Letter Sequence Other |
---|
CAC:MF8173, TS Inservice Testing (IST) Program Removal (Open) CAC:MF8174, TS Inservice Testing (IST) Program Removal (Open) |
|
MONTHYEARTSTF-15-11, TSTF Comments on Draft Model Safety Evaluation of Traveler TSTF-545, TS Inservice Testing Program & Clarify SR Usage Rule Application to Section 5.5 Testing and Transmittal of TSTF-545, Revision 32015-10-21021 October 2015 TSTF Comments on Draft Model Safety Evaluation of Traveler TSTF-545, TS Inservice Testing Program & Clarify SR Usage Rule Application to Section 5.5 Testing and Transmittal of TSTF-545, Revision 3 Project stage: Draft Request ML15181A0452016-03-18018 March 2016 Fr Notice of Availability Model SE for Traveler TSTF-545, Rev. 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing Using the CLIIP Project stage: Other 05000272/LER-2016-0012016-07-0505 July 2016 Unanalyzed Condition due to Degraded Reactor Baffle to Former Bolts, LER 16-001-00 for Salem, Unit 1, Regarding Unanalyzed Condition due to Degraded Reactor Baffle to Former Bolts Project stage: Request LR-N16-0138, Extension for License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 32016-07-27027 July 2016 Extension for License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3 Project stage: Request ML16218A0052016-08-11011 August 2016 Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-001 Project stage: RAI LR-N16-0153, Response to Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-0012016-08-18018 August 2016 Response to Request for Additional Information Concerning Request for an Extension to Enforcement Guidance Memorandum 12-001 Project stage: Response to RAI ML16235A4712016-08-26026 August 2016 Request for an Extension to Enforcement Guidance Memorandum 12-001 Project stage: Other 2016-07-05
[Table View] |
Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report – Cycle 302023-11-0101 November 2023 Core Operating Limits Report – Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-23
[Table view] |
Text
EA-2016-181 Mr. Peter P. Sena, Ill President PSEG Nuclear LLC -N09 P.O. Box 236 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 26, 2016 Hancocks Bridge, NJ 08038
SUBJECT:
SALEM NUCLEAR GENERATING
- STATION, UNIT NOS. 1 AND 2 -REQUEST FOR AN EXTENSION TO ENFORCEMENT GUIDANCE MEMORANDUM 12-001 (CAC NOS. MF8173 AND MF8174)
Dear Mr. Sena:
By letter dated July 27, 2016 (Agencywide Documents Access and Management System {ADAMS) Accession No. ML 16209A013},
as supplemented by letter dated August 18, 2016 {ADAMS Accession No. ML 16231A044),
PSEG Nuclear LLC (PSEG, the licensee) requested an extension of the enforcement discretion authorized in the U.S. Nuclear Regulatory Commission's (NRC's) Enforcement Guidance Memorandum (EGM) 12-001, "Dispositioning Noncompliance with Administrative Controls Technical Specifications Programmatic Requirements that Extend Test Frequencies and Allow Performance of Missed Tests," dated February 24, 2012 (ADAMS Accession No. ML 11258A243),
for the Salem Nuclear Generating
- Station, Unit Nos. 1 and 2 (Salem).
In EGM 12-001, the NRG stated that it will exercise enforcement discretion to allow application of surveillance requirements (SRs) applicability provisions to technical specification (TS} administrative controls programs as written into plant-specific TS programs with the exceptions described in the February 24, 2012, letter. EGM 12-001 states that the NRG will consider extending the 4-month submittal period on a case-by-case basis, with adequate justification from the licensee.
EGM 12-001 provides guidance on how to disposition licensee noncompliance with Section 5.0, "Administrative Controls,"
TS 5.5., "Program and Manuals,"
testing requirements that make available SR 3.0.2 or SR 3.0.3, or both. In EGM 12-001, the NRG staff determined that enforcement discretion is appropriate for this issue, because the restructuring of TS chapters during the development of improved standard technical specifications resulted in unintended consequences when Section 3.0, "Surveillance Requirement Applicability,"
provisions were made applicable to Section 5.0 TSs. In EGM 12-001, the NRG stated that in order to continue to receive enforcement desecration, affected licensees shall submit a license amendment request (LAR) that is accepted by the NRG staff for review within 4 months after the issuance of the notice of availability (NOA) applicable to a licensee's reactor type. The NOA for Technical Specifications Task Force (TSTF) Traveler TSTF-545, "TS lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing" (ADAMS Accession No. ML 15181 A045), which addresses a reactor type applicable to Salem, was issued on March 28, 2016.
P. Sena, Ill In its request for extension, PSEG stated that due to the level of activity associated with returning Salem, Unit No. 1, to service from extended outage, it is requesting an extension as provided for in EGM 12-001. The level of activity included replacement of reactor baffle to former bolts. In a letter dated July 5, 2016 (ADAMS Accession No. ML 16187A330),
the licensee informed the NRC of an unanalyzed condition due to degraded reactor baffle to former bolts and its planned corrective actions.
The NRC staff has reviewed the information provided in PSEG's letters dated July 27, 2016, and August 18, 2016, and has determined that PSEG has provided sufficient justification.
The staff agrees that PSEG was involved in various safety-significant tasks that required extra attention.
Some of these tasks included completion of required baffle to former bolt replacements, TS-required surveillance
- testing, and post-maintenance testing to assure operability of systems required for Salem, Unit No. 1, to return to service.
Accordingly, provided that PSEG submits a LAR consistent with the model in TSTF-545 no later than September 28, 2016, PSEG will continue to remain eligible for enforcement discretion in accordance with EGM 12-001 at Salem until the NRC staff takes final action on the LAR. If you have any questions regarding this matter, please contact the project manager, Ms. Carleen Parker, at (301) 415-1603 or Carleen.Parker@nrc.gov.
Docket Nos. 50-272 and 50-311 cc: Distribution via Listserv Douglas A Broaddus, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation P. Sena, Ill In its request for extension, PSEG stated that due to the level of activity associated with returning Salem, Unit No. 1, to service from extended outage, it is requesting an extension as provided for in EGM 12-001. The level of activity included replacement of reactor baffle to former bolts. In a letter dated July 5, 2016 (ADAMS Accession No. ML 16187A330),
the licensee informed the NRC of an unanalyzed condition due to degraded reactor baffle to former bolts and its planned corrective actions.
The NRC staff has reviewed the information provided in PSEG's letters dated July 27, 2016, and August 18, 2016, and has determined that PSEG has provided sufficient justification.
The staff agrees that PSEG was involved in various safety significant tasks that required extra attention.
Some of these tasks included completion of required baffle to former bolt replacements, TS-required surveillance
- testing, and post-maintenance testing to assure operability of systems required for Salem, Unit No. 1, to return to service.
Accordingly, provided that PSEG submits a LAR consistent with the model in TSTF-545 no later than September 28, 2016, PSEG will continue to remain eligible for enforcement discretion in accordance with EGM 12-001 at Salem until the NRC staff takes final action on the LAR. If you have any questions regarding this matter, please contact the project manager, Ms. Carleen Parker, at (301) 415-1603 or Carleen.Parker@nrc.gov.
Docket Nos. 50-272 and 50-311 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL 1-2 R/F RidsACRS_MailCTR Resource RidsRgn1 MailCenter Resource RidsNrrDorlLpl1-2 Resource RidsNrrLALRonewicz Resource RidsNrrPMSalem Resource RidsNrrDssStsb Resource RidsOeMailCenter Resource BFretz, OE ADAMS A ccess1on N ML16235A471 o.: OFFICE NRR/DORL/LPLl-2/PM NAME MMarshall DATE 08/25/16 OFFICE NRR/DSS/STSB/BC NAME AKlein DATE 08/25/16 Sincerely,
/RA/ Justin C. Poole for Douglas A. Broaddus, Chief Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
- b 1y e-mail NRR/DORL/LPLl-2/PM N RR/DORL/LPLl-2/LA CParker LRonewicz 08/25/16 08/24/16 OE/EB/BC(A)
NRR/DORL/LPLl-2/BC RFretz DBroaddus (JPoole for) 08/26/16 08/26/16 OFFICIAL RECORD COPY