Report 22, Inspection/Activity Plan, 07/01/2009 - 12/31/2010
ML092440301
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/01/2009
From:
NRC/RGN-II/DRP/RPB2
To:
Shared Package
ML092440290 List:
References
Download: ML092440301 (2)


Text

Page 1 of 2 Vogtle 09/01/2009 08:10:43 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL RQ - REQUAL INSPECTION 3 1, 2 07/13/2009 07/17/2009 IP 7111111B Licensed Operator Requalification Program PSB1-RP - RADIATION PROTECTION PUBLIC INSPECTION 3 1, 2 07/13/2009 07/17/2009 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1, 2 07/13/2009 07/17/2009 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2 07/13/2009 07/17/2009 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2 07/13/2009 07/17/2009 IP 71151 Performance Indicator Verification EB3ISI - UNIT 1 INSERVICE INSPECTION 2 1 09/28/2009 10/02/2009 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - TI-172 RCS DM BUTT WELDS 1 1 09/28/2009 10/02/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds PSB1-RP - RP ACCESS CONTROLS INSPECTION (OUTAGE) 1 1, 2 09/28/2009 10/02/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 1, 2 09/28/2009 10/02/2009 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 09/28/2009 10/02/2009 IP 71151 Performance Indicator Verification PSB1-RP - RP GROUNDWATER PROTECTION 1 1, 2 10/05/2009 10/07/2009 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative EB3SGISI - UNIT 1 STEAM GENERATOR INSERVICE INSP 1 1 10/05/2009 10/09/2009 IP 7111108P Inservice Inspection Activities - PWR OL EXAM - INITIAL EXAM PREP 3 1 02/01/2010 02/05/2010 V23358 VOGTLE/FEBRUARY 2010 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 3 1 02/22/2010 02/26/2010 V23358 VOGTLE/FEBRUARY 2010 EXAM AT POWER FACILITIES PSB1-RP - RP OCCUPATIONAL BASELINE WEEK1 4 1, 2 03/08/2010 03/12/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 03/08/2010 03/12/2010 IP 7112102 ALARA Planning and Controls 1, 2 03/08/2010 03/12/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 03/08/2010 03/12/2010 IP 71151 Performance Indicator Verification EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 03/15/2010 03/19/2010 IP 7111108P Inservice Inspection Activities - PWR EB3TI172 - TI-172 RCS DM BUTT WELDS 1 2 03/15/2010 03/19/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds EB3SGISI - UNIT 2 SGISI 1 2 03/22/2010 03/26/2010 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Vogtle 09/01/2009 08:10:43 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RP OCCUPATIONAL BASELINE WEEK 2 2 1, 2 03/22/2010 03/26/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 03/22/2010 03/26/2010 IP 7112102 ALARA Planning and Controls 1, 2 03/22/2010 03/26/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 03/22/2010 03/26/2010 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 05/17/2010 05/21/2010 IP 7111401 Exercise Evaluation 1, 2 05/17/2010 05/21/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 05/17/2010 05/21/2010 IP 71151 Performance Indicator Verification EB1-CDBI - COMPONENT DESIGN BASES INSPECTION 7 1, 2 05/31/2010 06/04/2010 IP 7111121 Component Design Bases Inspection 1, 2 06/14/2010 06/18/2010 IP 7111121 Component Design Bases Inspection 1, 2 06/28/2010 07/02/2010 IP 7111121 Component Design Bases Inspection 1, 2 07/12/2010 07/16/2010 IP 7111121 Component Design Bases Inspection FP - TFPI 5 1, 2 08/02/2010 08/06/2010 IP 7111105T Fire Protection [Triennial]

1, 2 08/16/2010 08/20/2010 IP 7111105T Fire Protection [Triennial]

This report does not include INPO and OUTAGE activities.