ML17157B366
From kanterella
Revision as of 09:24, 27 April 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17157B366 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 05/03/2017 |
From: | Welsch J M Pacific Gas & Electric Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
DCL-17-038 | |
Download: ML17157B366 (7) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Letter
MONTHYEARML24260A1222024-09-14014 September 2024
[Table view]14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application DCL-24-054, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 IR 05000275/20240012024-04-23023 April 2024 Integrated Inspection Report 05000275/2024001 and 05000323/2024001 ML24114A2032024-04-22022 April 2024 Request for Information for EP Program and Performance Indicator Verification Inspection (Wolf Creek Nuclear Generating Station) Inspection Report 05000482/2024003 ML24106A2882024-04-18018 April 2024 License Renewal Application Environmental Review RCIs and RAIs ML24106A2892024-04-18018 April 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of March 2024 Audit Regarding the Environmental Review of the License Renewal Application DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24108A1122024-04-15015 April 2024 License Amendment Request 24-02 Request for Approval of DCPP Early Warning System to Meet 10 CFR 73.55(i)(2) and 10 CFR 73.55(e)(9)(vi)(A) DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant ML24082A2592024-03-25025 March 2024 Notice of Enforcement Discretion for Diablo Canyon Power Plant, Unit 2 (EPID L-2024-LLD-0002) - March 25, 2024 ML24081A0462024-03-22022 March 2024 Audit Summary in Support of the License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability ML24081A4052024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability 2024-09-09 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARL-23-011, Independent Spent Fuel Storage Installation Biennial Submittal of Updated Final Safety Analysis Report2023-12-14014 December 2023
[Table view]Independent Spent Fuel Storage Installation Biennial Submittal of Updated Final Safety Analysis Report ML23241A7582023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 1, Figure 1.2-3, Drawing 500001, Rev. 1, Piping and Mechanical Area Locaiton Plan ML23241A7772023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 8.3-10, Drawing 437626, Rev. 34, Sheet 1, Electrical Schematic Diagram 4160V Bus G Automatic Transfer ML23241A7792023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4-8, Drawing 469001, Rev. 3, Restored Cross Sections & Embedment Plan Breakwaters - Restoration & Improvements ML23241A7762023-05-25025 May 2023 Submittal of Revision 27 to Updated Final Safety Analysis Report ML23241A7282023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.5-9, Drawing 438165, Revision 14, Civil Emergency Diesel Generator Fuel Oil System, Sheet 1 ML23241A7462023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 102023, Rev. 57, Sheet 2 ML23241A7622023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496280, Rev. 4, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 ML23241A7552023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-17, Drawing 441240, Revision 48, Electrical Single Line Meter and Relay Diagram 125V D.C. System, Sheet 1 ML23241A7702023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 437667, Rev. 47, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 13 ML23241A7632023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-6, Drawing 437916, Revision 48, Electrical Single Line Meter and Relay Diagram 480 Volt System Bus Section 1F, Sheet 1 ML23241A7602023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 441358, Rev. 43, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 21 & 22 ML23241A7572023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-8, Drawing 441239, Sheet 1, Rev. 48, Electrical Single Line Meter & Relay Diagram 480 Volt System Bus Section 2H ML23241A7472023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-19, Drawing 437545, Revision 10, Sheet 1, Electrical Single Line Diagram Pressurized Heaters ML23241A7612023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-7, Drawing 441238, Rev. 54, Sheet 1, Electrical Single Line Meter & Relay Diagram 480 V System Bus Section 2G ML23241A7642023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496277, Rev. 7, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 ML23241A7662023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Revision 111, Sheet 4, Condensate System ML23241A7712023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 496276, Revision 7, Electrical Schematic Diagram 4160V Diesel Generator No. 23 and Associated Circuit Breaker, Sheet 1 ML23241A7412023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-11, Drawing 441354, Rev. 33, Sheet 1, Electrical Schematic Diagram 4160 V Bus Section H Automatic Transfer ML23241A7392023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-2, Drawing 59316, Revision 23, Mechanical Ventilation Flow Diagram Auxiliary Building Engineered Safety Equipment Area, Sheet 1 ML23241A7442023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441286, Revision 11, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section F Automatic Transfer ML23241A7782023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-2, Drawing 501365, Revision 18, Mechanial Ventilation Flow Diagram Auxiliary Building Engineered Safety Equipment Area, Sheet 1 ML23241A7502023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-20, Drawing 437614, Revision 37, Electrical Schematic Diagram Bus Potential & Synchronizing 4160V System, Sheet 1 ML23241A7302023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.4-7, Drawing 468999-1, Layout, Details, Notes ML23241A7492023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-7, Drawing 437542, Sheet 1, Rev. 57, Electrical Single Line Meter & Relay Diagram 480 Volt System Bus Section 1G ML23241A7332023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 108001-3, Sheet 3 of 3 ML23241A7382023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 458864, Rev. 18, Sheet 1, Electrical Logic Diagram 4160 Volt Bus Section G Automatic Transfer ML23241A7312023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-14, Drawing 437674, Revision 32, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators Auxiliary Motors ML23241A7592023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-4, Drawing 441230, Revision 34, Electrical Single Line Meter & Relay Diagram 4160V System Bus Section G & H: DG 21 & 22, Sheet 1 ML23241A7402023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-8, Drawing 437543, Revision 52, Electrical Single Line Meter & Relay Diagram 480 V System Bus Section H, Sheet 1 ML23241A7562023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437676, Rev. 29, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers ML23241A7802023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-9, Drawing 441352, Revision 26, Electrical Schematic Diagram 4160V Bus Section F Automatic Transfer, Sheet 1 ML23241A7342023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 441357, Rev. 44, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator Control No. 21 & 22 DCL-23-044, 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-10, Drawing 512904, Revision 15, Mechanical Air Monitoring Technical Support Center and Post-Accident Sampling System Air Flow Diagrams2023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-10, Drawing 512904, Revision 15, Mechanical Air Monitoring Technical Support Center and Post-Accident Sampling System Air Flow Diagrams ML23241A7672023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 108023, Rev 36, Sheet 2 ML23241A7532023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-11, Drawing 516111, Sheet 1, Rev. 5, Mechanical Plans, Sections & Details Area L & GE Elev. 140'-0 ML23241A7522023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-8, Drawing 516103, Revision 16, Mechanical Ventilation Flow Diagrams, Sheet 1 ML23241A7732023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-5, Drawing 437530, Revision 41, Electrical Single Line Meter & Relay Diagram 12KV Start-Up System, Sheet 1 ML23241A7292023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-1, Drawing 102001, Rev. 19, Sheet 3, Piping Schematic Legend ML23241A7752023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, Sheet 5, Rev. 112, Condensate System ML23241A7482023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.4-3, Drawing 59317, Sheet 1, Mechanical Flow Diagram Containment Fuel Handling & Fan Rooms ML23241A7372023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437665, Rev. 37, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generator and Associated Circuit Breakers ML23241A7352023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441337, Revision 13, Sheet 1, Electrical Logic Diagram 4160KV Bus Section H Automatic Transfer ML23241A7682023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-18, Drawing 445295, Revision 13, Electrical Single Line Meter and Relay Diagram 125 Volt and 250 Volt D.C. System, Sheet 1 ML23241A7692023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-12, Drawing 496281, Rev. 8, Sheet 1, Electrical Schematic Diagram 4160KV Diesel Generator Control No. 23 ML23241A7652023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-13, Drawing 437666, Revision 8, Revision 21, Sheet 1, Electrical Schematic Diagram 4KV Diesel Generators and Associated Circuit Breakers ML23241A7742023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-11, Drawing 437627, Revision 38, Electrical Schematic Diagram 4160V Bus Section H Automatic Transfer, Sheet 1 ML23241A7722023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-16, Drawing 441297, Revision 14, Electrical Logic Diagram 4160 Volt Bus Section G Automatic Transfer, Sheet 1 ML23241A7452023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-20, Drawing 441340, Rev. 31, Sheet 1, Electrical Schematic Diagram Potential & Synchronizing Diagram 4160V Bus Sections F, G, & H ML23241A7812023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-10, Drawing 441353, Sheet 1, Rev. 30, Electrical Schematic Diagram 1460V Bus Section G Automatic Transfer 2023-05-25 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML17157B366&oldid=605913"