|
---|
Category:License-Operator
MONTHYEARIR 05000331/20193012019-06-18018 June 2019 NRC Initial License Examination Report 05000331/2019301 ML22143A9392019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-301-7 ML22143A9422019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-401-9 ML22143A9352019-05-16016 May 2019 2019 DAEC Ile ES-201-1 ML22143A9412019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-401-4 ML22143A9432019-05-16016 May 2019 DAEC 2019 Outline Comments ML22143A9382019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-201-3 NG-19-0058, 2019 DAEC Addendum to Post Exam Submittal Letter-Comments on Q-70 Clarification2019-04-26026 April 2019 2019 DAEC Addendum to Post Exam Submittal Letter-Comments on Q-70 Clarification NG-19-0057, 2019 DAEC Initial License Examination Post Exam Submittal Letter2019-04-19019 April 2019 2019 DAEC Initial License Examination Post Exam Submittal Letter ML22143B0022019-04-0808 April 2019 2019 Deac Ile Administered Written Exam ML22143A9992019-04-0808 April 2019 2019 DAEC Ile Administered Admin JPMs ML22143B0032019-04-0808 April 2019 RO and SRO Exam Reference Handouts ML22143B0002019-04-0808 April 2019 2019 DAEC Ile Administered Sim and Inplant JPMs ML22143B0012019-04-0808 April 2019 2019 DAEC Ile Scenarios ML19087A3022019-03-28028 March 2019 Operator Licensing Examination Approval (Cdz) ML22144A0672019-02-22022 February 2019 2019 DAEC Ile Proposed RO and SRO Admin JPMs ML22144A0692019-02-22022 February 2019 2019 DAEC Ile Proposed Sim and Inplant JPMs ML22144A0732019-02-22022 February 2019 2019 DAEC Ile Proposed Written Exam ML22144A0742019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-301-3 ML22144A0752019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-301-4 ML22144A0712019-02-22022 February 2019 2019 DAEC Ile Proposed Scenarios ML22144A0792019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-401-6 ML22144A0762019-02-22022 February 2019 2019 Duane Arnold Initial License Exam Form ES-301-6 ML22145A4392019-01-23023 January 2019 2019 DAEC Initial License Examination Submittal Letter ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III ML22143B0052018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-1 ML22143B0042018-12-21021 December 2018 2019 DAEC Ile ES-201-2 ML22143B0082018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-401-1 and 401-3 ML22143B0072018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-5 ML22143B0092018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-D1 ML22143B0062018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-2 ML22143B0102018-11-12012 November 2018 2019 DAEC Ile Outline Submittal Letter NG-18-0089, Preparation and Scheduling of Operator Licensing Examinations (Response to RIS 2018-02)2018-07-25025 July 2018 Preparation and Scheduling of Operator Licensing Examinations (Response to RIS 2018-02) ML18099A2622018-04-0909 April 2018 Gfes Results-March 2018, Duane Arnold Energy Center (Cover Letter Only) ML18086B0662018-03-27027 March 2018 Facility Cover Letter - Riii - March 2018 - GFE ML17361A0302017-12-26026 December 2017 GFE Annual Registration Letter - 2018 Examinations - Region III IR 05000331/20173012017-07-14014 July 2017 NRC Initial License Examination Report 05000331/2017301 (Meb) ML17214A0502017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam SRO Written Examination ML17214A0342017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Operating JPMs ML17214A0272017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam ES-401-6 ML17214A0282017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Admin RO-SRO JPMs ML17214A0382017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam RO Written Examination ML17214A2142017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Scenarios ML17214A0362017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Scenarios 1-2-3-Alt ML17214A4112017-06-14014 June 2017 Dua 2017 Ile Administrative Files ES-401-9 Final ML17214A3072017-06-14014 June 2017 Dua 2017 Ile - Administered Exam SRO Written Examination ML17214A2592017-06-14014 June 2017 Dua 2017 Ile - Administered Exam RO-SRO Admin JPMs ML17214A2322017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Operating Sim and IP JPMs ML17214A2952017-06-14014 June 2017 Dua 2017 Ile - Administered Exam RO Written Examination ML17214A4012017-06-14014 June 2017 Dua 2017 Ile Administrative Files ES-401-4 2019-06-18
[Table view] Category:Part 55 Examination Related Material
[Table view] |
Text
ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2 Facility: Duane Arnold Energy Center Date of Examination: 4/6/15 - 4/17/15 Exam Level: RO SRO-I SRO-U Operating Test No.: _2015301_____ Control Room Systems
@ (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function a. Start a Recirc MG Set and Recirc Pump. K/A: 202001, A4.01 IR: 3.7/3.7 BANK: #202001-04 D, L 1 b. Establish RPV Level Control Post Scram with RWCU Drain to Condenser (AP with System High Temperature and Failure to Isolate). K/A: 204000, A2.14 IR: 3.2/3.2 BANK: #204000-7. D, A 2 c. Isolate an MSIV at Power. K/A: 239001, A2.10 IR: 3.8/3.9. BANK: #239001
-03. D 3 d. Manually Inject into the RPV with Core Spray to Achieve Alternate Shutdown Cooling. K/A: 209001, A4.05 IR: 3.8/3.6 M, A 4 e. Drain Torus to Radwaste (AP must install Defeat 13). K/A: 219000, A2.12 IR: 3.0/3.1 BANK: #219000-04 D, A 5 f. Placing the Main Generator on the Grid. K/A: 262001, A4.05 IR: 3.3/3.3 BANK 262001
-05. D, L 6 g. APRM Gain Adjust. K/A: 215005, A 1.07 IR: 3.0/3.4. N 7 h. Install EOP Defeat 4 with a Group 7 Isolation. K/A: 400000, A4.01 IR: 3.1/3.0 BANK: #40000-04 D, A, P 8 In-Plant Systems
@ (3 for RO); (3 for SRO
-I); (3 or 2 for SRO
-U) i. Vent the Scram Air Header. K/A 2001001, K1.09, IR: 3.1/3.2 N, E, R 1 j. Operate RCIC from 1C208. K/A: 217000, A1.03 IR: 4.0/4.0 N, R, A 2 k. Shutdown of Regulating Transformer 1Y1A for Maintenance. K/A: 262002, A4.01 IR: 2.8/3.1 BANK: #
262002-05 D, R 6 @ All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in
-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 - / -
ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2 Facility: Duane Arnold Energy Center Date of Examination: 4/6/15 - 4/17/15 Exam Level: RO SRO-I SRO-U Operating Test No.: _2015301_____ Control Room Systems
@ (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function a. Start a Recirc MG Set and Recirc Pump. K/A: 202001, A4.01 IR: 3.7/3.7 BANK: #202001-04 D, L 1 b. Establish RPV Level Control Post Scram with RWCU Drain to Condenser (AP with System High Temperature and Failure to Isolate). K/A: 204000, A2.14 IR: 3.2/3.2 BANK: #204000-7. D, A 2 c. n/a n/a n/a d. Manually Inject into the RPV with Core Spray to Achieve Alternate Shutdown Cooling. K/A: 209001, A4.05 IR: 3.8/3.6 M, A 4 e. Drain Torus to Radwaste (AP must install Defeat 13). K/A: 219000, A2.12 IR: 3.0/3.1 BANK: #219000
-04 D, A 5 f. Placing the Main Generator on the Grid. K/A: 262001, A4.05 IR: 3.3/3.3 BANK 262001
-05. D, L 6 g. APRM Gain Adjust. K/A: 215005, A 1.07 IR: 3.0/3.4. N 7 h. Install EOP Defeat 4 with a Group 7 Isolation. K/A: 400000, A4.01 IR: 3.1/3.0 BANK: #40000
-04 D, A, P 8 In-Plant Systems
@ (3 for RO); (3 for SRO
-I); (3 or 2 for SRO
-U) i. Vent the Scram Air Header. K/A 2001001, K1.09, IR: 3.1/3.2 N, E, R 1 j. Operate RCIC from 1C208. K/A: 217000, A1.03 IR: 4.0/4.0 N, R, A 2 k. Shutdown of Regulating Transformer 1Y1A for Maintenance. K/A: 262002, A4.01 IR: 2.8/3.1 BANK: #
262002-05 D, R 6 @ All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in
-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 - / -