2014/02/26 NRR E-mail Capture - Constellation License Transfer Tq RAI Responses (MF2584-88)
ML14057A713
Person / Time
Site: Calvert Cliffs, Nine Mile Point, Ginna  Constellation icon.png
Issue date: 02/14/2014
From: Tyler E M
Constellation Energy Nuclear Group
To: Morgan N S
Division of Operating Reactor Licensing
References
MF2584, MF2585, MF2586, MF2587, MF2588
Download: ML14057A713 (4)


Text

1NRR-PMDAPEm Resource From:Morgan, Nadiyah Sent:Wednesday, February 26, 2014 2:19 PM To:NRR-PMDA-ECapture Resource Cc:Lee, Erika

Subject:

Constellation License Transfer TQ RAI and Responses (MF2584-88)

Attachments:

License Transfer Response.docx; Technical Qua lifications RAI re: Constellation License Transfer (MF2584-88)

Hearing Identifier: NRR_PMDA Email Number: 1117 Mail Envelope Properties (9C2386A0C0BC584684916F7A0482B6CAF7E8A72827)

Subject:

Constellation License Transfer TQ RAI and Responses (MF2584-88) Sent Date: 2/26/2014 2:19:20 PM Received Date: 2/26/2014 2:19:21 PM From: Morgan, Nadiyah Created By: Nadiyah.Morgan@nrc.gov Recipients: "Lee, Erika" <Erika.Lee@nrc.gov>

Tracking Status: None "NRR-PMDA-ECapture Resource" <NRR-PMDA-ECapture.Resource@nrc.gov> Tracking Status: None Post Office: HQCLSTR02.nrc.gov

Files Size Date & Time MESSAGE 4 2/26/2014 2:19:21 PM License Transfer Response.docx 40966 Technical Qualifications RAI re: Constellation License Transfer (MF2584-88) 8214 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

1. With the proposed license transfer of the Facilities, the CENG entities will contract Exelon Generation to operate the Facilities under a Nuclear Operating Services Agreement (NOSA). The CENG entity will remain the owner of the Facilities but will not have a functioning organization or staff. The current CENG corporate organization is planned to be absorbed into the Exelon Generation nuclear corporate organization. The Exelon Generation nuclear corpor ate organization consists of senior executives and support staff responsible for governance and oversight of the existing Exelon fleet. The organization includes Nuclear Oversight, Licensing and Regulatory A ffairs, Engineering, Fuels, Outage Services and functional area managers in all the areas of plant operations. In addition, administrative and support functional leaders reside in the nuclear corporate organization, such as human resources, communications, IT, finance and procurement. The Exelon Generation nuclear organization is governed by a Management Model based upon an overriding philosophy of an engaged management team that establishes and enforces high standards and clear accountabilities. The Management Model involves: disciplined processes to assure day-to-day safety and operating rigor; standard templates for outage planning, preparation and execution; consistent performance reporting, monitoring and metrics; effective human performance tools; and appropriate financial controls. The CENG Facilities will transition to the Management Model after the proposed transfers. The nuclear corporate support technical functions that currently provide the governance and oversight in the existing Exelon fleet will provide same to the CENG Facilities. 2.

The plant staff at the Facilities will remain essentially unchanged as a result of the license transfers, including senior managers and key operational and technical staff. The site organizations will be transitioned to the Exelon Nuclear Management Model organization structure, which supports achieving and sustaining high levels of performance and safety.

The transition will involve adaption of processes, programs and policies of the Exelon Nuclear Management Model and the alignment of the staff to support their safe and efficient execution. Except for realignment of administrative and support functions (such as IT, procurement and finance) to offsite corporate functional departments, the lines of authority and communication for site operations and technical staff will remain the same, reporting up through the Site Vice President. The Site Vice Presidents of each of the CENG-owned sites will continue to report to the CENG Chief Nuclear Officer (CNO), who will also be an executive of Exelon Generation after the license transfers. The CENG CNO will report up through the Exelon Generation Chief Nuclear Officer. The Exelon Generation CNO will be the senior corporate officer with all the necessary authority and full responsibility for the safe and reliable operation of the Exelon Generation nuclear fleet, including the CENG-owned sites. Exelon Generation will interf ace with EDF through CENG Board interactions. These interactions will primarily be a function of the senior executives who will hold dual officer positions in Exelon and CENG, including the CENG Chief Executive Officer, Chief Nuclear Officer, Chief Financial Officer, Secretary and Treasurer. The Exelon Generation staff organization(s) responsible for the technical support/plant staff day-to-day operation and maintenance of the Facilities will have minimal interaction with EDF, i.e., EDF will not ordinarily interface with the onsite operating organization.

SVP Operations CENG CNOPlant Manager,OperationsSite VP,Calvert CliffsSite VP,R.E. GinnaSite VP,Nine Mile PointSVP Exelon Generation President & CNO Exelon Nuclear