La Crosse Boiling Water Reactor Revision to Dpc'S Interim Compensatory Measure Clarification
ML101270032
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 04/30/2010
From: SansCrainte C V
Dairyland Power Cooperative
To:
Document Control Desk, NRC/FSME
References
LAC-14114
Download: ML101270032 (2)


Text

LA CROSSE BOILING WATER REACTOR (LACBWR)DAIRYLAND POWER COOP E RATIVE April 30, 2010 In reply, please refer to LAC- 14114 DOCKET NO. 50-409 Document Control Desk US Nuclear-Regulatory Commission Washington, DC 20555-0001

SUBJECT:

REFERENCE:

Dairyland Power Cooperative (DPC)La Crosse Boiling Water Reactor (LACBWR)Possession-Only License No.. DPR-45 Revision to DPC's Interim Compensatory Measure Clarification (1) Letter of December 2, 2009, DPC to NRC, Interim Compensatory Measure Clarification, and attached Corrective Action Report (CAR) 2009-70 (Safeguards Information)

The purpose of this transmittal is to provide a revision to Dairyland Power Cooperative's Interim Compensatory Measure Clarification letter and supporting documentation.

The revision is primarily to replace NRC Order EA-02-077, "Interim Compensatory Measures for Decommissioning Nuclear Power Plants With Spent Fuel in the Spent Fuel Pool and Independent Spent Fuel Storage Installations Using Wet Storage," dated 3/29/02, with NRC Order EA-02-077, "Interim Compensatory Measures for the Current Threat Environment," dated 5/22/02. The incorrect Order was referenced and placed in DPC's original supporting documentation.

DPC's Cause Analysis and Disposition and CAR form were also revised to accommodate the Order. NRC Order EA-02-077, dated 3/29/02, has been destroyed.

DPC's CAR 2009-70, Cause Analysis and Disposition, Revision 1, and NRC Order EA-02-077 (5/22/02) are safeguards documents and will only be provided to listed individuals.

If you have any questions, please call Michael Brasel of my staff at (608) 689-4220.A Touchstone Energy Cooperative

_týJ -65 Cý (S4601 State Highway 35 -Genoa, WI 54632-8846

  • 608-689-2331

-608-689-4200 fax -www.dairynet.com

_.-

Sincerely, DAIRYLAND POWER COOPERATIVE Chuck Sans C-rainte, Vice President, Generation CVS: MAB: two Attachment 1: Corrective Action Form Attachment 2 (SAFEGUARDS INFORMATION)

Attachment 2: LACBWR Cause Analysis and Disposition, Revision 1 (SAFEGUARDS INFORMATION)

Attachment 3: NRC order EA-02-077 (5/22/02) (SAFEGUARDS INFORMATION) cc w/att: Kristina Banovac Project Manager U. S. Nuclear Regulatory Commission Mail Stop T-8-F5 Washington, DC 20555 Gene Bonano ISFSI Security Specialist Region III -Division of Nuclear Material Safety 2443 Warrenville Rd.Lisle, IL 60532 Douglas Garner Security Specialist Office of Nuclear Security and Incident Response Mail Stop: T4 F25M Washington, DC 20555 cc w/o att: Paul Schmidt Manager, Radiation Protection Section State of Wisconsin PO Box 2659 Madison, WI 53701-26459