ML17167A219

From kanterella
Revision as of 12:28, 4 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Nine Mile Point Nuclear Station, Unit 2 - Acceptance of Requested Licensing Action Amendment to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-522 (CAC No. MF9804)
ML17167A219
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/21/2017
From: Marshall M
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Marshall M, DORL/LPL1, 415-2871
References
CAC MF9804
Download: ML17167A219 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 June 21, 2017

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNIT 2-ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE (TSTF) TRAVELER TSTF-522 (CAC NO. MF9804)

Dear Mr. Hanson:

By letter dated May 31, 2017 (Agencywide Documents Access and Management System Accession No. ML 17151A214), Exelon Generation Company, LLC submitted a license amendment request for Nine Mile Point Nuclear Station, Unit 2. The proposed amendment would modify the Nine Mile Point Nuclear Station, Unit 2, Technical Specifications, to allow operation of ventilation systems with charcoal filters in accordance with Technical Specifications Tasks Force (TSTF) Improved Standard Technical Specifications Change Traveler, TSTF-522, Revision 0, "Revise Ventilation System Surveillance Requirements to Operate for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> per Month" (Agencywide Documents Access and Management System Accession No. ML 100890316). The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 1 O of the Code of Federal Regulations (1 O CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following, as far as applicable, the form prescribed for original applications. Section 50.34 of 1 O CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

  • The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified, despite completion of an B. Hanson adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take less than 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> to complete. The NRC staff expects to complete this review by your requested date of May 31, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staff's initial review of the application and they could change due to several factors, including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications. If you have any questions, please contact me at (301) 415-2871 or Michael.Marshall@nrc.gov. Docket No. 50-41 O cc: Distribution via Listserv Sincerely, Michael L. Marshall, Jr., Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation B. Hanson

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNIT 2 -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE (TSTF) TRAVELER TSTF-522 (CAC NO. MF9804) DATED JUNE 21,'2017. DISTRIBUTION: Public RidsACRS_MailCTR Resource RidsNrrDorl Resource RidsNrrDorlLp11 Resource RidsNrrLALRonewicz Resource RidsNrrPMNineMilePoint Resource RidsRgn1 MailCenter Resource ADAMS Accession No.: ML 17167A219 OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NAME MMarshall LRonewicz DATE 06/19/2017 06/19/2017 NRR/DORL/LPL 1/BC JDanna 06/20/2017 OFFICIAL RECORD COPY NRR/DORL/LPL 1 PM MMarshall 06/21/2017