05000255/LER-1983-006, Informs That Safety Injection & Refueling Water Tank Support Structure Insp Will Not Be Performed for Tank in Present Partially Loaded Configuration.Insp Will Not Be Performed Until Structure in Fully Loaded Condition,Per LER 8

From kanterella
Jump to navigation Jump to search
Informs That Safety Injection & Refueling Water Tank Support Structure Insp Will Not Be Performed for Tank in Present Partially Loaded Configuration.Insp Will Not Be Performed Until Structure in Fully Loaded Condition,Per LER 83-06
ML20083J720
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/19/1983
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8401050381
Download: ML20083J720 (1)


LER-2083-006, Informs That Safety Injection & Refueling Water Tank Support Structure Insp Will Not Be Performed for Tank in Present Partially Loaded Configuration.Insp Will Not Be Performed Until Structure in Fully Loaded Condition,Per LER 83-06
Event date:
Report date:
2552083006R00 - NRC Website

text

_ _ . . . . . _ .

Ame

(

power O Consumers Company General offices: 1945 West Parnatt Road, Jackson, MI 49201 * (51717P8-0550 December 19, 1983 l

l James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - SAFETY INJECTION AND REFUELING WATER TANK SUPPORT STRUCTURE MONITORING i

Consumers Power Company letter dated April 28, 1983 and entitled Licensee Event Report 83-06 (SIRW Tank Support Structure Discrepancies) Update indicated that we would be performing quarterly inspection of the SIRW Tank support structure until the structural design fix is completed. To date, we have performed two inspections of the structure, one in the loaded configura-tion and one in the unloaded configuration. The present Palisades refueling outage schedule has this structure in a partially loaded configuration. Since taking measurements in this condition vould not give any relevar.t information, it is our intent not to perform an inspection until such time as the structure is in a fully loaded condition. We will inform the NRC Resident Inspector of our inspection schedule well in advance of actual performance in order that the appropriate people from Region III can be contacted regarding their attendance.

Brian D Johnson Staff Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades 8401050381 831219 PDR ADOCK 05000255 G PDR OC1283-0012AA-NLG2 DEC 211983 i j

_ - _ _ _ _ - _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . JA22