Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML17292B7421999-07-20020 July 1999 LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr ML17292B4451998-10-27027 October 1998 LER 98-012-01:on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With 981027 Ltr ML17284A7561998-09-0303 September 1998 LER 98-013-00:on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With 980903 Ltr ML17284A7571998-09-0202 September 1998 LER 98-014-00:on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With 980902 Ltr ML17284A7551998-09-0202 September 1998 LER 98-015-00:on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With 980902 Ltr ML17284A7311998-08-17017 August 1998 LER 98-012-00:on 980716,determined That 24-month SR 3.8.4.7 Had Not Been Fulfilled within Specified Frequency.Caused by Inadequate Work Practices.License Requested & Received Enforcement Discretion Re Battery Svc test.W/980817 Ltr ML17284A7121998-07-23023 July 1998 LER 98-006-01:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes ML17284A6951998-07-17017 July 1998 LER 98-011-00:on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted. W/980717 Ltr ML17284A6961998-07-15015 July 1998 LER 98-010-00:on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP tubing.W/980715 Ltr ML17284A6731998-07-0101 July 1998 LER 98-009-00:on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in preparation.W/980701 Ltr ML17284A6651998-06-24024 June 1998 LER 98-007-00:on 980530,inadvertent Full Scram & Division 1 ECCS Injection Was Noted.Caused by Failure to Meet Mgt Work Practice Expectation When Encountering Deficient Procedure. Incident Review Board Convened to Review event.W/980624 Ltr ML17284A6641998-06-24024 June 1998 LER 98-008-00:on 980531,inadvertent Full Scram During RPV Leak Testing in Mode 4 Was Noted.Caused by Change in Mgt Techniques.Revised Procedures to Take Into Account Addl Water Head in Pressure Sensing lines.W/980624 Ltr ML17284A6631998-06-19019 June 1998 LER 98-006-00:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of App R Calculations for High Impedance Fault Analysis.Caused Indeterminate. Implemented Procedural Changes Involving Operator Action ML17284A6551998-06-0404 June 1998 LER 98-005-00:on 980506,potential for Failure of RHR Sys Valve to Close on Isolation Signal Was Noted.Caused by Design Deficiency.Caution Tag Was Placed on RHR-V-40 Control Switch to Inform Plant Operators of limitation.W/980604 Ltr ML17284A6421998-06-0101 June 1998 LER 98-004-00:on 980502,determined That Primary Containment Penetration Overcurrent Protection Does Not Meet Reg Guide 1.63 Requirements.Caused by Inadequate Design Changes. Installed Addl Fuse in RHR-MO-9 circuit.W/980601 Ltr ML17292B3281998-04-0909 April 1998 LER 98-002-00:on 980311,reactor Scram & Plant Transient Occurred,Due to Failed Closed Main Steam Isolation Valve. Caused by Loss of Pneumatic Actuating Supply Pressure. Problem Evaluation Request Written for Failure of MS-V-22D ML17292B3291998-04-0909 April 1998 LER 98-003-00:on 980311,WNP-2 Experienced SCRAM Signal as Result of Low Rpv.Caused by Less than post-SCRAM Operational Strategy for Resetting SCRAM Signal in Conditions.Changes in post-SCRAM Operational Strategy implemented.W/980409 Ltr ML17292B2661998-03-0404 March 1998 LER 98-001-00:on 980203,automatic Start of HPCS EDG Was Noted.Caused by Operator Error.Operations Crew Stabilized Plant at Approximately 75% Reactor Power & Investigation of Event Was initiated.W/980304 Ltr ML17292B1111997-11-10010 November 1997 LER 97-011-00:on 971010,HPCS Battery Charger Failed.Caused by Failure of a Phase Firing Control Circuit Board Due to Aging During 7 Yrs of Use.Hpcs Sys Was Immediately Declared inoperable.W/971110 Ltr ML17292B1151997-11-0707 November 1997 LER 97-010-00:on 970906,discovered That TS SR 3.4.5.1 for Identified Portion of RCS Total Leakage Would Not Be Able to Perform within Time Limits of SR 3.0.2.Caused by Inadequate Methods.Method of Meeting SR 3.4.5.1 Established ML17292B0641997-09-24024 September 1997 LER 97-004-01:on 970327,plant Operators Manually Scrammed Reactor as Required by TS Due to Indication of Entry Into Region a of power-to-flow Map.Caused by Inadequate Attention to Detail.Established Event Evaluation teams.W/970924 Ltr ML17292B0241997-08-18018 August 1997 LER 97-009-00:on 970717,discovered Error in Recently Performed Inservice Testing procedure,OSP-TIP/IST-R701. Caused by Procedure Inadequacy.Plant Procedure OSP/TIP/IST-R701 Will Be changed.W/970818 Ltr ML17292B0291997-08-15015 August 1997 LER 97-008-00:on 970716,wire Seal Used to Lock Containment Instrument Air Pressure Control valve,CIA-PCV-2B,found Not Intact.Cause of Misadjustment of CIA-PCV-2B Unknown.Event Will Be Communicated to Plant employees.W/970815 Ltr ML17292B0201997-08-15015 August 1997 LER 97-S01-00:on 970718,failure to Take Compensatory Measure for Inoperative Microwave Security Zone Occurred. Caused by Personnel Error.Training Will Be Conducted W/ Appropriate Members of Security force.W/970815 Ltr ML17292A9481997-07-23023 July 1997 LER 97-007-00:on 970611,voluntary Rept of Automatic Start of DG-1 & DG-2 Was Experienced.Caused by Undervoltage Condition on Electrical Busses SM-7 & SM-8.Circulating Water Pump CW-P-1C Control Switch Placed in pull-to-lock.W/970723 Ltr ML17292A9201997-06-26026 June 1997 LER 97-006-00:on 970527,non-performance of Surveillance Requirement 3.6.1.3.2 for Blind Fanges,Was Noted.Caused Because Misunderstanding of Intent of Specs.Added Five Structural Assemblies for SP.W/970626 Ltr ML17292A8331997-04-28028 April 1997 LER 97-004-00:on 970327,plant Operators Manually Scrammed Reactor as Required by TS Due to Entry Into Region a of power-to-flow Map Following Planned Trip of Single Mfp. Event Evaluation teams,established.W/970428 Ltr ML17292A8311997-04-28028 April 1997 LER 97-005-00:on 970327,valid Reactor Scram Signal Received Due to Low Water Level Condition During Preparations for SRV Testing.Caused by Risks & Consequences of Decisions Not Completely Identified.Restored Water level.W/970428 Ltr ML17292A8251997-04-21021 April 1997 LER 97-003-00:on 970320,notification of Noncompliance W/Ts as TS SRs for Response Time Testing Were Not Being Met for Specified Instrumentation in Rps,Pcis & Eccs.Requested Enforcement Discretion for One Time exemption.W/970421 Ltr ML17292A7431997-03-20020 March 1997 LER 97-002-00:on 970218,determined That Rod Block Monitor (RBM) Calibr Values Were Not Set IAW Tech Specs.Caused by Calibr Procedures Inadequacies.Revised & re-performed RBM Channel Calibr procedures.W/970330 Ltr ML17292A7401997-03-13013 March 1997 LER 97-001-00:on 970211,reactor Water Cleanup Sys Blowdown Flow Isolation Setpoint Was Slightly Above TS Allowable Valve Occurred Due to Calculation Error.Lds Fss LD-FS-15 LD-FS-16 Were Declared inoperable.W/970313 Ltr ML17292A6641997-01-22022 January 1997 LER 96-009-00:on 961220,miscalculation of Instantaneous Overcurrent Relay Settings Resulted in Inoperability of safety-related Equipment.Caused by Utilization of Inappropriate Design.Testing Was completed.W/970122 Ltr ML17292A6461997-01-0606 January 1997 LER 96-008-00:on 961205,failure to Comply with TS Action Requirement for Emergency Core Cooling Sys Actuation Instrumentation Occurred Due to Unidentified Inoperability Condition.Pmr initiated.W/970106 Ltr ML17292A6371996-12-19019 December 1996 LER 96-007-00:on 961122,electrical Breakers Were Not Seismically Qualified in Test/Disconnect Position.Circuit Breaker Mfg Did Not Consider Raced Out Breaker Position During Testing.Relocated Circuit breakers.W/961217 Ltr ML17292A4121996-08-0808 August 1996 LER 96-006-00:on 960709,average Power Range Monitor Rod Block Downscale Surveillance Not Performed Prior to Entry Into Mode 1.Caused by long-standing Misinterpretation of Requirements of Tss.Procedures revised.W/960808 Ltr ML17292A3801996-07-24024 July 1996 LER 96-004-00:on 960624,plant Was Manually Scrammed by Control Room Personnel Due to Reactor Water Level Transient Experienced During Testing of Digital Feedwater Sys.Caused by Programming Error.Sys Was corrected.W/960724 Ltr ML17292A3771996-07-24024 July 1996 LER 96-005-00:on 960624,determined Missed Surveillance Test Re Channel Check of Average Power Range Monitor.Caused by Inadequate Procedures.Revised Surveillance Procedure Re When APRM Checks Must Be performed.W/960724 Ltr ML17292A3641996-07-12012 July 1996 LER 96-003-00:on 960615,required Surveillance Test Not Performed When Required by TS 3.4.1.3.Caused by Inadequate Procedures.Implementing Surveillance Procedure & Reactor Plant Startup Procedures revised.W/960712 Ltr ML17292A3361996-06-20020 June 1996 LER 96-002-00:on 960504,critical Bus SM-8 Lost Power When Supply Breaker 3-8 Tripped.Caused by Personnel Error. Operators Counselled & Procedures revised.W/960620 Ltr ML17292A2861996-05-24024 May 1996 LER 96-001-00:on 960425,inadvertent ESF Actuations Occurred Due to Tripping of Temporary Power Supply to IN-3.Caused by Personnel Error.Operations Restored to IN-3 Loads & Reset ESF actuations.W/960524 Ltr ML17291B0891995-10-19019 October 1995 LER 95-011-00:on 950919,failed to Comply W/Ts SR for RCIC Sys Due to Analysis Deficiency That Resulted in Inadequate Surveillance Test Procedure.Surveillance Procedure Revised to Correct deficiency.W/951019 Ltr ML17291A9021995-07-0707 July 1995 LER 95-010-00:on 950609,HPCS DG Declared Inoperable Due to Discovery That TS Test Method Incomplete.Caused by Inadequate Testing Procedure.Test Procedure for HPCS DG Reviewed & Special Test Procedures written.W/950707 Ltr ML17291A9031995-07-0707 July 1995 LER 95-009-00:on 950607,inadvertent MSIV Closure Occurred During Surveillance Test Due to Poor Communication Between Test Team.Determined That MSIV Closure Not Valid Because Closure Not Triggered by Plant conditions.W/950707 Ltr ML17291A8501995-06-0808 June 1995 LER 95-006-01:on 950405,reactor Scram Occurred During Surveillance Testing Due to Protective Sys Relay Failure. Replaced Failed Relay Before Plant Startup ML17291A8101995-05-12012 May 1995 LER 95-008-00:on 940125,TS Wording Lead to Potential TS Violation.Caused by Lack of Clarity in Ts.Submitted Improved TS for Plant to Provide Addl clarity.W/950512 Ltr ML17291A7841995-05-0505 May 1995 LER 95-007-00:on 950222,emergency Diesel Start Occurred Due to Voltage Transient on BPA Grid.Confirmation Was Received at 17:51 H That Disturbance Had Originated in BPA Grid ML17291A7801995-05-0404 May 1995 LER 95-006-00:on 950405,main Turbine Trip Occurred During Performance of Surveillance Test Due to Protective Sys Relay Failed.Replaced Failed Relay Before Plant startup.W/950504 Ltr ML17291A7851995-05-0303 May 1995 LER 95-005-00:on 950222,inoperable IRM Had Been Relied Upon to Meet TS Requirements During Reactor Startup.Caused by Lack of Neutron Source to Test Instrumentation. Sys Knowledge Gained Will Be incorporated.W/950503 Ltr ML17291A7071995-03-25025 March 1995 LER 95-004-00:on 950226,malfunction in Main Turbine DEH Control Sys Caused All Four High Pressure Turbine Governor Valves to Rapidly Close.Caused by Blown Fuse.Suspected Faulty Circuit Card replaced.W/950325 Ltr ML17291A7011995-03-20020 March 1995 LER 95-002-00:on 950218,automatic Reactor Scram Occurred. Caused by Erroneous Positioning of Control During Performance of Scheduled Periodic Functional Test.Control repositioned.W/950320 Ltr 1999-07-20
[Table view] Category:RO)
MONTHYEARML17292B7421999-07-20020 July 1999 LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr ML17292B4451998-10-27027 October 1998 LER 98-012-01:on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With 981027 Ltr ML17284A7561998-09-0303 September 1998 LER 98-013-00:on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With 980903 Ltr ML17284A7571998-09-0202 September 1998 LER 98-014-00:on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With 980902 Ltr ML17284A7551998-09-0202 September 1998 LER 98-015-00:on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With 980902 Ltr ML17284A7311998-08-17017 August 1998 LER 98-012-00:on 980716,determined That 24-month SR 3.8.4.7 Had Not Been Fulfilled within Specified Frequency.Caused by Inadequate Work Practices.License Requested & Received Enforcement Discretion Re Battery Svc test.W/980817 Ltr ML17284A7121998-07-23023 July 1998 LER 98-006-01:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes ML17284A6951998-07-17017 July 1998 LER 98-011-00:on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted. W/980717 Ltr ML17284A6961998-07-15015 July 1998 LER 98-010-00:on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP tubing.W/980715 Ltr ML17284A6731998-07-0101 July 1998 LER 98-009-00:on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in preparation.W/980701 Ltr ML17284A6651998-06-24024 June 1998 LER 98-007-00:on 980530,inadvertent Full Scram & Division 1 ECCS Injection Was Noted.Caused by Failure to Meet Mgt Work Practice Expectation When Encountering Deficient Procedure. Incident Review Board Convened to Review event.W/980624 Ltr ML17284A6641998-06-24024 June 1998 LER 98-008-00:on 980531,inadvertent Full Scram During RPV Leak Testing in Mode 4 Was Noted.Caused by Change in Mgt Techniques.Revised Procedures to Take Into Account Addl Water Head in Pressure Sensing lines.W/980624 Ltr ML17284A6631998-06-19019 June 1998 LER 98-006-00:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of App R Calculations for High Impedance Fault Analysis.Caused Indeterminate. Implemented Procedural Changes Involving Operator Action ML17284A6551998-06-0404 June 1998 LER 98-005-00:on 980506,potential for Failure of RHR Sys Valve to Close on Isolation Signal Was Noted.Caused by Design Deficiency.Caution Tag Was Placed on RHR-V-40 Control Switch to Inform Plant Operators of limitation.W/980604 Ltr ML17284A6421998-06-0101 June 1998 LER 98-004-00:on 980502,determined That Primary Containment Penetration Overcurrent Protection Does Not Meet Reg Guide 1.63 Requirements.Caused by Inadequate Design Changes. Installed Addl Fuse in RHR-MO-9 circuit.W/980601 Ltr ML17292B3281998-04-0909 April 1998 LER 98-002-00:on 980311,reactor Scram & Plant Transient Occurred,Due to Failed Closed Main Steam Isolation Valve. Caused by Loss of Pneumatic Actuating Supply Pressure. Problem Evaluation Request Written for Failure of MS-V-22D ML17292B3291998-04-0909 April 1998 LER 98-003-00:on 980311,WNP-2 Experienced SCRAM Signal as Result of Low Rpv.Caused by Less than post-SCRAM Operational Strategy for Resetting SCRAM Signal in Conditions.Changes in post-SCRAM Operational Strategy implemented.W/980409 Ltr ML17292B2661998-03-0404 March 1998 LER 98-001-00:on 980203,automatic Start of HPCS EDG Was Noted.Caused by Operator Error.Operations Crew Stabilized Plant at Approximately 75% Reactor Power & Investigation of Event Was initiated.W/980304 Ltr ML17292B1111997-11-10010 November 1997 LER 97-011-00:on 971010,HPCS Battery Charger Failed.Caused by Failure of a Phase Firing Control Circuit Board Due to Aging During 7 Yrs of Use.Hpcs Sys Was Immediately Declared inoperable.W/971110 Ltr ML17292B1151997-11-0707 November 1997 LER 97-010-00:on 970906,discovered That TS SR 3.4.5.1 for Identified Portion of RCS Total Leakage Would Not Be Able to Perform within Time Limits of SR 3.0.2.Caused by Inadequate Methods.Method of Meeting SR 3.4.5.1 Established ML17292B0641997-09-24024 September 1997 LER 97-004-01:on 970327,plant Operators Manually Scrammed Reactor as Required by TS Due to Indication of Entry Into Region a of power-to-flow Map.Caused by Inadequate Attention to Detail.Established Event Evaluation teams.W/970924 Ltr ML17292B0241997-08-18018 August 1997 LER 97-009-00:on 970717,discovered Error in Recently Performed Inservice Testing procedure,OSP-TIP/IST-R701. Caused by Procedure Inadequacy.Plant Procedure OSP/TIP/IST-R701 Will Be changed.W/970818 Ltr ML17292B0291997-08-15015 August 1997 LER 97-008-00:on 970716,wire Seal Used to Lock Containment Instrument Air Pressure Control valve,CIA-PCV-2B,found Not Intact.Cause of Misadjustment of CIA-PCV-2B Unknown.Event Will Be Communicated to Plant employees.W/970815 Ltr ML17292B0201997-08-15015 August 1997 LER 97-S01-00:on 970718,failure to Take Compensatory Measure for Inoperative Microwave Security Zone Occurred. Caused by Personnel Error.Training Will Be Conducted W/ Appropriate Members of Security force.W/970815 Ltr ML17292A9481997-07-23023 July 1997 LER 97-007-00:on 970611,voluntary Rept of Automatic Start of DG-1 & DG-2 Was Experienced.Caused by Undervoltage Condition on Electrical Busses SM-7 & SM-8.Circulating Water Pump CW-P-1C Control Switch Placed in pull-to-lock.W/970723 Ltr ML17292A9201997-06-26026 June 1997 LER 97-006-00:on 970527,non-performance of Surveillance Requirement 3.6.1.3.2 for Blind Fanges,Was Noted.Caused Because Misunderstanding of Intent of Specs.Added Five Structural Assemblies for SP.W/970626 Ltr ML17292A8331997-04-28028 April 1997 LER 97-004-00:on 970327,plant Operators Manually Scrammed Reactor as Required by TS Due to Entry Into Region a of power-to-flow Map Following Planned Trip of Single Mfp. Event Evaluation teams,established.W/970428 Ltr ML17292A8311997-04-28028 April 1997 LER 97-005-00:on 970327,valid Reactor Scram Signal Received Due to Low Water Level Condition During Preparations for SRV Testing.Caused by Risks & Consequences of Decisions Not Completely Identified.Restored Water level.W/970428 Ltr ML17292A8251997-04-21021 April 1997 LER 97-003-00:on 970320,notification of Noncompliance W/Ts as TS SRs for Response Time Testing Were Not Being Met for Specified Instrumentation in Rps,Pcis & Eccs.Requested Enforcement Discretion for One Time exemption.W/970421 Ltr ML17292A7431997-03-20020 March 1997 LER 97-002-00:on 970218,determined That Rod Block Monitor (RBM) Calibr Values Were Not Set IAW Tech Specs.Caused by Calibr Procedures Inadequacies.Revised & re-performed RBM Channel Calibr procedures.W/970330 Ltr ML17292A7401997-03-13013 March 1997 LER 97-001-00:on 970211,reactor Water Cleanup Sys Blowdown Flow Isolation Setpoint Was Slightly Above TS Allowable Valve Occurred Due to Calculation Error.Lds Fss LD-FS-15 LD-FS-16 Were Declared inoperable.W/970313 Ltr ML17292A6641997-01-22022 January 1997 LER 96-009-00:on 961220,miscalculation of Instantaneous Overcurrent Relay Settings Resulted in Inoperability of safety-related Equipment.Caused by Utilization of Inappropriate Design.Testing Was completed.W/970122 Ltr ML17292A6461997-01-0606 January 1997 LER 96-008-00:on 961205,failure to Comply with TS Action Requirement for Emergency Core Cooling Sys Actuation Instrumentation Occurred Due to Unidentified Inoperability Condition.Pmr initiated.W/970106 Ltr ML17292A6371996-12-19019 December 1996 LER 96-007-00:on 961122,electrical Breakers Were Not Seismically Qualified in Test/Disconnect Position.Circuit Breaker Mfg Did Not Consider Raced Out Breaker Position During Testing.Relocated Circuit breakers.W/961217 Ltr ML17292A4121996-08-0808 August 1996 LER 96-006-00:on 960709,average Power Range Monitor Rod Block Downscale Surveillance Not Performed Prior to Entry Into Mode 1.Caused by long-standing Misinterpretation of Requirements of Tss.Procedures revised.W/960808 Ltr ML17292A3801996-07-24024 July 1996 LER 96-004-00:on 960624,plant Was Manually Scrammed by Control Room Personnel Due to Reactor Water Level Transient Experienced During Testing of Digital Feedwater Sys.Caused by Programming Error.Sys Was corrected.W/960724 Ltr ML17292A3771996-07-24024 July 1996 LER 96-005-00:on 960624,determined Missed Surveillance Test Re Channel Check of Average Power Range Monitor.Caused by Inadequate Procedures.Revised Surveillance Procedure Re When APRM Checks Must Be performed.W/960724 Ltr ML17292A3641996-07-12012 July 1996 LER 96-003-00:on 960615,required Surveillance Test Not Performed When Required by TS 3.4.1.3.Caused by Inadequate Procedures.Implementing Surveillance Procedure & Reactor Plant Startup Procedures revised.W/960712 Ltr ML17292A3361996-06-20020 June 1996 LER 96-002-00:on 960504,critical Bus SM-8 Lost Power When Supply Breaker 3-8 Tripped.Caused by Personnel Error. Operators Counselled & Procedures revised.W/960620 Ltr ML17292A2861996-05-24024 May 1996 LER 96-001-00:on 960425,inadvertent ESF Actuations Occurred Due to Tripping of Temporary Power Supply to IN-3.Caused by Personnel Error.Operations Restored to IN-3 Loads & Reset ESF actuations.W/960524 Ltr ML17291B0891995-10-19019 October 1995 LER 95-011-00:on 950919,failed to Comply W/Ts SR for RCIC Sys Due to Analysis Deficiency That Resulted in Inadequate Surveillance Test Procedure.Surveillance Procedure Revised to Correct deficiency.W/951019 Ltr ML17291A9021995-07-0707 July 1995 LER 95-010-00:on 950609,HPCS DG Declared Inoperable Due to Discovery That TS Test Method Incomplete.Caused by Inadequate Testing Procedure.Test Procedure for HPCS DG Reviewed & Special Test Procedures written.W/950707 Ltr ML17291A9031995-07-0707 July 1995 LER 95-009-00:on 950607,inadvertent MSIV Closure Occurred During Surveillance Test Due to Poor Communication Between Test Team.Determined That MSIV Closure Not Valid Because Closure Not Triggered by Plant conditions.W/950707 Ltr ML17291A8501995-06-0808 June 1995 LER 95-006-01:on 950405,reactor Scram Occurred During Surveillance Testing Due to Protective Sys Relay Failure. Replaced Failed Relay Before Plant Startup ML17291A8101995-05-12012 May 1995 LER 95-008-00:on 940125,TS Wording Lead to Potential TS Violation.Caused by Lack of Clarity in Ts.Submitted Improved TS for Plant to Provide Addl clarity.W/950512 Ltr ML17291A7841995-05-0505 May 1995 LER 95-007-00:on 950222,emergency Diesel Start Occurred Due to Voltage Transient on BPA Grid.Confirmation Was Received at 17:51 H That Disturbance Had Originated in BPA Grid ML17291A7801995-05-0404 May 1995 LER 95-006-00:on 950405,main Turbine Trip Occurred During Performance of Surveillance Test Due to Protective Sys Relay Failed.Replaced Failed Relay Before Plant startup.W/950504 Ltr ML17291A7851995-05-0303 May 1995 LER 95-005-00:on 950222,inoperable IRM Had Been Relied Upon to Meet TS Requirements During Reactor Startup.Caused by Lack of Neutron Source to Test Instrumentation. Sys Knowledge Gained Will Be incorporated.W/950503 Ltr ML17291A7071995-03-25025 March 1995 LER 95-004-00:on 950226,malfunction in Main Turbine DEH Control Sys Caused All Four High Pressure Turbine Governor Valves to Rapidly Close.Caused by Blown Fuse.Suspected Faulty Circuit Card replaced.W/950325 Ltr ML17291A7011995-03-20020 March 1995 LER 95-002-00:on 950218,automatic Reactor Scram Occurred. Caused by Erroneous Positioning of Control During Performance of Scheduled Periodic Functional Test.Control repositioned.W/950320 Ltr 1999-07-20
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17284A9001999-10-31031 October 1999 Rev 0 to COLR 99-15, WNP-2 Cycle 15,COLR GO2-99-177, LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With1999-10-0101 October 1999 LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With ML17284A8941999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With 991012 Ltr ML17284A8801999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr ML17292B7421999-07-20020 July 1999 LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr ML17292B6641999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5621999-01-31031 January 1999 Rev 1 to COLR 98-14, WNP-2 Cycle 14 Colr. ML17292B5341999-01-15015 January 1999 Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error ML17292B5331999-01-15015 January 1999 Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE ML17292B4791998-12-31031 December 1998 Washington Public Power Supply Sys 1998 Annual Rept. with 981215 Ltr ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr ML17292B5741998-12-31031 December 1998 WNP-2 1998 Annual Operating Rept. with 990225 Ltr ML17284A8231998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With 981207 Ltr ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr ML17292B4451998-10-27027 October 1998 LER 98-012-01:on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With 981027 Ltr ML17284A7831998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With 981007 Ltr ML17284A7491998-09-10010 September 1998 WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998. ML17284A7561998-09-0303 September 1998 LER 98-013-00:on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With 980903 Ltr ML17284A7571998-09-0202 September 1998 LER 98-014-00:on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With 980902 Ltr ML17284A7551998-09-0202 September 1998 LER 98-015-00:on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With 980902 Ltr ML17284A7681998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With 980915 Ltr ML17284A7311998-08-17017 August 1998 LER 98-012-00:on 980716,determined That 24-month SR 3.8.4.7 Had Not Been Fulfilled within Specified Frequency.Caused by Inadequate Work Practices.License Requested & Received Enforcement Discretion Re Battery Svc test.W/980817 Ltr ML17284A7261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2.W/980810 Ltr ML17284A7121998-07-23023 July 1998 LER 98-006-01:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes ML17284A6951998-07-17017 July 1998 LER 98-011-00:on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted. W/980717 Ltr ML17284A6961998-07-15015 July 1998 LER 98-010-00:on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP tubing.W/980715 Ltr ML17284A6731998-07-0101 July 1998 LER 98-009-00:on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in preparation.W/980701 Ltr ML17284A6751998-06-30030 June 1998 Ro:On 980617,flooding of RB Northeast Stairwell with Consequential Flooding of Two ECCS Pump Rooms.Caused by Inadequate Fire Protection Sys Design.Pumped Out Water from Affected Areas to Point Below Berm Areas of Pump Rooms ML17284A6641998-06-24024 June 1998 LER 98-008-00:on 980531,inadvertent Full Scram During RPV Leak Testing in Mode 4 Was Noted.Caused by Change in Mgt Techniques.Revised Procedures to Take Into Account Addl Water Head in Pressure Sensing lines.W/980624 Ltr ML17284A6651998-06-24024 June 1998 LER 98-007-00:on 980530,inadvertent Full Scram & Division 1 ECCS Injection Was Noted.Caused by Failure to Meet Mgt Work Practice Expectation When Encountering Deficient Procedure. Incident Review Board Convened to Review event.W/980624 Ltr ML17284A6631998-06-19019 June 1998 LER 98-006-00:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of App R Calculations for High Impedance Fault Analysis.Caused Indeterminate. Implemented Procedural Changes Involving Operator Action ML17284A6551998-06-0404 June 1998 LER 98-005-00:on 980506,potential for Failure of RHR Sys Valve to Close on Isolation Signal Was Noted.Caused by Design Deficiency.Caution Tag Was Placed on RHR-V-40 Control Switch to Inform Plant Operators of limitation.W/980604 Ltr ML17284A6421998-06-0101 June 1998 LER 98-004-00:on 980502,determined That Primary Containment Penetration Overcurrent Protection Does Not Meet Reg Guide 1.63 Requirements.Caused by Inadequate Design Changes. Installed Addl Fuse in RHR-MO-9 circuit.W/980601 Ltr ML17284A6491998-05-31031 May 1998 Rev 0 to COLR 98-14, WNP-2,Cycle 14 Colr. ML17292B4031998-05-31031 May 1998 Monthly Operating Rept for May 1998 for WNP-2.W/980608 Ltr ML17292B3921998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr ML17292B3291998-04-0909 April 1998 LER 98-003-00:on 980311,WNP-2 Experienced SCRAM Signal as Result of Low Rpv.Caused by Less than post-SCRAM Operational Strategy for Resetting SCRAM Signal in Conditions.Changes in post-SCRAM Operational Strategy implemented.W/980409 Ltr ML17292B3281998-04-0909 April 1998 LER 98-002-00:on 980311,reactor Scram & Plant Transient Occurred,Due to Failed Closed Main Steam Isolation Valve. Caused by Loss of Pneumatic Actuating Supply Pressure. Problem Evaluation Request Written for Failure of MS-V-22D ML17292B3371998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2.W/980409 Ltr ML17292B2641998-03-0404 March 1998 Performance Self Assessment,WNP-2. ML17292B2661998-03-0404 March 1998 LER 98-001-00:on 980203,automatic Start of HPCS EDG Was Noted.Caused by Operator Error.Operations Crew Stabilized Plant at Approximately 75% Reactor Power & Investigation of Event Was initiated.W/980304 Ltr ML17292B2911998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr ML17284A7971998-02-17017 February 1998 Rev 28 to Operational QA Program Description, WPPSS-QA-004.With Proposed Rev 29 ML17292B3591998-02-12012 February 1998 WNP-2 Cycle 14 Reload Design Rept. 1999-09-30
[Table view] |
Text
+~~~~~~ULA QXRK DIALOG (Rz~~z~
ACCESSION NBR:8810120110 DOC.DATE: 88/10/03 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION WASHINGTON,S.L. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
LER 88-031-00:on 880902,found that due to single failure control room HVAC sys could operate in recirculation mode.
W/8 ltr.
DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR I ENCL J SIZE: F TITLE: 50.73 Licensee Event Report (LER), Incident Rpt, etc.
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 SAMWORTHiR 1 1 INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 ACRS WYLIE 1 1 AEOD/DOA 1 1 AEOD/DSP/NAS 1 1 AEOD/DSP/ROAB 2 2 AEOD/DSP/TPAB 1 1 ARM/DCTS/DAB 1 1 DEDRO 1 1 NRR/DEST/ADS 7E 1 0 NRR/DEST/CEB 8H 1 1 NRR/DEST/ESB'8D 1 1 NRR/DEST/ICSB 7 1 1 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/PSB 8D 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA/EAB 11 1 1 NRR/DREP/RAB 10 1 1 NRR/DREP/RPB 10 2 2 NRPgD SIB 9A 1 1 NUDOCS-ABSTRACT 1 1 REO P'- 02 1 1 RES TELFORDgJ 1 1 RES/DSIR DEPY 1 1 RES/DSIR/EIB 1 1 RGN5 FILE 01 1 1 EXTERNAL EGGG WILLIAMSg S 4 4 FORD BLDG HOYiA 1 1 H ST LOBBY WARD 1 1 LPDR 1 1 NRC PDR .1 1 NSIC HARRISgJ 1 1 NSIC MAYSgG 1 1 D
D S
-46 ;:ENCLI<< -'~45 8
-.wv"~cV'"'TOTAL NUMBER OF COPIES REQUIRED: LTTR
v NRC Form 358 U.S. NUCLEAR AEOULATOAY COMMISSION (9.83 I w APPROVED OMB NO. 315(MIOe EXPIRES: 8/31/88 LICENSEE EVENT REPORT (LER)
FACILITY NAME (II DOCKET NUMBER l2) PAGE 3 Washington Nuclear Plant - Unit 2 0 5 0 0 039 71oF07
')ng e as ure ou ause on ro oom o pera e s n an nana yze Operation Mode Due to Design EVENT DATE (5) LER NUMBER IS) REPORT DATE (7) OTHER FACILI'TIES INVOLVED (8)
MONTH DAY YEAR YEAR SEOUENTIAL "??: MONTH OAY YEAR FACILITYNAMES DOCKET NUMBER(SI NUMBER %F4 NUMBER 0 5 0 0 0 09 028 8 8 8 0 31 00 10 0 3 8 8 0 5 0 0 0 THIS AEPORT IS SUBMITTED PURSUANT T0 THE AEOUIREMENTS OF 10 CF R (): (Cheep onr or more of thr followinpi (11 OPERAT INC MODE (8) 20.C02(b) 20.405(c) 50.73(el(2) (lv) 73.7)Br)
POWER = 20.405( ~ )(I ) (I) 50M(v ) (1) 50.73( ~ I (2)(v) 73.71(c)
LEYEL 0 0 0 20.e05(e) II)(ll) 50.38(cl l2) 50.73(e) (2)(viil OTHER ISpeeify in Aplrrret hrlow rodin Trer, IIRC Fohn 20.e05(e)(1)(ilil 50.73(e) l2) (S 50 73( ~ l(2)(viill(A) 366AI 20.e05( ~ )ill(lv) 50.7 3(e l(2)(iil 50.73(e)(2l(vill)ISI 20.e05( ~ )(1)(vl 50.73(el(2)(iii) 50.73( ~ l(2)(rrl v LICENSEE CONTACT FOR THIS LER (12)
NAME TELEPHONE NUMBER AREA CODE S.L. Washin ton, Compliance Engineer 0 9 7 7 - 2 8 0 COMPLFTE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)
'8vv'c+. ry ."r MANUFAC MANUFAG EPORTABLE:
CAUSE SYSTEM COMPONENT TV RE R PR ~r'.Pg*rmeIrfy CAUSE SYSTEM COMPONENT TVRER TO NPRDS p
- ?
K>~3'> I'gag,,.r
.ooyrri FAXES%!
SUPPLEMENTAL REPORT EXPECTED IICI MONTH DAY YEAR EXPECTED SUBMISSION DATE (15)
YES Ilfyn, complerr fXpfCyfD SUBhrISSIOIY DAFfi NO 8 0 1 8 9 ABBTRAOT ILimlr to Ir00 rpecer, I 8, epproxlmerrly tifrren einple.r peer ryprwri Nen linn) 118)
On September 2, 1988 a Design Engineer determined that due to a single failure the Control Room Heating and Ventilation (HVAC) System could operate in the recirculation mode during emergency conditions. This unanalyzed condition was found while performing an engineering evaluation of the safety significance of the event reported in LER 88-005-00.
During a Loss of Coolant Accident (LOCA) the normal fresh air intake for the Control Room HVAC is isolated and two remote air intake lines're opened. Each remote air intake line .,
has two isolation valves and one valve is powered from division 1 and the other from division 2. A single failure (not a loss of power failure) in a power division could cause a valve in each remote air intake line to isolate. With the loss of all fresh air input the Control Room HVAC would continue to operate but in the recirculation mode. In the recirculation mode the Control Room would not r'emain pressurized with respect to surrounding areas, and operating post LOCA in this mode is not analyzed (for control room habitability).
Immediate corrective actions were: The motor operators for the four (two per line)-
remote air intake isolation valves were replaced with manual operators. Two of the four ,.
radiation purge line isolation valves motor operators were electrically disconnected.-
Both isolation valves on one remote intake line were locked open to assure that a single failure could not result in recirculation mode operation. The Control Room Emergency Filtration System was started and the Control Room HVAC System is operating in the pressurization mode.
PDR ADOCK 050003~9~7 l IF(gr NRC Form 388
NRC Form 3SSA US. NUCLEAR REGULATORY COMMISSION (8831 LICENSEE EVENT REPORT {LER) TEXT CONTINUATION APPROVED OMB NO. 3160WI04 EXPIRES: 8/31/BB FACILITY NAME Ill DOCKET NUMBER 12) LER NUMBER Idl ~ AQE (3l YEAR @N'EQUENTIAL @j REVISION NUMS E II NUM S II Washington Nuclear Plant - Unit 2 o s o o o 397 8 3 1 0 0 0 2 QF 7 TEXT //moro Nmco llroSuiorE ow //I/ooo////IC Forrrr 3/FIA'f/(ill Abstract (Cont'd)
The cause of this event was the Plant Architect/Engineer (AE) did not provide a, Control Room HVAC System design which protected the system against all possible single failures. The root cause of this event is a lack of communication between AE design groups.
Further corrective actions include: The Control Room HVAC recirculation mode of operation will be analyzed and inleakage tests conducted, the safety significance of this event. A technical specification change will be if necessary, to determine requested to allow normal Control Room HVAC operation. A letter will be sent to Burns & Roe Inc. requesting a 10CFR Part 21 evaluation.
The safety significance of this event is being evaluated and a supplemental report will be submitted when it is completed.
Plant Conditions a) Power Level - OX b) Plant Mode - 4 (Cold Shutdown)
Event Descri tion On September 2, 1988 a Design Engineer determined that, due to single failures, the Control Room Heating and Ventilation (HVAC) System could operate during emergency conditions in the recirculation mode, which is an unanalyzed condition. This unanalyzed condition was discovered while performing an engineering evaluation committed to in LER 88-005-00 to evaluate the potential effects of minor Control Room HVAC system changes on system bypass flow.
The following brief description of the Control Room HVAC System (before modification) for normal operation and emergency operation during a Loss of Coolant Accident (LOCA) is presented to aid in understanding the event hnd the changes made to the system. Figure 1 is a partial diagram of the Control Room HVAC System prior to the event. The Control Room HVAC System consists of two redundant systems for both normal and emergency operation. During normal operation, 1000cfm of fresh air ~
from the normal roof intake Radwaste Building is mixed with 20,000cfm of recirculated air (through fan 51A or 51B). Seven hundred and fifty (750) cfm is exhausted from the control room through fan 51 and the remaining 250cfm pressurizes the control room and is exfiltrated. Also during normal operation, the remote air ;
intake isolation valves (51A and B and 52A and B) are closed and the radiation monitor purge line valves (51D and E and 52D and E) are open with radiation monitor purge line .fans 53A and B operating. During a LOCA when any of the following trip levels are reached 1) High drywell pressure (RF" signal), 2) Low low reactor water - '=.
level (NAR signal) or 3) Reactor building ventilation exhaust high radiation ("ZN signal) the following actions occur:
a) The normal roof intake Radwaste Building is isolated by closing valves 51C and 52C.
NRC PORM SSSA o U.S.GPO: I 0 BB042+838/add IBMI
NRC fons 3EEA VS. NVCLEAR REGULATORY COMMISSION N43)
LICENSEE EVENT REPORT {LER) TEXT CONTINUATION APPROV EO OMS NO. 3)50M)04 EXPIRES: S/31/88 fACILITYNAME (I) OOCKET NUMSER (2) LER NVMSER (E) PAGE (3)
YEAR m: 5EQVENZIAL NUM ER rPrpl
- 45 SKVIEION NVM ES Washington Nuclear Plant - Unit 2 0 s 0 0 0 397 8 8 031 0 0 0 3 oF 7 TExT /// moro 5/roco/5 rfr/brorE off /I/or/on/I ///Ic Form 3(E)AS/ (\T) b) The 750cfm control room exhaust fan (51) de-energizes.
c) The remote air intake isolation valves (51A, 51B, 52A, and 52B) open and the radiation monitor purge line isolation valves (51D, 51E, 52D and 52E) close.
The remote air intake isolation valves and the radiation monitor purge line isolation valves are interlocked so when an intake line is opened the-associated purge line is isolated.
d) The control room emergency filtration system is automatically started and draws 1000cfm of fresh air through the remote air intakes. This additional air, when added to the recirculated air, pressurizes the control room.
The event described in LER 88-005 was for leakage around the emergency filters in excess of the technical specification allowable limit. During the engineering evaluation committed to in LER 88-005 to determine the effect of the excess leakage on control room habitability, a design engineer determined that postulated single failures could cause some combination of remote air intake line isolation valves to fail to open or to re-isolate and; thus, isolate both remote air intake lines. If this condition existed during LOCA conditions, the Control Room HVAC would be running in a recirculation mode only since the normal roof intake is also isolated.
In the recirculation mode the 20,000cfm would continue to be drawn from the control room and recirculated back to the control room; however, without the fresh air input the control room would not be pressurized. In a neutral pressure condition the inleakage to the control room would increase and this condition is not analyzed.
Immediate Actions The planned Plant Startup was delayed until the following actions were completed.
- 1) The motor operators were removed and manual operators were installed on the remote air intake isolation valves (51A and B and 52A and B). The valve operators were changed to manual so the isolation valves on one remote intake line could be opened without an FAZ signal present; thereby, assuring that a single failure could not cause operation in the recirculation mode. With this remote air intake line open, the control room emergency filtration system was started. This put the Control Room HVAC system in the pressurization mode of operation which satisfied the action statement of Technical Specification 3.3.7. 1. The current Plant configuration is the West remote intake line is open (51A and 52A are locked open) and the East remote intake line is closed with 52B locked closed and 51B locked open. Figure 2 shows the post event Control Room HVAC configuration. 2) Two of the radiation purge line isolation valve electro-pneumatic operator motors (52D and 51E) were electrically disconnected which causes the valves to open. This was done so that only one manual action is required to isolate a remote path and cause the associated purge path to open or vice versa. 3) The 750cfm control room exhaust fan (51) was de-energized. 4) Specific directions for Plant. Operators to execute to maintain design bases in the event of a LOCA were provided in (approved) deviated Plant procedures. Each new operations crew was provided training by Operation Managers.
NRC PORM 345A oV S GPO'IOSS.OS24 SSS/Edd (043)
NRC form 3SSA U.S. NUCLEAR REOULATORY COMMISSION 1883 l LICENSEE EVENT REPORT ILER) TEXT CONTINUATION APPROVED OMS NO, 3150&181 EXPIRES: 8/31/88 fACILITYNAME Ill POCKET NUMSER 12I LER NUMSER Id) ~ AOE IS) yEAR 'la SEOVCNT/AL NVM Ell;:.iv,.'lEVISION NVM Ell Washington Nuclear Plant - Unit 2 o s o o o 397 88 31 0 0 4 OF 7 TEXT //frr>>fo N>>of /1 rodule4 Irfo aSR/fr>>/H/IC Form 3838'f/ (ITI Further Evaluation and Corrective Action A. Further Evaluation This event was reported per 10CFR50.72(b)(2)(i) on September 2, 1988 at 1702 hours0.0197 days <br />0.473 hours <br />0.00281 weeks <br />6.47611e-4 months <br />. The event is reported per 10CFR50.73(a)(2)(ii)(A). For this event the condition is unanalyzed but the actual safety significance has not yet been determined; however, based on a review of existing analysis this condition is potentially safety significant.
There were no structures, systems, or components inoperable prior to this event which contributed to the event.
The cause of this event was the failure of the Plant Architect/Engineer (Burns 8 Roe Inc.) to provide a system design for which a single failure could not isolate both remote air intakes and cause the Control Room HVAC System to operate in the recirculation mode, or to analyze the recirculation mode of operation. The root cause of this event is a lack of communication between the Architect/Engineer design groups.
B. Further Corrective Action The Control Room HVAC recirculation mode of operation will be analyzed and, the if necessary, recirculation tests conducted to determine control room inleakage in mode to determine Post LOCA control room habitability.
- 2) A Plant Technical Specification change will be requested to allow normal (not in the emergency filtration pressurization mode) operation of the control room HVAC system with the present Plant configuration.
- 3) A letter will be sent to Burns 8 Roe Inc., requesting a 10CFR Part 21 evaluation.
Safet Si nificance safety significance of thi s event wi1 1 be determined by compl eting the The engineering - evaluation (committed to 'n LER 88-005) and performing tests to determine the actual inleakage to the Control'oom when the Control Room HVAC System is operated in the recirculation mode. The change from automatic to manual operation of the remote air intake isolations valves has been analyzed as required and does not increase the possibility of an accident, nor does it. create the possibility of a new or different kind of accident. A supplemental report will be submitted when the engineering evaluation of the safety significance of this event is completed.
Similar Events None .
NRCPORM 34SA *U8 GPO 18880824 838/4dd 18831
NRC Pnrln 3SSA UA NUCLEAR RECULATORY COMMISSION 1883 I LICENSEE EVENT REPORT ILER) TEXT CONTINUATION APPROVEO OMS NO 3150&104 EXPIRES'/31/88 I'ACILITYNAME Ill OOCKET NUMSER 131 LER NUMSER ISI PACE 13) lj SCOVCNTIAL NVM CR
@>~ REVISION NVM CR Washington Nuclear Plant - Unit 2 o s o o o 397 88 3 1 000 5 OF TEXT /8'rncrp Necn /c rpCNPSIE vcp sc/elena/H/1C Arne 3/C/AS/ lITI EI IS Information Text Reference EIIS Reference System Component Control Room Heating and Ventilation (HVAC) System VH Normal Fresh Air Intake (Normal Roof Intake Radwaste Building) VH Remote Air Intake Line, (East or West) VH Remote Air Intake Isolation Valves ( 51A and B and 52A and B) VH ISV Remote Air Intake Isolation Valve Motor Operator (Electro-Pneumatic Motor Operator) VH 84 Radiation Purge Line Isolation Valves (51D and E and 52D and E) VH ISV Radiation Purge Line Isolation Valve Motor Operator (Electro-Pneumatic Motor Operators) VH 84 Control Room Emergency Filtration System Fan 51A or 51B VH FAN 750cfm Control Room Exhaust Fan (51) VH FAN Radiation Purge Line Exhaust Fans (53A and B) VH FAN NRC CORM SCCA n U.S.GPO:1 08@0424 838/4dd 18431
NRC Form 3ddA U.S. NUCLEAR REGULATORY COMMISSION I0431 LICENSEE EVENT REPORT (LER) TEXT CONTINUATION APPROVED OMS NO. 3050W104 EXPIRES: 8/3I/88 FACILITY NAME (11 OOCKET NUMBER 131 LER NUMBER Idl PAGE IS)
VEA/I pi( SEQUENTIAL NUMSER:. v.
REVISION NUMSER washington Nuc1ear Plant,- Unit 2 o 5 o o o 9 7 8 0 1 0 0 6o" 0 7 TEXT //1 more SO000/I redvkeIE I/00 ~hrRC Forrrr &54'0/ Illl VALVES CLOSE NORMAL RQQF ON HIGH-HlGH INTAKE I "I I RADIATIQN ALARM RADVASTE VALVES I <TYPICAL> BLDG ' I VALVES ROIQTE OPEN QN I OPEN ow I REMOTE INTAKE FAZ 0 FAZ M/TAKE dl OO 5IC DIV I l2 IVEST) I I (EAS TI I
EHO CI.OSE QM FAZ ISI FC RE J OIQ 52C DIV Il 0 IV Il II I DIV I NC slh 52A DIV I 54A"I DIV II 54S-I 51B NC DIV II ( FQDFV Ir DIV II I I DIV IFQ I I I I " ENERG raTER EHERG FILTER I RR TYPICAL I I I I TYPICAL. I I I I 'AM
- DIV s4A I
51A-I IB-I DIVI VH FAN 542 DIV 11 I I I I I I I I I I I I I I I I
.r~ L I
FAN 5lh FAM 5IB
- r~ L~
I DIV I DIV 11 I I CONTROL RQQN 51D DIV I FO 52DFO DIV 11 150 CFH
~ roS ll rQ DIV'I 5'IV LEKHR FAH DIV 53A'AH I
53B Dlv II 750 CFH EXHAUST DEOKRGIZE OM FAZ FCR FAll. CLOSED PURGE CGIAUST FAN 51 FOR FAIL OPEN IK:~ NRHALLY CLOSED N7 IS/SMALLY OPEN LO LOCKED OP EH FAZR HIGH ORWELL PRESSURO LOV REACTOR LCR UXXED CLOSED VESSEL VATER LEVEL/ REACTOR BUILDING ANR AISESCIATOR Id VENTILATION EXHAUST HIGH RADIATION, 'PE YASISKOTSM PUSUQ TOYXS RER RAD ELEMENT RRR RAD RECORDER 43 SUPPLY SYSTBM'IOul+
VASHMIOM 9935&868 EHQ~ELECTRO HYDRAILIC OPERATOR TIrLE
=
HAN MANUAL OPERATOR INFORMATION DRAVIMG ON T SEPT 22, 1988 ORIGINAL VNL 2 PARTIAL COMTROL ROIM VENTILATION SYS Figure 1 Pre-Event Control Room HVAC NIIC FOIIM SddA *U.S.QPO:10884424 838/45$
18431
NRC Forr>> 344A V.S. NUCLEAR REGULATORY COMMISSION (0431 LICENSEE EVENT REPORT (LER) TEXT CONTINUATION APPROVf 0 OMS NO. 3I SOWI04 EXPIRES: 8/3I/88 FACILITY NAME lll DOCKS'I NUMBER III LER NUMBER 141 ~ ACE ISI YEAR SEQVSNT IAL 1IW~ IIEvlsloN NVMSSII r%: NVMSS N Washington Nuc1ear P1ant - Unit 2 o 5 o o o 397 0 31 000 7oP 0 7 TEXT ////NSrf fpfcf Ir /44>>inc/, INS SUE//cM/I //RC Fsrrrr 3RIABJ IIII CEASING HORHAL ROOf'NTAKE RADVASTE BLDG RENOTE REHOTE Hn INTAKE INTAKE Sl ENO 5IC DIV I 42 IVEST>
CI.OSC Ok FAZ I/O RE HAH Hhk HAN NAN ENO 52C DIV 11 I I
"I DIV IV 11 Il 548 NO 51A 52A DIV I 34A I DIV 1 28 51'8 LODIV II DIV ll DIV'lILC I DIV I LO EHERG EHERG FILTER FILTER RR TYPICAL AH FAN 5fh 51A-I IB-I FAN 5> FAIL CLOSED FAH 51 FO>> FAIL OPEN HCA ISXUIALLY CLOSED NO>> NORHALLY OPOI LO>> LOCKED CPEH FAZ>> HIGH DRYVELL PRESSURO LOV REACTOR LC>> LOCKED CLOSED VESSEL VATER LEVELS REACTOR BINLDIHG 'mm/SIST PI/SIX: PO XXX VEHTILATOBI EXHAUST HIGH RADIATI AN>> ANABICIATOR IE Ri: RAD anion RR>> RAD RECORDER 43 SUPPLY SYSTEM RKRAIGL VATHD510I 9995'~
OEI>>ELECTRO HYDRAILIC OPERATOR HAN>>HANUAL OPERATOR DBTBIHATIOH DRAVIHG IBE.Y SEPT 22, 1988 CURROIT VIS>>2 PARTIAL CONTROL ROOH VOITILATIOH SYS'igure 2 Post-Event Control Room HVAC N/IC FORM 344A + U.S.GPO:10854 524 535/45$
f043 I
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 October 3, 1988 Document Control'Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
NUCLEAR PLANT NO. 2 LICENSEE EVENT REPORT NO.88-031
Dear Sir:
Transmitted herewith is Licensee Event Report No.88-031 for the WNP-2 Plant.
This report is submitted in response to the report requirements of 10CFR50.73 and discusses the items of reportability, corrective action taken, and action taken to preclude recurrence.
Very truly yours, C. . Powers (M/D 927M)
WNP-2 Plant Manager CMP:lg