ML17082A531

From kanterella
Revision as of 21:04, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Ltr 03/23/17 Completion of Actions by Davis-Besse Nuclear Power Station, as Set Forth in Letter Dated March 1, 2017, in Response to NRC Confirmatory Order Dated September 1, 2016 (Rjo)
ML17082A531
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/23/2017
From: O'Brien K G
Division of Reactor Safety III
To: Boles B D
FirstEnergy Nuclear Operating Co
References
EA-16-022
Download: ML17082A531 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532

-4352 March 23, 2017 EA-16-022 Mr. Brian D. Boles Site Vice President FirstEnergy Nuclear Operating Co.

Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop A

-DB-3080 Oak Harbor, OH 43449

-9760

SUBJECT:

COMPLETION OF ACTIONS BY DAVIS

-BESSE NUCLEAR POWER STATION, AS SET FORTH IN LETTER DATED MARCH 1, 2017, IN RESPONSE TO NRC CONFIRMATORY ORDER DATED SEPTEMBER 1, 2016

Dear Mr. Boles:

This letter acknowledges receipt of your letter dated March 1, 2017, which describes the actions you have completed up to the date of the letter in response to the Confirmatory Order issued to you by the U.S. Nuclear Regulatory Commission (NRC) on September 1, 2016. We have completed our review of the actions described in your letter, which appear to be responsive to Section V of the Confirmatory Order, and have no further questions at this time. These actions will be examined during future inspections.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading

-rm/adams.htm and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding."

If you have any questions or comments, please contact Robert Orlikowski, Chief, Operations Branch, at (630) 829

-9834. Sincerely,

/RA/ Kenneth G. O'Brien, Director Division of Reactor Safety Docket No. 50

-346 License No. NPF

-3 cc: Distribution via LISTSERV

Letter to Brian D. Boles from Kenneth G. O'Brien dated March 23, 2017

SUBJECT:

COMPLETION OF ACTIONS BY DAVIS

-BESSE NUCLEAR POWER STATION, AS SET FORTH IN LETTER DATED MARCH 1, 2017, IN RESPONSE TO NRC CONFIRMATORY ORDER DATED SEPTEMBER 1, 2016 DISTRIBUTION

Jeremy Bowen

RidsNrrDorlLpl3 RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII

ADAMs Accession Number: ML17082A531 OFFICE RIII RIII RIII RIII NAME ROrlikowski:jw RSkokowski KO'Brien DATE 03/23/17 03/23/17 03/23/17 OFFICIAL RECORD COPY