Letter Sequence Response to RAI |
---|
TAC:MF5151, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B, SDV Actions (Open) TAC:MF5152, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B, SDV Actions (Open) |
|
|
|
---|
Category:Letter
MONTHYEARPLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 ML24291A1562024-10-16016 October 2024 Missed Annual Inventory Required by 40 CFR 266, Subpart in PLE 0026645 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004-01, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001-01, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8123, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 2024-09-06
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARPLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8013, Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-80132022-06-27027 June 2022 Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-8013 PLA-8005, Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005)2022-05-23023 May 2022 Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005) PLA-7984, Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 22022-03-0808 March 2022 Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-7865, Response to Request for Additional Information Regarding Proposed License Amendment Requesting Revision to the Dose Consequence Analysis for a Loss of Coolant Accident (PLA-7865) Loss of Coolant Accident2020-06-0202 June 2020 Response to Request for Additional Information Regarding Proposed License Amendment Requesting Revision to the Dose Consequence Analysis for a Loss of Coolant Accident (PLA-7865) Loss of Coolant Accident PLA-7853, Ninety-Day Response to Request for Additional Information Regarding Proposed License Amendment Requesting Application of Advanced Framatome Methodologies PLA-78532020-04-0101 April 2020 Ninety-Day Response to Request for Additional Information Regarding Proposed License Amendment Requesting Application of Advanced Framatome Methodologies PLA-7853 PLA-7841, Thirty-Day Response to Request for Additional Information Regarding Proposed License Amendment Requesting Application of Advanced Framatome Methodologies2020-02-0606 February 2020 Thirty-Day Response to Request for Additional Information Regarding Proposed License Amendment Requesting Application of Advanced Framatome Methodologies PLA-7830, Response to Second Request for Additional Information Regarding Proposed License Amendment Requesting a Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-12-0909 December 2019 Response to Second Request for Additional Information Regarding Proposed License Amendment Requesting a Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping PLA-7793, Response to Request for Additional Information Regarding Proposed License Amendment Requesting a Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-06-0303 June 2019 Response to Request for Additional Information Regarding Proposed License Amendment Requesting a Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping PLA-7704, Response to Generic Letter 2016-01, Request for Supplemental Information2018-05-24024 May 2018 Response to Generic Letter 2016-01, Request for Supplemental Information PLA-7701, Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination.2018-04-11011 April 2018 Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination. PLA-7673, Proposed Amendment to Licenses NPF-14 and NPF-22: Response to Request for Additional Information and Supplement to Application to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-76732018-02-16016 February 2018 Proposed Amendment to Licenses NPF-14 and NPF-22: Response to Request for Additional Information and Supplement to Application to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7673 PLA-7655, Response to Request for Additional Information, (CAC Nos. MF9131 and MF9132) PLA-76552017-12-0404 December 2017 Response to Request for Additional Information, (CAC Nos. MF9131 and MF9132) PLA-7655 PLA-7619, Response to Request for Additional Information Regarding License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits2017-08-0404 August 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits PLA-7583, Response to NRC Request for Supplemental Information for License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits (PLA-7583)2017-03-21021 March 2017 Response to NRC Request for Supplemental Information for License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits (PLA-7583) PLA-7518, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2016-10-31031 October 2016 Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. PLA-7537, Response to Request for Additional Information License Amendment Request Extending Completion Times in Support of 480V Ess Load Center Transformer Replacements2016-10-10010 October 2016 Response to Request for Additional Information License Amendment Request Extending Completion Times in Support of 480V Ess Load Center Transformer Replacements ML16097A4872016-04-0606 April 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Temporary Change of Technical Specifications 3.7.1 and 3.8.7, Applicable Drawings PLA-7418, Response to Request for Additional Information for the Third Interval Relief Requests 3RR-19, 3RR-20 and 3RR-212015-12-10010 December 2015 Response to Request for Additional Information for the Third Interval Relief Requests 3RR-19, 3RR-20 and 3RR-21 PLA-7406, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-4252015-11-11011 November 2015 Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 ML15296A0602015-10-16016 October 2015 Enclosure 3, Revised (Clean) Copy of the SSES EAL Basis Document Which Includes the Changes Made in Enclosure 2 ML15296A0592015-10-16016 October 2015 Enclosure 1, Response to NRC Request for Additional Information Regarding License Amendment Request to Adopt Nuclear Energy Institute 99-0 1, Revision 6 and Enclosure 2, Mark-up of the Changes Made to the SSES EAL Basis.. ML15296A0532015-10-15015 October 2015 Enclosure 4 to PLA-7399 Revised (Clean) Copy of the SSES EAL Basis Document ML15296A0522015-10-15015 October 2015 Attachments 1 Through 9 - EP-RM-004 to Enclosure 3 to PLA-7399 Mark-up of Proposed Additional Changes Made to the SSES EAL Basis Document ML15296A0502015-10-15015 October 2015 Enclosures 1 and 2 to PLA-7399 - List of Proposed Additional Changes to the Susquehanna Steam Electric Station Emergency Action Level Basis Document and Mark-up of Proposed Additional Changes Made to the SSES EAL Comparison Matrix (Revision PLA-7399, Proposed Additional Changes to the SSES Emergency Plan Basis Document Since Submittal of Response to NRC Request for Additional Information PLA-73992015-10-15015 October 2015 Proposed Additional Changes to the SSES Emergency Plan Basis Document Since Submittal of Response to NRC Request for Additional Information PLA-7399 PLA-7389, Flood Hazards Reevaluation Report, Information to Support Audit2015-09-24024 September 2015 Flood Hazards Reevaluation Report, Information to Support Audit PLA-7381, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-4252015-09-21021 September 2015 Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7371, Response to Request for Supplemental Information for the Third Interval Relief Requests 3RR-19, 3RR-20, and 3RR-212015-08-0606 August 2015 Response to Request for Supplemental Information for the Third Interval Relief Requests 3RR-19, 3RR-20, and 3RR-21 PLA-7334, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-4252015-07-0202 July 2015 Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 ML18024A1091978-09-0808 September 1978 Letter Attaching a Schedule for Responses to NRC Question List of June 5, 1978 ML18026A1161978-08-31031 August 1978 Letter Responding to the Letter of May 17, 1978 Enclosing Information for Antitrust Review of Operating License. ML18025A5151978-08-31031 August 1978 Letter Regarding Information for Antitrust Review of Operating License Application ML18024A0921978-04-14014 April 1978 Letter Responding to the Commission Request for Additional Information with a Schedule for Response on Containment ML18024A0891978-03-31031 March 1978 Letter Replying to the Questionnaire Contained in the December 6, 1977 Letter and Attaching an Updated Response for Unit 1 and a Complete Response for Unit 2 ML18024A0851978-03-0707 March 1978 Letter Regarding the Commission Letter of February 15, 1978 Containing the Staff Position on the Use of Austenitic Stainless Steel and Advising That PP&L Will Provide a Response by September 1, 1978 ML18025A2481977-06-14014 June 1977 Letter Submitting Additional Information Relative to the Commission'S Previous Request to Establish a Cold Weather Concrete Freeze-Protection Period of Three Days ML18025A2611977-01-19019 January 1977 Letter Documenting Responses to Questions Given to Mr. Singh Bawa of the NRC from Pp&L'S Mr. E.D. Testa in Telephone Conversations on 1/17/1977 and 01/18/1977 ML18025A2641976-12-30030 December 1976 Letter Responding to Letters Requesting That Certain Information Be Submitted to Address Anticipated Transients Without Scram (ATWS) for SSES Including Analysis and Justification of the GE Analysis Model ... ML18023A9051976-11-18018 November 1976 Response to Four Questions on the Susquehanna-Siegfried 500 Kv Line ML18023B4951976-11-18018 November 1976 Letter Responding the November 3, 1976 Letter with Answer to Four Questions on the Susquehanna-Siegfried 500 Kv Line as Indicated in Amendment 5 and Attaching PA Dept. of Environmental Resources Approval for the Crossing ... ML18025A4871976-10-15015 October 1976 Responses to Questions with Attached Drawings and Maps ML18023B4961976-10-15015 October 1976 Letter Responding to the October 6, 1976 Letter Requesting Additional Information on SSES Transmission Lines ML18025A2741976-09-0909 September 1976 Letter Responding to the Commission Letter of August 9, 1976 Relating to Annulus Pressurization and Cracks in the Feedwater Nozzle Blend Radii ML18025A4951975-06-0505 June 1975 Letter Responding to the April 17, 1975 Letter Requesting Additional Information Relative to the Design of the Containment for SSES and Attaching the Mark II Containment Program and Schedule ML18023A7651975-05-13013 May 1975 Letter Responding to NRC Letters Dated February 18, 1975 and March 14, 1975 Containing NRC Staff Positions 2024-09-18
[Table view] |
Text
Jon A. Franke Site Vice President Susquehanna
- Nuclear, LLC 769 Salem Boulevard
- Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 jon.franke@talenenergy.com ENERGY SEP 2 1 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.90 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION ON TECHNICAL SPECIFICATION CHANGES TO ADOPT TRAVELER TSTF -425 PLA-7381 Docket Nos. 50-387 and 50-388
References:
- 1. Letter PLA-7119,
[Proposed Amendments to License NPF-14 and NPF-22} Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control-Risk Informed Technical Task Force (RITSTF)
Initiative 5, "dated October 27, 2014 (AccessionML14317A052).
- 2. Letter PLA-7334, "Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425, "dated July 2, 2015 (Accession ML15183A248)
. 3. NRC Letter, "Request for Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force Traveler (TSTF)-425, (TAC Nos. MF5151 andMF5152),
"dated August 24, 2015 (AccessionML15209A974)
. The purpose of this letter is for Susquehanna
- Nuclear, LLC to provide the requested additional information (RAI). By Reference 1, and as supplemented by additional information in Reference 2, Susquehanna
- Nuclear, LLC submitted a license amendment request (LAR) to modify Susquehanna Stearn Electric
- Station, Units 1 and 2 (SSES) Technical Specifications (TS) by relocating specific surveillance frequencies to a licensee-controlled program.
The program will implement Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies,"
(Accession ML071360456).
The changes adopt an NRC approved Technical Specification Task Force (TSTF) traveler, TSTF-425, Revision 3, (Accession ML080280275).
In Reference 3, the RAI includes two questions for which responses are provided in Attachment
- 1. Susquehanna
- Nuclear, LLC has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRC in Reference
- 1. The additional infmmation provided by this submittal does not Document Control Desk PLA-7381 affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration.
Furthe1more, the additional information also does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
There are no new regulatory commitments associated with this response.
If you have any questions or require additional information, please contact Mr. Jeffery N. Grisewood (570) 542-1330.
I declare under penalty of pe1jury that the foregoing is tme and conect. Executed on: 7ranke Attachment 1: Response to Requested Additional Information Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Mr. J. A. Whited, NRC Project Manager Mr. M. Shields, PA DEP/BRP Attachment 1 to PLA-7381 Response to Requested Additional Information Attachment 1 to PLA-7381 Page 1 of 4 Response to Requested Additional Information By letter dated October 27, 2014,(1) and as supplemented by additional infmmation in a letter dated July 2, 201s,CZ>
Susquehanna
- Nuclear, LLC submitted a license amendment request (LAR) for the Susquehanna Steam Electric Station (SSES), Units 1 and 2. The proposed amendment would modify the SSES Technical Specifications by relocating specific frequencies to a licensee-controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies.
"<3> The NRC requested additional information (RAI) in a letter dated August 24, 2015.(4) This Attachment provides the requested additional information.
RAI8: In the response to request for additional information (RAI) 3, regarding Supporting Requirement (SR) HR-B2, the licensee clarified that the intent of the finding and observation (F&O) resolution was to indicate that there is no longer any reliance on staggered testing/maintenance principles for screening
- purposes, and that the pre-initiator process was used for screening.
The licensee's response also seems to suggest that all common mode elTors were screened out. Discuss the justification and conclusions on screening pre-initiator common mode elTors. Also, discuss the considerations and the bases for the inclusion or exclusion of modeling of common-mode elTors in the probabilistic risk assessment (PRA). SSES Response to RAI 8: Both common mode miscalibration events and common mode misalignment events were considered for the SSES pre-initiator Human Reliability Analysis (HRA). (1) Letter (PLA-7119),
[Proposed Amendments to License NPF-14 and NPF-22] Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control-Risk Informed Technical Specification Task Force (RITSTF)
Initiative 5, "dated October 27,2014 (Accession ML14317A052)
. (2) Letter (PLA-7334),
"Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425, "dated July 2, 2015 (Accession ML15183A248).
(3) Nuclear Energy Institute (NEI) 04-10, Revision 1, "Risk-Informed Technical Specifications Initiative 5B, Risk-Informed Method for Control of Surveillance Frequencies,"
dated April30, 2007 (Accession ML071360456).
( 4) NRC Letter, "Request for Additional Information Regarding License Amendment Request to Adopt Technical Specifications TaskForce Traveler (TSTF)-425, (TAC Nos. MF5151 and MF5152),"
dated August 24, 2015 (Accession ML15209A974).
Attachment 1 to PLA-7381 Page 2 of4 For common mode miscalibrations, the pre-initiator identification process identified those calibration activities during which a common error could occur that would prevent the automatic actuation of a function required in the PRA. For example, common mode miscalibration events are included in the PRA for the critical Reactor Pressure Vessel (RPV) pressure switch channels that would fail the low pressure permissive logic required for Low Pressure Coolant Injection and Core Spray injection (i.e., A and B, A and D, Band C, etc.). Common mode calibration activities were screened from the analysis if:
- The activities could lead to calibration errors in non-PRA systems.
- The activities could lead to calibration errors for equipment within a component's boundary (i.e., miscalibrations of sensors/instruments that are within the component boundary are inherent in the component failure data and do not require additional failure events).
- The combination of miscalibration errors does not result in critical failure of the logic. For example, for an actuation signal that requires operation of channel "A" OR "B" AND channel "C" OR "D" for success, it is not necessary to include events of common cause miscalibration of channels "A" and "D" because the signal is not failed by that combination.
For common mode misalignment errors, the pre-initiator identification process identified single activities that could result in the misalignment of a component that would prevent operation of multiple redundant trains of a system or diverse systems.
For example, a misalignment was included for a spray pond retum valve, which if left closed, would result in the failure of the "A" train of Emergency Service Water (for both Units 1 & 2) and the "A" train of Residual Heat Removal Service Water (also for both Units 1 & 2). Activities leading to misalignment/restoration errors were screened if:
- The activities were related to non-PRA systems.
- The activities were related to n01mally operating systems and operation would reveal a misalignment.
Components in multi-train systems in which one train may be assumed to be normally running and the other( s) assumed to be in standby were not screened.
All trains were assumed to be in standby for the pre-initiator Human Error Probability (REP) identification process.
- Position indication is available in the main control room, automatic re-alignment occurs on system initiation, a status check is perf01med on a shiftly basis, or a signal exists that would identify the misalignment.
This screening rule was not applied to misalignments/restoration errors that could simultaneously impact multiple redundant trains or diverse systems.
Common mode events impacting redundant system trains or diverse systems were specifically treated in accordance with HR-A3. This SR requires the identification of work practices that "involve a mechanism that simultaneously affects equipment in either Attachment 1 to PLA-7381 Page 3 of4 different trains of a redundant system or diverse systems (e.g., use of common calibration equipment by the same crew on the same shift, a maintenance or test activity that requires realignment of an entire system (e.g., SLCS)." The intent of the SR was viewed to focus on capturing single activities that impact redundant trains of a system or diverse
- systems, not multiple, separate activities that impact redundant or diverse systems, even if they are performed in an outage. Any components that could be manipulated in a way that would disable different trains of a redundant system or diverse systems should be identified through the system review and developed as events. These activities may not be screened.
Quantification of the common mode pre-initiator events was performed using the initiator Accident Sequence Evaluation Program (ASEP) methodology, which is identified in Section 3.2 of NUREG-1842, "Evaluation of Human Reliability Analysis Methods Against Good Practices,"
as a valid approach for evaluating risk-significant initiator events. RAI9: The response to RAI 4 does not discuss reflecting the current plant configuration and operating experience when considering extemal events using NEI 04-10 guidance.
(The response does confirm this for the intemal events analysis.)
Please explain whether evaluation of the fire risk and other extemal events supporting this application
- reflects, or considers, the current plant configuration and operating experience.
SSES Response to RAI 9: By following Steps 1 Oa and 1 Ob of the NEI 04-10 guidance, the evaluation of fire risk and other extemal events risk supporting this application will reflect and consider the current plant configuration and operating experience.
The Individual Plant Examination for Extemal Events (IPEEE) is not a living document and has not been updated to the present plant configuration and operating experience.
As a result, the fire risk and other extemal event risk information from the IPEEE is limited to qualitative insights.
For the surveillance test interval (STI) change evaluations, the intent is not to directly use any numerical results from the IPEEE fire studies or other extemal events, but to qualitatively assess any available information to determine the impact on the proposed surveillance interval
- changes, consistent with Step 1 Oa of the NEI 04-10 methodology.
This qualitative assessment of fire risk and other extemal event risk will include a review of applicability to the current plant configuration and operating experience.
Additionally, for some STI change evaluations, per Step lOb of the NEI 04-10 methodology, qualitative reasoning and very low changes to core damage frequency and large Attachment 1 to PLA-7381 Page 4 of4 early release frequency (L1LERF) results from the internal events analysis may be sufficient to support the STI change evaluation where Step 1 Ob reads in part: "Alternative evaluations for the impact from external events and shutdown events are also deemed acceptable at this point. For example, if the !:l.eDF and MERF values have been demonstrated to be very small from an internal events perspective based on detailed analysis of the impact of the SSe being evaluated for the STI change, and if it is known that the eDF or LERF impact from external events (or shutdown events as applicable) is not specifically sensitive to the sse being evaluated (by qualitative reasoning),
then the detailed internal events evaluations and associated required sensitivity cases (as described in Step 14) can be used to bound the potential impact from external events and shutdown PRA model contributors.
" Qualitative evaluation of fire and external events risk in support of Step 1 Ob would also include consideration of applicability to the cunent plant configuration and operating expenence.
Therefore, by following Steps 1 Oa and 1 Ob of the NEI 04-10 guidance, the evaluation of fire risk and other external events will reflect and consider the cunent plant configuration and operating experience.