ML15086A161

From kanterella
Revision as of 15:48, 12 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
E-Mail from James Morris, Pg&E, to John Hickman, NRC, Response to a Request for Additional Information Re Humboldt Bay License Termination Plan
ML15086A161
Person / Time
Site: Humboldt Bay
Issue date: 03/16/2015
From: Morris J R
Pacific Gas & Electric Co
To: John Hickman
Office of Nuclear Material Safety and Safeguards
References
Download: ML15086A161 (1)


Text

Hickman, JohnFrom: Morris, James R <JY1E@pge.com>Sent: Monday, March 16, 2015 1:36 PMTo: Hickman, JohnCc: Barley, William; Erickson, Martin

Subject:

RE: LTPFollow Up Flag: Follow upFlag Status: FlaggedJohn,With respect to the draft questions associated with the topic of Development of Embedded and Buried Piping DCGLValue, the following clarifying information is provided.Please let me know if any additional information is required.Regards,JimThe cover material depth for buried piping is 2 meters. The TBD will be revised to reflect the 2meter depth.The 9.67E-04 mrem/yr in the TBD is correct. The new RESRAD runs were performed after the RAIresponse was submitted.Section 5.4.3.2 will be revised in Revision 2 of the LTP to include the two paragraphs with theexception of the GARDIAN Ill. The GARDIAN III was not available therefore we will be using theGARDIAN. The second paragraph will be revised to describe the four vs six detector configuration.The TBD we will submit will evaluate the use of the GARDIAN system.We will also add to the end of the 2nd paragraph: "Either bulk assay method must be able toadequately assess soils to the same rigor of a MARSSIM FSS. As such, materials surveyed via liftsor bulk survey methods will be subject to the same NRC review, inspection and confirmatorysurveys associated with all site FSS survey areas."From: Hickman, John [1]Sent: Thursday, February 26, 2015 6:03 AMTo: Morris, James R

Subject:

LTPJim,As we are finalizing the SE for the LTP we have identified 3 relative minor issues that we need resolved. Ihave attached portions of the draft SE that include the issues with comments. Please forward to theappropriate staff and get back to me with resolutions.Thanks,JohnI