L-97-024, Forwards Updated ISI Ten-Year Plan for Third Interval, as Addl Info to Assist in Review of Next Interval ISI Program

From kanterella
Jump to navigation Jump to search
Forwards Updated ISI Ten-Year Plan for Third Interval, as Addl Info to Assist in Review of Next Interval ISI Program
ML20217B285
Person / Time
Site: Beaver Valley
Issue date: 09/17/1997
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217B289 List:
References
L-97-024, L-97-24, NUDOCS 9709230309
Download: ML20217B285 (2)


Text

.. .

4 v Rey Power Station SNpphert, f% 1507100M )

susm.c.mu 3eptember 17,1997 g i,9,3.ssi, "d" %','" L-97-024 '"")"8" aw.=e...,o m n U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Inservice Inspection Program - Ten-Year Update The purpose of this submittal is to fonvard to the Nuclear Regulatory Commission the Beaver Valley Power Station Unit No. I updated Inservice Inspection (ISI) Program. ,

This program is applicable for the third Ten-Year Interval update of the ISI Program as required by 10 CFR 50.55a.

Additional infonnation has also been provided to assist you in your review of the next interval ISI Program. The following Enclosures are included in this submittal:

Enclosure 1: Inservice Inspection Ten-Year Plan For The Third Interval At Beaver Valley Power Station Unit 1. (Note: The examination tables of this Plan contain only those components scheauled for examination.)

Enclosure 2: Listing of all components within the scope of the Third Interval ISI Program.

Enclosure 3: Unit 1 ISI Isometric drawings

> \

Enclosure 4: Spreadsheets prepared to assist in the selection process for those /b ~N examination categories having prorated examination requirements. )

Enclosure 5: Unit 1 System flow diagrams j\

The Prograra as submitted in Enclosr:e 1 also contains eleven relief / alternative examination requests submitted under the provisions of 10 CFR 50.55a(a)(3)(i),

(a)(3)(ii), or (g)(6)(i) for which Nuclear Regulatory Commission approval is required.

DEllVEllllG 9709230309 970917 QUALlTV

$DR ADOCK 050003 4 ,Jhggg j,,

t, p 3, .

, .A (_

N

< B'eaver Valley Pswer Station, Unit No.1 l Inservice Inspection Program - Ten-Year Update

)

Page 2 '

l The Third Ten-Year IST interval begins September 20,1997, and the updated ,

Program has been prepared following the requirements of the 1989 Edition of the ASME i B&PV Code which is consistent with 10 CFR 50.55a paragraph (b).

If you have any questions regarding this request, please contact Mr. J. Arias at (412) 393-5203.

Sincerely, Sushil C. Jain c: Mr. D. M. Kern, Sr. Resident Inspector Mr. II. J. Miller, NRC Region I Administrator Mr. D. S. Brinkman, Sr, Project Manager