LER 88-031-00:on 880902,found That Due to Single Failure Control Room HVAC Sys Could Operate in Recirculation Mode. Motor Operators for Four Remote Air Intake Isolation Valves Replaced W/Manual operators.W/881003 Ltr
ML17284A548
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/03/1988
From: POWERS C M, WASHINGTON S L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
LER-88-031, LER-88-31, NUDOCS 8810120110
Download: ML17284A548 (11)


Text

+~~~~~~ULA QXRK DIALOG (Rz~~z~ACCESSION NBR:8810120110 DOC.DATE: 88/10/03 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION WASHINGTON,S.L.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

LER 88-031-00:on 880902,found that due to single failure control room HVAC sys could operate in recirculation mode.W/8 ltr.DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR I ENCL J SIZE: F TITLE: 50.73 Licensee Event Report (LER), Incident Rpt, etc.NOTES: RECIPIENT ID CODE/NAME PD5 LA SAMWORTHiR INTERNAL: ACRS MICHELSON ACRS WYLIE AEOD/DSP/NAS AEOD/DSP/TPAB DEDRO NRR/DEST/CEB 8H NRR/DEST/ICSB 7 NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT RES TELFORDgJ RES/DSIR/EIB EXTERNAL EGGG WILLIAMS g S H ST LOBBY WARD NRC PDR NSIC MAYSgG COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 4 4 1 1.1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD ACRS MOELLER AEOD/DOA AEOD/DSP/ROAB ARM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB'8D NRR/DEST/MEB 9H NRR/DEST/PSB 8D NRR/DEST/SGB 8D NRR/DLPQ/QAB 10 NRR/DREP/RAB 10 NRPgD SIB 9A REO P'-02 RES/DSIR DEPY RGN5 FILE 01 FORD BLDG HOYiA LPDR NSIC HARRISgJ COPIES LTTR ENCL 1 1 2 2 1 1 2 2 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D D S-.wv"~cV'"'TOTAL NUMBER OF COPIES REQUIRED: LTTR-46;:ENCLI<<-'~45 8

v NRC Form 358 (9.83 I w LICENSEE EVENT REPORT (LER)U.S.NUCLEAR AEOULATOAY COMMISSION APPROVED OMB NO.315(MIOe EXPIRES: 8/31/88 FACILITY NAME (II Washington Nuclear Plant-Unit 2')ng e as ure ou ause on ro oom Operation Mode Due to Design DOCKET NUMBER l2)PAGE 3 0 5 0 0 039 71oF07 o pera e s n an nana yze EVENT DATE (5)LER NUMBER IS)REPORT DATE (7)OTHER FACILI'TIES INVOLVED (8)MONTH DAY YEAR YEAR SEOUENTIAL

"??: NUMBER%F4 MONTH NUMBER OAY YEAR FACILITY NAMES DOCKET NUMBER(SI 0 5 0 0 0 09 028 8 8 8 0 31 00 10 0 3 8 8 0 5 0 0 0 OPERAT INC MODE (8)POWER=LEYEL 0 0 0 20.C02(b)20.405(~)(I)(I)20.e05(e)II)(ll)20.e05(e)(1)(ilil 20.e05(~)ill(lv)20.e05(~)(1)(vl 20.405(c)50M(v)(1)50.38(cl l2)50.73(e)l2)(S 50.7 3(e l(2)(iil 50.73(el(2)(iii) v LICENSEE CONTACT FOR THIS LER (12)50.73(el(2)(lv)50.73(~I (2)(v)50.73(e)(2)(viil 50 73(~l(2)(viill(A) 50.73(e)(2l(vill)ISI 50.73(~l(2)(rrl THIS AEPORT IS SUBMITTED PURSUANT T 0 THE AEOUIREMENTS OF 10 CF R (): (Cheep onr or more of thr followinpi (11 73.7)Br)73.71(c)OTHER ISpeeify in Aplrrret hrlow rodin Trer, IIRC Fohn 366AI NAME AREA CODE TELEPHONE NUMBER S.L.Washin ton, Compliance Engineer COMPLFTE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)0 9 7 7-2 8 0 CAUSE SYSTEM COMPONENT MANUFAC TV RE R PR~r'.Pg*rmeIrfy CAUSE SYSTEM COMPONENT K>~3'>FAXES%!MANU FAG TVRER'8vv'c+.ry."r EPORTABLE:

p TO NPRDS:?I'gag,,.r.ooyrri SUPPLEMENTAL REPORT EXPECTED IICI YES Ilf yn, complerr f Xpf CyfD SUBhrISSIOIY DAFfi NO ABBTRAOT ILimlr to Ir00 rpecer, I 8, epproxlmerrly tifrren einple.r peer ryprwri Nen linn)118)EXPECTED SUBMISSION DATE (15)MONTH DAY 8 0 1 YEAR 8 9 On September 2, 1988 a Design Engineer determined that due to a single failure the Control Room Heating and Ventilation (HVAC)System could operate in the recirculation mode during emergency conditions.

This unanalyzed condition was found while performing an engineering evaluation of the safety significance of the event reported in LER 88-005-00.

During a Loss of Coolant Accident (LOCA)the normal fresh air intake for the Control Room HVAC is isolated and two remote air intake lines're opened.Each remote air intake line., has two isolation valves and one valve is powered from division 1 and the other from division 2.A single failure (not a loss of power failure)in a power division could cause a valve in each remote air intake line to isolate.With the loss of all fresh air input the Control Room HVAC would continue to operate but in the recirculation mode.In the recirculation mode the Control Room would not r'emain pressurized with respect to surrounding areas, and operating post LOCA in this mode is not analyzed (for control room habitability).

Immediate corrective actions were: The motor operators for the four (two per line)-remote air intake isolation valves were replaced with manual operators.

Two of the four ,.radiation purge line isolation valves motor operators were electrically disconnected.-

Both isolation valves on one remote intake line were locked open to assure that a single failure could not result in recirculation mode operation.

The Control Room Emergency Filtration System was started and the Control Room HVAC System is operating in the pressurization mode.PDR ADOCK 050003~9~7 NRC Form 388lIF(gr NRC Form 3SSA (8831 LICENSEE EVENT REPORT{LER)TEXT CONTINUATION US.NUCLEAR REGULATORY COMMISSION APPROVED OMB NO.3160WI04 EXPIRES: 8/31/BB FACILITY NAME Ill DOCKET NUMBER 12)LER NUMBER Idl YEAR@N'EQUENTIAL NUM S E II@j REVISION NUM S II~AQE (3l Washington Nuclear Plant-Unit 2 TEXT//moro Nmco llroSuiorE ow//I/ooo////IC Forrrr 3/FIA'f/(ill o s o o o 397 8 3 1 0 0 0 2 QF 7 Abstract (Cont'd)The cause of this event was the Plant Architect/Engineer (AE)did not provide a, Control Room HVAC System design which protected the system against all possible single failures.The root cause of this event is a lack of communication between AE design groups.Further corrective actions include: The Control Room HVAC recirculation mode of operation will be analyzed and inleakage tests conducted, if necessary, to determine the safety significance of this event.A technical specification change will be requested to allow normal Control Room HVAC operation.

A letter will be sent to Burns&Roe Inc.requesting a 10CFR Part 21 evaluation.

The safety significance of this event is being evaluated and a supplemental report will be submitted when it is completed.

Plant Conditions a)Power Level-OX b)Plant Mode-4 (Cold Shutdown)Event Descri tion On September 2, 1988 a Design Engineer determined that, due to single failures, the Control Room Heating and Ventilation (HVAC)System could operate during emergency conditions in the recirculation mode, which is an unanalyzed condition.

This unanalyzed condition was discovered while performing an engineering evaluation committed to in LER 88-005-00 to evaluate the potential effects of minor Control Room HVAC system changes on system bypass flow.The following brief description of the Control Room HVAC System (before modification) for normal operation and emergency operation during a Loss of Coolant Accident (LOCA)is presented to aid in understanding the event hnd the changes made to the system.Figure 1 is a partial diagram of the Control Room HVAC System prior to the event.-The Control Room HVAC System consists of two redundant systems for both normal and emergency operation.

During normal operation, 1000cfm of fresh air~from the normal roof intake Radwaste Building is mixed with 20,000cfm of recirculated air (through fan 51A or 51B).Seven hundred and fifty (750)cfm is exhausted from the control room through fan 51 and the remaining 250cfm pressurizes the control room and is exfiltrated.

Also during normal operation, the remote air;intake isolation valves (51A and B and 52A and B)are closed and the radiation monitor purge line valves (51D and E and 52D and E)are open with radiation monitor purge line.fans 53A and B operating.

During a LOCA when any of the following trip levels are reached 1)High drywell pressure (RF" signal), 2)Low low reactor water-'=.level (NAR signal)or 3)Reactor building ventilation exhaust high radiation ("ZN signal)the following actions occur: a)The normal roof intake Radwaste Building is isolated by closing valves 51C and 52C.NRC PORM SSSA IBM I o U.S.GPO: I 0 BB042+838/add

NRC fons 3EEA N43)LICENSEE EVENT REPORT{LER)TEXT CONTINUATION VS.NVCLEAR REGULATORY COMMISSION APPROV EO OMS NO.3)50M)04 EXPIRES: S/31/88 fACILITY NAME (I)OOCKET NUMSER (2)LER NVMSER (E)PAGE (3)Washington Nuclear Plant-Unit 2 TExT///moro 5/roco/5 rfr/brorE off/I/or/on/I

///Ic Form 3(E)AS/(\T)0 s 0 0 0 397 YEAR m: 8 8 5EQVENZIAL NUM ER 031 rPrpl SKVIEION:45 NVM ES 0 0 0 3 oF 7 b)The 750cfm control room exhaust fan (51)de-energizes.

c)The remote air intake isolation valves (51A, 51B, 52A, and 52B)open and the radiation monitor purge line isolation valves (51D, 51E, 52D and 52E)close.The remote air intake isolation valves and the radiation monitor purge line isolation valves are interlocked so when an intake line is opened the-associated purge line is isolated.d)The control room emergency filtration system is automatically started and draws 1000cfm of fresh air through the remote air intakes.This additional air, when added to the recirculated air, pressurizes the control room.The event described in LER 88-005 was for leakage around the emergency filters in excess of the technical specification allowable limit.During the engineering evaluation committed to in LER 88-005 to determine the effect of the excess leakage on control room habitability, a design engineer determined that postulated single failures could cause some combination of remote air intake line isolation valves to fail to open or to re-isolate and;thus, isolate both remote air intake lines.If this condition existed during LOCA conditions, the Control Room HVAC would be running in a recirculation mode only since the normal roof intake is also isolated.In the recirculation mode the 20,000cfm would continue to be drawn from the control room and recirculated back to the control room;however, without the fresh air input the control room would not be pressurized.

In a neutral pressure condition the inleakage to the control room would increase and this condition is not analyzed.Immediate Actions The planned Plant Startup was delayed until the following actions were completed.

1)The motor operators were removed and manual operators were installed on the remote air intake isolation valves (51A and B and 52A and B).The valve operators were changed to manual so the isolation valves on one remote intake line could be opened without an FAZ signal present;thereby, assuring that a single failure could not cause operation in the recirculation mode.With this remote air intake line open, the control room emergency filtration system was started.This put the Control Room HVAC system in the pressurization mode of operation which satisfied the action statement of Technical Specification 3.3.7.1.The current Plant configuration is the West remote intake line is open (51A and 52A are locked open)and the East remote intake line is closed with 52B locked closed and 51B locked open.Figure 2 shows the post event Control Room HVAC configuration.

2)Two of the radiation purge line isolation valve electro-pneumatic operator motors (52D and 51E)were electrically disconnected which causes the valves to open.This was done so that only one manual action is required to isolate a remote path and cause the associated purge path to open or vice versa.3)The 750cfm control room exhaust fan (51)was de-energized.

4)Specific directions for Plant.Operators to execute to maintain design bases in the event of a LOCA were provided in (approved) deviated Plant procedures.

Each new operations crew was provided training by Operation Managers.NRC PORM 345A (043)oV S GPO'IOSS.OS24 SSS/Edd NRC form 3SSA 1883 l LICENSEE EVENT REPORT ILER)TEXT CONTINUATION U.S.NUCLEAR REOULATORY COMMISSION APPROVED OMS NO, 3150&181 EXPIRES: 8/31/88 fACILITY NAME Ill POCKET NUMSER 12I LER NUMSER Id)yEAR'la SEOVCNT/AL NVM Ell;:.iv,.'lEVISION NVM Ell~AOE IS)Washington Nuclear Plant-Unit 2 TEXT//f rr>>fo N>>of/1 rodule4 Irfo aSR/fr>>/H/IC Form 3838'f/(ITI o s o o o 397 88 31 0 0 4 OF 7 Further Evaluation and Corrective Action A.Further Evaluation This event was reported per 10CFR50.72(b)(2)(i) on September 2, 1988 at 1702 hours0.0197 days <br />0.473 hours <br />0.00281 weeks <br />6.47611e-4 months <br />.The event is reported per 10CFR50.73(a)(2)(ii)(A).

For this event the condition is unanalyzed but the actual safety significance has not yet been determined; however, based on a review of existing analysis this condition is potentially safety significant.

There were no structures, systems, or components inoperable prior to this event which contributed to the event.The cause of this event was the failure of the Plant Architect/Engineer (Burns 8 Roe Inc.)to provide a system design for which a single failure could not isolate both remote air intakes and cause the Control Room HVAC System to operate in the recirculation mode, or to analyze the recirculation mode of operation.

The root cause of this event is a lack of communication between the Architect/Engineer design groups.B.Further Corrective Action The Control Room HVAC recirculation mode of operation will be analyzed and, if necessary, tests conducted to determine control room inleakage in the recirculation mode to determine Post LOCA control room habitability.

2)A Plant Technical Specification change will be requested to allow normal (not in the emergency filtration pressurization mode)operation of the control room HVAC system with the present Plant configuration.

3)A letter will be sent to Burns 8 Roe Inc., requesting a 10CFR Part 21 evaluation.

Safet Si nificance The safety significance of thi s event wi1 1 be determined by compl eting the engineering

-evaluation (committed to'n LER 88-005)and performing tests to determine the actual inleakage to the Control'oom when the Control Room HVAC System is operated in the recirculation mode.The change from automatic to manual operation of the remote air intake isolations valves has been analyzed as required and does not increase the possibility of an accident, nor does it.create the possibility of a new or different kind of accident.A supplemental report will be submitted when the engineering evaluation of the safety significance of this event is completed.

Similar Events None.NRCPORM 34SA 18831*U 8 GPO 18880824 838/4dd NRC Pnrln 3SSA 1883 I LICENSEE EVENT REPORT ILER)TEXT CONTINUATION UA NUCLEAR RECULATORY COMMISSION APPROVEO OMS NO 3150&104 EXPIRES'/31/88 I'ACILITY NAME Ill OOCKET NUMSER 131 LER NUMSER ISI lj SCOVCNTIAL

@>~NVM CR REVISION NVM CR PACE 13)Washington Nuclear Plant-Unit 2 TEXT/8'rncrp Necn/c rpCNPSIE vcp sc/elena/H/1C Arne 3/C/AS/lITI EI IS Information o s o o o 397 88 3 1 000 5 OF Text Reference EIIS Reference System Component Control Room Heating and Ventilation (HVAC)System Normal Fresh Air Intake (Normal Roof Intake Radwaste Building)Remote Air Intake Line, (East or West)Remote Air Intake Isolation Valves (51A and B and 52A and B)Remote Air Intake Isolation Valve Motor Operator (Electro-Pneumatic Motor Operator)Radiation Purge Line Isolation Valves (51D and E and 52D and E)Radiation Purge Line Isolation Valve Motor Operator (Electro-Pneumatic Motor Operators)

Control Room Emergency Filtration System Fan 51A or 51B 750cfm Control Room Exhaust Fan (51)Radiation Purge Line Exhaust Fans (53A and B)VH VH VH VH VH VH VH VH VH VH ISV 84 ISV 84 FAN FAN FAN NRC CORM SCCA 18431 n U.S.GPO:1 08@0424 838/4dd NRC Form 3ddA I0431 LICENSEE EVENT REPORT (LER)TEXT CONTINUATION U.S.NUCLEAR REGULATORY COMMISSION APPROVED OMS NO.3050W104 EXPIRES: 8/3I/88 FACILITY NAME (11 OOCKET NUMBER 131 LER NUMBER Idl VEA/I pi(SEQUENTIAL NUMSER:.v.REVISION NUMSER PAGE IS)washington Nuc1ear Plant,-Unit 2 TEXT//1 more SO000/I redvkeIE I/00~hrRC Forrrr&54'0/Illl o 5 o o o 9 7 8-0 1 0 0 6o" 0 7 ROIQTE INTAKE dl IV EST)VALVES CLOSE ON HIGH-HlGH I RADIATIQN ALARM VALVES I<TYPICAL>OPEN QN I FAZ 0 NORMAL RQQF INTAKE RADVASTE BLDG OO 5IC DIV I I I VALVES'OPEN ow I FAZ I I IV Il I NC slh DIV II I I I I I I I I.r~TYPICAL.CI.OSE QM FAZ FC ISI OIQ 52C DIV Il EHO I 52A (FQDFV Ir ENERG I" raTER I I I'AM s4A I: DIV I I I L I I DIV II I EHERG FILTER I I I I I I:r~I I 51A-I IB-I DIVI VH FAN 542 DIV 11 FAM 5IB DIV 11 FAN 5lh DIV I CONTROL RQQN 0 I 51B NC I DIV IFQ I I I I I I I I L~DIV I 54A"I DIV II 54S-I"I REMOTE M/TAKE l2 (EAS TI I RE J DIV I RR TYPICAL 51D FO 52DFO DIV I DIV 11 150 CFH~roS rQ 5'IV ll DIV'I LEKHR FCR FAll.CLOSED FOR FAIL OPEN IK:~NRHALLY CLOSED N7 IS/SMALLY OPEN LO LOCKED OP EH LCR UXXED CLOSED ANR AISESCIATOR Id RER RAD ELEMENT RRR RAD RECORDER EHQ~ELECTRO HYDRAILIC OPERATOR=HAN MANUAL OPERATOR FAH 53A'AH 53B DIV I Dlv II PURGE CGIAUST FAN 51 750 CFH EXHAUST DEOKRGIZE OM FAZ FAZR HIGH ORWELL PRESSURO LOV REACTOR VESSEL VATER LEVEL/REACTOR BUILDING VENTILATION EXHAUST HIGH RADIATION, INFORMATION DRAVIMG ON T SEPT 22, 1988'PE YASISKOTSM PUSUQ TOYXS 43 SUPPLY SYSTBM'IOul+

VASHMIOM 9935&868 TIrLE ORIGINAL VNL 2 PARTIAL COMTROL ROIM VENTILATION SYS Figure 1 Pre-Event Control Room HVAC NIIC FOIIM SddA 18431*U.S.QPO:10884424 838/45$

NRC Forr>>344A (0431 LICENSEE EVENT REPORT (LER)TEXT CONTINUATION V.S.NUCLEAR REGULATORY COMMISSION APPROVf 0 OMS NO.3I SOWI04 EXPIRES: 8/3I/88 FACILITY NAME lll DOCKS'I NUMBER III YEAR LER NUMBER 141 SEQVSNT IAL NVMSSII 1IW~IIEvlsloN r%: NVMSS N~ACE ISI Washington Nuc1ear P1ant-Unit 2 TEXT////NSrf fpfcf Ir/44>>inc/, INS SUE//cM/I//RC Fsrrrr 3RIABJ IIII o 5 o o o 397 0 31 000 7oP 0 7 AH RENOTE INTAKE Sl IVEST>IV 11 HAH Hhk I NO 51A 52A LODIV II DIV ll EHERG FILTER HORHAL ROOf'NTAKE RADVASTE BLDG Hn ENO 5IC DIV I DIV I 34A I DIV Il 548 1 CI.OSC Ok FAZ I/O ENO 52C DIV 11 HAN NAN"I 28 LC 51'8 LO DIV'lI I DIV I EHERG FILTER REHOTE INTAKE 42 CEASING I DIV RE RR TYPICAL FAN 5fh DIV I 51A-I DIV I IB-I DV O FAN 5>FAIL CLOSED FO>>FAIL OPEN HCA ISXUIALLY CLOSED NO>>NORHALLY OPOI LO>>LOCKED CPEH LC>>LOCKED CLOSED AN>>ANABICIATOR IE Ri: RAD anion RR>>RAD RECORDER OEI>>ELECTRO HYDRAILIC OPERATOR HAN>>HANUAL OPERATOR FAN 53A FAN 53B DIV 1 DIV FI FAZ>>HIGH DRYVELL PRESSURO LOV REACTOR VESSEL VATER LEVELS REACTOR BINLDIHG VEHTILATOBI EXHAUST HIGH RADIATI DBTBIHATIOH DRAVIHG IBE.Y SEPT 22, 1988 750 CFN EXHAUST DEEHERGITE Ok FAZ CURROITLY DEEHERGIZED FAH 51'mm/SIST PI/SIX: PO XXX 43 SUPPLY SYSTEM RKRAIGL VATHD510I 9995'~CURROIT VIS>>2 PARTIAL CONTROL ROOH VOITILATIOH SYS'igure 2 Post-Event Control Room HVAC N/IC FORM 344A f043 I+U.S.GPO:10854 524 535/45$

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 October 3, 1988 Document Control'Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555

Subject:

NUCLEAR PLANT NO.2 LICENSEE EVENT REPORT NO.88-031

Dear Sir:

Transmitted herewith is Licensee Event Report No.88-031 for the WNP-2 Plant.This report is submitted in response to the report requirements of 10CFR50.73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.

Very truly yours, C..Powers (M/D 927M)WNP-2 Plant Manager CMP:lg

Enclosure:

Licensee Event Report No.88-031 cc: Mr.John B.Martin, NRC-Region V Mr.C.J.Bosted, NRC Site (M/D 901A)INPO Records Center-Atlanta, GA Ms.Dottie Sherman, ANI Mr.D.L.Williams, BPA (M/D 399)