L-98-020, Forwards fitness-for-duty Program for Period of Jul-Dec 1997

From kanterella
Jump to navigation Jump to search
Forwards fitness-for-duty Program for Period of Jul-Dec 1997
ML20203A240
Person / Time
Site: Beaver Valley
Issue date: 02/10/1998
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-98-020, L-98-20, NUDOCS 9802230315
Download: ML20203A240 (3)


Text

_ _ _ - - _ - - - - __- - -- _ _

Duquesne Lkpt Company aggv a+ rsiia SNp,)tngport, PA 16077 0004 e

800 47.... {

r.N1!! *31: i 0ll:::C.bn i February 10, 1998 L-98-020

.l. 3. Nuclear Regulatmy Commission Attention: Document Control Dcsk l

Washington, DC 20555-0001 l  !

l

Subject:

Beaver Valley Power Station, O > and No. 2 BV-1 Docket No.30-334, License i40. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Fitness-For-Daty Pi ..am Six Month Report In accordance with 10 CFR 26.71(d), attached is the Fitness-For-Duty Program Six

, Month Repon for the period of July 1,1997, through December 31,1997.

If there are any questions concerning this report, please contact Mr. J. Arias at (412)393-5203 Sincerely, b

Sushil C. Jain Attachment c: Mr. D. S. Brinkman, Sr. Project Manager Mr. D. M. Kert Sr. Resident Inspector Mr. H. J. Miller, NRC Region I Administrator C

e  :

DEllVERif6G 980223o315 9e0210 0 U.A L l T Y lDR ADOCK 0500 4 lll ll l lllll ll ll ( y W -.n

s' DUQUESNE LIGHT COMPANY .

Nuclear Power Division Beaver Valley Power Station FITNESS-FOR-DUTY REPORT MRO SIX MONTII REPORT From July 1,1997, through December 31,1997, our records indicate, in the Pre-Access program category for the licensee pool, one (1) confirmed positive for dual substances, ane (1) confirmed positive in the Long-Term contractor pool and four (4) confirmed positives in the Short-Term contractor pool.

FOLLOW-UP OF PREVIOUS SIX-MONTII REPORT RANDOM On June 4,1997, a licensee employee experienced a confirrned intoxilyzer positive test result. The employee was placed o, indefinite suspension, denied unescorted access and referred to the Employee Assistance Program (EAP) for evaluatic,; and treatment recommendations. The employee was returned to work on July 7,1997, completed the recommended rehabilitation prc gam, and unescorted access was reinstated on July 9, 1997 The employee is presently participating in a follow-up program.

4 i

f 4

Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 DUQUESNE LIGHT COMPANY 12-31-97 cm '

s Weatu Enene BEAVER VALLEY POWER STATION Leemeen Employee Relations

_ Eugene P. Edwards. Fitness-for-Duty Program Mgr. (412)393-5288 Comaa Name Pnore (name area snee)

Cutoff s: ScreerVConfirmation (n0/ml) R Appendix A to 10CFR 26 l Marijuana / Amphetamines / _ /

Cocaine / Phencyclidine / /

Opiates / Alcohol (% BAC) /

l Long-Term Short-Term Testing Results Jcensee Emoloyees Contractor Personnel Contractor Personnel Average Number witt.

Unescorted Access 1,184 128 407 Categories Tested Positive Tested Poshive Tested Poshive Pre-Access 76

' 1 72 1 930 4

[ Post accidsnt U

h Observed behavior 3 0 2 0 Random 294 0 29 0 100 0 Follow up 14 0 10 0 Other Total 337 1 101 1 1,042 4 REV.1/92

. . . _ __o