CRO-106 R0 - a Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

CRO-106 Place Spare Deborating IX in Service

CANDIDATE EXAMINER

CRO-106 R0 - a Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Place the Spare Deborating IX in service for purification Alternate Path:

No Facility JPM #:

CRO-106 K/A Rating(s):

System: 004 K/A: A4.17 Rating: 2.7/2.7 Task Standard:

Perform OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power))

to place the Spare Deborating IX in service

. Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator

__ X __ In-Plant __ ___ Perform __X___ Simulate

____

References:

OP/1/A/1103/004 C (Deborating IXs) Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power)

) Validation Time:

15 minutes Time Critical:

NO ====================================================================================

Candidate:

_______________________________________

Time Start: __

_______ NAME Time Finish: ________

Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________

Examiner:

______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS CRO-106 R0 - a Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS:

Consider providing a copy of OP/1/A/1103/004 C, Deborating IXs to allow a review of limits and precautions prior to entering the simulator area. This will prevent using simulator time to perform this review.

1. Recall Snap 205 (3% IC), BOL,
2. Import files for CRO

-106. 3. Update boron status board RCS = 1771 ppmb, A BHUT = 1950 ppmb

4. Verify ICS in Auto (diamond and both FDW Masters).
5. If not already done, provide a copy of OP/1/A/1103/004 C, Deborating IXs. and a working copy of Encl. 4.9, (Spare Deborating IX for RCS Purification)
6. Put completed IX status log and component boron log for the letdown filter to be place in service in appropriate logbooks.
7. Ensure reactivity management controls are established in the control room.
8. Ensure blank cover on 1CS

-32/37 9. Go to Run CRO-106 R0 - a Page 4 of 9 Tools/Equipment/Procedures Needed:

OP/1/A/1103/004 C (Deborating IXs)

Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power)) Demineralizer Log Sheet for Spare Deb IX Component Boron Concentration Log Sheet for 1B Letdown Filter READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 startup in progress following a refueling outage Unit 1 Power = 3% stable for the past 45 mins

. Unit 1 RCS Boron = 1 771 ppm Primary Chemistry requests that the Spare Deborating IX be placed in service for RCS purification for the next two (2) hrs. The Spare Deborating IX is loaded with cation resin.

Unit 2 & 3 are at 100%.

INITIATING CUES:

The Unit 1 CR SRO directs you to Place the Spare Deborating IX in service for RCS purificatio n per OP/1/A/1103/004 C (Deborating IXs)

Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power))

starting at step 2.4

.

CRO-106 R0 - a Page 5 of 9 START TIME: _______

NOTE: gals of water at a different boron concentration. {5} {6} (R.M.)

STEP 1: Step 2.4 IF two Letdown Filters are available AND NOT already in service

, perform the following

(1A Letdown Filter is not is service

) 2.4.1 Review Component Boron Log for out

-of-service Letdown Filter boron. 2.4.2 Determine RCS boron based on placing second Letdown Filter in service. 2.4.3 RCS boron ____

1771___ ppm 2.4.4 IF RCS makeup is required to achieve acceptable boron, determine RCS makeup sources and volumes per OP/1/A/1103/004 (Soluble Poison Control).

(not required)

STANDARD: Candidate reviews the Component Boron Log for the 1A Letdown Filter and determines that: it will have no affect on RCS boron, additional makeup is NOT required, and that acceptable RCS boron will exist

. COMMENTS:

___ SAT

___ UNSAT STEP 2: Step 2.5 Perform one of the following (for all applicable steps 2.1 through 2.4):

_____ Verify acceptable RCS boron.

SRO _____ Ensure appropriate RCS makeup plans determined to ensure SRO acceptable boron. STANDARD: Candidate has SRO sign the first block because all boron concentrations are acceptable

. Examiner Cue: Sign the first block and inform the candidate to proceed to the next step COMMENTS:

___ SAT

___ UNSAT

CRO-106 R0 - a Page 6 of 9 STEP 3: Step 2.6 IF two Letdown Filters are available AND NOT already in service, perform the following:

Ensure 1HP

-17 (1A LETDOWN FILTER INLET) switch to "OPEN" Ensure 1HP

-18 (1B LETDOWN FILTER INLET) switch to "OPEN" STANDARD: Candidate opens: 1HP

-18 (already open) and 1HP-17 (must be opened); placing 1 A Letdown Filter in service COMMENTS: ___ SAT

___ UNSAT STEP 4: Step 2.7 IF RCS makeup is required to ensure acceptable boron, makeup per OP/1/A/1103/004 (Soluble Poison Control).

STANDARD: Candidate determines RCS makeup is not required and proceeds to step 2.8 COMMENTS:

___ SAT

___ UNSAT NOTE: Anytime IX is placed in service CRD movement may result. (R.M.) STEP 5: Step 2.8 WHILE placing Spare Deborating IX in service, monitor the following indications: (R.M.)

Appropriate ranged NIs Primary tank levels Neutron error CRD position STANDARD: Candidate begins monitoring all above indications. No unexpected changes will occur.

COMMENTS: ___ SAT ___ UNSAT

CRO-106 R0 - a Page 7 of 9 STEP 6: Step 2.9 Align Spare Deborating IX for service:

Verify closed 1CS

-27 (DEBOR IX INLET).

  • Ensure closed 1 CS-26 (LETDOWN TO RC BHUT).
  • Open 1CS-32 & 37 (SPARE DEBOR IX INLET & OUTLET). Verify 1HP

-15 Controller in "MANUAL".

  • Open 1HP-16 (LDST MAKEUP ISOLATION).

STANDARD: The candidate performs the above items to align the Spare Deb IX: Verify closed 1CS

-27 (already closed

). Ensure closed 1CS

-26 (LETDOWN TO RC BHUT).

Open 1CS-32 & 37 (SPARE DEBOR IX INLET & OUTLET).

Verify 1HP

-15 Controller in "MANUAL".

(already in manual

) Open 1HP-16 (LDST MAKEUP ISOLATION).

COMMENTS:

  • CRITICAL STEP

___ SAT

___ UNSAT STEP 7: Step 2.10 Position 1HP

-14 (LDST BYPASS) to "BLEED" to place Spare Deborating IX in service.

STANDARD: The candidate positions 1HP-14 (LDST BYPASS) to "BLEED"

.

Examiner Cue: Given time for the candidate to monitor indications from step 10, and when he begins to inform chemistry, tell him another operator will continue with this procedure.

COMMENTS:

END TASK CRITICAL STEP

___ SAT ___ UNSAT STOP TIME: ____________

CRO-106 R0 - a Page 8 of 9 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 6 Aligns the Spare Deborating IX 7 Initiates flow through the Spare Deborating IX

a CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 startup in progress following a refueling outage Unit 1 Power = 3% stable for the past 45 mins.

Unit 1 RCS Boron = 1771 ppm Primary Chemistry requests that the Spare Deborating IX be placed in service for RCS purification for the next two (2) hrs.

The Spare Deborating IX is loaded with cation resin.

Unit 2 & 3 are at 100%.

INITIATING CUES:

The Unit 1 CR SRO directs you to Place the Spare Deborating IX in service for RCS purificatio n per OP/1/A/1103/004 C (Deborating IXs)

Encl. 4.9 (Spare Deborating IX For RCS Purification (Rx At Power))

starting at step 2.4.

CRO-204 R0 - b Page 1 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

CRO-204 ES Recovery

CANDIDATE EXAMINER CRO-204 R0 - b Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: ES Recovery Alternate Path: No Facility JPM #:

CRO-204 K/A Rating(s):

System: 006 K/A: A4.08 Rating:

4.2/4.3 Task Standard:

ES Channels 1 and 2 are returned to normal using EOP Enclosure 5.41 (ES Recovery).

Preferred Evaluation Location:

Preferred Evaluation Method: Simulator __X__ In-Plant __ ___ Perform __X___ Simulate

____

References:

EOP Encl.

5.41 (ES Recovery)

Validation Time

15 minutes Time Critical:

NO ====================================================================================

Candidate:

_______________________________________

Time Start: __

_______ NAME Time Finish: ________

Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________ Examiner:

______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS CRO-204 R0 - b Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 206 2. Go to Run CRO-204 R0 - b Page 4 of 15 Tools/Equipment/Procedures Needed:

EOP Encl.

5.41 (ES Recovery)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A transient has occurred.

The Reactor has tripped ES Channels 1 and 2 have actuated on low RCS pressure.

EOP Encl.

5.1 (ES Actuation) is in progress.

The OSM concurs that reset of ES Channels 1 and 2 is desired.

INITIATING CUES:

The SRO directs you to perform EOP Encl.

5.41 (ES Recovery).

The OSM has directed that Keowee Hydro Unit Shutdown is NOT desired.

CRO-204 R0 - b Page 5 of 15 START TIME: _______

NOTE Technical Specification entry is required when any ES component is in Manual while ES signal is present or ES Voters are in OVERRIDE. These conditions are exited when all channels are reset.

STEP 1: Step 1 WHEN all the following exist:

ES Channels have actuated Condition causing ES Channel actuation has cleared ES Channel reset is desired OSM concurs THEN continue.

STANDARD: Determine ES Channels 1 and 2 have actuated by observing the White and Blue lights of Channels 1 and 2 on the Status Control Panel. Also Statalarms 1SA

-1/A-10 (ES CHANNEL 1 TRIP and 1SA

-1/B-10 (ES CHANNEL 1 TRIP) are illuminated.

Determine that RCS pressure is now above ES Channel 1 and 2 actuation setpoint (1600 psig).

Determine the OSM concurs.

Continue to Step 2.

COMMENTS: ___ SAT ___ UNSAT STEP 2: Step 2 Verify reset of any of the following is desired

ES Channel 1 ES Channel 2 Diverse HPI STANDARD: Determine reset of ES Channels 1 & 2 and Diverse HPI is desired by data on the cue sheet.

Continue to step 3 COMMENTS: ___ SAT ___ UNSAT

CRO-204 R0 - b Page 6 of 15 STEP 3: Step 3 Verify the following Stat Alarms have cleared: 1SA-7/A-1 (1A1 ES TRIP) 1SA-7/B-1 (1B1 ES TRIP) 1SA-7/C-1 (1C1 ES TRIP) 1SA-7/A-2 (1A2 ES TRIP) 1SA-7/B-2 (1B2 ES TRIP) 1SA-7/C-2 (1C2 ES TRIP)

STANDARD: Candidate determines that the above Statalarms located on 1SA

-7 are not illuminated.

Continue to Step

4. COMMENTS: ___ SAT

___ UNSAT STEP 4: Step 4 Perform the following to reset ES (1UB1):

Depress RESET for CH 1.

Depress RESET for CH 2.

STANDARD: Depress digital channel RESET pushbuttons for the Channels 1 and 2 located on 1UB1.

Continue to Step

5. COMMENTS:

CRTICAL STEP

___ SAT

___ UNSAT STEP 5: Step 5 Verify Diverse HPI Bypass BISTABLE TRIPPED light is off.

STANDARD: Candidate verifies Diverse HPI Bypass BISTABLE TRIPPED light is off

. Continue to Step

6. COMMENTS:

___ SAT

___ UNSAT

CRO-204 R0 - b Page 7 of 15 STEP 6: Step 6 Perform the following to reset Diverse HPI:

Depress BYPASS. Depress ENABLE.

STANDARD: Candidate depresses BYPASS and ENABLE for Diverse HPI.

Continue to Step

7. COMMENTS: CRITICAL STEP

___ SAT

___ UNSAT STEP 7: Step 7 Verify both Statalarms are off: 1SA-1 E-8 (DIVERSE HPI BYP) 1SA-1 E-9 (DIVERSE HPI TRIP)

STANDARD: Candidate verifies both Statalarms are off. Continue to Step 8. COMMENTS:

___ SAT ___ UNSAT STEP 8: Step 8 Depress RESET on the DIVERSE HPI OVERRIDE switch.

STANDARD: Candidate depresses RESET

. Continue to Step 9

. COMMENTS:

___ SAT

___ UNSAT

CRO-204 R0 - b Page 8 of 15 STEP 9: Step 9 Verify: CH 1 TRIPPED light off CH 2 TRIPPED light off DIVERSE HPI OVERRIDE light off STANDARD: Candidate verifies above lights are off Continue to Step

10. COMMENTS: ___ SAT

___ UNSAT STEP 10: Step 10 Dispatch an operator to perform Enclosure (SSF Restoration) of AP/1/A/1700/042 (Inadvertent ES Actuation).

STANDARD: Candidate calls kitchen to dispatch an operator to perform Enclosure (SSF Restoration) of AP/42. Continue to Step

11. Booth Cue: Inform candidate that an operator has been dispatched with Enclosure SSF Restoration, COMMENTS: ___ SAT

___ UNSAT STEP 11: Step 11 Verify both exist:

Keowee Hydro shutdown is desired.

OSM concurs STANDARD: Candidate determines from cue that Keowee Hydro shutdown is not desired. Continue to Step 11 RNO.

Examiner Cue: If asked, inform the candidate that Keowee Hydro shutdown is not desired (Information also provided in the Initiating Cue)

. COMMENTS:

___ SAT ___ UNSAT

CRO-204 R0 - b Page 9 of 15 STEP 12: Step 11 RNO GO TO Step 23 STANDARD: Continue to Step 2

3. COMMENTS:

___ SAT

___ UNSAT STEP 13: Step 23 Stop the 1C HPI Pump.

STANDARD: Verifies that 1C HPI Pump is NOT operating by observing the red ON light not illuminated and no amps are indicated.

Continue to Step 2

4. COMMENTS: ___ SAT

___ UNSAT STEP 14: Step 24 Open 1HP-27. STANDARD: Verifies 1HP-27 located on 1UB1 is open by observing the red OPEN light is lit or OAC indication

. Continue to Step 2

5. COMMENTS: ___ SAT ___ UNSAT STEP 15: Step 25 Close 1HP

-409. STANDARD: Verifies 1HP-409 located on 1UB1 is closed by observing the green CLOSED light is lit or OAC indication

. Continue to Step 2

6. COMMENTS:

___ SAT

___ UNSAT

CRO-204 R0 - b Page 10 of 15 NOTE The following steps will reset HPI pump ES logic.

STEP 16: Step 26 Verify 1A HPI PUMP operating.

STANDARD: Determine s that the 1A HPI pump is operating by observing the red on light is lit and normal amps are indicated.

Continue to Step 2

7. COMMENTS: ___ SAT

___ UNSAT STEP 17: Step 27 Perform the following

A. Ensure 1A HPI PUMP switch in AUTO.

B. Place 1A HPI PUMP switch to ON.

C. Ensure 1B HPI PUMP switch to OFF.

D. Place 1B HPI PUMP switch to AUTO.

STANDARD: Position the switch for the 1A HPI pump to AUTO and then to the ON position.

Position the switch for the 1B HPI pump to OFF and then to the AUTO position.

Continue to Step 2

8. COMMENTS:

CRITICAL STEP

___ SAT ___ UNSAT

CRO-204 R0 - b Page 11 of 15 STEP 18: Step 28 Verify both of the following breakers open:

SL-1 CT5 STBY BUS 1 FEEDER SL-2 CT5 STBY BUS 2 FEEDER STANDARD: Verifies SL-1 and SL-2 located on 2AB3 are open by observing the green OPEN light is illuminated.

Continue to Step 2

9. COMMENTS: ___ SAT

___ UNSAT STEP 19: Step 29 Verify both:

CC system operating with CC TOTAL FLOW > 575 gpm.

RCP seal injection flow is between 6 and 12 gpm/RCP.

STANDARD: Candidate verifies CC flow >575 gpm by observing flow gauge on panel 1AB3. Candidate verifies RCP seal injection flow 6

-12 gpm/RCP by observing gauges on panel 1VB3, or OAC indications.

Continue to Step

30. COMMENTS: ___ SAT

___ UNSAT

CRO-204 R0 - b Page 12 of 15 STEP 20: Step 30 Perform the following:

A. Open: 1HP-20 1HP-21 B. Open: 1HP-228 1HP-226 1HP-232 1HP-230 STANDARD: Candidate verifies open the following valves

1HP-20 red open light lit on the status control panel 1HP-21 red open light lit on 1UB1 1HP-228, 1HP-226, 1HP232, and 1HP

-230 red open lights are lit on 1VB3. Continue to Step

31. COMMENTS: ___ SAT

___ UNSAT

CRO-204 R0 - b Page 13 of 15 STEP 21: Step 31 Restore RB RIAs as follows: A. Open: 1PR-7 1PR-9 1PR-8 1PR-10 B. Start the RB RIA sample pump from the ENABLE CONTROLS screen on the RIA View Node as follows

. 1) Click on the Sample pump OFF icon.

2) WHEN "Processing Request" dialog is complete, THEN click on the Sample pump ON icon.

STANDARD: Open 1PR-7 and 1PR

-9 on ES Channel 1 RZ Module by depressing the red OPEN push button. Verify the red OPEN light illuminates.

Open 1PR-8 and 1PR

-10 on ES Channel 2 RZ Module by depressing the red OPEN push button. Verify the red OPEN light illuminates. Select ENABLE CONTROLS screen on the RIA View Node.

Click on the Sample pump OFF icon.

WHEN "Processing Request" dialog is complete, THEN click on the Sample pump ON icon Cue: Another RO will complete Enclosure 5.41, this JPM is complete COMMENTS:

END TASK CRITICAL STEP

___ SAT

___ UNSAT STOP TIME: ____________

CRO-204 R0 - b Page 14 of 15 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 4 This step is required to reset the ES channels.

6 This step is required to reset Diverse HPI

. 17 This step is required to reset the 1A and 1B HPI pump.

21 This step is required to return the RB RIAs to service

.

b CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A transient has occurred.

The Reactor has tripped ES Channels 1 and 2 have actuated on low RCS pressure.

EOP Encl.

5.1 (ES Actuation) is in progress.

The OSM concurs that reset of ES Channels 1 and 2 is desired.

INITIATING CUES:

The SRO directs you to perform EOP Encl.

5.41 (ES Recovery).

The OSM has directed that Keowee Hydro Unit Shutdown is NOT desired.

CRO-303 R0 - c Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

CRO-303 Perform Required Actions for a Failed LPI Train

CANDIDATE EXAMINER CRO-303 R0 - c Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Perform Required Actions For A Failed LPI Train Alternate Path:

Yes Facility JPM #:

CRO-004 K/A Rating(s):

System: EPE 011 K/A: EA1.04 Rating:

4.4/4.4 Task Standard:

1C LPI pump is aligned and started. Time

-critical clock starts when the second LPI pump fails to start and stops when 1C LPI pump is started

. Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X___ Simulate

____

References:

EOP Encl. 5.1 (ES Actuation

) Validation Time

10 minutes Time Critical
YES ====================================================================================

Candidate:

_______________________________________

Time Start: __

_______ NAME Time Finish: ________

Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________

Examiner:

______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS CRO-303 R0 - c Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 207 2. Import files for CRO-303 3. Call up BWST Level (SHOWDIG O1P1600

) on OAC screen

4. Go to Run and acknowledge alarms
5. Go to Freeze
6. Go to Run when directed by lead examiner
7. IMMEDIATELY Fire Timer 1 CRO-303 R0 - c Page 4 of 12 Tools/Equipment/Procedures Needed:

EOP Encl. 5.1 (ES Actuation

)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A LOCA is in progress and RCS Pressure has stabilized at 1000 psig ES Channels 1

-6 have actuated on high RB pressure Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by another Reactor Operator EOP Encl.

5.1(ES Actuation) has been completed up to Step 122 Rule 2 (Loss of SCM) is complete

INITIATING CUES:

The Control Room SRO instructs you to continue in Encl.

5.1 (ES Actuation) and respond to plant conditions.

THIS JPM IS TIME CRITICAL CRO-303 R0 - c Page 5 of 12 START TIME:

_______ STEP 1: Step 122 REFER TO Enclosure 5.1 IAAT Steps prior to Step 122. STANDARD: Checks IAAT steps to determine if any apply Determines that IAAT Step 3 now applies Continue to Step

3. COMMENTS: ___ SAT ___ UNSAT STEP 2: Step 3 IAAT additional ES actuation setpoints are exceeded, THEN perform Steps 1

- 2. STANDARD: Determines that ES Channels 7 and 8 have actuated Continue to Step

1. COMMENTS: ___ SAT

___ UNSAT STEP 3: Step 1 Determine all ES channels that should have actuated based on RCS pressure and RB pressure.

Actuation Setpoint (psig) Associated ES Channel 1600 (RCS) 1 & 2 550 (RCS) 3 & 4 3 (RB) 1, 2, 3, 4, 5, & 6 10 (RB) 7 & 8 STANDARD: Determines that ES Channels 7 and 8 have actuated.

Continue to Step

2. COMMENTS:

___ SAT

___ UNSAT

CRO-303 R0 - c Page 6 of 12 STEP 4: Step 2 Verify all ES channels associated with actuation setpoints have actuated.

STANDARD: Determine ES Channels 7 & 8 have actuated by observing tripped lights on UB1 are illuminated.

Continue to Step 122. COMMENTS:

___ SAT ___ UNSAT STEP 5: Step 122 REFER TO Enclosure 5.1 IAAT Steps prior to Step 122. STANDARD: Checks IAAT steps to determine if any apply Determines that IAAT Step 89 now applies Continue to Step 89.

COMMENTS: ___ SAT

___ UNSAT STEP 6: Step 89 IAAT RCS pressure is < LPI pump shutoff head, THEN perform Steps 90

- 91. STANDARD: Determine that RCS pressure is < LPI pump shutoff head. (less than 180 psig) Continue to Step

90.

COMMENTS:

___ SAT ___ UNSAT

CRO-303 R0 - c Page 7 of 12 STEP 7: Step 90 Perform the following:

Open 1LP-17 Start 1A LPI Pump STANDARD: Determine that 1LP-17 is open by observing the Red open light is lit located on 1UB2.

Places 1A LPI Pump switch to START and observes Red lights remains off and white light on.

Continue to Step 20 RNO. Note: 1A LPI Pump fails to start COMMENTS:

___ SAT ___ UNSAT ALTERNATE PATH STEP 8: Step 90 RNO Stop 1A LPI Pump Close 1LP

-17 STANDARD: Determine the1A LPI Pump is stopped by observing the green "off" light lit and close 1LP

-17 located on 1UB2.

Continue to Step 91 COMMENTS:

___ SAT

___ UNSAT

CRO-303 R0 - c Page 8 of 12 STEP 9: Step 91 Perform the following:

Open 1LP-18 Start 1B LPI Pump STANDARD: Determine that 1LP-18 is open by observing the red open light is lit located on 1UB2.

Places 1B LPI pump switch to START and observes Red lights remain off and white light on.

Continue to Step 91 RNO. TIME CRITICAL clock Starts:________

Note: 1B LPI Pump fails to start. Required completion time to start 1C LPI Pump is 60 minutes from failure of 1B LPI Pump.

COMMENTS:

___ SAT

___ UNSAT ALTERNATE PATH STEP 10: Step 91 RNO Stop 1B LPI Pump Close 1LP

-18 STANDARD: Determine the1B LPI Pump is stopped by observing the green "off" light lit and close 1LP

-18 located on 1UB2.

Continue to Step 122 COMMENTS:

___ SAT ___ UNSAT

CRO-303 R0 - c Page 9 of 12 STEP 11: Step 122 REFER TO Enclosure 5.1 IAAT Steps prior to Step 122. STANDARD: Checks IAAT steps to determine if any apply Determines that IAAT Step 92 now applies Continue to Step 92. COMMENTS:

___ SAT ___ UNSAT STEP 12: Step 92 IAAT 1A and 1B LPI PUMPs are off/tripped, AND all of the following exist RCS pressure < LPI pump shutoff head 1LP-19 closed 1LP-20 closed THEN perform Steps 93 - 94. STANDARD: Student determines the following:

RCS pressure is < LPI pump shutoff head and 1LP-19 and 1LP

-20 green closed lights lit.

Continue to Step 93 COMMENTS: ___ SAT

___ UNSAT

CRO-303 R0 - c Page 10 of 12 STEP 13: Step 93 Open the following:

1LP-9 and 1LP-10 1LP-6 and 1LP-7 1LP-17 and 1LP-18 1LP-21 and 1LP-22 STANDARD: Candidate opens the following valves (located on 1UB2) and verifies red open lights lit:

  • 1LP-9 *1LP-10 *1LP-6 *1LP-7 *1LP-18 *1LP-17 Candidate verifies red open lights lit for the following valves (located on 1UB2):: 1LP-21 1LP-22 Continue to Step 94 COMMENTS: *CRITICAL STEP

___ SAT

___ UNSAT STEP 14: Step 94 Start 1C LPI Pump STANDARD: Start the 1C LPI Pump located on 1UB2.

Verify the red on light is lit and the pump develops discharge pressure and flow.

TIME CRITICAL clock Stopped:________

Examiner Note: 1C LPI pump must be started within 60 minutes of the 1B LPI pump failure to start.

COMMENTS: Examiner Cue: Another operator will continue with this procedure END TASK CRITICAL STEP

___ SAT ___ UNSAT

STOP TIME: ____________

CRO-303 R0 - c Page 11 of 12 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 13 Necessary to align a suction source and a discharge flow path from the 1C LPI pump for its use since 1A and 1B LPI pumps are failed 14 Necessary to start the 1C LPI pump to provide LPI flow to the core (Must be completed within 60 minutes of A and B LPI pump failure.

c CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A LOCA is in progress and RCS Pressure has stabilized at 1000 psig ES Channels 1

-6 have actuated on high RB pressure Steam Generator levels are being raised to the Loss of Subcooling Margin setpoint by another Reactor Operator EOP Encl.

5.1(ES Actuation) has been completed up to Step 122 Rule 2 (Loss of SCM) is complete

INITIATING CUES:

The Control Room SRO instructs you, to continue in Encl.

5.1 (ES Actuation) and respond to plant conditions.

THIS JPM IS TIME CRITICAL

CRO-409 R0 - d Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

CRO-409 Depressurize SGs and Feed with CBPs

CANDIDATE EXAMINER

CRO-409 R0 - d Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Depressurize S/G's and Feed With CBPs Alternate Path

No Facility JPM #

CRO-014 K/A Rating(s)

System: APE 054 K/A: AA1.01 Rating:

4.5/4.4 Task Standard

Both OTSG's are depressurized and fed with the CBP's until RCS temperature is controlled while maintaining RCS pressure between 2300 psig and 1600 psig.

Preferred Evaluation Location

Preferred Evaluation Method
Simulator __X__ In-Plant __ ___ Perform __X___ Simulate

____ References

EOP Rule 3 (Loss of Main or Emergency FDW)

Validation Time:

12 minutes Time Critical:

NO ====================================================================================

Candidate

_______________________________________

Time Start: __

_______ NAME Time Finish: ________ Performance Rating

SAT ______ UNSAT ______

Performance Time

_________

Examiner: ______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS CRO-409 R0 - d Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS

1. Recall Snap 208 2. Import files for CRO-409 3. Provide a clean copy of Rule 3 (Loss of Main or Emergency FDW) on the front board
4. Go to run when directed by lead examiner

CRO-409 R0 - d Page 4 of 12 Tools/Equipment/Procedures Needed

EOP Rule 3, Loss of Main or Emergency FDW

READ TO OPERATOR DIRECTION TO TRAINEE

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS The reactor has tripped.

The SRO directs you to perform a Symptom Check.

INITIATING CUES

You are to respond to the plant conditions found during the Symptom Check.

CRO-409 R0 - d Page 5 of 12 START TIME: _______

STEP 1: Step 1 Perform a Symptoms Check STANDARD: Candidate ensures Power Range NIs are < 5% and decreasing

. Candidate ensures Subcooling Margin > 0

°F. Candidate diagnoses a Loss of Heat Transfer and attempts to start available EFDW pumps per OMP 1

-18. Candidate requests concurrence to perform Rule 3.

Examiner Cue: As CRSRO, Concur with the performance of Rule 3

. Note: EFDW pumps will not start.

COMMENTS:

___ SAT ___ UNSAT STEP 2: Rule 3 Step 1 Verify loss of Main FDW/EFDW is due to Turbine Building Flooding.

STANDARD: Candidate determines that loss of Main/EFDW is not due to Turbine Building Flooding by determining that 2SA

-18/A-11 (TURBINE BST WATER EMERGENCY HIGH LEVEL) in not illuminated and continues to Step 1 RNO. COMMENTS: ___ SAT

___ UNSAT STEP 3: Rule 3 Step 1 RNO GO TO Step 3. STANDARD: Candidate continues to Step 3

COMMENTS:

___ SAT ___ UNSAT

CRO-409 R0 - d Page 6 of 12 STEP 4: Rule 3 Step 3 IAAT NO SGs can be fed with FDW (Main/CBP/Emergency), AND any of the following exist:

RCS pressure reaches 2300 psig OR NDT limit Pzr level reaches 375" THEN PERFORM Rule 4 (Initiation of HPI Forced Cooling)

STANDARD: Candidate determines that the IAAT step does not apply at this time and continues to Step 4.

COMMENTS:

___ SAT ___ UNSAT STEP 5: Rule 3 Step 4 Start operable EFDW pumps, as required, to feed all intact SGs. STANDARD: Candidate determines that both SGs are intact and that no EFDW pumps will start and continues to Step 5.

COMMENTS: ___ SAT ___ UNSAT STEP 6: Rule 3 Step 5 Verify any EFDW pump operating.

STANDARD: Candidate determines that no EFDW pump is operating and continues to Step 5 RNO. COMMENTS:

___ SAT

___ UNSAT

CRO-409 R0 - d Page 7 of 12 STEP 7: Rule 3 Step 5 RNO GO TO Step 7 STANDARD: Candidate continues to Step 7 COMMENTS: ___ SAT ___ UNSAT STEP 8: Rule 3 Step 7 Place in MANUAL and close:

1FDW-315 1FDW-316 STANDARD: Candidate locates 1FDW

-315 and 1FDW

-316 Moore controllers on 1UB1 and places them in manual.

Candidate closes 1FDW

-315 and 1FDW

-316 by reducing demand on the Moore controllers to zero. Continues to Step 8.

Note: These valves may be operated simultaneously.

COMMENTS: ___ SAT ___ UNSAT STEP 9: Rule 3 Step 8 Verify both: Any CBP operating TBVs available on an intact SG STANDARD: Candidate determines that CBPs are operating by observing light indication and pump amps located on 1AB1

. Candidate determines that both SGs are intact with TBVs available and continues to Step 9.

COMMENTS: ___ SAT ___ UNSAT

CRO-409 R0 - d Page 8 of 12 STEP 10: Rule 3 Step 9 Select OFF for both digital channels on AFIS HEADER A STANDARD: Candidate locates AFIS Header A switches located on 1UB1 and depresses the OFF pushbutton for Channels 1 & 2.

Candidate continues to Step 10.

COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT STEP 11: Rule 3 Step 10 Select OFF for both digital channels on AFIS HEADER B STANDARD: Candidate locates AFIS Header B switches located on 1UB1 and depresses the OFF pushbutton for Channels 1 & 2.

Candidate continues to Step 11.

COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT STEP 12: Rule 3 Step 11 Place Startup Block valve control switch for all intact SGs in OPEN:

1A SG 1B SG 1FDW-33 1FDW-42 STANDARD: Candidate determines that both SGs are intact and locates the Startup Block valve switches on 1UB1 and rotates the switches to the OPEN position.

Candidate continues to Step 12.

COMMENTS: CRITICAL STEP

___ SAT

___ UNSAT

CRO-409 R0 - d Page 9 of 12 STEP 13: Rule 3 Step 12 Simultaneously position Startup Control valves 10

- 20% open on all intact SGs: 1A SG 1B SG 1FDW-35 1FDW-44 STANDARD: Candidate determines that both SGs are intact and locates the Startup Control valve controllers on 1UB1 and simultaneously places the controllers in manual.

Candidate positions Startup Control Valves 10

- 20% open.

Candidate continues to Step 13.

Note: Two handed operations are allowed for Startup Control valves.

COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT STEP 14: Rule 3 Step 13 Perform the following:

Place 1FDW

-31 switch in CLOSE Place 1FDW

-40 switch in CLOSE Close 1FDW

-32 Close 1FDW

-41 STANDARD: Candidate locates the control switches for 1FDW

-31 and 1FDW

-40 on 1UB1 and places the switches in CLOSE.

Candidate locates the controllers for 1FDW

-32 and 1FDW

-41 on 1UB1 and places the controllers in manual and ensures demand is zero.

Candidate continues to Step 14.

COMMENTS:

___ SAT ___ UNSAT

CRO-409 R0 - d Page 10 of 12 STEP 15: Rule 3 Step 14 Verify Rule 4 (Initiation of HPI Forced Cooling) in progress.

STANDARD: Candidate determines that Rule 4 is not in progress and continues to Step 14 RNO. COMMENTS: ___ SAT ___ UNSAT STEP 16: Rule 3 Step 14 RNO CAUTION Until SGs are dry, lower SG pressure slowly to prevent overcooling.

1. Lower SG pressure in available

. 2. Control FDW flow to stabilize RCS P/T by throttling the following as necessary:

Startup Control valves TBVs 3. Notify CR SRO that CBP feed is in progress. STANDARD: Candidate locates the Bailey controllers for 1A and 1B Turbine Bypass Valves on 1UB1 and places the controllers in HAND by depressing the white HAND pushbuttons.

Candidate lowers SG pressure by using the raise/lower toggle switches on the 1A/1B TBVs to increase position demand to open the valves.

Candidate controls FDW flow to stabilize RCS P/T by throttling Startup Control valves (1FDW

-35 and 1FDW

-44) and throttles TBVs to control steam pressure at 500 psig.

Examiner Note: Once the candidate demonstrates that they have gained control of RCS P/T and has notified the CR SRO CBP feed is in progress

, inform the Candidate another operator will continue with this procedure

. COMMENTS:

END OF TASK CRITICAL STEP

___ SAT ___ UNSAT STOP TIME: ____________

CRO-409 R0 - d Page 11 of 12 CRITICAL STEP EXPLANATIONS STEP # Explanation 10 & 11 Steps prevent actuation of AFIS circuit which would block feed from the CBPs if actuated.

12 Step aligns flow path to the Startup FDW valves. 13 Step decreases Startup FDW valve position to prevent excessive flow while allowing feed to enter the SG.

16 Step required to decrease SG pressure to below shutoff head of the CBPs and throttle FDW flow to stabilize RCS P/T.

d CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS

The reactor has tripped.

The SRO directs you to perform a Symptom Check.

INITIATING CUES

You are to respond to the plant conditions found during the Symptom Check.

CRO-413 R0 - e Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

CRO-413 Initiate HPI Forced Cooling

CANDIDATE EXAMINER CRO-413 R0 - e Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Initiate HPI Forced Cooling Alternate Path:

Yes Facility JPM #:

CRO-019, CRO-020 K/A Rating(s):

System: EPE 074 K/A: EA1.08 Rating:

4.2/4.2 Task Standard:

Perform Rule 4 (Initiate HPI Forced Cooling

). Preferred Evaluation Location:

Preferred Evaluation Method: Simulator

__X___ In-Plant ___ __ Perform __X___ Simulate

____

References:

EOP Rule 3 (Loss of Main or Emergency FDW

) EOP Rule 4 (Initiate HPI Forced Cooling

) TCA #26, Initiate HPI Forced Cooling when required Validation Time

3 minutes Time Critical:

YES ====================================================================================

Candidate:

_______________________________________

Time Start: __

_______ NAME Time Finish: ________

Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________

Examiner:

______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS CRO-413 R0 - e Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 209 2. Import simulator files for CRO

-413

3. Go to run when directed by lead examiner

CRO-413 R0 - e Page 4 of 14 Tools/Equipment/Procedures Needed:

EOP Rule 3 (Loss of Main or Emergency FDW

) EOP Rule 4 (Initiate HPI Forced Cooling

) READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 has tripped following a total loss of feedwater.

IMAs are complete.

You have been performing Rule # 3 (Loss of Main or Emergency FDW

) to regain heat transfer.

CBP feed could not be established and efforts to restore steam generator heat transfer per Rule # 3 have not been successful.

You are at the step 22 "WHEN" step in Rule 3 (Loss of Main or Emergency FDW

). INITIATING CUES:

The CR SRO directs you to review outstanding IAAT's

.

This JPM is Time Critical

CRO-413 R0 - e Page 5 of 14 START TIME: _______

STEP 1: The candidate determines that it is necessary to perform Rule 4 based on IAAT in Rule 3 or in OMP 1-18 STANDARD: Candidate announces the initiation of Rule 4. Examiner Cue: If requested, provide concurrence (as CR SRO) for initiation of Rule 4.

EXAMINER NOTE: This starts the 5 minute "Time critical" time clock.

Time = ___________.

COMMENTS:

___ SAT

___ UNSAT STEP 2: Step 1 Verify any HPI pump can be operated.

STANDARD: The candidate recognizes one HPI pump is in operation.

COMMENTS: ___ SAT

___ UNSAT STEP 3: Step 2 OPEN the following:

1HP-24 1HP-25 STANDARD: The candidate:

Rotates 1HP

-24 switch on 1UB1 to the OPEN position and observes that the red open light comes ON and the green closed light goes OFF. Rotates 1HP

-25 switch on 1UB1 to the OPEN position and observes that the red open light comes ON and the green closed light goes OFF. COMMENTS: CRITICAL STEP

___ SAT

___ UNSAT

CRO-413 R0 - e Page 6 of 14 STEP 4: Step 3 Start all available HPI pumps STANDARD: The candidate:

Starts any non

-running HPI pump by the control switches located on 1UB1. The running HPI pump amps are verified stable.

COMMENTS: ___ SAT

___ UNSAT STEP 5: Step 4 OPEN the following:

1HP-26 1HP-27 STANDARD: The candidate:

Rotates and holds 1HP

-26 switch on 1UB1 to the OPEN position Candidate notes that 1HP

-26 did not open by observing the green "CLOSED indication is still illuminated and the red "OPEN" light is extinguished

. Locates 1HP

-27 ('1B' HP Injection) on 1UB1 and verifies red 'OPEN' indication is illuminated, and the green 'CLOSED' indication is extinguished,

. Examiner Note: 1HP

-26 is failed closed.

COMMENTS:

___ SAT

___ UNSAT STEP 6: Step 5 OPEN 1RC-4 STANDARD: The candidate locates 1RC

-4 control switch on 1UB1 and verifies that the red "OPEN" indication is illuminated and the green "CLOSED" indication is extinguished.

Examiner Note: This valve should already be open COMMENTS: ___ SAT

___ UNSAT

CRO-413 R0 - e Page 7 of 14 STEP 7: Step 6 VERIFY flow exists in any HPI header.

STANDARD: The candidate locates HPI Flow Train A and B flow meters on 1UB1. Loop B flow is verified.

COMMENTS: CRITICAL STEP

___ SAT

___ UNSAT STEP 8: Step 7 Perform the following:

A. Place 1RC-66 SETPOINT SELECTOR to OPEN B. Depress 1RC

-66 OPEN PERMIT pushbutton STANDARD: The candidate:

Rotates 1RC

-66 SETPOINT SELECTOR switch on 1UB1 to the OPEN position Depresses 1RC

-66 OPEN PERMIT pushbutton on 1UB1 Verifies PORV is open by verifying that the red "OPEN" indication is illuminated and the PORV Flow Statalarm (1SA18/A1) is in alarm.

EXAMINER NOTE: This stops the 5 minute "Time Critical" time clock.

Time = _____________.

COMMENTS: CRITICAL STEP

___ SAT

___ UNSAT STEP 9: Step 8 Verify at least two HPI pumps operating.

STANDARD: The candidate verifies that three HPI pumps are operating.

COMMENTS: ___ SAT ___ UNSAT

CRO-413 R0 - e Page 8 of 14 STEP 10: Step 9 Verify flow in both HPI headers is in the acceptable region of Figure 1 (Required HPI Flow Per Header).

STANDARD: The candidate verifies HPI flow in the B HPI header is in the acceptable region of Figure 1 below, but that there is no flow in HPI header A, so he proceeds to step 9 RNO. Examiner Note:

Since 1HP

-26 failed closed earlier, there is no flow in HPI header A, so the candidate must go to the RNO to open 1HP

-410. COMMENTS:

___ SAT

___ UNSAT

CRO-413 R0 - e Page 9 of 14 ALTERNATE PATH:

STEP 11: Step 9 RNO 1. IF 1A HPI header flow is unacceptable, THEN open 1HP-410. 2. IF 1B HPI header flow is unacceptable, THEN open 1HP-409. STANDARD: The candidate determines that 1A HPI header flow is unacceptable and opens 1HP

-410. COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT STEP 12: Step 10 Verify flow exists in any HPI header.

STANDARD: The candidate locates HPI Flow Train A and B flow meters on 1UB1. Loop A and Loop B flow is verified.

Examiner Note: This flow has already been verified in step 7 COMMENTS:

___ SAT

___ UNSAT STEP 13: Step 11 Perform the following:

A. Place 1RC

-66 SETPOINT SELECTOR to OPEN B. Depress 1RC-66 OPEN PERMIT pushbutton STANDARD: The candidate verifies 1RC

-66 open. These actions have already been taken in step 8:

COMMENTS: ___ SAT ___ UNSAT

CRO-413 R0 - e Page 10 of 14 STEP 14: Step 12 Verify > one RCP operating.

STANDARD: Candidate determines that all four RCPs are operating.

COMMENTS: ___ SAT

___ UNSAT NOTE: 1A1 RCP provides the best Pzr spray and is preferred to be left running in case recovery from HPI forced cooling is performed and a Pzr bubble drawn.

STEP 15: Step 13 Stop all but one RCP. STANDARD: The candidate stops three RCPs by rotating their control switches to "OFF" position on the three of the four RCPs. COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT STEP 16: Step 14 IAAT the following limits are exceeded THEN throttle HPI to maximize flow flow limit.

STANDARD: The candidate verifies header flows less than the limits in the table above.

COMMENTS:

___ SAT

___ UNSAT

CRO-413 R0 - e Page 11 of 14 STEP 17: Step 15 De-energize all PZR heaters.

STANDARD: The candidate:

Rotates the PZR heater bank #1 on 1UB1 switch to the "OFF" position.

Presses the OFF pushbutton controls for PZR heater banks 2, 3 and 4 on 1UB1 COMMENTS: CRITICAL STEP

___ SAT

___ UNSAT STEP 18: Step 16 Close 1HP

-5 (LETDOWN ISOLATION)

STANDARD: The candidate:

Rotates the switch for 1HP

-5 on 1UB1 to the closed position.

Observes the red OPEN light go off and the green CLOSED light come on. COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT STEP 19: Step 17 Close the following:

TBVs 1FDW-35 1FDW-44 STANDARD: Take the TBVs to HAND and reduce demand to zero using the toggle switch Take 1FDW

-35 and 1FDW-44 to HAND and reduce demands to zero using the toggle switches.

COMMENTS: ___ SAT ___ UNSAT

CRO-413 R0 - e Page 12 of 14 STEP 20: Step 18 IAAT all HPI is lost, THEN: A. Stop all RCPs B. Position 1RC

-66 SETPOINT SELECTOR to HIGH STANDARD: The candidate verifies HPI is available and operating and the IAAT step does not apply at this time.

COMMENTS: ___ SAT

___ UNSAT STEP 21: Step 19 WHEN directed by CR SRO, THEN EXIT this rule.

STANDARD: The candidate announces that Rule 4 is complete with outstanding IAATs and returns the Cue sheet to the examiner indicating he has completed his JPM.

COMMENTS:

END TASK

___ SAT

___ UNSAT STOP TIME: ____________

CRO-413 R0 - e Page 13 of 14 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Step is required provide proper system alignment for HPI forced cooling flow 7 Step is required to verify HPI flow available for forced cooling.

8 Step is required to open the PORV to initiate HPI forced cooling through the core (TCA #26).

11 Step required to allow flow in both HPI headers 15 Step required to limit the heat input to the RCS 17 Step required to limit the heat input to the RCS 18 Step required to Reduce the amount of heat energy added to the RB Containment

e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 has tripped following a total loss of feedwater.

IMAs are complete.

You have been performing Rule # 3 (Loss of Main or Emergency FDW) to regain heat transfer.

CBP feed could not be established and efforts to restore steam generator heat transfer per Rule # 3 have not been successful.

You are at the step 22 "WHEN" step in Rule 3 (Loss of Main or Emergency FDW).

INITIATING CUES:

The CR SRO directs you to review outstanding IAAT's

.

This JPM is Time Critical

CRO-507 R0 - f Page 1 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

CRO-507 Perform EOP Encl. 5.35 (Containment Isolation)

CANDIDATE EXAMINER CRO-507 R0 - f Page 2 of 9 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Perform EOP Encl 5.35 (Containment Isolation)

Alternate Path:

Yes Facility JPM #:

CRO-503 K/A Rating(s):

System: 103 K/A: G2.1.23 Rating: 4.3/4.4 Task Standard:

Perform EOP Encl 5.35 (Containment Isolation)

. Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator

___ X___ In-Plant ___ ___ Perform __X___ Simulate

__ __

References:

EOP Encl 5.35 (Containment Isolation)

Validation Time:

10 min. Time Critical:

NO ====================================================================================

Candidate:

_______________________________________

Time Start: ____

___________ NAME Time Finish: ______________ Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________ Examiner:

______________________________ ___________________________________/____

_____ NAME SIGNATURE DATE

========================================================================

Comments CRO-507 R0 - f Page 3 of 9 SIMULATOR OPERATOR INSTRUCTIONS

1. Recall Snap 210 2. Import Simulator files for CRO

-507

3. Go to Run and Acknowledge alarms
4. Go to Freeze
5. Go to Run when directed by lead examiner

CRO-507 R0 - f Page 4 of 9 Tools/Equipment/Procedures Needed EOP Encl 5.35 (Containment Isolation)

READ TO OPERATOR DIRECTIONS TO STUDENT

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS Unit 1 reactor trips from 100% power due to a spurious Main Turbine trip

RCS leak of 190 gpm occurs as result of the trip

EOP LOCA CD tab is in progress

ES Actuation has NOT occurred INITIATING CUE

The CR SRO directs you to perform EOP Encl 5.35 (Containment Isolation)

CRO-507 R0 - f Page 5 of 9 START TIME: _______

STEP 1: Step 1 Verify Encl 5.1 (ES Actuation) is in progress or complete.

STANDARD: Determine ES has NOT actuated and perform the RNO step.

Continue to Step 1 RNO 1.

COMMENTS:

___ SAT ___ UNSAT STEP 2: Step 1 RNO 1. 1. Close the following ES operated RB isolation valves:

ES Chan 1 ES Chan 2 1HP-3 1HP-5 1HP-4* 1GWD-12 1GWD-13 1LWD-1 1LWD-2 1CS-5 1CS-6 1PR-1 1PR-2 1PR-6 1PR-3 1PR-4 1PR-5 1PR-7* 1PR-8* 1PR-9* 1PR-10* 1RC-5 1RC-7 1RC-6 1FDW-105 1FDW-106 1FDW-107 1FDW-108 1FDW-103 1FDW-104 STANDARD: The above valves are closed.

ALTERNATE PATH

1HP-3 will NOT close. Continue to Step 1 RNO 2.

COMMENTS: *CRITICAL STEP

___ SAT ___ UNSAT

CRO-507 R0 - f Page 6 of 9 STEP 3: Step 1 RNO 2.

2. IF 1HP-3 fails to close, THEN close 1HP-1 STANDARD: Determine 1HP

-3 is open by observing red open light on and green closed light off.

Position 1HP

-1 switch in closed position and verify green closed light on and red open light off.

Continue to Step 1 RNO 3.

COMMENTS: CRITICAL STEP

___ SAT

___ UNSAT STEP 4: Step 1 RNO 3.

1. IF 1HP-4 fails to close, THEN close 1HP-2 STANDARD: Observe that 1HP

-4 is closed with red light off and green light on.

Continue to Step 1 RNO 4.

COMMENTS: ___ SAT ___ UNSAT STEP 5: Step 1 RNO

4. 2. IF 1HP-5 fails to close, THEN close 1HP-7 and 1HP

-6 STANDARD: Observe that 1HP

-5 is closed with red light off and green light on.

Continue to Step 2. COMMENTS: ___ SAT

___ UNSAT STEP 6: Step 2 Verify all RCPs off.

STANDARD: Determine that all RCPs are operating by observing red on light lit and RCP amps indicate normal. Perform RNO.

GO TO Step 5 COMMENTS:

___ SAT ___ UNSAT

CRO-507 R0 - f Page 7 of 9 STEP 7: Step 5 Rotate switches to the closed position for the following components.

1LPSW-1054 1LPSW-1055 1LPSW-1061 1LPSW-1062 *Note: Either 1LPSW

-1054 or 1LPSW

-55 and 1LPSW

-1061 or 1LPSW

-1062 must be closed to satisfy th is critical step.

STANDARD: Rotate the above switches to the closed position located on 1VB3

. Continue to Step 6 COMMENTS: *CRITICAL STEP

___ SAT ___ UNSAT STEP 8: Step 6 Verify the following components indicate closed.

1LPSW-1054 1LPSW-1055 1LPSW-1061 1LPSW-1062 STANDARD: Verify the above valves indicate closed by observing the green closed light is lit located on 1VB3

. Continue to Step 7 COMMENTS:

___ SAT

___ UNSAT STEP 9: Step 7 EXIT this enclosure.

STANDARD: Exit the enclosure.

COMMENTS: END OF TASK

___ SAT ___ UNSAT TIME STOP: ________

CRO-507 R0 - f Page 8 of 9 CRITICAL STEP EXPLANATIONS STEP # Explanation 2 This step is critical to isolate the Reactor Building.

3 This step is critical since 1HP

-3 is failed open 1HP

-1 isolates this pathway.

7 This step is critical to isolate the Reactor Building.

f CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS

Unit 1 reactor trips from 100% power due to a spurious Main Turbine trip

RCS leak of 190 gpm occurs as result of the trip

EOP LOCA CD tab is in progress

ES Actuation has NOT occurred INITIATING CUE

The CR SRO directs you to perform EOP Encl 5.35 (Containment Isolation)

CRO-605 R0 - g Page 1 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-605 Energize Main Feeder Buses from CT-4

CANDIDATE EXAMINER CRO-605 R0 - g Page 2 of 15 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Energize Main Feeder Buses From CT

-4 Alternate Path:

No Facility JPM #:

CRO-007 K/A Rating(s):

System: EPE 055 K/A: EA2.03 Rating: 3.9/4.7 Task Standard:

Energize Main Feeder Buses from CT

-4 Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator __X___ In-Plant ______ Perform __X__ Simulate _____

References:

EOP Encl 5.38 (Restoration of Power)

Validation Time

15 minutes Time Critical
NO ====================================================================================

Candidate:

_______________________________________

Time Start: _________ NAME Time Finish: ________

Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________

Examiner:

______________________________ ____________________________________/________

NAME SIGNATURE DATE

========================================================================

COMMENTS CRO-605 R0 - g Page 3 of 15 SIMULATOR OPERATOR INSTRUCTIONS:

1. Recall Snap 211 2. Import Files for CRO-605
3. Place simulator in Run and acknowledge alarms
4. Go to Freeze
5. Go to Run when directed by lead examiner

CRO-605 R0 - g Page 4 of 15 Tools/Equipment/Procedures Needed:

EOP Encl 5.38 (Restoration of Power)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 experienced a lockout on CT

-1 followed by a unit trip.

Keowee Unit 2 emergency Locks Out

Blackout tab of the EOP is in progress

The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).

INITIATING CUES:

The CRS directs you to initiate Encl. 5.38 (Restoration of Power

) to regain power to the Main Feeder Buses.

CRO-605 R0 - g Page 5 of 15 START TIME: _______

STEP 1: Step 1 Verify power has been restored.

STANDARD: Determine power has NOT been restored by observing MFB voltage on 1AB1. Perform RNO step. COMMENTS: ___ SAT

___ UNSAT STEP 2: Step 1 RNO GO TO Step 3. STANDARD: GO TO Step 3. COMMENTS: ___ SAT

___ UNSAT STEP 3: Step 3 Place 1HP

-31 in HAND and reduce demand to 0.

STANDARD: Place 1HP

-31 in HAND and reduce demand to 0 using the toggle switch. Located on 1UB1.

Continues to Step 4

COMMENTS: CRITICAL STEP ___ SAT ___ UNSAT STEP 4: Step 4 Close 1HP

-21. STANDARD: Close 1HP

-21 by rotating the switch to the close position and verifying the red open light goes out and the green closed light illuminates. Switch is located on 1 UB2. Continues to Step 5 COMMENTS: ___ SAT ___ UNSAT

CRO-605 R0 - g Page 6 of 15 STEP 5: Step 5 Verify any of the following energized:

MFB1 MFB2 STANDARD: Observes that zero (0) volts are indicated on both MFBs meters located on 1AB1 and performs RNO. COMMENTS: ___ SAT ___ UNSAT STEP 6: Step 5 RNO GO TO Step 8. STANDARD: GO TO Step 8.

COMMENTS: ___ SAT

___ UNSAT STEP 7: Step 8 Verify CT

- STANDARD: Observes that zero (0) volts is indicated on CT

-1 on 1AB1 and performs RNO.

COMMENTS:

___ SAT ___ UNSAT STEP 8: Step 8 RNO GO TO Step 18. STANDARD: GO TO Step 18. COMMENTS: ___ SAT ___ UNSAT

CRO-605 R0 - g Page 7 of 15 STEP 9: Step 18 Verify both Standby Bus #1 and Standby Bus #2 are de

-energized.

STANDARD: Observes that zero (0) volts is indicated on both Standby Buses located on 2AB3. Continues to Step 19 COMMENTS: ___ SAT ___ UNSAT STEP 10: Step 19 Verify both Keowee units operating.

STANDARD: Determine that Keowee Unit 1 is operating

. Determine that Keowee Unit 2 is NOT operating (Emergency Lockout

) by observing Statalarm 2SA-18/A1 is actuated. Perform RNO step.

COMMENTS: ___ SAT

___ UNSAT STEP 11: Step 19 RNO 1. Emergency start Keowee units:

KEOWEE EMER START CHANNEL A KEOWEE EMER START CHANNEL B

2. IF NO Keowee units are operating, THEN GO TO Step 36. STANDARD: Place the KEOWEE EMER START CHANNEL A switch to start located on 1UB1. Continues to Step 20.

Note: KEOWEE EMER START CHANNEL B switch is not modeled.

COMMENTS: ___ SAT ___ UNSAT

CRO-605 R0 - g Page 8 of 15 STEP 12: Step 20 0BVerify both Keowee units in Oconee Control (statalarms on):

UNIT 1 OCONEE CONTROL (2SA-17/E-1) UNIT 2 OCONEE CONTROL (2SA-18/E-1). STANDARD: Determine that 2SA-17/E-1 and 2SA-18/E-1 are not actuated.

Perform RNO step. COMMENTS: ___ SAT ___ UNSAT STEP 13: Step 20 RNO Notify Keowee Operator to place both Keowee units Master Transfer switches to remote.

STANDARD: Call Keowee and ask the Keowee Operator to place both Keowee units Master Transfer switches to remote.

Verify that statalarm 2SA-17/E-1 and 2SA-18/E-1 actuate..

Booth Cue: When directed by the candidate, use Quick Strike and place both KHU's in Remote.

COMMENTS: CRITICAL STEP ___ SAT

___ UNSAT STEP 14: Step 21 Verify both Keowee units operating.

STANDARD: Determine that Keowee Unit 1 is operating.

Determine that Keowee Unit 2 is NOT operating (Emergency Lockout) by observing Statalarm 2SA

-18/A1 is actuated. Perform RNO step COMMENTS: ___ SAT ___ UNSAT

CRO-605 R0 - g Page 9 of 15 STEP 15: Step 21 RNO 1. IF UNIT 1 EMER FDR ACB 3 is closed, AND Unit 1 Keowee is NOT operating, THEN open UNIT 1 EMER FDR ACB 3.

2. IF UNIT 2 EMER FDR ACB 4 is closed, AND Unit 2 Keowee is NOT operating, THEN open UNIT 2 EMER FDR ACB 4.

STANDARD: Determine Unit 2 Keowee is NOT operating and open UNIT 2 EMER FDR ACB 4 located on 2AB3.

Continues to Step 22

COMMENTS: ___ SAT ___ UNSAT STEP 16: Step 22 1BEnsure one of the following is closed for an operating Keowee unit:

Unit 1 Unit 2 UNIT 1 EMER FDR ACB 3 UNIT 2 EMER FDR ACB 4 STANDARD: Determine that KHU #1 is operating and close s ACB-3 located on 2AB3. Continues to Step 23 COMMENTS: CRITICAL STEP ___ SAT

___ UNSAT STEP 17: Step 23 Verify 4160 volt power has been restored to the MFB

. STANDARD: Candidate determines that 4160 volts has not been restored to the MFB

. Continues to Step 2 3 RNO COMMENTS: ___ SAT ___ UNSAT

CRO-605 R0 - g Page 10 of 15 STEP 18: Step 23 RNO GO TO step 25. STANDARD: Continues to Step 25 COMMENTS:

___ SAT ___ UNSAT STEP 19: Step 25 Verify CT

-4 indicates 4160 volts.

STANDARD: Verify CT

-4 indicates 4160 volts by observing CT

-4 voltage gauge located on 2AB3.

Continues to Step 2 6

COMMENTS:

___ SAT ___ UNSAT STEP 20: Step 26 2BPlace the following transfer switches in MAN:

CT4 BUS 1 AUTO/MAN CT4 BUS 2 AUTO/MAN STANDARD: Place the above transfer switches located on 2AB3 in MAN. Continues to Step 2 7 COMMENTS:

___ SAT

___ UNSAT STEP 21: Step 27 3BPlace the following switches in ON:

STBY BUS 1 SYNCHRONIZING STBY BUS 2 SYNCHRONIZING STANDARD: Place the above switches located on 2AB3 in ON. Continues to Step 2 8

COMMENTS:

___ SAT ___ UNSAT

CRO-605 R0 - g Page 11 of 15 STEP 22: Step 28 4BClose the following breakers:

5BSK1 CT4 STBY BUS 1 FEEDER SK2 CT4 STDY BUS 2 FEEDER STANDARD: Candidate observes that both SK1 and SK2 are already closed by observing both red "closed" lights are illuminated.

. Continues to Step 2 9 COMMENTS:

___ SAT ___ UNSAT STEP 23: Step 29 6BPlace the following switches in OFF:

STBY BUS 1 SYNCHRONIZING STBY BUS 2 SYNCHRONIZING STANDARD: Place the above switches located on 2AB3 in OFF. Continues to Step 30 COMMENTS: ___ SAT

___ UNSAT STEP 24: Step 30 Verify Standby Bus #1 energized.

STANDARD: Observes that 4160 volts are indicated for Standby Bus #1 located on 2AB3. Continues to Step 31

COMMENTS: ___ SAT

___ UNSAT

CRO-605 R0 - g Page 12 of 15 STEP 25: Step 31 Notify CR SRO in each unit where a blackout exists that Standby Bus #1 is energized.

STANDARD: Notifies CR SRO that Standby Bus #1 is energized.

Continues to Step 32 Cue: If asked, inform candidate that only Unit 1 is affected.

COMMENTS: ___ SAT ___ UNSAT STEP 26: Step 32 7BPlace the following switches in MAN:

MFB1 AUTO/MAN MFB2 AUTO/MAN STANDBY 1 AUTO/MAN STANDBY 2 AUTO/MAN STANDARD: Place the above switches located on 1UB2 in MAN.

Continues to Step 3 3 COMMENTS: ___ SAT ___ UNSAT STEP 27: Step 33 8BOpen the following breakers:

N11 MFB1 NORMAL FDR N21 MFB2 NORMAL FDR E11 MFB1 STARTUP FDR E21 MFB2 STARTUP FDR STANDARD: Verify the above breakers located on 1UB2 are OPEN.

Continues to Step 3 4 COMMENTS: ___ SAT

___ UNSAT

CRO-605 R0 - g Page 13 of 15 STEP 28: Step 34 Close the following breakers:

S11 STBY BUS 1 TO MFB1 S21 STBY BUS 2 TO MFB2 STANDARD: Goes to the CLOSED position for each of the switches listed above. Continues to Step 3 5 *Note: Only 1 of the Stby Busses must be energized to restore power to MFBs, and therefore only one (either one) of the above breaker closures is critical

. COMMENTS: *CRITICAL STEP ___ SAT ___ UNSAT STEP 29: Step 35 Verify any of the following energized:

1TC 1TD 1TE STANDARD: Observes that 4160 volts indicated on either MFB voltmeters or OAC

. Continues to Step 3 6 COMMENTS: ___ SAT

___ UNSAT STEP 30: Step 36 Notify Unit 1 CR SRO of status of 4160V SWGR.

9BSTANDARD: Notifies CR SRO of status of 4160V SWGR Continues to Step 3 7 COMMENTS: ___ SAT

___ UNSAT STEP 31: Step 37 EXIT this enclosure, 10BSTANDARD: Notifies CR SRO that Encl. 5.38 is complete.

COMMENTS: END TASK ___ SAT ___ UNSAT STOP TIME: ____________

CRO-605 R0 - g Page 14 of 15 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 3 Step is required to protect the RCP seals.

13 Step is required to satisfy power switching logic.

16 Step is required to satisfy power switching logic.

28 Step is required to energize the Main Feeder Bus.

g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 1 experienced a lockout on CT

-1 followed by a unit trip.

Keowee Unit 2 emergency Locks Out

Blackout tab of the EOP is in progress

The Blackout tab directs the initiation of Encl. 5.38 (Restoration of Power).

INITIATING CUES:

The CRS directs you to initiate Encl. 5.38 (Restoration of Power

) to regain power to the Main Feeder Buses

CRO-902 R0 - h Page 1 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE CRO-902 Place Reactor Building Purge in Operation

CANDIDATE EXAMINER CRO-902 R0 - h Page 2 of 14 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Place the Reactor Building Purge In Operation Alternate Path:

Yes Facility JPM #:

CRO-100 K/A Rating(s):

System: 029 K/A: A2.03 Rating: 2.7/3.1 Task Standard:

RB Purge is placed in operation in accordance with OP/1/A/1102/014 (RB Purge System) and the RB Purge Fan secured and valves closed following 1RIA-45 HIGH alarm. Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator

___X ___ In-Plant ____ ___ Perform __X___ Simulate

__ __

References:

OP/1/A/1102/014 (RB Purge System

) PT/0/A/0230/001 (Radiation Monitor Check

) AP/1/A/1700/0 18 (Abnormal Release of Radioactivity

) OP/1/A/6101/008 (Alarm Response Guide 1SA

-08) B-9 and D-9 Validation Time:

15 min. Time Critical:

NO ====================================================================================

Candidate:

_______________________________________

Time Start: ____

___________ NAME Time Finish: ______________ Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________

Examiner:

______________________________ ___________________________________/____

_____ NAME SIGNATURE DATE

========================================================================

Comments CRO-902 R0 - h Page 3 of 14 SIMULATOR OPERATOR INSTRUCTIONS

1. Recall Snap 212 2. Import files for CRO-902
3. Go to run CRO-902 R0 - h Page 4 of 14 Tools/Equipment/Procedures Needed OP/1/A/1102/014 (RB Purge System

) Encl. 4.1 (RB Purge Release

) AP/1/A/1700/018 (Abnormal Release of Radioactivity)

READ TO OPERATOR DIRECTIONS TO STUDENT I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS RCS temperature = 1 14°F RCS pressure =

45 psig No Gaseous or Liquid releases are in progress RB Hatch is closed Continuous release is NOT in progress RB Purge startup is in progress using OP/1/A/1102/014 (RB Purge System), Encl.

4.1 (RB Purge Release)

INITIATING CUE The CRS directs you to place the RB Purge in operation at 1/3 Station Limit using OP/1/A/1102/014 (RB Purge System) Encl. 4.1 (RB Purge Release) starting at Step 3.

8.

CRO-902 R0 - h Page 5 of 14 START TIME: _______

STEP 1: Step 3.8 Perform the following:

3.8.1. Ensure one of the following:

1A RB AUX FAN is Off.

1B RB AUX FAN is Off.

3.8.2. Ensure "T/O Sheet" Control Room Tag on 1A RB AUX FAN.

3.8.3. Ensure "T/O Sheet" Control Room Tag on 1B RB AUX FAN.

3.8.4. Ensure note on Turnover sheet: "If RB Purge Fan is operating, 1A RB Aux Fan or 1B RB Aux Fan should be off."

STANDARD: *Secure the 1A or 1B RB AUX FAN and place a "T/O Sheet" Control Room Tag on the 1A and 1B RB AUX FAN control room switches. Note: Placing tags on the RB Aux Fan switches in NOT critical.

Candidate should state they would place note on Turnover sheet: "If RB Purge Fan is operating, 1A RB Aux Fan or 1B RB Aux Fan should be off." Continue to Step 3.9

Examiner Cues: If asked as the SRO, inform the candidate that the 1A RB Aux Fan should be secured.

When appropriate, inform candidate that note has been placed on Turnover sheet per 3.8.4.

COMMENTS: *CRITICAL STEP

___ SAT ___ UNSAT NOTE: Completion of Step 3.9 establishes an appropriate vent path during Fuel Movement Operations with any Transfer Tube open per the Shutdown Protection Plan. This prevents FTC and SFP level variations caused by differential pressures between RB and SFP.

STEP 2: Step 3.9 Perform the following:

3.9.1 - Open 1PR-1 (RB PURGE OUTLET (RB)).

STANDARD: Open 1PR-1 by rotating the switch located on 1AB3 to open and verifying that the red open light illuminates and the green closed light goes out.

May verify 1PR

-1 open on the OAC.

Continue to Step 3.9.2 COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT

CRO-902 R0 - h Page 6 of 14 STEP 3: Step 3.9.2 Open 1PR-2 (RB PURGE OUTLET (PR)).

STANDARD: Open 1PR-2 by rotating the switch located on 1AB3 to open and verifying that the red open light illuminates and the green closed light goes out.

May verify 1PR

-2 open on the OAC.

Continue to Step 3.9.3 COMMENTS:

CRITICAL STEP

___ SAT

___ UNSAT STEP 4: Step 3.9.3 Ensure closed 1PR

-3 (RB PURGE FLOW). (Bailey Controller)

STANDARD: Rotate 1PR

-3 controller knob until the position indication indicates zero.

Continue to Step 3.9.4 COMMENTS:

___ SAT ___ UNSAT STEP 5: Step 3.9.4 Verify 1PR

-3 closed using alternate indication.

STANDARD: Verify 1PR

-3 is closed by observing the closed light is lit on the ES Component Status Panel on 1VB2 or verifying 1PR

-3 position on the OAC. Continue to Step 3.9.5 COMMENTS: ___ SAT

___ UNSAT STEP 6: Step 3.9.5 WHILE RB Purge operating, monitor unit vent RIAs

. STANDARD: Candidate monitors unit vent RIAs.

Continue to Step 3.9.6 COMMENTS:

___ SAT

___ UNSAT

CRO-902 R0 - h Page 7 of 14 STEP 7: Step 3.9.6 Perform the following:

NOTE: When 1PR-3 (RB PURGE OUTLET SWITCH) is positioned to open, 1PR

-3 will remain in the closed position since 1PR

-3 Bailey Controller is closed.

A. Position 1PR

-3 (RB PURGE OUTLET SWITCH) to open.

B. Throttle > 60% open 1PR

-3 (RB PURGE FLOW). (Bailey Controller

) STANDARD: Position 1PR

-3 (RB PURGE OUTLET SWITCH) to open on 1VB2. Rotate knob on the Bailey Controller for 1PR-3 until it indicates > 60% open on 1AB3. Continue to Step 3.10 COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT

CRO-902 R0 - h Page 8 of 14 STEP 8: Step 3.10 IF required to operate the RB Purge Fan, perform the following:

3.10.1 Perform one of the following:

A. Perform the following:

B. Ensure the following:

(these steps will be N/Aed

) 1PR-4 (RB PURGE INLET) valve position interlock jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves) 1PR-5 (RB PURGE INLET (PR)) valve position interlock jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves) 1PR-6 (RB PURGE INLET (RB)) valve position interlock jumpered per IP/0/A/0161/004 (Outage Interlock Bypass For Purge Isolation Valves) Open RB Equipment Hatch Examiner Cue: If asked, inform the candidate that there is no information regarding the purge valves on the turnover sheet.

NOTE: Starting/Stopping RB Purge may cause SFP level changes. Entry into AP/1&2/A/1700/35 not required if SFP level changes are evaluated and stabilizes as expected.

3.10.2 *Start RB Purge Fan.

Examiner Note: The RB Purge fan has a 20 second delay to allow dampers to operate. 3.10.3 Ensure 1PR

-3 (RB PURGE FLOW) (Bailey Controller) adjusted to

< recommended release rate.

STANDARD: Open 1PR-4, 5, and 6 by rotating the switches located on 1AB3 to open and verifying that the red open lights are illuminated and the green closed lights go out.

May verify 1PR

-4, 5, and 6 open on the OAC.

Start RB Purge Fan by placing the switch located on 1AB3 to start and verifying that the red on light illuminates.

Adjust 1PR-3 (RB PURGE FLOW) (Bailey Controller) < recommended release rate as read on Chessell Misc. System Recorder 1 located on 1VB1.

Continue to Step 3.11 Note: After the RB Purge Fan is started, the HIGH alarm for 1RIA

-45 will actuate. The associated interlock will not occur

. COMMENTS: *CRITICAL STEP

___ SAT ___ UNSAT

CRO-902 R0 - h Page 9 of 14 ATLERNATE PATH The following Statalarms will actuate:

1SA-08/D-9 (RM Reactor Building Purge Discharge Radiation Inhibit) 1SA-08/B-9 (Process Monitor Radiation High)

Examiner Cue: IF SRO is informed of the alarms actuating, inform the candidate that the SRO reply is to "Refer to the alarm response guides".

Examiners Note: The candidate may refer to one or both ARGs.

If 1SA-08/D-9 is selected, then STEP 9 will be performed and that will end the task. If 1SA08/B

-9 is selected, then STEPs 10 - 13 will be performed and that will end the task. Either step 9 or step 13 is Critical but not both. STEP 9: Refer to 1SA-08/D-9 (RM Reactor Building Purge Discharge Radiation Inhibit) 3.1 Ensure auto action has taken place.

3.2 Observe Reactor Building RIAs and evacuate personnel as it becomes necessary.

3.3 Determine cause of inhibit and correct.

STANDARD: Determine that the automatic actions have NOT taken place and using ARG guidance perform the following:

Stop the RB Purge Fan Close 1PR

-2 Close 1PR

-3 Close 1PR

-4 Close 1PR

-5 COMMENTS:

END OF TASK CRITICAL STEP

___ SAT

___ UNSAT

CRO-902 R0 - h Page 10 of 14 STEP 10: Refer to 1SA-08/B-9 (Process Monitor Radiation High 3.1 Perform one of the following:

3.1.1. Determine radiation monitors in alarm.

3.1.2. IF Radiation Monitoring data from the PMC System is NOT in service, refer to OP/1/A/1103/026, (Loss of Sorrento Radiation Monitor).

NOTE: Loss of power to a process monitor skid actuates the Process Monitor Fault alarm, causes the associated RIA to activate the High alarm, and actuates any associated interlocks from the High alarm. The actual RIA readout may indicate magenta with readings of negative values. 3.2 IF 1SA-08/B-10 (Process Monitor Fault) has occurred for the same monitor, Go To the ARG for 1SA

-08/B-10 (Process Monitor Fault). {3}

3.3 IF 1RIA-40 alarms, Go To the appropriate procedure:

< 25 gpm (36,000 gpd)

- AP/1/A/1700/031 (Primary To Secondary Leakage) - EP/1/A/1800/001 (Emergency Operating Procedure) 3.4 IF any of the following RIAs have valid alarms, Go To AP/1/A/1700/018 (Abnormal Release of Radioactivity).

RIA RIA-31 1RIA-35 1RIA-39 1RIA-41 1RIA-42 1RIA-45, 46 1RIA-49A 1RIA-50 1RIA-54 STANDARD: Determine 1RIA

-45 is in HIGH alarm Determine that Radiation Monitoring data from the PMC System is in service Determine 1SA-08/B-10 (Process Monitor Fault) is NOT in alarm Determine 1RIA

-40 is NOT is alarm Determine 1RIA

-45 is in alarm and Go To AP/1/A/1700/018 (Abnormal Release of Radioactivity).

COMMENTS:

___ SAT ___ UNSAT

CRO-902 R0 - h Page 11 of 14 STEP 11: AP/1/A/1700/018 (Abnormal Release of Radioactivity)

Step 4.1

- Perform the following:

At the discretion of the CRS, make a PA announcement of the event including any necessary precautions to be observed.

Notify OSM to reference the following:

o RP/0/B/1000/001 (Emergency Classification).

o NSD-202 (Reportability) o OMP 1-14 (Notifications)

STANDARD: Candidate makes announcement and notifies OSM Continue to Step 4.2 COMMENTS: ___ SAT ___ UNSAT STEP 12 Step 4.2 GO TO appropriate sections for any monitors in High or Alert alarm:

Section Monitor 4A RIA-31 4B 1RIA-32 4C 1RIA-35 4D 1RIA-39 4E 1RIA-41 4F 1RIA-42 4G 1RIA-45 or 46 4H 1RIA-47, 1RIA-48, 1RIA-49, or 1RIA

-49A 4I 1RIA-50 4J 1RIA-54 STANDARD: Candidate determines that 1RIA

-45 is the alarming monitor and that he must proceed to Section 4G Continue to Section 4G COMMENTS:

___ SAT

___ UNSAT

CRO-902 R0 - h Page 12 of 14 STEP 13: AP/1/A/1700/018 (Abnormal Release of Radioactivity)

Section 4G Step 1 IAAT 1RIA-45 or 1RIA

-46 reaches the High set point, THEN ensure automatic actions occurred:

A. RB PURGE FAN secured.

B. 1PR-2 closed.

C. 1PR-3 closed. D. 1PR-4 closed.

E. 1PR-5 closed.

STANDARD: Determine 1RIA

-45 is in High alarm and perform the following:

Stop the RB Purge Fan Close 1PR

-2 Close 1PR

-3 Close 1PR

-4 Close 1PR

-5 Cue: Another operator will continue with this procedure.

COMMENTS: END OF TASK CRITICAL STEP

___ SAT ___ UNSAT TIME STOP: ________

CRO-902 R0 - h Page 13 of 14 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to prevent tripping 1XR incoming feeder breaker.

2 This step is required to establish RB Purge flow.

3 This step is required to establish RB Purge flow.

7 This step is required to establish desired RB Purge flow.

8 This step is required to start the RB Purge fan.

9 or 13 One of these steps is required to stop the RB Purge fan and isolate the RB.

h CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS RCS temperature = 114°F RCS pressure = 45 psig No Gaseous or Liquid releases are in progress RB Hatch is Closed Continuous release is NOT in progress RB Purge startup is in progress using OP/1/A/1102/014 (RB Purge System), Encl.

4.1 (RB Purge Release)

INITIATING CUE The CRS directs you to place the RB Purge in operation at 1/3 Station Limit using OP/1/A/1102/014 (RB Purge System) Encl. 4.1 (RB Purge Release) starting at Step 3.8.

NLO-100 R0 - i Page 1 of 7 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

NLO-100 Trip the Reactor from the Control Rod Drive Breakers CANDIDATE EXAMINER NLO-100 R0 - i Page 2 of 7 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Trip the Reactor from the Control Rod Drive Breakers Alternate Path:

No Facility JPM #:

Modified K/A Rating(s):

System: EPE 029 K/A: EA1.11 Rating: 3.9*/4.1 Task Standard:

Both 600 volt CRD breakers are opened.

Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator

__ ___ In-Plant ___X ___ Perform _____ Simulate

__ X__

References:

Unit 3 EOP Rule 1 (ATWS/Unanticipated Nuclear Power Production

) Validation Time:

4 min. Time Critical:

NO ====================================================================================

Candidate:

_______________________________________

Time Start: ____

___________ NAME Time Finish: ______________

Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________

Examiner:

______________________________ ___________________________________/____

_____ NAME SIGNATURE DATE

========================================================================

Comments NLO-100 R0 - i Page 3 of 7 SIMULATOR OPERATOR INSTRUCTIONS:

NONE NLO-100 R0 - i Page 4 of 7 Tools/Equipment/Procedures Needed:

None READ TO OPERATOR DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you hav e completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 3 is at 100% power

The reactor should have tripped.

Rule 1 (ATWS/Unanticipated Nuclear Power Production) in progress

INITIATING CUE:

The OATC directs you to open 600V CRD breakers (without wearing Arc Flash PPE

): 3X9-5C (U-3 CRD Trip Bkr A) (U3 Equipment Rm) 2X2-5D (U-3 CRD Alternate Fdr Bkr) (T

-3/Fa-28)

NLO-100 R0 - i Page 5 of 7 START TIME: _______

STEP 1: Open 3X9-5C (U-3 CRD Trip Bkr A) (U3 Equipment Rm) STANDARD: Locates and opens 3X9-5C by rotating switch to the trip position.

COMMENTS: CRITICAL STEP

___ SAT

___ UNSAT STEP 2: Open 2X2-5D (U-3 CRD Alternate Fdr Bkr) (T

-3/Fa-28) STANDARD: Locates and opens 2X2-5D by rotating switch to the trip position.

COMMENTS: END OF TASK CRITICAL STEP

___ SAT

___ UNSAT TIME STOP: ________

NLO-100 R0 - i Page 6 of 7 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to trip the reactor.

2 This step is required to trip the reactor.

i CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Unit 3 is at 100% power The reactor should have tripped.

Rule 1 (ATWS/Unanticipated Nuclear Power Production) in progress

INITIATING CUE:

The OATC directs you to open 600V CRD breakers (without wearing Arc Flash PPE

): 3X9-5C (U-3 CRD Trip Bkr A) (U3 Equipment Rm) 2X2-5D (U-3 CRD Alternate Fdr Bkr) (T

-3/Fa-28)

NLO-606 R0 - j Page 1 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

NLO-606 Makeup to Unit 1 CBAST from Unit 1 & 2 BAMT During a Unit 2 Blackout

CANDIDATE EXAMINER NLO-606 R0 - j Page 2 of 8 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Makeup to Unit 1 CBAST From Unit 1 & 2 BAMT during a Unit 2 blackout Alternate Path:

No Facility JPM #:

New K/A Rating(s):

System:

B/WE14 K/A: EA1.1 Rating:

3.8/3.6 Task Standard:

Makeup to Unit 1 CBAST from Unit 1 & 2 BAMT in accordance with Unit 2 EOP Encl. 5.39

.

Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator

__ ___ In-Plant ___X ___ Perform _____ Simulate

__ X__

References:

Unit 2 EOP Encl. 5.39 (Makeup to the BWST During Blackout)

Validation Time:

12 min. Time Critical:

No ====================================================================================

Candidate:

_______________________________________

Time Start: ____

___________ NAME Time Finish: ______________

Performance Rating:

SAT ______ UNSAT ______

Performance Time

_________

Examiner:

______________________________ ___________________________________/____

_____ NAME SIGNATURE DATE ====================================================================================

Comments NLO-606 R0 - j Page 3 of 8 SIMULATOR OPERATOR INSTRUCTIONS:

NONE NLO-606 R0 - j Page 4 of 8 Tools/Equipment/Procedures Needed:

Unit 2 EOP Encl. 5.39 (Makeup to the BWST During Blackout)

READ TO OPERATOR DIRECTIONS TO STUDENT:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

A blackout is in progress on Oconee Unit 2 EOP Enclosure 5.39 (Makeup to the BWST During Blackout) is in progress and is complete up thru Step 16.

It is necessary to pump the BAMT to Unit 1's CBAST The BAMT is filled and mixed and ready to be transferred INITIATING CUE:

The CRS directs you to continue with EOP Enclosure 5.39 (Makeup to the BWST During Blackout) beginning at Step 17 to transfer the entire contents of the BAMT to Unit 1's CBAST using the B LP Boric Acid Pump

NLO-606 R0 - j Page 5 of 8 START TIME: _______

STEP 1: Step 17 0BLocally perform the following (A

-1, 1&2 BAMT Rm):

A. 1BClose CA-38 (Unit 1/2 HP Boric Acid Pump Suction Tell Tale).

B. 4BOpen the following:

CA-4 (Unit 1/2 BAMT Outlet)

CA-20 (Boric Acid Hdr To CBAST) 2BSTANDARD:

Locate and Close CA

-38 (Unit 1/2 HP Boric Acid Pump Suction Tell Tale). Locate and open: CA-4 (Unit 1/2 BAMT Outlet)

CA-20 (Boric Acid Hdr To CBAST)

Cue: Inform the candidate that CA

-38 is closed and CA

-4 and CA-20 are open.

COMMENTS: CRITICAL STEP

___ SAT

___ UNSAT STEP 2: Step 18 Verify B LP Boric Acid Pump will be used for transfer of BAMT to CBAST. STANDARD: Determine that B LP Boric Acid Pump will be used for transfer of BAMT to CBAST using the cue sheet.

COMMENTS: ___ SAT ___ UNSAT STEP 3: Step 19 Locally open CA-11 (A/B LP BAMT Pumps Disch Tie) (A

-1, 1&2 BAMT Rm). STANDARD: Locate and open CA-11 Cue: Inform the candidate that CA-11 is open. COMMENTS: CRITICAL STEP

___ SAT

___ UNSAT STEP 4: Step 20 Locally start B LP Boric Acid Pump (A

-2, 1&2 Chem Add Panel).

STANDARD: Start B LP Boric Acid Pump by taking the switch to the start position.

COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT

NLO-606 R0 - j Page 6 of 8 STEP 5: Step 21 Locally cycle DW

-119 (Boric Acid Mix Pumps Suction Hdr Flush) (A

-1, 1&2 BAMT Rm).

STANDARD: Candidate cycles DW

-119 fully open and then fully closed.

Note: This is a quarter turn valve and a stop has to be pulled out ot allow the valve to operate.

COMMENTS: ___ SAT ___ UNSAT STEP 6: Step 22 Notify Units 1 and 2 to monitor for reactivity effects due to possible leakage of 1&2 BAMT into LDST.

STANDARD: Candidate notifies Units 1 and 2 to monitor for possible reactivity effects.

COMMENTS:

___ SAT ___ UNSAT STEP 7: Step 23 3BLocally perform the following (A

-2, 1&2 Chem Add Panel):

5BPlace Unit 1&2 BAMT Heater switch in OFF.

Stop Unit 1&2 BAMT Agitator.

STANDARD: Candidate places the Unit 1&2 BAMT Heater switch to the OFF position and turns the Unit 1 & 2 BAMT Agitator to the STOP position (spring return to neutral).

COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT STEP 8: Step 24 WHEN transfer is complete, THEN locally stop the selected LP Boric Acid Pump (A

-2, 1&2 Chem Add Panel). STANDARD: Determine that the transfer is complete and stop the B LP Boric Acid Pump. Cue: Indicate that BAMT level is zero inches.

COMMENTS:

END OF TASK CRITICAL STEP

___ SAT

___ UNSAT TIME STOP: ________

NLO-606 R0 - j Page 7 of 8 CRITICAL STEP EXPLANATIONS STEP # Explanation 1 This step is required to align the BAMT to Unit 1's CBAST.

3 This step is required to align the BAMT to Unit 1's CBAST.

4 This step is required to start the B Boric Acid Pump.

7 This step is required to prevent equipment damage.

8 This step is required to prevent equipment damage.

j CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

A blackout is in progress on Oconee Unit 2 EOP Enclosure 5.39 (Makeup to the BWST During Blackout) is in progress and is complete up thru Step 16.

It is necessary to pump the BAMT to Unit 1's CBAST The BAMT is filled and mixed and ready to be transferred INITIATING CUE:

The CRS directs you to continue with EOP Enclosure 5.39 (Makeup to the BWST During Blackout) beginning at Step 17 to transfer the entire contents of the BAMT to Unit 1's CBAST using the B LP Boric Acid Pump

NLO-802 R0 - k Page 1 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE

NLO-802 Start Diesel Air Compressor and Align to Service Air Header

CANDIDATE

EXAMINER:

NLO-802 R0 - k Page 2 of 12 REGION II INITIAL LICENSE EXAMINATION JOB PERFORMANCE MEASURE Task: Start Diesel Air Compressor and Align to Service Air Header Alternate Path:

Yes Facility JPM #:

NLO-007 K/A Rating(s):

System: APE 065 K/A: AA1.04 Rating: 3.

5*/3.4* Task Standard:

The Diesel Air Compressor NOT operating is started and aligned to the Service Air Header correctly per procedure.

Preferred Evaluation Location:

Preferred Evaluation Method:

Simulator _____ In-Plant __X___ Perform _____ Simulate

__X__

References:

AP/2/A/1700/022 (Loss of Instrument Air) Encl. 5.4 (Emergency Start of the Diesel Air Compressor)

AP/2/A/1700/

022 (Loss of Instrument Air) Encl. 5.7 (Manual Start of Diesel Air Compressors)

Validation Time:

20 minutes Time Critical:

NO ======================================================================================

Candidate:

_______________________________________

Time Start:

_____________ NAME Time Finish:

_____________ Performance Rating: SAT ______ UNSAT ______

Performance Time

__________

Examiner:

______________________________ ____________________________________/________

NAME SIGNATURE DATE

==========================================================================

COMMENTS NLO-802 R0 - k Page 3 of 12 SIMULATOR OPERATOR INSTRUCTIONS:

None NLO-802 R0 - k Page 4 of 12 Tools/Equipment/Procedures Needed:

AP/2/A/1700/

022 (Loss of Instrument Air) Encl. 5.4 (Emergency Start of the Diesel Air Compressor)

AP/2/A/1700/

022 (Loss of Instrument Air) Encl. 5.7 (Manual Start of Diesel Air Compressors)

READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Units 1, 2, and 3 are operating at 100% power.

The Unit 1 Control Room Operator receives the "INSTRUMENT AIR SYSTEM TROUBLE" Statalarm and observes that Instrument Air pressure is decreasing on the Control Room IA pressure gauge.

INITIATING CUES:

The Unit 2 Control Room Operator directs you to perform Encl. 5.4 (Emergency Start of the Diesel Air Compressor) of AP/2/A/1700/

022 (Loss Of Instrument Air).

NLO-802 R0 - k Page 5 of 12 START TIME: _______

Note: The procedure is pre

-staged at the Diesel Air Compressor. After the candidate locates the procedure, hand him a copy of the procedure to use.

NOTE Ingersoll

-Rand Diesel Air Compressor SN s 340574, 339718 and 339713 have Auto Start capability.

STEP 1: Encl. 5.4 Step 1 Verify all Diesel Air Compressors with Auto / Manual switches in Auto are running. STANDARD: Determine that Ingersoll

-Rand Diesel Air Compressor SN 340574 is in AUTO and NOT operating and perform RNO step.

Cue: Indicate to the operator that Ingersoll

-Rand Diesel Air Compressor SN 340574 is in AUTO and NOT operating

. (No noise, RPMs, or discharge pressure) and the other two compressors are in AUTO and operating.

COMMENTS: ___ SAT

___ UNSAT ALTERNATE PATH STEP 2: Encl. 5.4 Step 1 RNO Perform one manual start on each Diesel Air Compressor that did NOT Auto start using Encl 5.7 (Manual Start of Diesel Air Compressors).

STANDARD: Perform a manual start on Ingersoll

-Rand Diesel Air Compressor SN 340574 using Encl 5.7 (Manual Start of Diesel Air Compressors).

COMMENTS: ___ SAT

___ UNSAT

NLO-802 R0 - k Page 6 of 12 STEP 3: Encl. 5.7 Step 1 GO TO applicable step to manually start Diesel Air Compressor:

Compressor Step Ingersoll

-Rand (Auto start capability) SNs 340574, 339718 and 339713 2 Ingersoll

-Rand (5421) 10 Any other Diesel Air Compressor 19 STANDARD: Note the compressor that did not start from the table (340574) and GO TO Step 2. COMMENTS:

___ SAT

___ UNSAT STEP 4: Encl. 5.7 Step 2 Position Auto / Manual toggle switch to Manual.

STANDARD: Locate and position Auto / Manual toggle switch to Manual.

COMMENTS:

CRITICAL STEP

___ SAT ___ UNSAT STEP 5: Encl. 5.7 Step 3 Ensure Battery Switch is in ON position (Behind panel door on West side of Diesel Air Compressor).

STANDARD: Open panel door on West side of compressor and ensure the battery Switch is in ON position.

COMMENTS:

___ SAT

___ UNSAT

NLO-802 R0 - k Page 7 of 12 NOTE Engine ignition switch has 3 positions, STOP, ON, and ENGINE START.

The engine ignition switch must be ON to have panel indication. All warning lamps will illuminate briefly to test the lamps: the Low Engine Oil Pressure light and the Low Battery Voltage light will remain flashing until the engine is started.

Control panel display will display 1.70 when engine ignition switch is turned to the ON position and then clear, if no fault is present.

The (LAMPS) switch may be used to illuminate the panel for night operation.

STEP 6: Encl. 5.7 Step 4 Position engine ignition switch to ON.

STANDARD: Position engine ignition switch to ON (already ON).

COMMENTS:

___ SAT

___ UNSAT CAUTION The engine starter motor should NOT be operated continuously for more than 10 seconds. STEP 7: Encl. 5.7 Step 5 Position engine ignition switch to ENGINE START position until engine starts, then release.

STANDARD: Position engine ignition switch to ENGINE START position after verifying that engine start release switch.

Examiner Cue: Indicate that the compressor starts when engine ignition switch is placed in the ENGINE START position

. RPMs increase Oil pressure increases Air pressure increases COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT

NLO-802 R0 - k Page 8 of 12 STEP 8: Encl. 5.7 Step 6 Depress PRESSURE CONTROL button to allow compressor to load fully. STANDARD: Locate and depress PRESSURE CONTROL pushbutton. Cue: Indicate to the candidate that the compressor is loaded by the change in the sound.

COMMENTS: CRITICAL STEP

___ SAT ___ UNSAT STEP 9: Encl. 5.7 Step 7 Open SA-2955; SERVICE AIR VALVE (South end of compressor at discharge hose)

. STANDARD: Locate and verify SA-2955 is open by observing the handle parallel with the hose.

COMMENTS:

___ SAT

___ UNSAT STEP 10: Encl. 5.7 Step 8 Locate check valve at end of compressor discharge hose and open associated block valve per table below:

Check Valve Block Valve SA-2944 SA-2797 SA-2947 SA-2945 SA-2950 SA-2948 STANDARD: Verify SA-2948 is open by observing the handle parallel with the hose and then GO TO Encl. 5.4 Step 2.

COMMENTS:

___ SAT

___ UNSAT

NLO-802 R0 - k Page 9 of 12 STEP 11: Encl. 5.4 Step 2 Position Auto / Manual toggle switches to Manual for all running Diesel Air Compressors.

STANDARD: Position Auto / Manual toggle switches to Manual for ALL Ingersoll

-Rand Diesel Air Compressor

s. COMMENTS:

___ SAT

___ UNSAT STEP 12: Encl. 5.4 Step 3 Verify any Diesel Air Compressor running.

STANDARD: Determine that ALL Diesel Air Compressors are running by observing RPMs, discharge pressure, etc.

Cue: Indicate that the compressor s have normal RPMs and discharge pressure.

COMMENTS:

___ SAT

___ UNSAT NOTE When the SA system is operational, SA

-141 (SA TO IA CONTROLLER) automatically regulates IA header pressure to 85 psig if IA pressure decreases to <

85 psig. Opening SA-143 will bypass SA

-141 and allow the SA header to pressurize the IA header greater than 85 psig.

During some SA tag outs for maintenance, SA

-143 may be red tagged closed. If SA

-143 is red tagged closed, then the Diesel Air Compressors will already be aligned (via an alternate flow path) to supply directly into the IA system and opening SA

-143 is not required.

STEP 13: Encl. 5.4 Step 4 Verify SA-143 (SA TO IA CONTROLLER BYPASS) (T-1/L-33, 15' E on chain) is red tagged closed.

STANDARD: Valve is located in the Turbine Building basement and determine that it is not red tagged closed

. Continue to the RNO step. COMMENTS:

___ SAT ___ UNSAT

NLO-802 R0 - k Page 10 of 12 STEP 14: Encl. 5.4 Step 4 RNO Open SA-143 (SA TO IA CONTROLLER BYPASS) (T-1/L-33, 15' E on chain) STANDARD: SA-143 chain is pulled to rotate the valve counter clockwise until it reaches a hard stop.

Cue: After the operator indicates that he will open SA

-143, inform operator that valve is open COMMENTS:

___ SAT ___ UNSAT STEP 14: Encl. 5.4 Step 5 Notify Unit 2 CR of Diesel Air Compressor status. STANDARD: Unit 2 CR is notified that ALL Diesel Air Compressors are operating using a phone or radio.

Cue: Inform the candidate that another operator will continue with this procedure.

COMMENTS: END TASK

___ SAT ___ UNSAT

STOP TIME: ____________

NLO-802 R0 - k Page 11 of 12 CRITICAL STEP EXPLANATIONS:

STEP # Explanation 4 Required to manually start compressor 7 Required to manually start compressor 8 Required to manually start compressor

k CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

Units 1, 2, and 3 are operating at 100% power.

The Unit 1 Control Room Operator receives the "INSTRUMENT AIR SYSTEM TROUBLE" Statalarm and observes that Instrument Air pressure is decreasing on the Control Room IA pressure gauge.

INITIATING CUES:

The Unit 2 Control Room Operator directs you to perform Encl. 5.4 (Emergency Start of the Diesel Air Compressor) of AP/2/A/1700/

022 (Loss Of Instrument Air).