Vogtle, Report 22, Inspection/Activity Plan, 07/01/2009 - 12/31/2010
ML092440301
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II/DRP/RPB2
To:
Shared Package
ML092440290 List:
References
Download: ML092440301 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2009 08:10:43 Report 22 07/01/2009

-12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Vogtle OL RQ-REQUAL INSPECTION 3 1, 2 IP Licensed Operator Requalification Program 7111111B 07/13/2009 07/17/2009 PSB1-RP-RADIATION PROTECTION PUBLIC INSPECTION 3 1, 2 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 07/13/2009 07/17/2009 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 07/13/2009 07/17/2009 1, 2 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 07/13/2009 07/17/2009 1, 2 IP Performance Indicator Verification 71151 07/13/2009 07/17/2009 EB3ISI-UNIT 1 INSERVICE INSPECTION 2 1 IP Inservice Inspection Activities - PWR 7111108P 09/28/2009 10/02/2009 EB3TI172-TI-172 RCS DM BUTT WELDS 1 1 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 09/28/2009 10/02/2009 PSB1-RP-RP ACCESS CONTROLS INSPECTION (OUTAGE) 1 1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 09/28/2009 10/02/2009 1, 2 IP A ccess Control to Radiologically Significant Areas 7112101 09/28/2009 10/02/2009 1, 2 IP Performance Indicator Verification 71151 09/28/2009 10/02/2009 PSB1-RP-RP GROUNDWATER PROTECTION 1 1, 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 10/05/2009 10/07/2009 EB3SGISI-UNIT 1 STEAM GENERATOR INSERVICE INSP 1 1 IP Inservice Inspection Activities - PWR 7111108P 10/05/2009 10/09/2009 OL EXAM-INITIAL EXAM PREP 3 1 VOGTLE/FEBRUARY 2010 EXAM AT POWER FACILITIES V23358 02/01/2010 02/05/2010 OL EXAM-INITIAL EXAM WEEK 3 1 VOGTLE/FEBRUARY 2010 EXAM AT POWER FACILITIES V23358 02/22/2010 02/26/2010 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK1 4 1, 2 IP A ccess Control to Radiologically Significant Areas 7112101 03/08/2010 03/12/2010 1, 2 IP A LARA Planning and Controls 7112102 03/08/2010 03/12/2010 1, 2 IP Radioactive Material Processing and Transportation 7112202 03/08/2010 03/12/2010 1, 2 IP Performance Indicator Verification 71151 03/08/2010 03/12/2010 EB3ISI-UNIT 2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR 7111108P 03/15/2010 03/19/2010 EB3TI172-TI-172 RCS DM BUTT WELDS 1 2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 03/15/2010 03/19/2010 EB3SGISI-UNIT 2 SGISI 1 2 IP Inservice Inspection Activities - PWR 7111108P 03/22/2010 03/26/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 09/01/2009 08:10:43 Report 22 07/01/2009

-12/31/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Vogtle PSB1-RP-RP OCCUPATIONAL BASELINE WEEK 2 2 1, 2 IP A ccess Control to Radiologically Significant Areas 7112101 03/22/2010 03/26/2010 1, 2 IP A LARA Planning and Controls 7112102 03/22/2010 03/26/2010 1, 2 IP Radioactive Material Processing and Transportation 7112202 03/22/2010 03/26/2010 1, 2 IP Performance Indicator Verification 71151 03/22/2010 03/26/2010 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 IP Exercise Evaluation 7111401 05/17/2010 05/21/2010 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/17/2010 05/21/2010 1, 2 IP Performance Indicator Verification 71151 05/17/2010 05/21/2010 EB1-CDBI-COMPONENT DESIGN BASES INSPECTION 7 1, 2 IP Component Design Bases Inspection 7111121 05/31/2010 06/04/2010 1, 2 IP Component Design Bases Inspection 7111121 06/14/2010 06/18/2010 1, 2 IP Component Design Bases Inspection 7111121 06/28/2010 07/02/2010 1, 2 IP Component Design Bases Inspection 7111121 07/12/2010 07/16/2010 FP-TFPI 5 1, 2 IP Fire Protection [Triennial]

7111105T 08/02/2010 08/06/2010 1, 2 IP Fire Protection [Triennial]

7111105T 08/16/2010 08/20/2010 This report does not include INPO and OUTAGE activities.