Letter Sequence Other |
---|
TAC:MD7252, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (Approved, Closed) |
Results
Other: ML083100134, ULNRC-05476, One-Time Completion Time Extension for Essential Service Water (ESW) System, ULNRC-05482, Response to Questions Received on February 7, 2008 Regarding Amendment to Revise Technical Specifications for Essential Service Water, ULNRC-05520, One-Time Completion Time Extension for Essential Service Water (ESW) System, (OL1281), ULNRC-05534, One-Time Completion Time Extension for Essential Service Water (ESW) System
|
MONTHYEARML0725504882007-08-30030 August 2007 10 CFR 50.55a Request: Proposed Alternative to ASME Section Xi Requirements for Replacement of Class 3 Buried Piping Project stage: Request ULNRC-05445, One-Time Completion Time Extension for Essential Service Water (ESW) System2007-10-31031 October 2007 One-Time Completion Time Extension for Essential Service Water (ESW) System Project stage: Request ULNRC-05476, One-Time Completion Time Extension for Essential Service Water (ESW) System2008-02-21021 February 2008 One-Time Completion Time Extension for Essential Service Water (ESW) System Project stage: Other ML0803806472008-02-29029 February 2008 Summary of Meeting with Union Electric Company Callaway Plant, Unit 1, 8/30/2007 Relief Request and 10/31/2007 License Amendment Request Applications Related to Replacement of Essential Service Water Piping (Tac No. MD6792 and MD7252) Project stage: Meeting ULNRC-05482, Response to Questions Received on February 7, 2008 Regarding Amendment to Revise Technical Specifications for Essential Service Water2008-03-0707 March 2008 Response to Questions Received on February 7, 2008 Regarding Amendment to Revise Technical Specifications for Essential Service Water Project stage: Other ML0808800122008-03-31031 March 2008 Request for Additional Information Related to LAR to Revise TS 3.7.8, Essential Service Water System, and TS 3.8.1, AC Sources - Operating, for One-time Completion Time Extension Re Underground Piping Project stage: RAI ULNRC-05500, Response to Request for Additional Information One-Time Completion Time Extension for Essential Service Water (ESW) System2008-05-0606 May 2008 Response to Request for Additional Information One-Time Completion Time Extension for Essential Service Water (ESW) System Project stage: Response to RAI ML0815800112008-06-10010 June 2008 Request for Additional Information, Relief Request No. 13R-10 and License Amendment Request to Revise TS 3.7.8, Essential Service Water System, and TS 3.8.1, AC Sources - Operating, for One-time CT Extension Underground Piping Project stage: RAI ULNRC-05520, One-Time Completion Time Extension for Essential Service Water (ESW) System, (OL1281)2008-07-10010 July 2008 One-Time Completion Time Extension for Essential Service Water (ESW) System, (OL1281) Project stage: Other ULNRC-05534, One-Time Completion Time Extension for Essential Service Water (ESW) System2008-08-13013 August 2008 One-Time Completion Time Extension for Essential Service Water (ESW) System Project stage: Other ML0828106432008-10-31031 October 2008 Issuance of Amendment No. 186, Revise TS 3.7.8, Essential Service Water System, and TS 3.8.1, AC Sources - Operating, for One-time Completion Time Extension Re Underground Piping Project stage: Approval ML0831001342008-11-0606 November 2008 Correction to Amendment No. 186 Approving One-Time Extension of Completion Time for Inoperable Essential Service Water System and Emergency Diesel Generators Project stage: Other ML0834503272008-12-19019 December 2008 Summary of Meeting with Representatives of Union Electric Company, Licensee for Callaway Plant, Unit 1 Second Round of Requests for Information, Extension of Completion Time for Essential Service Water Systems (TAC Nos. MD6792 & MD7252) Project stage: Meeting 2008-02-29
[Table View] |
|
---|
Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] |
Text
AmerenUE Callaway Plant PO Box 620 Fulton, MO 65251 August 13, 2008 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 ULNRC-05534 Ladies and Gentlemen:
ViAmeren DOCKET NUMBER 50-483 CALLAWAY PLANT UNION ELECTRIC COMPANY ONE-TIME COMPLETION TIME EXTENSION FOR ESSENTIAL SERVICE WATER (ESW) SYSTEM (OL1282 -TAC NO. MD7252)
References:
- 1. ULNRC-05445 dated October 31, 2007 2. ULNRC-05476 dated February 21, 2008 3. ULNRC-05482 dated March 7, 2008 4. NRC Request for Additional Information dated March 31, 2008 5. ULNRC-05500 dated May 6, 2008 6. NRC Request for Additional Information (RAI)Letter from Mohan C. Thadani to Charles D. Naslund dated June 10, 2008 7. ULNRC-05520 dated July 10, 2008 In Reference 1 above AmerenUE requested a license amendment that would revise Callaway Technical Specification (TS) 3.7.8, "Essential Service Water (ESW)System," and TS 3.8.1, "AC Sources -Operating," to allow a one-time Completion Time extension from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 14 days per ESW train to be used prior to December 31, 2008, for replacing underground ESW piping.From the NRC's ongoing review of the subject license amendment request (LAR), several requests for additional information (RAIs) have been transmitted to AmerenUE, to which AmerenUE has responded.
The letters that transmitted NRC RAIs, as well as AmerenUE's responses to the NRC RAIs, are in the above list of references.
With regard to information provided via the letters of References 5 and 7, two additional, clarifying questions were identified by the NRC staff and then received via an electronic request on July 28, 2008. AmerenUE's responses to those questions are hereby provided 4i Attachment 1 to this letter. Within the attachment, each Ac061 ,lIe a subsidiary of Ameren Corporation ULNRC-05534 August 13, 2008 Page 2 question is presented and followed by AmerenUE's response.
There are no new commitments associated with these responses.
If you have any questions on this letter or its enclosures, please contact Mr.Scott Maglio at (573) 676-8719.I declare under penalty of perjury that the foregoing is true and correct.Very truly yours, Executed on: 8 -( ý -)-o o 2 Luke H. Graessle Manager -Regulatory Affairs GGY/nls Attachments:
1 -Response to Additional NRC Questions ULNRC-05534 August 13, 2008 Page 3 cc: U.S. Nuclear Regulatory Commission (Original and 1 copy)Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Mr. Elmo E. Collins, Jr.Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8G14 Washington, DC 20555-2738 ULNRC-05534 August 13, 2008 Page 4 Index and send hardcopy to QA File A160.0761 Hardcopy: Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:
A. C. Heflin F. M. Diya T. E. Herrmann L. H. Graessle S. A. Maglio S. L. Gallagher L. M. Belsky (NSRB)T. B. Elwood D. E. Martin G. G. Yates Ms. Diane M. Hooper (WCNOC)Mr. Dennis Buschbaum (TXU)Mr. Scott Bauer (Palo Verde)Mr. Stan Ketelsen (PG&E)Mr. Scott Head (STP)Mr. John O'Neill (Pillsbury, Winthrop, Shaw, Pittman LLP)Missouri Public Service Commission Mr. Floyd Gilzow (DNR)
ATTACHMENT 1 RESPONSE TO ADDITIONAL NRC QUESTIONS Attachment 1 to ULNRC-05534 Page 1 of 2 Question: 1. Does Callaway have procedures and operator training in place to permit local/manual operation of the turbine driven AFW pump during long term station blackout conditions or post-fire conditions?
Response: Emergency Operating Procedure (EOP) ECA-0.0, "Loss of All AC Power," steps 4.a and 4.b provide guidance for restoring the turbine-driven auxiliary feedwater pump (TDAFP).EOP Addendum 18 is used to assure proper AFW valve emergency alignment, including the steam and water supply valves to the TDAFP turbine, flow control discharge valves to the steam generators, turbine mechanical trip and throttle valve, and turbine speed governor control valve. All of these valves can be operated from the auxiliary shutdown panels if the main control room is inaccessible as discussed in off-normal procedure OTO-ZZ-00001, "Control Room Inaccessibility," which would be used for a control room fire.Lastly, Attachments R and W of Callaway's Emergency Coordinator Supplemental Guideline provide directions to be used, as directed by the Emergency Coordinator, to start the TDAFP after a loss of AC and DC power and to align firewater (from pumper truck(s) if necessary) to the TDAFP.Training is conducted on the use of the above procedures.
Question: 2. Callaway states the temporary diesels are located in the switchyard.
What consideration was given to assuring the presence of diesel fuel oil in the switchyard is adequate from a fire protection point of view? Are the temporary diesels adequately separated from equipment needed for offsite power to the station in the event of a diesel fire? Will the diesels be operated in the switchyard during the extended CT for testing purposes?Response: The temporary modification for the alternate AC power supply commitment (four supplemental diesel generators (DGs) located in the switchyard) is still being designed, and fire protection provisions are still under evaluation.
However, the design and implementation of this temporary modification will meet the requirements of FSAR Site Addendum Section 9.5.1, "Fire Protection System," including Section 9.5.1.12, with respect to administrative controls governing the control of flammable liquids. A combination of fire protection features -control of combustibles (a preliminary review Attachment 1 to ULNRC-05534 Page 2 of 2 has concluded that no fuel oil containment dike or berm is needed), physical separation, manual suppression equipment, and fire barriers (if required)
-will assure that a fire in the switchyard will not prevent a safe shutdown of the plant.Storage of flammable liquids will comply with the requirements of NFPA 30-1973,"Flammable and Combustible Liquids Code." Physical separation from the safeguard transformer ring bus (as shown on FSAR Site Addendum Figure 8.2-5 and as discussed in response to RAI 2.b in ULNRC-05482 dated March 7, 2008) will be maintained to the extent allowed by the switchyard configuration.
An underground yard main provides fire fighting water to the switchyard.
Fire hydrants are located at approximately 250-foot intervals along the yard main with manual fire fighting equipment supplied by two mobile units.Each temporary DG will be filled with approximately 1,000 gallons of diesel fuel. There will also be two oil-filled transformers to step the voltage up to the required level. These combustible loads have preliminarily been evaluated by the design engineer and found to not require berms. The nearest permanently-installed plant structure, system, or component (SSC) in the switchyard will be the 'B' safeguards transformer V24 (its complete equipment tag number is XMDV24) which is one of the two preferred sources of offsite power to the Class lE AC power system. The redundant
'A' safeguards transformer V22 (its complete equipment tag number is XMDV22, and is also a permanently-installed SSC in the switchyard) is located approximately 188 feet plant north of V24 and therefore is outside the vicinity of the temporary installation and will be available regardless of any potential damage. (FSAR Site Addendum Figure 8.2-7 shows the equipment arrangement for these permanent plant SSCs.) Furthermore, the temporary DGs will be situated at the maximum available distance from transformer V24. This distance (which is not yet firmly established) will be evaluated for its potential fire hazard as part of the temporary modification.
If there is a potential risk associated with the proximity of the diesels to nearby plant SSCs, further steps will be taken to mitigate the fire hazards, such as installation of fire barriers or re-positioning of the diesels.Each of the four supplemental DGs will be load tested to 1600 kW, prior to entering the one-time 14-day LCO outage on each train, in order to demonstrate that the supplemental DGs can together supply a load equal to the 6,201 kW continuous duty rating of one station emergency DG. During the LCO outage, inspections will be conducted once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to assure operational readiness.
These commitments were made in response to RAI 2.b in ULNRC-05482.
Upon successful completion of the pre-outage load test runs, the supplemental DGs will be maintained "ready to start" for the duration of the LCO outage with 24-hour support staff coverage.
There will be no scheduled preventive maintenance testing, or test runs, during the LCO outage.