ML16105A441

From kanterella
Revision as of 02:52, 5 April 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Regulatory Audit Plan for May 10-11, 2016, Audit at Excel Facility in Rockville, Maryland, in Support of Extended Power Uprate License Amendment Request (CAC Nos. MF6741, MF6742, and MF6743)
ML16105A441
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/27/2016
From: Saba F E
Plant Licensing Branch II
To: Shea J W
Tennessee Valley Authority
Saba F E
References
CAC MF6741, CAC MF6742, CAC MF6743
Download: ML16105A441 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3R-C Chattanooga, TN 37 402-2801 April 27, 2016

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 -REGULA TORY AUDIT PLAN FOR MAY 10 -11, 2016, AUDIT AT EXCEL FACILITY IN ROCKVILLE, MARYLAND, IN SUPPORT OF EXTENDED POWER UPRATE LICENSE AMENDMENT REQUEST (CAC NOS. MF6741, MF6742, AND MF6743)

Dear Mr. Shea:

By letter dated September 21, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15282A 152), as supplemented by letters dated November 13, December 15, and December 18, 2015 (ADAMS Accession Nos. ML 15317A361, ML 15351A113, and ML 15355A413, respectively), Tennessee Valley Authority (the licensee) submitted a license amendment request (LAR) for the Browns Ferry Nuclear Plant, Units 1, 2, and 3. The proposed amendment would increase the authorized maximum steady-state reactor core power level for each unit from 3,458 megawatt thermal (MWt) to 3,952 MWt. This LAR represents an increase of approximately 20 percent above the original licensed thermal power level of 3,293 MWt, and an increase of approximately 14.3 percent above the current licensed thermal power level of 3,458 MWt. In addition, by letters dated January 28 and 29, 2016 (ADAMS Accession Nos. ML 16019A283 and ML 16020A 111, respectively) the U.S. Nuclear Regulatory Commission (NRC) issued requests for additional information (RAls) to the licensee. The licensee, by letters dated February 16 and March 8, 2016 (ADAMS Accession Nos. ML 16049A248 and ML 16069A142), responded to the staff's RAls. To support its safety evaluations, the NRC staff will conduct an audit with the licensee at the EXCEL Services Corporation facility in Rockville, Maryland, from May 10 to 11, 2016. The audit plan to support the review of the extended power uprate (EPU) LAR regarding spent fuel pool criticality analysis and Boral plates is enclosed.

J.Shea If you have any questions, please contact me at (301) 415-1447 or Farideh.Saba@nrc.gov. Docket Nos. 50-259, 50-260, and 50-296

Enclosure:

Audit Plan for EPU LAR cc w/encl: Distribution via Listserv Sincerely, *-t-r'I Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REGULATORY AUDIT PLAN FOR MAY 10 to 11. 2016. AUDIT AT EXCEL FACILITY IN ROCKVILLE. MARYLAND. TO SUPPORT REVIEW OF EXTENDED POWER UPRATE LICENSE AMENDMENT REQUEST Background TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT. UNITS 1. 2. AND 3 DOCKET NOS. 50-259. 50-260. AND 50-296 The U.S. Nuclear Regulatory Commission (NRC) staff is currently engaged in a review of a license amendment request (LAR) for the Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3. By letter dated September 21, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15282A 152), as supplemented by letters dated November 13, December 15, and December 18, 2015 (ADAMS Accession Nos. ML 15317A361, ML 15351A 113, and ML 15355A413, respectively), Tennessee Valley Authority (TVA, the licensee) submitted an LAR for the BFN, Units 1, 2, and 3. The proposed amendment would increase the authorized maximum steady-state reactor core power level for each unit from 3,458 megawatt thermal (MWt) to 3,952 MWt. This LAR represents an increase of approximately 20 percent above the original licensed thermal power level of 3,293 MWt, and an increase of approximately 14.3 percent above the current licensed thermal power level of 3,458 MWt. In addition, by letters dated January 28 and 29, 2016 (ADAMS Accession Nos. ML 16019A283 and ML 16020A 111, respectively) the U.S. Nuclear Regulatory Commission (NRC) issued requests for additional information (RAls) to the licensee. The licensee, by letters dated February 16 and March 8, 2016 (ADAMS Accession Nos. ML 16049A248 and ML 16069A142), responded to the staff's RAls. The NRC staff has determined that a regulatory audit of the BFN LAR should be conducted in accordance with the Nuclear Reactor Regulation (NRR) Office Instruction LIC-111, "Regulatory Audits," for the NRC staff to gain a better understanding of the licensee's calculations and other aspects of the LAR. Enclosure Regulatory Audit Basis The basis of this audit is TVA's LAR and NUREG-0800, "Standard Review Plan for the Review of Nuclear Power Plants: Section 9.1.1, "Criticality Safety of Fresh and Spent Fuel Storage and Handling." This audit will provide information necessary for the evaluation of the spent fuel pool (SFP) being conducted by NRG staff from the Performance and Code Review Branch, Division of Safety Systems; and Steam Generator Tube Integrity and Chemical Engineering Branch (ESGB), Division of Engineering, NRR. Regulatory Audit Scope The scope of this regulatory audit will include documents used to support the technical basis for the SFP criticality analysis and neutron absorber (Boral) monitoring program. Information Necessary for the Regulatory Audit The licensee is requested to have the draft responses available on site for the audit team for the staff request for additional information regarding SFP criticality analysis and Boral monitoring program transmitted to TVA by e-mail on March 22, 2016. The NRG staff requests the licensee to make any analyses or documentation referenced in the draft responses available. The draft responses could be provided electronically or by paper copies. If provided electronically, the licensee is requested to have at least two computers available for the audit team, with a printer connected. Additional information needs identified during the audit will be communicated to the designated point of contact. The NRG staff also requests the licensee to make personnel who are familiar with the LAR (including site staff and contractors, if appropriate) accessible upon request (either in person or by phone). The personnel should be able to respond to NRG staff questions. Team Assignments I Resource Estimates Audit Team Lead Farideh Saba (NRG) Technical Reviewer Kent Wood (NRG) Technical Reviewer Scott Krepel (NRG) Technical Reviewer Matthew Yoder (NRG) Logistics The audit will be conducted with the licensee at the EXCEL Services Corporation facility in Rockville, Maryland, from May 1 Oto 11, 2016. Entrance and exit briefings will be held at the beginning and end of this audit. The licensee is requested to arrange for a conference room for use by the audit team. The audit will start at 9:00 a.m. on Tuesday, May 10, 2016, and conclude on Wednesday, May 11, 2016. Our tentative schedule for the audit is as follows: May 10. 2016 9:00 a.m. 9:30 a.m. 10:00 a.m. 12:00 p.m. 1:00 p.m. 4:00 p.m. 4:30 p.m. 5:00 p.m. May 11, 2016 9:00 a.m. 12:00 p.m. 1:00 p.m. 3:30 p.m. 4:00 p.m. 5:00 p.m. Deliverables Check-in at EXCEL Office -meet licensee contact(s), setup for entrance meeting. Entrance Meeting -introductions, audit activities, goals, and logistics. NRC Team Breakout/Discussion with the licensee. Lunch. NRC Team Breakout/Discussion with the licensee. Audit Team Caucus. NRG/Licensee Interim Meeting. Audit Team Daily Closeout. NRC Team Breakout/ Discussion with the licensee. Lunch. NRC Team Breakout/Discussion with the licensee. Audit Team Caucus. NRG/Licensee Interim/Exit Meeting. NRG/Licensee Audit Closeout. At the conclusion of the audit, the NRC staff will conduct an exit briefing and will provide a summary of audit results in each subject area defined in the audit scope. An audit report/summary will be issued to the licensee within approximately 90 days from the end of the audit. Additionally, the results of the audit will be utilized to focus the scope of any requests for additional information issued in the course of this review.

J. Shea If you have any questions, please contact me at (301) 415-1447 or Farideh.Saba@nrc.gov. Sincerely, /RA/ Siva P. Lingam for Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296

Enclosure:

Audit Plan for EPU LAR cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC RidsACRS_MailCTR Resource RidsNrrDorllpl2-2 Resource RidsNrrDpr Resource RidsNrrLABClayton Resource RidsRgn2MailCenter Resource MYoder, NRR LPL2-2 R/F RidsNrrDorl Resource RidsNrrPMBrownsFerry Resource RidsNrrDssSnpb Resource KWood, NRR SKrepel, NRR Slingam, NRR ADAMS Accession No.: ML 16105A441 OFFICE DORL/LPLIV-1/PM DORL/LP LI 1-2/PM DORL/LP LI 1-2/LA NAME SLingam (FSaba for) FSaba BClayton DATE 04/26/16 04/26/16 04/26/16 OFFICE DSS/SNPB/BC

  • DORL/LP LI 1-2/BC DORL/LP LI 1-2/PM NAME JDean BBeaslev FSaba (Slinaam for) DATE 04/25/16 04/27/16 04/27116 OFFICIAL RECORD COPY *by email DE/ESGB/BC
  • GKulesa <MYoder, for) 04/22116