ML14112A080

From kanterella
Revision as of 19:03, 1 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
River Bend -2014-03-As Given Operating Test
ML14112A080
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/27/2014
From: Vincent Gaddy
Operations Branch IV
To:
Entergy Operations
laura hurley
References
05-458/14-03, RJPM-NRC-M14-S2, Rev 3
Download: ML14112A080 (18)


Text

As Given Operating Test Attached are the two job performance measures (JPM's) which were changed after final exam approval. The first, JPM S2, was changed to a different main steam isolation valve train based on a simulator fidelity issue documented in exam report 05000458/2014301. The JPM is otherwise unchanged. This issue did not impact any other portion of the administered exam. The second, JPM P1, was also changed to different chilled water trains due to actual maintenance work that was being performed on the original components during exam administration. This maintenance only affected this one in

-plant JPM, and the JPM was otherwise unchanged.

RJPM-NRC-M14-S2Rev 3River Bend Station Initial License ExamPage1of8NUCLEAR PLANT OPERATOR JOB PERFORMANCE MEASURE SROROALTERNATE PATHTITLE:Perform STP-109-6302 (MSIV Quarterly Partial Stroke Operability Test)OPERATOR:DATE:EVALUATOR:EVALUATOR SIGNATURE:CRITICAL TIME FRAME:Required Time (min):

NAActual Time (min):

NAPERFORMANCE TIME:Average Time (min):15 Actual Time (min):JPM RESULTS*:(Circle one)

  • Refer to Grading Instructions at end of JPM SATUNSATEVALUATION METHOD
EVALUATION LOCATION
XPerformPlantSimulateXSimulatorControl RoomPrepared:Dave Bergstrom Date:March 4, 2014Reviewed:Jeff Reynolds Date:March 4, 2014 (Operations Representative)Approved:Joey ClarkDate:March 4, 2014(Facility Reviewer)

RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2Rev3Page2of8EXAMINER INFO SHEETTask Standard:MSIV Partial Stroke Operability Test has been completed for B21-AOVF028B.(STP-109-6302, Section 7.3)

.Synopsis:The reactor is operating with the reactor at 100%. This task will test MSIVspartial stroke.NOTE: If in the Plant or the Control Room,Caution the operator NOT to MANIPULATE thecontrols, but to make clear what they would do if this were not a simulated situation.

1)Read to the operator

"I will provide the initial conditions and initiating cues to you. I may also provide cuesduring the performance and ask follow-up questions at the conclusion of this JPM. Whenyou complete the task successfully, the objective for this JPM will be satisfied.Inform me when you have completed the task.2) Initiating Cues:The CRS has directed you to perform STP-109-6302 (MSIV Quarterly Partial StrokeOperability Test) for B21-AOVF028B.3) Initial Conditions: The reactor is operating at 100%. All MSIV's are open. The status lights on the back panels have been verified ENERGIZED, STP-109-6302 iscomplete through step 6.6.16. Step 6.7 is ready to be performed.4) Solicit and answer any questions the operator may have.

RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2Rev3Page3of8DATA SHEETTASK Title:Task NumberK&A SYSTEM

K&A RATING
MSIV Partial Stroke Operability Test239017001001239001 A4.014.2 / 4.0Reason for RevisionRevision 3 is due to changing which MSIV is tested to support a simulator DR.

REFERENCES:

APPLICABLE OBJECTIVESSTP-109-6302, Rev 15RLP-STM-0109, Obj 7, 8REQUIRED MATERIALS:SAFETY FUNCTION:Marked up copy of STP-109-6302,__3__MSIV Quarterly Partial Stroke Operability TestSIMULATOR CONDITIONS & SETUP:1. IC # 2172. Rx Power: 100% operating.CRITICAL ELEMENTS:Items marked with an "

  • " are Critical Steps and are required to beperformed. Failure to successfully complete a Critical Step requires theJPM to be evaluated as Unsatisfactory.TASKSTANDARD:MSIV Partial Stroke Operability Test has been completed for B21-AOVF028B. (STP-109-6302, Section 7.3)

RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2Rev3Page4of8PERFORMANCE:START TIME:STP-109-6302MSIV Quarterly Partial Stroke Operability TestPrerequisites 1.Procedure Step:6.7 Record pressure as indicated from IAS-PI105, INSTRUMENT AIRHEADER PRESS on Panel H13-P870:StandardApplicant records instrument air pressure from correct pressure instrument.

CueNotesResultsSATUNSATPROCEDURE NOTEWhen performing STP-051-0201 in conjunction with this procedure...This note is NA7 PROCEDURE 7.1 B21-AOVF028B, MSL B OUTBD MSIV (Partial Stroke Close), Operability TestPROCEDURE CAUTION RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2Rev3Page5of82.Procedure Step:7.3.1 Verify Main Steam Lines A, C, and D are not isolated.StandardApplicant verified red lights ON and green lights OFF for inboard andoutboard A, C, and D MSIVs.

CueNotesResultsSATUNSAT3.*Procedure Step:7.3.2 Place B21H-S1E, MSL B OUTBD MSIV handswitch inOPEN/SLOW TEST.StandardApplicant positioned the B outboard MSIV switch from AUTO to Open/SlowTest (turning the switch clockwise).

CueNotesResultsSATUNSATPROCEDURE NOTEThe next two steps meet the partial stroke exercise requirement.

4.*Procedure Step:7.3.3 Depress B21H-S3E, MSL B OUTBD MSIV TEST pushbutton to beginslow closing B21-AOVF028B. WHEN the remote position indicationdepicts a not fully open valve (dual indication), THEN immediatelyrelease B21H-S3E.StandardApplicant depressed the S3E pushbutton.Applicant released the S3E pushbutton, when dual indication (red and greenlights ON), and prior to high flow in any other steam line.

CueNotesResultsSATUNSAT RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2Rev3Page6of85.Procedure Step:7.3.4 Verify that the remote position indication depicts a fully open valve(red light only).StandardApplicant verifies that the green light is OFF and the red light is ON.

CueNotesResultsSATUNSAT6.Procedure Step:7.3.5 IF B21-AOVF028B was successfully partial stroke closed and fullyopened as indicated in steps 7.3.3 and 7.3.4, THEN record as Acceptable forB21-AOVF028B on Data Sheet 1, OTHERWISE record as Unacceptable.StandardApplicant circled "A" on Data Sheet 1 for B21-AOVF028B CueNotesResultsSATUNSAT7.Procedure Step:7.3.6 Place B21A-S1E, MSL B OUTBD MSIV handswitch in AUTO.StandardApplicant positioned the B outboard MSIV switch from Open/Slow Test toAUTO (turning the switch counter-clockwise).

CueNotesStep 7 is not critical due to the logic still enabling all trips to close the MSIVsThe next two steps are for independent verification of valve/switch positionResultsSATUNSATTerminating Cue:MSIV Partial Stroke Operability Test has been completed for B21-AOVF028B. (STP-109-6302, Section 7.3).This completes this JPM.STOP TIME:

RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2Rev3Page7of8JPM COMMENT SHEETCRITERIA FOR SATISFACTORY EVALUATION1. 100% of critical elements/steps identified in the JPM successfully completed.2. Critical Time Frame is met if applicable.3. No actual safety violation (radiological or industrial) requiring evaluator intervention.CRITERIA FOR UNSAT EVALUATION1. Any critical element/step is graded as "UNSAT"2. Critical Time Frame is not met if applicable. *3. Actual safety violation (radiological or industrial) requiring evaluator intervention.4. Operator's actions would have damaged plant equipment, created a personnel safety hazard, orotherwise reduced the level of safety of the plant RJPM-NRC-M14-S2Rev. 3RJPM-NRC-M14-S2Rev3Page8of8OPERATOR CUE SHEETINITIAL CONDITIONS: The reactor is operating at 100%. All MSIV's are open. The status lights on the back panels have been verified ENERGIZED,STP-109-6302 is complete through step 6.6.16. Step 6.7 is ready to be performed.INITIATING CUE:The CRS has directed you to perform STP-109-6302 (MSIV Quarterly Partial StrokeOperability Test) for B21-AOVF028B.

RJPM-NRC-M14-P1Rev 1River Bend Station Initial License ExamPage1of9NUCLEAR PLANT OPERATOR JOB PERFORMANCE MEASURE SROROALTERNATE PATHTITLE:Alternate Control Building Chilled Water Pumps within the Standby DivisionOPERATOR:DATE:EVALUATOR:EVALUATOR SIGNATURE:CRITICAL TIME FRAME:NANAPERFORMANCE TIME:JPM RESULTS*:EVALUATION METHOD

EVALUATION LOCATION
XXPrepared: Date:Reviewed: Date: (Approved:Date:

RJPM-NRC-M14-P1Rev1Page2of9EXAMINER INFO SHEETTask Standard:Synopsis:NOTECautionNOTRead to the operator RJPM-NRC-M14-P1Rev1Page3of9DATA SHEETTASK Title:Task NumberK&A SYSTEM

K&A RATING

291011001001

REFERENCES:

APPLICABLE OBJECTIVESREQUIRED MATERIALS:SAFETY FUNCTION:__9__SIMULATOR CONDITIONS & SETUP:CRITICAL ELEMENTS:*TASKSTANDARD:

RJPM-NRC-M14-P1Rev1Page4of9PERFORMANCE:START TIME:*Procedure Step:*Procedure Step:

RJPM-NRC-M14-P1Rev1Page5of9PROCEDURE NOTEOil level can be lower than normal if service water temperature islow, greater than or equal to 65°F and less than or equal to 75°F.For a non-operating chiller an oil level in or above the upper sightglass is normal. When idle, the level may be higher due to theabsorption of refrigerant by the oil.Procedure Step:Procedure Step:Procedure Step:

RJPM-NRC-M14-P1Rev1Page6of9Procedure Step:Procedure Step:Procedure Step:

RJPM-NRC-M14-P1Rev1Page7of9Procedure Step:Procedure Step:

This completes this JPM.STOP TIME:

RJPM-NRC-M14-P1Rev1Page8of9JPM COMMENT SHEET

RJPM-NRC-M14-P1Rev1Page9of9OPERATOR CUE SHEETINITIAL CONDITIONS:INITIATING CUE: