pressure on safe shutdown facility control panel, on April 20, 2018

(3) PT/1/A/4200/009, Engineering Safety Feature Actuation Periodic Actuation test

following the repair of 1NW61B, 1B NW surge chamber RN supply on

April 24, 2018

(4) PT/1/A/4350/002 B, Diesel generator 1B operability test, following repair of 1B

DG KD engine cooling tubing leak on May 29, 2018

(5) PT/2/A/4350/002 B, Diesel generator 2B operability test, following repair for 2B

DG non-emergency trip on June 27, 2018

71111.20 - Refueling and Other Outage Activities (1 Sample)

The inspectors evaluated refueling outage 2RFO22 activities from March 17, 2018, to

April 17, 2018.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Routine (6 Samples)

(1) PT/2/A/4700/014, Auxiliary shutdown panel 2B functional test (Unit 1 outage), on

March 28, 2018

(2) PT/2/A/4200/009, Engineered safety features actuation periodic test, on

April 7, 2018

(3) PT/2/A/4600/022 A, Mode 1 periodic surveillance items, on May 23, 2018

(4) PT/1/A/4200/027, NW Valve In-service Test, on June 6, 2018

(5) PT/2/A/4350/002 A, Diesel Generator 2A Operability Test, on June 14, 2018

(6) PT/1/A/4350/002 A, Diesel Generator 1A Operability Test, on June 20, 2018

In-service (1 Sample)

(1) PT/2/A/4200/041 A, Local leak rate test during outage, on April 5, 2019

7

71114.01 - Exercise Evaluation (1 Sample)

The inspectors evaluated the biennial emergency plan exercise during the week of

June 4, 2018. The exercise scenario simulated a feedwater containment isolation

valve going closed, followed by a manual reactor trip with several adjacent control

rods not inserting. A steam generator tube rupture and manual safety injection,

followed by an unisolable main steam leak at the main steam safety valve with

worsening fuel damage that led to both a Site Area Emergency and General

Emergency simulated classifications so that the offsite organizations could

demonstrate their ability to implement emergency actions.

71114.04 - Emergency Action Level and Emergency Plan Changes (1 Sample)

The inspectors evaluated submitted Emergency Action Level and Emergency Plan

changes during the week of June 4, 2018. This evaluation does not constitute NRC

approval.

71114.08 - Exercise Evaluation - Scenario Review (1 Sample)

The inspectors reviewed and evaluated in-office, the proposed scenario for the biennial

emergency plan exercise at least 30 days prior to the day of the exercise.

71114.06 - Drill Evaluation

Drill/Training Evolution (1 Sample)

The inspectors evaluated a training evolution scenario which simulated a hot particle

in the controlled access security room, a 1A reactor coolant pump high vibration, a 1A

charging pump failure, a fuel clad failure and high containment hydrogen on

May 1, 2018.

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (1 Sample)

The inspectors evaluated radiological hazards assessments and controls.

Instructions to Workers (1 Sample)

The inspectors evaluated worker instructions.

Contamination and Radioactive Material Control (1 Sample)

The inspectors evaluated contamination and radioactive material controls.

8

Radiological Hazards Control and Work Coverage (1 Sample)

The inspectors evaluated radiological hazards control and work coverage.

High Radiation Area and Very High Radiation Area Controls (1 Sample)

The inspectors evaluated risk-significant high radiation area and very high radiation area

controls.

Radiation Worker Performance and Radiation Protection Technician Proficiency (1 Sample)

The inspectors evaluated radiation worker performance and radiation protection technician

proficiency.

71124.02 - Occupational As Low As Reasonably Achievable (ALARA) Planning and Controls

Radiological Work Planning (1 Sample)

The inspectors evaluated the licensees radiological work planning by reviewing the

following activities:

(1) 2NC-27 and 2NC-29 Actuator Replacement Activities, RWP No. 2140, HIGH

RADIATION AREA 2NC-27 and 2NC-29 Actuator Replacement

(2) Regenerative Heat Exchanger Activities, RWP No. 2135, HIGH RADIATION AREA

Regen HX Activities (Lower Containment) No Room Entries

(3) RX Head Inspection Activities, RWP No. 2453, Rx Head Inspections Includes Shroud,

Hanger, Insulation & Inspections (U/L)

(4) Thimble Tube Activities, RWP No. 2108, ENA Thimble Tube Activities in Lower

Containment, Annulus and Auxiliary Bldg.

Verification of Dose Estimates and Exposure Tracking Systems (1 Sample)

The inspectors evaluated dose estimates and exposure tracking.

Implementation of ALARA and Radiological Work Controls (1 Sample)

The inspectors reviewed ALARA practices and radiological work controls by reviewing the

following activities:

(1) ALARA Plan No. C1EOC23-17-06, Core Exit Thermocouple (CET) Replacement,

(2) ALARA Plan No. C2R22-18-01, Install/Remove Temporary Shielding during C2R22

(3) ALARA Plan No. C2R22-18-02, Reactor Head Activities

(4) ALARA Plan No. C2R22-18-09, Remove/Replace Rx Head Bare Metal Insulation during

C2R22

(5) ALARA Plan No. C2R22-18-20, 2NC027 and 2NC029 Actuator Replacement

9

Radiation Worker Performance (1 Sample)

The inspectors evaluated radiation worker and radiation protection technician performance.

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Engineering Controls (1 Sample)

The inspectors evaluated airborne controls and monitoring.

Use of Respiratory Protection Devices (1 Sample)

The inspectors evaluated respiratory protection.

Self-Contained Breathing Apparatus for Emergency Use (1 Sample)

The inspectors evaluated the licensees self-contained breathing apparatus program.

71124.04 - Occupational Dose Assessment

Source Term Characterization (1 Sample)

The inspectors evaluated the licensees source term characterization.

External Dosimetry (1 Sample)

The inspectors evaluated the licensees external dosimetry program.

Internal Dosimetry (1 Sample)

The inspectors evaluated the licensees internal dosimetry program.

Special Dosimetric Situations (1 Sample)

The inspectors evaluated the licensees performance for special dosimetric situations.

71124.05 - Radiation Monitoring Instrumentation

Walk Downs and Observations (1 Sample)

The inspectors evaluated radiation monitoring instrumentation during plant walkdowns.

Calibration and Testing Program (1 Sample)

The inspectors evaluated the licensees calibration and testing program.

10

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below for the

period from June 1, 2017, through March 31, 2018. (8 Samples)

(1) Mitigating System Performance Index (MSPI) Emergency AC

(2) MSPI High Pressure Injection Systems

(3) MSPI Heat Removal Systems (AFW)

(4) Radiological Effluent TS/ODCM Radiological Effluent Occurrences

(5) Occupational Exposure Control Effectiveness

71152 - Problem Identification and Resolution

Semiannual Trend Review (1 Sample)

The inspectors reviewed the licensees corrective action program for trends that might

be indicative of a more significant safety issue.

71153 - Follow-up of Events and Notices of Enforcement Discretion

Licensee Event Reports (1 Sample)

The inspectors evaluated the following licensee event report which can be accessed

at https://lersearch.inl.gov/LERSearchCriteria.aspx:

(1) Licensee Event Report (LER) 414/2018-001-00, Auxiliary Feedwater System Auto-

Start Due to a Loss of Both Feedwater Pumps Signal, on March 19, 2018

Notice of Enforcement Discretion (1 Sample)

The inspectors evaluated the licensee actions surrounding Notice of Enforcement

Discretion (NOED) 18-2-001 which can be accessed at http://www.nrc.gov/reading-

rm/doc-collections/enforcement/notices/noedreactor.html, on June 14, 2018.

11

INSPECTION RESULTS

Failure to Identify and Correct CAQ Associated with Failure of the 2B Seal Water Injection

Filter O-ring

Cornerstone Significance Cross-cutting Report

Aspect Section

Initiating Events Green NCV [P.2] - 71111.12 - 05000414/2018002-01 Evaluation Maintenance

Closed Effectiveness

A self-revealed Green NCV of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action,

was identified for the licensees failure to promptly identify and correct a condition adverse to

quality associated with the failure of 2B seal water injection filter (SWIF) O-ring. Specifically,

the licensees failure to implement corrective actions for the first failure of the O-ring on 2B

SWIF on March 12, 2018, led to a second failure of 2B SWIF O-ring on May 13, 2018.

Description:

On March 12, 2018, with Unit 2 at 100 percent power, control room operators entered AP-10,

Reactor Coolant Leak, due to indications of a charging line leak. Operators also entered

AP-8 Malfunction of Reactor Coolant Pump due to all four Unit 2 reactor coolant pump

(RCP) lower bearing and #1 seal outlet temperatures increasing. The RCS leak was

determined to be from the in-service 2B seal injection filter. Operators took immediate

actions to terminate the leak by isolating reactor coolant system letdown. Operators placed

the 2A SWIF in-service and restored seal water cooling to the RCPs. Shortly after the failure

it was determined that the leak was caused by failure of an O-ring on the 2B SWIF lid

housing. Following the transient the licensee entered the issue into the corrective action

program (CAP) and initiated actions to determine the cause.

On May 13, 2018, with Unit 2 at 100 percent power, the 2B SWIF O-ring failed causing an

RCS leak. Operators took similar actions to isolate the leak and placed the 2A SWIF in-

service. After further investigation, the licensee determined that the two failures were caused

by torque applied to the filter trunnion bolts during maintenance activities over time. This

resulted in a gap in the lid to the filter housing joint and allowed the O-ring to fail. After the

second failure, the licensee initiated actions to determine the appropriate torque value and

replace the trunnions. The licensee also initiated actions to ensure that no gap existed

between the lid and the filter housing for the SWIFs on both Units.

After the second failure the inspectors noted that the cause evaluation for the O-ring failure

on March 12, 2018, was not complete. The due date for the evaluation was changed twice

because the failed O-ring had not been sent for lab analysis. The inspectors concluded that

the failure to identify and correct the adverse condition associated with the March failure

contributed to the second failure on May 13, 2018.

Corrective Actions: The licensee took immediate corrective actions to isolate the RCS leak

and restore seal water cooling to the reactor coolant pumps by aligning the backup filter. The

licensee also initiated actions to identify the appropriate torque and revise maintenance

procedures verify no gap exists between the lid and filter housing.

Corrective Action Reference: CR 219084

12

Performance Assessment:

Performance Deficiency: The inspectors determined that the licensees failure to promptly

identify and correct a condition adverse to quality associated with the failure of 2B seal water

injection filter (SWIF) O-ring was a performance deficiency and a violation of 10 CFR Part 50,

Appendix B, Criterion XVI.

Screening: The inspectors determined the performance deficiency was more than minor

because it adversely affected the equipment performance attribute of the initiating events

cornerstone and its objective to limit the likelihood of events that upset plant stability and

challenge critical safety functions during shutdown as well as power operations. Specifically,

the failure to implement timely corrective actions for the failure of the 2B SWIF O-ring on

March 12, 2018, resulted in a second failure of the 2B SWIF O-ring on May 13, 2018.

Significance: The inspectors assessed the significance of the finding using IMC 0609,

Attachment 4, Initial Characterization of Findings, dated October 7, 2016, and IMC 0609,

Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated

June 19, 2012. The inspectors determined that the finding was of very low safety significance

(Green) because the finding would not have likely affected other systems used to mitigate a

LOCA resulting in a total loss of their function.

Cross-cutting Aspect: The inspectors determined the finding had a cross-cutting aspect of

evaluation in the area of problem identification and resolution, because the licensee failed to

thoroughly evaluate the failure of the 2B SWIF on March 12, 2018, to ensure that resolutions

addressed the cause of the O-ring failure.

Enforcement:

Violation: Title 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, states that

measures shall be established to ensure that conditions adverse to quality, such as failures,

malfunctions, deficiencies, deviations, defective material and equipment, and non-

conformances are promptly identified and corrected.

Contrary to the above, the licensee failed to promptly identify and correct a condition adverse

to quality following the failure of the Unit 2, 2B SWIF O-ring on March 12, 2018. As a result,

Unit 2 experienced a second failure of the 2B SWIF O-ring on May 13, 2018. The licensee

took immediate corrective actions isolate the RCS leak and restore seal water cooling to the

reactor coolant pumps by aligning the backup filter.

Enforcement Action: This violation is being treated as a Non-Cited Violation, consistent with

Section 2.3.2 of the Enforcement Policy.

13

Failure to Promptly Identify and Correct a Condition Adverse to Quality

Cornerstone Significance Cross-cutting Report

Aspect Section

Mitigating Green NCV [P.2] - 71111.15 -

Systems05000413/2018002-02 Evaluation Operability

Closed Determinations

and

Functionality

Assessments

The inspectors identified a Green NCV of 10 CFR Part 50, Appendix B, Criterion XVI,

Corrective Action, for the licensees failure to promptly identify and correct a condition

adverse to quality associated with low resistance readings for core exit thermocouples (CET)

identified during testing on January 30, 2018. Specifically, the licensee failed to declare two

CETs inoperable when resistance readings were outside of the acceptance criteria, until April

9, 2018.

Description:

On January 30, 2018, while performing thermocouple indication calibration check

(IP/2/A/3122/003B, Section 10.5, ICCM Train A Analog/Digital Internal Loop Calibration and

Power Supply Check/Replacement,) maintenance identified three CETs that didnt meet the

lead resistance to ground acceptance criteria and documented the values as unsatisfactory.

On February 2, 2018, CR 2181846 was generated to address the shorted CET readings. The

CR identified that three CETs had ground readings out of specification, but the actual

thermocouple was indicating properly for plant conditions. Maintenance verified via work order

(WO) 20177989 that the thermocouples were indicating properly and the CR was closed. On

April 7, 2018, CR 2196923 was generated as a result of inspectors follow-up questions. This

CR reviewed and evaluated operating experience that addressed potential CET water intrusion

that could be detected by the thermocouple to ground resistance checks. Maintenance (via

WO 20244802) took additional resistance CET/ground measurements closer to the reactor

vessel head, to eliminate potential erroneous readings and verify the acceptance criteria of the

CETs. These measurements identified unacceptable lead resistance to ground readings on

two CETs.

Corrective Action(s): Based on the unacceptable resistance readings, the license declared two

CETs inoperable and initiated corrective actions to address the CETs in a future refueling

outage.

Corrective Action Reference(s): CR 2204792

Performance Assessment:

Performance Deficiency: The inspectors determined that the licensees failure to promptly

identify and correct a condition adverse to quality associated with low resistance readings for

CET identified during testing, was a performance deficiency and a violation of 10 CFR Part 50,

Appendix B, Criterion XVI.

Screening: The performance deficiency was more than minor because it was associated with

the equipment performance attribute of the mitigating systems cornerstone, and adversely

14

affected the cornerstone objective to ensure availability, reliability, and capability of systems

that respond to initiating events. Specifically, the licensee failed to declare two CETs

inoperable when resistance readings were outside of the acceptance criteria, until April 9,

2018.

Significance: The inspectors assessed the significance of the finding using IMC 0609,

Attachment 4, Initial Characterization of Findings, dated October 7, 2016, and IMC 0609,

Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated

June 19, 2012, The inspectors determined that the finding was of very low safety significance

(Green) because it was not a design deficiency; did not represent a loss of system and/or

function; did not represent an actual loss of function of at least a single train for longer than its

technical specification allowed outage time; and did not result in the loss of a high safety-

significant, non-technical specification train.

Cross-cutting Aspect: The finding had a cross-cutting aspect of evaluation in the area of

problem identification and resolution because the licensee failed to thoroughly evaluate

unacceptable resistance measurements for the CETs identified on January 30, 2018.

Specifically, the licensee did not use the corrective action program and acceptance criteria in

the maintenance procedure to evaluate the low resistance readings and the impact to CET

operability.

Enforcement:

Violation: 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, requires that

measures shall be established to assure that conditions adverse to quality, such as failures,

malfunctions, deficiencies, deviations, defective material and equipment, and non-

conformances are promptly identified and corrected.

Contrary to the above, between January 30, 2018, and April 9, 2018, the licensee failed to

promptly identify and correct a condition adverse to quality associated with low resistance

readings for CETs identified during maintenance testing.

Enforcement Action: This violation is being treated as a NCV, consistent with Section 2.3.2 of

the Enforcement Policy.

Observation 71152 -

Problem Identification

and Resolution

The inspectors identified an adverse trend associated with emergent equipment issues with

emergency diesel generators. During the last assessment from January 2018 to June 2018,

all four of the Catawbas EDGs have had emergent equipment issues that have resulted in

extended periods of unavailability. The following items are examples of this trend:

On May 29, 2018, an auxiliary operator identified a jacket water leak on the 1B EDG while in

standby. Engineering calculated that the leak would increase to approximately 1.38 gph with

the diesel operating and would not meet the 7 day mission time if no action was taken. The

diesel was declared inoperable and returned to service on May 30, 2018, following repairs.

15

On June 11, 2018, during a post maintenance test of the 2A EDG, the output breaker 2ETA18

tripped open due to actuation of lockout relay 86D when trying to parallel and load. The

licensee determined that the issue was likely caused by recent maintenance. The 2A EDG was

declared operable on June 14, 2018, following repairs.

On June 19, 2018 during the performance of maintenance on the 1A EDG, the licensee

identified that power driven potentiometer (PDP) was not working. The diesel was declared

operable on June 20, 2018, following replacement of the PDP.

On June 26, 2018, during a scheduled surveillance test, the 2B EDG tripped due to a low lube

oil pressure non-emergency trip. The licensee implemented a compensatory action to remove

the non-emergency trip until repairs could be made and declared the diesel operable on June

27, 2018.

Unresolved Item Notice of Enforcement Discretion Granted from 71153 - Follow-

(Open) Technical Specifications Related to the Failure of the up of Events

2A EDG during Post-maintenance Test and Notices of

URI 05000414/2018-002-03 Enforcement

Discretion

Description:

As required by Inspection Manual Chapter 0410 Section 06.03.c, an unresolved item is being

opened associated with a Notice of Enforcement Discretion 18-2-001 related to approval to not

comply with TS requirements associated with the failure of the 2A emergency diesel generator

during post-maintenance testing on June 11, 2018.

On the basis of the staffs evaluation of the licensees request, the NRC concluded that

granting the NOED was consistent with the NRCs Enforcement Policy and had no adverse

impact on public health and safety or the environment. Therefore, as communicated orally to

the Duke staff on June 14, 2018, the NRC exercised enforcement discretion to not enforce

compliance with TS LCO 3.8.1 Condition G requirements that Catawba Nuclear Station, Units

2, be in Mode 2 by 10:08 a.m. EDT on June 14, 2018. Unit 2, Mode 3 entry was extended by

48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, to allow completion of repair on the 2A emergency diesel generator.

Planned Closure Action: Inspectors will review the licensees cause evaluation for this issue.

Licensee Actions: Duke completed repairs to the 2A emergency diesel generator such that the

condition causing the need for the NOED was corrected at 9:06 p.m. EDT on June 14, 2018.

Corrective Action Reference: CR 2212222

16

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this

report.

The inspectors confirmed that proprietary information was controlled to protect from

public disclosure.

  • On July 23, 2018, the inspector presented the quarterly resident inspector inspection

results to Mr. Clark Curry, and other members of the licensee staff.

17

LIST OF DOCUMENTS REVIEWED

71111.01 - Adverse Weather Protection

CR 2198735, Damage to temporary structures due to high wind event

PT/0/B/4700/039, Hot Weather Protection, Rev.23

OP/0/B/6700/015, Weather Related Activities

71111.04 - Equipment Alignment

OP/1/A/6350/002, Diesel Generator Operation

OP/1/A/6200/006, Safety Injection System

OP/2/A/6550/002, D/G Lube Oil System

71111.05AQ - Fire Protection Annual/Quarterly

CSD-CNS-PFP-AB-0522-001, Auxiliary Building Elev 522 Pre-Fire Plan

CSD-CNS-PFP-AB-0577-001, Auxiliary Building Elevation 574 and 577

71111.11 - Licensed Operator Requalification Program and Licensed Operator

Performance

CPE 1811, Crew Performance Evaluation

AP/2/5500/013, Boron dilution

71111.12 - Maintenance Effectiveness

NCR 2208969, WO 20253228-01 found timer OOT

NCR 2192722, 2ETB Degraded Voltage Timer Failed Acceptance Criteria

EC 411844, Degraded Bus Timer Setpoint Change

IP/0/A/4971/005, Degraded Bus Voltage Trip and Alarm Timers Calibration Procedure

NCR 2200142, Repair 2NCP5121

71111.19 - Post Maintenance Testing

WO 20247706, 2NC PT 5121: Repair pressure reading low

NCR 2199526, 1D Steam Generator Narrow Range Level Channel 3 is failing

WO 20247339, Replace 1D SG NR level channel 3 7300 card

71111.22 - Surveillance Testing

CR 2199526, 1D Narrow Range Level CH#3 failing

71114.01 - Exercise Evaluation

Procedures

Catawba Nuclear Station (CNS) Emergency Plan, Section B, Rev. 165

AD-EP-ALL-0101, Emergency Classification, Rev. 1

AD-EP-ALL-0103, Activation an Operations of the Emergency Operations Facility, Rev. 1

AD-EP-ALL-0104, ERO Communication Guidelines and Forms, Rev. 1

AD-EP-ALL-0105, Activation & Operation of the Technical Support Center, Rev. 1

AD-EP-ALL-0109, Offsite Protective Action Recommendations, Rev. 2

AD-EP-ALL-0110, Recovery, Rev. 1

AD-EP-ALL-0202, Emergency Response Dose Assessment, Rev. 6

AD-EP-ALL-0203, CNS Specific Field Monitoring, Rev. 0

AD-EP-ALL-0304, State & County Notifications, Rev. 1

18

RP/0/A/5000/010, Conducting a Site Assembly or Preparing the Site for an Evacuation,

Rev. 28

Records and Data

Catawba Nuclear Station 2018 Emergency Planning Graded Exercise Scenario Book

Control Room Simulator, Operations Support Center, Technical Support Center, and

Emergency Operations Facility/Joint Information Center - Documentation packages

(logs, Event Notification Forms, Protective Action Recommendations, Media

Releases, and Radiological Dose Assessments)

Corrective Action Program Documents (Nuclear Condition Reports)

NCR 02211058, CNS EP Exercise 18-02 RP bridge line non-functional

NCR 02211060, CNS EP Drill 18-02 - RWP 33 LHRA task

NCR 02211311, CNS Exercise 18-02 Objective B.2 unsatisfactory

NCR 02211320, CNS Exercise 18-02 Objective B.7 graded unsatisfactory

NCR 02211328, CNS Exercise 18-02 Objective E.2 Demonstration Criteria 7

unsatisfactory

NCR 02211337, CNS Exercise Objective H.1 Demonstration Criteria 8 unsatisfactory

NCR 02211589, CNS NRC EX 18-02 unsatisfactory Objective I3

NCR 02211616, Demonstration Criteria I.3 scored unsatisfactory for TSC

NCR 02211661, CNS Exercise 18-02 Demonstration Criteria H.3 was not met

71114.04 - Emergency Action Level and Emergency Plan Changes

Procedures

AD-EP-ALL-0101, Emergency Classification, Rev. 1

AD-EP-ALL-0109, Offsite Protective Action Recommendations, Rev. 1 & 2

AD-EP-ALL-0202, Emergency Response Offsite Dose Assessment, Rev. 6

AD-EP-ALL-0502, Emergency Preparedness 10 CFR 50.54(q) Training Requirements,

Rev. 1

AD-EP-ALL-0602, Emergency Plan Change Screening and Effectiveness Evaluations 10

CFR 50.54(Q), Rev. 5

Catawba Nuclear Station Emergency Plan, Section B, Rev. 165

Change Packages

10 CFR 50.54(q) Screening Evaluation Form for AD-EP-ALL-0202, Rev. 6, Emergency

Response Offsite Dose Assessment, dated September 25, 2017

10 CFR 50.54(q) Effectiveness Evaluation Form for AD-EP-ALL-0202, Rev. 6, Emergency

Response Offsite Dose Assessment, dated September 25, 2017

10 CFR 50.54(q) Screening Evaluation Form for AD-EP-ALL-0101, Rev. 1, Emergency

Classification, dated December 5, 2017

10 CFR 50.54(q) Effectiveness Evaluation Form for AD-EP-ALL-0101, Rev. 1, Emergency

Classification, dated December 5, 2017

10 CFR 50.54(q) Screening Evaluation Form for AD-EP-ALL-0109, Rev. 2, Offsite

Protective Action Recommendations, dated March 16, 2018

10 CFR 50.54(q) Effectiveness Evaluation Form for AD-EP-ALL-0109, Rev. 2, Offsite

Protective Action Recommendations, dated March 19, 2018

10 CFR 50.54(q) Screening Evaluation Form for Catawba Emergency Plan, Sections A, B,

E, G, H, I, J, K, M, O, & P, dated September 21, 2017

19

10 CFR 50.54(q) Effectiveness Evaluation Form for Catawba Emergency Plan, Sections

A, B, E, G, H, I, J, K, M, O, & P, dated September 21, 2017

10 CFR 50.54(q) Screening Evaluation Form for Catawba Emergency Plan, Sections A, B,

E, G, H, I, J, K, M, O, & P, dated December 5, 2017

10 CFR 50.54(q) Effectiveness Evaluation Form for Catawba Emergency Plan, Sections

A, B, E, G, H, I, J, K, M, O, & P, dated December 5, 2017

10 CFR 50.54(q) Screening Evaluation Form for Catawba Emergency Plan, Section B

Rev. 165, dated March 15, 2018

10 CFR 50.54(q) Screening Evaluation Form for Catawba Emergency Plan, Section N,

Rev. 149, dated February 2, 2018

10 CFR 50.54(q) Screening Evaluation Form for Catawba Emergency Plan, Section Q,

Rev. 151, dated March 15, 2018

Corrective Action Program Documents

NCR 02211821, Material provided to NRC led to inspection delays (NRC-identified)

71114.08 - Exercise Evaluation

Procedures

Catawba Nuclear Station (CNS) Emergency Plan, Section B, Rev. 165

CNS 2018 Emergency Planning Graded Exercise Scenario Book

AD-EP-ALL-0101, Emergency Classification, Rev. 1

AD-EP-ALL-0103, Activation an Operations of the Emergency Operations Facility, Rev. 1

AD-EP-ALL-0104, ERO Communication Guidelines and Forms, Rev. 1

AD-EP-ALL-0105, Activation & Operation of the Technical Support Center, Rev. 1

AD-EP-ALL-0109, Offsite Protective Action Recommendations, Rev. 2

AD-EP-ALL-0110, Recovery, Rev. 1

AD-EP-ALL-0202, Emergency Response Dose Assessment, Rev. 6

AD-EP-ALL-0203, CNS Specific Field Monitoring, Rev. 0

AD-EP-ALL-0304, State & County Notifications, Rev. 1

Records and Data

CNS 8-Year Matrix of Scenario Elements

April 5, 2016 Critique Report

July 28, 2016 Critique Report, dated 8/29/16

November 9, 2016 Contaminated Injured Person Drill Report, dated 12/8/16

November 10, 2016 SAMG Drill Critique Report, dated 12/8/16

November 14, 2016 Augmentation Drill Report, dated 12/8/16

January 19, 2017 Critique Report

July 15, 2017 ERO Augmentation Drill Report

September 14, 2017 & November 2, 2017 Critique Report

Self-Assessment Report QHSA 2174092-05, 2018 CNS EP Program NRC Biennial

Exercise Readiness, dated 5/8/18

71124.01: Radiological Hazard Assessment and Exposure Controls

Procedures, Guidance Documents and Manuals

AD-PI-ALL-0100, Corrective Action Program, Rev. 13

AD-RP-ALL-0002, Radiation and Contamination Surveys, Rev. 0

AD-RP-ALL-0004, Radiological Posting and Labeling, Rev. 0

20

AD-RP-ALL-0005, Access Controls for High and Locked High Radiation Areas, Rev. 0

AD-RP-ALL-0006, Personnel Contamination Monitoring, Rev. 0

AD-RP-ALL-0007, Control of Radioactive Material, Rev. 0

AD-RP-ALL-1103, Radiation Protection Self Assessments, Rev. 2

AD-RP-ALL-2017, Access Controls for High, Locked High, and Very High Radiation Areas,

Rev. 5

AD-RP-ALL-3002, Unconditional Release of Material, Rev. 1

AD-RP-ALL-4015, Dosimetry in Gradient Radiation Fields, Rev. 0

Records and Data

Air Sample CN18032000022, U2 Rx Building Upper Containment Blind Flange Removal

Air Sample CN18032000025, U2 Rx Building Upper Containment Blind Flange Removal

Air Sample CN18032000036, U2 Equipment Hatch

Air Sample CN18032100005, U2 Equipment Hatch

Air Sample CN18032100033, U2 Rx PRT Routine

Air Sample CN18032200029, U2 Rx PRT Routine

Catawba Nuclear Site Radioactive Source Index

National Source Tracking System Annual Inventory Reconciliation Report, 01/16/18

Radiological Survey M-20131005-10, U2 Rx Building Upper Containment Deep End Post-vac

Radiological Survey M-20160930-5, U2 Rx Building Upper Containment Deep End

Radiological Survey M-20161002-14, U2 Rx Building Upper Containment Deep End

Radiological Survey M-20171003-10, 577 Aux Building General Area

Radiological Survey M-20180212-4, 577 Aux Building General Area

Radiological Survey M-20180319-14, U2 Crudburst Room 308

Radiological Survey M-20180319-3, U2 Mech Pen Room

Radiological Survey M-20180320-17, U2 Job Coverage for Blind Flange Removal

Radiological Survey M-20180321-10, U2 Incore Sump Equipment Hatch Area

Radiological Survey M-20180323-9, Aux Building 577 Overhead Areas

Radiation Work Permit (RWP) No. 2101, RP Activities in Lower Containment & Annulus

RWP No. 2405, VV Ductwork (HRA)

RWP No. 2415, Rx Building Fuel Activities

Self-briefing Location Map

Summary of Spent Fuel Pool Inventory, 12/31/17

U1 Alpha Radiation Characterization, 10/23/17

U2 Alpha Radiation Characterization, 01/11/17

Corrective Action Program (CAP) Documents

AR 02174014

AR 02142221

Quick-hitter Self-assessment Report 02086403-05

71124.02: Occupational ALARA Planning and Controls

Procedures, Guidance Documents and Manuals

AD-PI-ALL-0100, Corrective Action Program, Rev. 13

AD-RP-ALL-2000, Preparation and Management of Radiation Work Permits, Rev. 3

AD-RP-ALL-9000, ALARA Program, Rev. 8

AD-RP-ALL-9001, ALARA Planning, Rev. 4

MP/0/A/7650/126, Installation of Temporary Lead Shielding, Rev. 7

21

RPMP 02-01, Establishing RWP Setpoints, Rev. No. 1

Records and Data

2CR22 CBCU Dose Rates, 03/19/18

ALARA Plan No. C1EOC23-17-01, Install/Remove Temporary Shielding during 1EOC23, Rev. 0

ALARA Plan No. C1EOC23-17-02, Reactor Head Activities, Rev. 0

ALARA Plan No. C1EOC23-17-11, 1NC027 and 1NC029 Activities, Rev. 0

ALARA Plan No. C2R22-18-03A, 2A NCP Seal Replacement, Rev. 0

ALARA Plan No. C2R22-18-17, CRGT Relocation, Rev. 0

Attachment 4, C2R22 Crudburst, C2R22 Crudburst Shutdown.xls (Crud Graph), Undated

CNS 2017 and 2018 Annual Estimate Developments, Undated

CSD-RP-CNS-4001, Boundary Dose Rates Established for ISFSI Phase III Project, Rev. 0,

02/13/18, Tier Level 3

Memorandums for File, Catawba Nuclear Station: ALARA Committee Meeting Minutes, File No.

CN-750.20, 2017 CNS October (Rescheduled September Meeting), ALARA Committee

Meeting, 12/12/17; 2017 CNS November, ALARA Committee Meeting, 11/27/17; 2018 CNS

January, ALARA Committee Meeting, 01/22/18; and CNS March, ALARA Committee Meeting,

03/22/18

Memorandums for File, Catawba Nuclear Station: CNS Unit 2EOC21 Refueling & Maintenance

Outage, Summary of Personnel Radiation Exposures, File No. CN-750.20, 11/14/16; and CNS

Unit 1EOC23 Refueling & Maintenance Outage, Summary of Personnel Radiation Exposures,

File No. CN-750.20, 05/25/17

RWP No. 2114, Snubbers and Hanger Work (Lower Containment and

Annulus), Rev. 23

RWP No. 2116, Scaffolding Activities (Lower Containment and Annulus), Rev. 16

RWP No. 2405, Reactor Head Activities, Rev. 22

Temporary Shielding Request (TSR) No.17-221, 2FW 009, Work Order No. (WON) 20178174,

Task Nos. 27 & 57, 09/14/17

TSR No 17-224B, Letdown Orifice Area, WON 20178174, Task Nos. 32 & 62, 09/14/17

TSR No.17-260, NV Line Room 427, WON 20178304, Task Nos. 01 & 12, 09/14/17

TSR No.17-261, ND B Train Room 109, WON 20178304, Task Nos. 03 & 06, 09/06/17

TSR No.17-262, ND A Train Room 110, WON 20178304, Task Nos. 08 & 15, 09/06/17

TSR No.18-239, SFP Manipulator Bridge, WON 20178304, Task Nos. 19 & 20, 02/15/18

TSR No. 18-296B, 2B NC Hot Leg RTD, WON 20174285, Task Nos. 12 & 16, 03/21/18

VSDS Standard Map Survey Report, Catawba Nuclear Station, Survey CNS-M-20180131-1,

ISFSI 3rd Pad Project Occupancy Study, 01/31/18

CAP Documents

CR 02173309

CR 02194662

CR 02194663

CR 02198835

71124.03: In-Plant Airborne Radioactivity Control and Mitigation

Procedures, Guidance Documents and Manuals

AD-RP-ALL-0003, Radiological Air Sampling, Rev. 0

AD-RP-ALL-2019, TEDE ALARA Evaluations and DAC Hour Tracking, Rev. 2

AD-RP-ALL-6000, Respiratory Protective Equipment Approval and Issue, Rev. 2

22

AD-RP-ALL-6001, Quantitative Fit Testing, Rev. 0

AD-RP-ALL-6002, Inspections of Self-Contained Breathing Apparatus (SCBA) and Associated

Equipment, Rev. 0

AD-RP-ALL-7004, Operation of Air Sampling Equipment, Rev. 2

Records and Data

AD-RP-ALL-6002 Inspections of Self-Contained Breathing Apparatus (SCBA) and Associated

Equipment Data Sheets for Inspections Conducted January and February 2018

Laboratory Report Compressed Air Gas Quality Testing, EAGLE 5000 BARON II SCBA COMP

(RCA), 01/25/18

Laboratory Report Compressed Air Gas Quality Testing, BARON 3 SCBA COMPRESSOR

(CTR), 01/25/18

Lesson Plan HS0113, Advanced Basic Respiratory Initial Training Initial Training (SCBA) and

Requalification for MSA, M-7 Firehawk

MSA C.A.R.E Authorized Repair Center & Technician Certifications, Exp - May 2018

Portable HEPA #100186 Particulate Air Filter Test Results, 02/22/18

Portable HEPA #3392 Particulate Air Filter Test Results, 02/22/18

Respiratory Fit Test Training Roster, 04/26/18

SCBA Flow Test Certification, ENRAD ID 04094, 08/16/16 and 09/15/17

SCBA Flow Test Certification, ENRAD ID 04350, 06/12/16 and 06/29/17

SCBA Flow Test Certification, ENRAD ID 04357, 06/12/17 and 11/07/15

Work Order (WO) 20075254, 1CRA-PFT-1, Carbon Adsorber Bank in Place Leak Test, HEPA

Filter DOP Test and Radioiodine Penetration Test, 11/09/16

WO 2162714, 1CRA-PFT-1, Carbon Adsorber Bank in Place Leak Test, HEPA Filter DOP Test

and Radioiodine Penetration Test, 04/24/15

WO 2017108, 1CRA-PFT-2, Carbon Adsorber Bank in Place Leak Test, HEPA Filter DOP Test

and Radioiodine Penetration Test, 04/21/16

WO 20157324, 1CRA-PFT-2, Carbon Adsorber Bank in Place Leak Test, HEPA Filter DOP Test

and Radioiodine Penetration Test, 10/26/17

CAP Documents

AR 02056821

AR 02058684

AR 02069119

AR 02079067

AR 02088897

AR 02091112

AR 02168635

AR 02168702

71124.04: Occupational Dose Assessment

Procedures, Guidance Documents and Manuals

AD-RP-ALL-2010, Skin Dose from Contamination, Rev. 1

AD-RP-ALL-4010, Internal Dose Assessment, Rev. 1

AD-RP-ALL-4011, In Vitro Bioassay, Rev. 1

AD-RP-ALL-7008, APEX INVIVO Whole Body Counter Operation, Quality Control Checks and

Data Review, Rev. 2

CSD-RP-ALL-4016, Prospective Determination for Occupational Exposure, Rev. 0

23

TE-RP-ALL-4003, Placement of Personnel Dosimetry for Non-Uniform Radiation Fields,

Rev. 0

TE-RP-ALL-4004, Multiple Dosimetry, Rev. 4

Records and Data

AD-RP-ALL-0003, Attachment 1, Airborne Radioactivity Calculation Worksheet, Survey # CNS-

M-20180403-6, U-2 Refuel Cavity Deep End, 04/23/18

AD-RP-ALL-2014, Attachment 3, Alpha Air Sample Counting Results Form, U-2 Refuel Cavity

Deep End, 04/23/18

AD-RP-ALL-2019, Attachment 4, TEDE/ALARA Evaluation and DAC Hour Tracking, 04/23/18

Air Sample Survey # CNS-M-20180403-10, U-2 Refuel Cavity Deep End, Gamma Spec Results

Catawba Nuclear Station - TLD/ED Correlations for 2nd Semi-Annual 2017

CNS Alpha Radiation Characterization, 04/12/18

Daily Job Dose History Report for RWP 2414, 04/03/18

NVLAP Certificate of Accreditation to ISO/IEC 17025:2005: Effective dates 04/01/17 through

3/31/18

Personnel Contamination Event Logs, 2016, 2017 and 2018 to date Report, CNS ISFSI Neutron

to Gamma Ratio Characterization, undated

TE-RP-ALL-4001, Attachment 1, Pregnancy Exposure Agreement for two workers, 2018

TE-RP-All-4004, Attachment 2, Multipack Forms: Multipack ID#4732, 01/10/18

CAP Documents

AR 02079103

AR 02131088

AR 02136044

AR 02136049

AR 02145007

AR 02174077

AR 02193996

Self-Assessment Number: 02086398, 2017 CNS Alpha Program Self-Assessment, 07/06/17

Self-Assessment Number: 02086402, External Dosimetry Program Assessment, 10/05/17

71124.05: Radiation Monitoring Instrumentation

Procedures, Guidance Documents and Manuals

AD-PI-ALL-0100, Corrective Action Program, Rev. 13

AD-RP-ALL-7005, Radiation Protection Portable Instrument Source Response Check, Rev 2

AD-RP-ALL-7008, Apex In Vivo Whole Body Counter Operation, Quality Checks and Data

Review, Rev. 2

CNS NEI Rev 006 Wallcharts (EALs), Rev. 0

Enrad-Proc-811, Operation and Maintenance of J.L. Shepherd Calibrator, Rev. 2

RA/0/1300/002, Setup, Calibration and Quality Control of Canberra Series 5 Automatic

Planchet Counting System (APC), Rev. 2

RA/0/1300/005, Quality Control Check of Count Room Equipment, Rev. 3

RA/0/1400/006, Radiation Protection Fixed Instruments Response Check, Rev. 32

RA/0/1400/014, Radiation Protection Portable Instruments Response Check, Rev. 2

Records and Data

AD-RP-ALL-7007, Apex In Vivo Whole Body Counter Calibration, 10/31/16 and 11/17/17

24

Control Charts - APC-1296 QA and Bkgd, APC-1299 QA and Bkgd, Germanium Detector No. 5

Total Counts and Peak FWHMs, and LS-1300 H-3 Background and Efficiency Baseline,

03/25/18 - 04/24/18

Duke Energy Interlaboratory Cross Check Program Sample Analysis Form, Tritium in Water,

LS-1300 and LS-1301, 07/12/17

Eckert & Zeigler Analytics, Results of Radiochemistry Cross Check Program, 4th Quarter 2017

Enrad Laboratories Certificate of Calibration, AMS-4 No. 01398, 10/26/17 and 02/14/18

Enrad Laboratories Certificate of Calibration, Argos-5AB No. 12885, 03/07/17 and 01/25/18

Enrad Laboratories Certificate of Calibration, Cronos-4 No. 12246, 01/05/17 and 01/3/18

Enrad Laboratories Certificate of Calibration, GEM-5 No. 02800, 01/04/17 and 01/3/18

Enrad Laboratories Certificate of Calibration, Lud-9-3 No. 11731, 03/14/17 and 02/23/18

Enrad Laboratories Certificate of Calibration, Ludlum Model 3 (CPM) No. 03602, 01/26/17 and

02/19/18

Enrad Laboratories Certificate of Calibration, Ludlum Model 12-4 (Remball) No. 03134, 07/02/16

and 08/28/17

Enrad Laboratories Certificate of Calibration, Telepole No. 02134, 09/21/16 and 02/09/18

FASTSCAN1 Calibration and Background Checks, 04/26/18

LS-1300, Liquid Scintillation Counter Calibration Verification, 08/02/16 and 08/23/17

MGP Instruments Calibration Certificate, ED No. 968416, 03/23/17 and 01/17/18

Quality Assurance Reports, DET05, 1st Check and 2nd Check After Gain Adjustment, 04/24/18

RA 0 1300 001, Calibration of PerkinElmer TriCarb 2900TR Series Liquid Scintillation Counters,

LS-1300, 08/2/16 and 08/23/17

RA 0 1300 002, Setup, Calibration and Quality Control of Canberra Series 5 Automatic Planchet

Counting System (APC), APC-1296, 04/16/17 and 04/16/18

RA 0 1300 002, Setup, Calibration and Quality Control of Canberra Series 5 Automatic Planchet

Counting System (APC), APC-1299, 04/16/17 and 04/16/18

RA 0 1300 003, Calibration of Apex Gamma Spectroscopy System, Detector # 5 Efficiency

Calibration Approval, 11/15/16 and 11/08/17

RA 0 1300 005, Quality Control Check of Count Room Equipment, Det #5 Recalibration,

04/24/18

Verification of the SCRAM Program used for calibration of the J.L.Shepherd Model 89 Shielded

Calibration Range Irradiator at Catawba Nuclear Station, 08/16/16 and 08/16/17

WO 02189993 01, 1EMF Perform Chnl Cal on EMF-12, 05/17/16

WO 20033365 01, 2EMF-53A Perform Channel Cal, 09/26/16

WO 20178491 04, 2EMF-53A Perform Channel Cal, 04/19/18

CAP Documents

CR 02170140

CR 02181393

CR 02182297

CR 02182301

CR 02185656

CR 02190975

Quick Hitter Self Assessment Report, Assignment No. 02086401-05, Radiation Protection

Instruments, 10/16/17

25

71151: Performance Indicator Verification

Procedures, Guidance Documents and Manuals

AD-CP-DEC-0021, Projected Offsite Dose from Radioactive Effluents, Rev. 1

AD-RP-ALL-1101, Performance Indicators (PI) for the Occupational and Public Radiation

Safety Cornerstones, Rev. 0

AD-EP-ALL-0002, NRC Regulatory Assessment Performance Indicator Guideline

Emergency Preparedness Cornerstone, Rev. 3

Records and Data

AD-CP-DEC-0021, Projected Offsite Dose from Radioactive Effluents, Attachment 2,

[CNS] Dose Commitment Date Sheet, Rev. 1, 01/15/18

AD-RP-ALL-1101, Performance Indicators (PI) for the Occupational and Public Radiation

Safety Cornerstones, Rev. 0, June 2017 through March 2018

Catawba Dose Rate Alarm Log, 06/01/17 - 04/20/18

Gaseous Waste Release Permit Report, GWR No. 2018025, 04/16/18

Liquid Waste Release Permit Report, LWR No. 2018018, 04/12/18

DEP opportunities documentation for 1st, 2nd, 3rd, 4th quarters 2017, & 1st quarter 2018

Siren test data for 1st, 2nd, 3rd, 4th quarters 2017, & 1st quarter 2018

Drill & exercise participation records of ERO personnel for 1st, 2nd, 3rd, 4th quarters 2017, &

1st quarter 2018

71152 - Problem Identification and Resolution

2215227, 2BEDG Non-Emergency Trip on Low Lube Oil Pressure

2209372, 1B DG KD Engine Cooling Tubing Leak

2212222, 2A Diesel Generator 86D Lockout Trip

2213816, 1EQC VR A: Power Driven Pot Not Working Properly

71153 - Follow-up of Events and Notices of Enforcement Discretion

CR 2192321, 2B CA Auto start

26