Braidwood, Units 1 and 2 - Transmittal of Report Titled Five Year Post-Construction Monitoring of the Unionid Community Near the Braidwood Station Kankakee River Discharge Location, Dated September 2015
ML15274A087
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/29/2015
From: Gallagher M P
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15274A093 List:
References
RS-15-259, TAC MF1832, TAC MF1833
Download: ML15274A087 (4)


Text

Exelon Generation Michael P. Gallagher Vice President, License RenewalExelon Nuclear200 Exelon WayKennett Square, PA 19348610 765 5958 Office610 765 5956 Faxwww.exeioncorp.com rnichaelp.gallagher@exeloncorp.corn 10 CFR 5010 CER 5110 CFR 54RS 259September 29, 2015U.S. Nuclear Regulatory Commission ATTN: Document Control DeskWashington, DC 20555-0001 Braidwood

Station, Units 1 and 2Facility Operating License Nos. NPF-72 and NPF-77NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

Report Titled "Five Year Post-construction Monitoring of the Unionid Community nearthe Braidwood Station Kankakee River Discharge Location,"

dated September 2015

References:

1. Letter from Michael P. Gallagher (Exelon Generation
Company, LLC [ExelonGeneration])

to U.S. Nuclear Regulatory Commission (NRC) Document ControlDesk, "Application for Renewed Operating Licenses",

dated May 29, 20132. Letter from Christopher G. Miller (NRC) to Michael P. Gallagher (Exelon Generation),

"Schedule Revision for the Review of the Braidwood

Station, Units 1 And 2, LicenseRenewal Application (TAC NOS. MF1 832 AND MF1 833)", dated September 14,2015In the Reference 1 letter, Exelon Generation
Company, LLC (Exelon Generation) submitted theLicense Renewal Application (LRA) for the Byron and Braidwood
Stations, Units 1 and 2, whichcontained combined technical information required by 10 CFR 54.21 for both stations andseparate site-specific environmental information required by 10 CFR 54.23 for each station.In the Reference 2 letter, the NRC informed Exelon Generation that the schedule for issuance ofthe final site-specific Supplemental Environmental Impact Statement (SEIS) for Braidwood
Station, Units 1 and 2 (Braidwood) license renewal has been delayed from September 2015 toNovember 2015. The purpose of the delay is to allow time for NRC staff "to review the results of[a field] study in the Kankakee River and revise the final Braidwood SEIS, as appropriate,"

withrespect to anticipated effects of extended Braidwood operation on the federally-listed endangered sheepnose mussel (Plethobasus cyphyus).

The enclosure to this letter is the report titled "Five Year Post-construction Monitoring of theUnionid Community near the Braidwood Station Kankakee River Discharge Location,"

dated2' September 29, 2015U.S. Nuclear Regulatory Commission Page 2September 2015. It presents the field study results requested by the NRC staff in order tofinalize the Braidwood license renewal SEIS in accordance with the revised schedule set forth inthe Reference 2 letter.Please note that a copy of this letter and its enclosure are being provided to the U.S.Department of Interior and the U.S. Fish and Wildlife Service -Chicago Field Office (FWS) inthe context of the ongoing Endangered Species Act Section 7 informal consultation betweenNRC and FWS regarding the endangered sheepnose mussel in the Kankakee River near thelocation of the Braidwood discharge.

This letter and its enclosure contain no regulatory commitments.

If you have any questions, please contact Ms. Nancy Ranek, Environmental Lead, ExelonGeneration License Renewal, at 610-765-5369.

I declare under penalty of perjury that the foregoing is true and correct.Executed on: Ot? z2 -"2,tf/)Michael P. Gallagher Vice President

-License Renewal ProjectsExelon Generation

Company, LLC

Enclosure:

"Five Year Post-construction Monitoring of the Unionid Community near theBraidwood Station Kankakee River Discharge Location."

Prepared for ExelonNuclear.

Prepared by Ecological Specialists, Inc. (ESI Project No.15-020).September 2015.cc: Regional Administrator

-NRC Region III (w/o Enclosure)

NRC Project Manager (Environmental Review),

NRR-DLR (w/o Enclosure)

NRC Project Manager (Safety Review),

NRR-DLR (w/o Enclosure)

NRC Project Manager, NRR-DORL Braidwood Station (w/o Enclosure)

NRC Senior Resident Inspector, Braidwood Station (w/o Enclosure)

Illinois Emergency Management Agency -Division of Nuclear Safety (w/o Enclosure)

U.S. Department of Interior

-Office of Environmental Policy and Compliance (wIEnclosure)

U.S. Fish and Wildlife Service -Chicago Illinois Field Office (w/ Enclosure)

RS- 15-259Enclosure Page 1RS-1 5-259ENCLOSURE "Five Year Post-construction Monitoring of the Unionid Community near the Braidwood Station Kankakee River Discharge."

Prepared forExelon Nuclear.

Prepared by Ecological Specialists, Inc. (ESI ProjectNo.15-020).

September 2015.(42 pages)

RS 259Enclosure Page 2THIS PAGE INTENTIONALLY BLANK