ML092010126

From kanterella
Revision as of 21:58, 25 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Beaver Valley, Units 1 & 2, Renewal of Quality Assurance Program Approval 0275 Request
ML092010126
Person / Time
Site: Beaver Valley, 07100275
Issue date: 07/14/2009
From: Sena P P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
Download: ML092010126 (1)


Text

FENOC FirstEnergy Nuclear Operating Company Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 Peter P. Sena III Site Vice President 724-682-5234 Fax: 724-643-8069 July 14, 2009 L-09-169 10 CFR 71.101 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station Unit Nos. 1 and 2 Docket No. 71-0275 Renewal of Quality Assurance Program Approval 0275 FirstEnergy Nuclear Operating Company's (FENOC's)

Quality Assurance Program Approval for radioactive material packages (Approval Number 0275, Revision Number 9) dated September 15, 2004, will expire on August 31, 2009. FENOC hereby requests renewal of the Quality Assurance Program Approval 0275 for radioactive material packages prior to August 31, 2009. In accordance with 10 CFR 71.101(f), FENOC will continue to apply the FENOC Quality Assurance Program Manual with regard to transportation packages.There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -Fleet Licensing, at 330-761-6071.

Sincerely, Peter P. Sena I11.cc: NRC Region I Administrator NRC Resident Inspector NRR Project Manager Director BRP/DEP Site BRP/DEP Representative 6Q 00C/