MONTHYEARIR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23345A0682023-11-28028 November 2023 Technical Specification Bases, Manual PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) IR 05000387/20230032023-11-0303 November 2023 Integrated Inspection Report 05000387/2023003 and 05000388/2023003 PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML23291A1132023-10-12012 October 2023 Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0412023-10-0505 October 2023 Notification of Commercial Grade Dedication Inspection (05000387/2024011 and 05000388/2024011) and Request for Information IR 05000387/20233012023-09-20020 September 2023 Initial Operator Licensing Examination Report 05000387/2023301 and 05000388/2023301 ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) IR 05000387/20230052023-08-31031 August 2023 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2023005 and 05000388/2023005) ML23228A1952023-08-21021 August 2023 Summary of August 10, 2023, Public Observation Meeting Re. Proposed Alternative PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval IR 05000387/20230022023-08-0101 August 2023 Integrated Inspection Report 05000387/2023002 and 05000388/2023002 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) ML23201A0152023-07-20020 July 2023 Operator Licensing Examination Approval ML23200A1012023-07-19019 July 2023 Notification of Conduct of a Fire Protection Team Inspection ML23193A0062023-07-12012 July 2023 Requalification Program Inspection PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence IR 05000387/20234012023-06-0707 June 2023 Security Baseline Inspection Report 05000387/2023401 and 05000388/2023401 PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) IR 05000387/20230012023-05-12012 May 2023 Integrated Inspection Report 05000387/2023001 and 05000388/2023001 PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 ML23090A2302023-03-31031 March 2023 NRC Decommissioning Funding Status Report PLA-8049 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) ML23095A0572023-03-29029 March 2023 NRC Decommissioning Funding Status Report December 31, 2022 PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 ML23065A1962023-03-0202 March 2023 EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1 IR 05000387/20220062023-03-0101 March 2023 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2022006 and 05000388/2022006) PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums IR 05000387/20220042023-02-0808 February 2023 Integrated Inspection Report 05000387/2022004 and 05000388/2022004 ML23010A0882023-01-15015 January 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Control Rod Technical Specifications 2024-02-07
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARPLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8013, Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-80132022-06-27027 June 2022 Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-8013 PLA-8005, Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005)2022-05-23023 May 2022 Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005) PLA-7984, Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 22022-03-0808 March 2022 Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-7865, Response to Request for Additional Information Regarding Proposed License Amendment Requesting Revision to the Dose Consequence Analysis for a Loss of Coolant Accident (PLA-7865) Loss of Coolant Accident2020-06-0202 June 2020 Response to Request for Additional Information Regarding Proposed License Amendment Requesting Revision to the Dose Consequence Analysis for a Loss of Coolant Accident (PLA-7865) Loss of Coolant Accident PLA-7853, Ninety-Day Response to Request for Additional Information Regarding Proposed License Amendment Requesting Application of Advanced Framatome Methodologies PLA-78532020-04-0101 April 2020 Ninety-Day Response to Request for Additional Information Regarding Proposed License Amendment Requesting Application of Advanced Framatome Methodologies PLA-7853 PLA-7841, Thirty-Day Response to Request for Additional Information Regarding Proposed License Amendment Requesting Application of Advanced Framatome Methodologies2020-02-0606 February 2020 Thirty-Day Response to Request for Additional Information Regarding Proposed License Amendment Requesting Application of Advanced Framatome Methodologies PLA-7830, Response to Second Request for Additional Information Regarding Proposed License Amendment Requesting a Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-12-0909 December 2019 Response to Second Request for Additional Information Regarding Proposed License Amendment Requesting a Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping PLA-7793, Response to Request for Additional Information Regarding Proposed License Amendment Requesting a Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-06-0303 June 2019 Response to Request for Additional Information Regarding Proposed License Amendment Requesting a Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping PLA-7704, Response to Generic Letter 2016-01, Request for Supplemental Information2018-05-24024 May 2018 Response to Generic Letter 2016-01, Request for Supplemental Information PLA-7701, Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination.2018-04-11011 April 2018 Response to NRC Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examination. PLA-7673, Proposed Amendment to Licenses NPF-14 and NPF-22: Response to Request for Additional Information and Supplement to Application to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-76732018-02-16016 February 2018 Proposed Amendment to Licenses NPF-14 and NPF-22: Response to Request for Additional Information and Supplement to Application to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7673 PLA-7655, Response to Request for Additional Information, (CAC Nos. MF9131 and MF9132) PLA-76552017-12-0404 December 2017 Response to Request for Additional Information, (CAC Nos. MF9131 and MF9132) PLA-7655 PLA-7619, Response to Request for Additional Information Regarding License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits2017-08-0404 August 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits PLA-7583, Response to NRC Request for Supplemental Information for License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits (PLA-7583)2017-03-21021 March 2017 Response to NRC Request for Supplemental Information for License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits (PLA-7583) PLA-7518, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2016-10-31031 October 2016 Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. PLA-7537, Response to Request for Additional Information License Amendment Request Extending Completion Times in Support of 480V Ess Load Center Transformer Replacements2016-10-10010 October 2016 Response to Request for Additional Information License Amendment Request Extending Completion Times in Support of 480V Ess Load Center Transformer Replacements ML16097A4872016-04-0606 April 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Temporary Change of Technical Specifications 3.7.1 and 3.8.7, Applicable Drawings PLA-7418, Response to Request for Additional Information for the Third Interval Relief Requests 3RR-19, 3RR-20 and 3RR-212015-12-10010 December 2015 Response to Request for Additional Information for the Third Interval Relief Requests 3RR-19, 3RR-20 and 3RR-21 PLA-7406, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-4252015-11-11011 November 2015 Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 ML15296A0602015-10-16016 October 2015 Enclosure 3, Revised (Clean) Copy of the SSES EAL Basis Document Which Includes the Changes Made in Enclosure 2 ML15296A0592015-10-16016 October 2015 Enclosure 1, Response to NRC Request for Additional Information Regarding License Amendment Request to Adopt Nuclear Energy Institute 99-0 1, Revision 6 and Enclosure 2, Mark-up of the Changes Made to the SSES EAL Basis.. ML15296A0532015-10-15015 October 2015 Enclosure 4 to PLA-7399 Revised (Clean) Copy of the SSES EAL Basis Document ML15296A0522015-10-15015 October 2015 Attachments 1 Through 9 - EP-RM-004 to Enclosure 3 to PLA-7399 Mark-up of Proposed Additional Changes Made to the SSES EAL Basis Document ML15296A0502015-10-15015 October 2015 Enclosures 1 and 2 to PLA-7399 - List of Proposed Additional Changes to the Susquehanna Steam Electric Station Emergency Action Level Basis Document and Mark-up of Proposed Additional Changes Made to the SSES EAL Comparison Matrix (Revision PLA-7399, Proposed Additional Changes to the SSES Emergency Plan Basis Document Since Submittal of Response to NRC Request for Additional Information PLA-73992015-10-15015 October 2015 Proposed Additional Changes to the SSES Emergency Plan Basis Document Since Submittal of Response to NRC Request for Additional Information PLA-7399 PLA-7389, Flood Hazards Reevaluation Report, Information to Support Audit2015-09-24024 September 2015 Flood Hazards Reevaluation Report, Information to Support Audit PLA-7381, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-4252015-09-21021 September 2015 Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7371, Response to Request for Supplemental Information for the Third Interval Relief Requests 3RR-19, 3RR-20, and 3RR-212015-08-0606 August 2015 Response to Request for Supplemental Information for the Third Interval Relief Requests 3RR-19, 3RR-20, and 3RR-21 PLA-7334, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-4252015-07-0202 July 2015 Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 ML18024A1091978-09-0808 September 1978 Letter Attaching a Schedule for Responses to NRC Question List of June 5, 1978 ML18026A1161978-08-31031 August 1978 Letter Responding to the Letter of May 17, 1978 Enclosing Information for Antitrust Review of Operating License. ML18025A5151978-08-31031 August 1978 Letter Regarding Information for Antitrust Review of Operating License Application ML18024A0921978-04-14014 April 1978 Letter Responding to the Commission Request for Additional Information with a Schedule for Response on Containment ML18024A0891978-03-31031 March 1978 Letter Replying to the Questionnaire Contained in the December 6, 1977 Letter and Attaching an Updated Response for Unit 1 and a Complete Response for Unit 2 ML18024A0851978-03-0707 March 1978 Letter Regarding the Commission Letter of February 15, 1978 Containing the Staff Position on the Use of Austenitic Stainless Steel and Advising That PP&L Will Provide a Response by September 1, 1978 ML18025A2481977-06-14014 June 1977 Letter Submitting Additional Information Relative to the Commission'S Previous Request to Establish a Cold Weather Concrete Freeze-Protection Period of Three Days ML18025A2611977-01-19019 January 1977 Letter Documenting Responses to Questions Given to Mr. Singh Bawa of the NRC from Pp&L'S Mr. E.D. Testa in Telephone Conversations on 1/17/1977 and 01/18/1977 ML18025A2641976-12-30030 December 1976 Letter Responding to Letters Requesting That Certain Information Be Submitted to Address Anticipated Transients Without Scram (ATWS) for SSES Including Analysis and Justification of the GE Analysis Model ... ML18023B4951976-11-18018 November 1976 Letter Responding the November 3, 1976 Letter with Answer to Four Questions on the Susquehanna-Siegfried 500 Kv Line as Indicated in Amendment 5 and Attaching PA Dept. of Environmental Resources Approval for the Crossing ... ML18023A9051976-11-18018 November 1976 Response to Four Questions on the Susquehanna-Siegfried 500 Kv Line ML18025A4871976-10-15015 October 1976 Responses to Questions with Attached Drawings and Maps ML18023B4961976-10-15015 October 1976 Letter Responding to the October 6, 1976 Letter Requesting Additional Information on SSES Transmission Lines ML18025A2741976-09-0909 September 1976 Letter Responding to the Commission Letter of August 9, 1976 Relating to Annulus Pressurization and Cracks in the Feedwater Nozzle Blend Radii ML18025A4951975-06-0505 June 1975 Letter Responding to the April 17, 1975 Letter Requesting Additional Information Relative to the Design of the Containment for SSES and Attaching the Mark II Containment Program and Schedule ML18023A7651975-05-13013 May 1975 Letter Responding to NRC Letters Dated February 18, 1975 and March 14, 1975 Containing NRC Staff Positions ML18025A2971975-05-0808 May 1975 Letter Responding to Letters Dated April 17, 1975 and April 23, 1975 and Informing the NRC That a Schedule and Program for Resolution of This Matter Is Being Developed in Conjunction with Other Utilities Owning Mark II ... ML18025A5711975-05-0808 May 1975 Pennsylvania Power & Light'S 05/08/1975 Response to Request for Additional Information Mark II Containment Designs to Account for Suppression Pool Hydrodynamic Loads That Occur During Coolant Loss & Safety Valve Discharge 2024-01-04
[Table view] |
Text
RC DISTAIBUTION FOR PART 50 DOCKET MATERIAL (TEfrj!POBABY FORM)
CONTIIOL NQ:
4 ~
F)LE'ROM:
pennsylvania Power 6 Liglr DATE OF 'DOC DATE BEC'D LTR TV/X RPT OTHER Co. Allentown,pa.
t'uttis 5-13>>75 5-19-75 XX xx TO: ORIG CC OTHER SENT AEC PDR xxx Dry Walter R. Butler 1.<<signed SENT l.OCAL PDB CLASS UNC LASS PROP INFO INPUT NO CYS REC'D DOCKET NO:
xxxx, 1 50-387 an 388 DESCR IP1 IOiN: ENCLOSURES:
I ~ i
.Ltr'otari"ed i5-16-75 . c, ~,,,ref our ~
i 3-14-75 'ltr furn responses to NRG Staff Positiorls 0 ~ ~ ~,0 ~ ~ '
p, ". $
).
~'
I
- PLANT NAME: 2.
Susquehana 1 6 FOR ACTiON/li~JFORf "iA i IOiN 5023<<75 JGB BUTLER (L) SCHNENCE R (L) Z I E'aANN { L) BEGAN (E)
EVRCopies lV/ Copies W/ Copies Ml/ Copies CLARK (L) STOLZ (L) DICKER (E) LEAf< (L)
W/ Copies R/ Copies hV/ Copi s W/ Cooies
'PARR il i VACQhi I i i (I 'I K'ir jiw i' I @pe r vY/ r oples W/ Copies hV/ Copies W/ Copies KNIEL (L) PURPl.E (L) YOUNGBLOOD (E) LIC:".'ISIIiG PROJECT HANAGER k'V/ Copies Vri/. Copies rN/ Copies hV/ Copies INTERNAL DISTRIBUTION Kb Fl rECII nEVIEi.. ~e. NTCN ASST A/T IND DR S CHBOEOLB R. DIGGS (L) B RA ITi'.iAN OGC, BOOY P.506A
~SSI CK/STAF F
~i 'iACCARY ~MfA LLR I H. GEAR libel (L) SA LTZ ( AN rnEt TZ-jhow NIGHT ~ASTN E E. GOULBOUBNE (L)
~CASE AV/LICK I BALLARD P. Kncu Tz En (E) g+AMBUSSO AHAO SPANGLER EE (L) P LAiXS
,BOYD E LLO ~< MAIGBET (L) ~DONALD M OnE(L) OUSTON T ENVIBO s. BEEo (E) CIJAPih>l>>i!
EYOUi>>G (L) WC) VAK Q~iULLER fn. SEnvicE (L) DUBE (L'.r)
SKOVI<OLT (L)
GOLLEB {L) (Ltr)
~SS DICKER s. sHEpp>>BD (L) E. COUPE PFTF BSON WPOLITO KN I G I I TON M. SLATEin (E)
~IjDESCO YOUNG B LOOD HABTFIELD (2)
L CO1,1.1NS ~~nLdS+'IC
-GAN H. SihllTH (L)
S TEFTS (L) KLECKEB QÃINAS P OJECT LDB G. IYILLIAl'IS(E) EISENHUT I=ILI: 8: BEGIOi>> (2) ENABOYA V. LVILSON (L) ,Wl G G I N TON 1IP XC OLLMEB R. INGRAM (L)
STEELE EXTF ANAL DISTR IBUTION
~~ I OCAL f>DB tlilkes I3arre,
~
P- TIC (ABEBNATI<Y) 4A(2 NSIC {BUCHANAN) 1 NATIQNA'L LABs Ml. PENN!! IGTOi'!, ~Brn E-201 GT P D B.SAN/LA,'NY
~BBOOK[IAVr;"'I 'AT I AB
+
ASLB ACII5 4o.
~E Newton Anclerson xi~ ppz~+
7 1 CONSULTANTS NE(Vi%1ABK/0 LUPI E/AG BABIAN 1 G. ULA IKSOi>>, O:~i" L 1 AGMCD (BUTI< G 'SS:,i>>i'!)
l -'.
,. Bm B 1.2.7 GT
'.... GT D. fIUNKLES, Brn E.201
)f I.""i-'"...lL TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEi {21'5) 821 ~ 5151
>>y 13, 1975 Docket Nos. 50-387 and 50-388 Dr. 4'alter R. Bu ler, Chief Light 'Inter Reactors Branch 1-2 Division at Reactor Licensing U.S. Nuclear Regulatory Comnission Washington, D.C. 20555 SU~UEHAITNL STEAII ELECTRiC STATIQN RESP0NSE TO NRC STAFF POSiTi0NS ER 100450 FiLE 840-2 m.-6
Reference:
- 1) NRC letter from Dr. N. R. Butler to bfr. N. N. Curtis dated, 2/18/75.
- 2) NRC letter fro,, D . U. R. Butler to Ih. N. N. Curt's dated 3/14/75.
Dear Dr. Butler:
The following are responses o two of the S aff's po itions in Reference 1:
STAFF PCSXTi0N 2:
Tnc proposed cnange to caole tray loading depth cri eria (le. ANS'rZR 1 on page 11) is unacceptable. t,"e would find the revised. criteria acceptaole i they oere supplemented, by tne words appea ing in lc ANSI'" R 1 on page ll for cable trays in non-highly concentrated" areas and a commitment to conform of ATRendmen I'lo. 8.
to XPCEA Publication No. P54-440 as issued July 19, 1972 ..
RESPONSE
Please refer to Amendment No. 8 (Page 11, Answer 1 amended oy Amendment No. 16) and revise Answer 1 as follows:
Cable trays with 6 inch (outside) side rails and a 5 inch (inside) depth are used for instrument and. control cables . Cable trays with 4 inch (outside) side-rails and a 3 inch (inside) depth are used for power, instrument and control cables. Tray f'll will not exceed. 30 percent of the tray cross section area.
%/<~I~ Q PENNSYLVANIA POWER 8 LIGHT COMPANY
J'.
Page 2 The depth of cables in each type of tray conforms to IPCEA Publication No. P54-440, dated July 19, 1972.
STAFF POSITION 3'he change in seismic analysis methods on page C.4-2 is not acceptable. Tne methods of analysis specified in the PSAR prior to Amendment No. 16 should be usedi
RESPONSE
The method specified in the PSAR prior to Amendment 16 will be used.
The above corrections will be included in 'a future PSAR Amendment.
Very truly yours,
'(id 6,wC.
N. vf. Curtis Vice-President-Engineering and Construction Sworn to and subscribed before me this /"(: "~ of 'p 1975 g~ .,"c I-~/ iso"'c/:3 Notary Publ'c lp commission expires: r'l~-u.h +y~>)4