2016/04/18 NRR E-mail Capture - FW: Acceptance for Review of CAC MF7496 and MF7497-LAR- Nine Mile Point 1 and 2 - License Amendment Request - Reactivity Anomalies Surveillance
ML16110A002
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 04/18/2016
From: Mozafari B
Plant Licensing Branch 1
To: Reynolds R
Exelon Corp
References
MF7496, MF7497
Download: ML16110A002 (2)


Text

1NRR-PMDAPEm Resource From:Mozafari, Brenda Sent:Monday, April 18, 2016 4:24 PM To:'Ronnie.Reynolds@exeloncorp.com'; Kristensen, Kenneth J:(GenCo-Nuc)

<kenneth.kristensen@exeloncorp.com>

(kenneth.kristensen@exeloncorp.com)

Subject:

FW: ACCEPTANCE for review of CAC MF 7496 and MF7497-LAR- NINE MILE POINT 1 and 2 - License Amendment Request - Reactivity Anomalies Surveillance Ronnie, By letter from Exelon Generation to NRC, regar ding CAC MF7496 and 7497,"License Amendment Request - Incorporate Previously NRG-Approved TSTF-439 Technical Specifications Changes " dated March 18, 2016, (ADAMS Accession No. ML16078A065). The proposed amendment requests a change to modify the Technical Specifications (TS) concerning a change to the method of calculating core reactivity for the purpose of performing the Reactivity Anomalies surveillance at NMP Units 1 and 2.

The purpose of this e-mail is to provide the results of the NRC staff's acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical re view. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. The proposed amendment changes NMP 1 and 2 TS to provide an allowance for brief, inadvertent, simultaneous opening of redundant secondary containment personnel access doors during normal entry and exit conditions.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LARs in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Brenda L. Mozafari Senior Project Manager, NRR/DORL U.S. Nuclear Regulatory Commission

Nine Mile Point 1 and 2 Power Plants 301-415-2020 email: brenda.mozafari@nrc.gov

Hearing Identifier: NRR_PMDA Email Number: 2788 Mail Envelope Properties (Brenda.Mozafari@nrc.gov20160418162400)

Subject:

FW: ACCEPTANCE for review of CAC MF7496 and MF7497-LAR- NINE MILE POINT 1 and 2 - License Amendment Request - Reactivity Anomalies Surveillance Sent Date: 4/18/2016 4:24:29 PM Received Date: 4/18/2016 4:24:00 PM From: Mozafari, Brenda Created By: Brenda.Mozafari@nrc.gov Recipients: "'Ronnie.Reynolds@exeloncorp.com'" <Ronnie.Reynolds@exeloncorp.com> Tracking Status: None "Kristensen, Kenneth J:(GenCo-Nuc) <kenneth.kristensen@exeloncorp.com> (kenneth.kristensen@exeloncorp.com)" <kenneth.kristensen@exeloncorp.com> Tracking Status: None

Post Office: Files Size Date & Time MESSAGE 2181 4/18/2016 4:24:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: