Annual Assessment Letter (IR 05000395-08-001)
ML080630301
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/03/2008
From: Eugene Guthrie
NRC/RGN-II/DRP/RPB5
To: Archie J
South Carolina Electric & Gas Co
References
IR-08-001
Download: ML080630301 (7)


Text

March 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - VIRGIL C. SUMMER NUCLEAR STATION (NRC INSPECTION REPORT 05000395/2008001)

Dear Mr. Archie:

On February 6, 2008, the NRC staff completed its performance review of the Virgil C. Summer Nuclear Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, Virgil C. Summer Nuclear Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting non-ROP inspections which include: TI 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3 Mitigating Strategies; and TI 2515/172, Reactor Coolant System Dissimilar Metal Butt Welds.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

SCE&G

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4662 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Eugene Guthrie, Chief Reactor Projects Branch 5 Division of Reactor Projects

Docket No.: 50-395 License No.: NPF-12

Enclosure:

Summer Inspection/Activity Plan (03/01/08 - 06/30/09)

cc w/encl.:

(See page 3)

_________________________

OFFICE RII:DRP RII:DRP RII:DRP RII:DRP

SIGNATURE

/RA/

/RA/

/RA/

/RA/

NAME JDodson DArnertt LGarner EGuthrie

DATE 2/28/08 2/27/08 3/3/08 3/3/08

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO

SCE&G

cc w/encl.:

Kathryn M. Sutton, Esq.

Morgan, Lewis & Bockius LLP Electronic Mail Distribution

Henry J. Porter Assistant Director Division of Radioactive Waste Mgmt.

S.C. Department of Health and Environmental Control Electronic Mail Distribution

Bruce L. Thompson Manager Nuclear Licensing (Mail Code 830)

South Carolina Electric & Gas Company Electronic Mail Distribution

Thomas D. Gatlin General Manager Nuclear Plant Operations (Mail Code 303)

South Carolina Electric & Gas Company Electronic Mail Distribution

SCE&G

Letter to Jeffrey from Eugene F. Guthrie dated March 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - VIRGIL C. SUMMER NUCLEAR STATION NRC INSPECTION REPORT 05000395/2008001

Distribution w/encl.:

C. Evans, RII EICS (Part 72 Only)

L. Slack, RII EICS OE Mail (email address if applicable)

R. Martin, NRR RIDSNRRDIRS PUBLIC

Summer Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/03/2008 08:12:34 Report 22

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 03/10/2008 03/14/2008

71152B IP Baseline Inspections Identification and Resolution of Problems 03/24/2008 03/28/2008

71152B IP

PSB1-RP

- RADIATION PROTECTION PREINSPECTION VISIT Baseline Inspections Access Control to Radiologically Significant Areas 03/24/2008 03/26/2008

7112101 IP

PSB1-RP

- RADIATION PROTECTION OCCUPATIONAL WK1 Baseline Inspections Access Control to Radiologically Significant Areas 04/28/2008 05/02/2008

7112101 IP Baseline Inspections ALARA Planning and Controls 04/28/2008 05/02/2008

7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/28/2008 05/02/2008

7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/28/2008 05/02/2008

71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 04/28/2008 05/02/2008

71151-PR01 IP

EB3-ISI

- SUMMER - ISI Baseline Inspections Inservice Inspection Activities - PWR 05/05/2008 05/09/2008

7111108P IP

PSB1-RP

- RADIATION PROTECTION OCCUPATIONAL WK2 Baseline Inspections Access Control to Radiologically Significant Areas 05/05/2008 05/09/2008

7112101 IP Baseline Inspections ALARA Planning and Controls 05/05/2008 05/09/2008

7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 05/05/2008 05/09/2008

7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 05/05/2008 05/09/2008

71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 05/05/2008 05/09/2008

71151-PR01 IP

TI-171

- B.5.B PHASE 2&3 Generic Safety Inspection Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 06/23/2008 06/27/2008

2515/171 IP

EB3TI172

- TI-172 Generic Safety Inspection Reactor Coolant System Dissimiliar Metal Butt Welds 07/07/2008 07/11/2008

2515/172 IP

EB1-CDBI

- COMPONENT DESIGN BASIS INSPECTION Baseline Inspections Component Design Bases Inspection 07/28/2008 08/01/2008

7111121 IP Baseline Inspections Component Design Bases Inspection 08/11/2008 08/15/2008

7111121 IP Baseline Inspections Component Design Bases Inspection 08/25/2008 08/29/2008

7111121 IP Baseline Inspections Component Design Bases Inspection 09/08/2008 09/12/2008

7111121 IP

OL RQ

- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 08/11/2008 08/15/2008

7111111B IP

PSB1-EP

- EP INSP EP Baseline Inspection Alert and Notification System Testing 09/22/2008 09/26/2008

7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 09/22/2008 09/26/2008

7111403 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 09/22/2008 09/26/2008

7111404 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 09/22/2008 09/26/2008

7111405 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Summer Inspection / Activity Plan 03/01/2008 - 06/30/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/03/2008 08:12:34 Report 22

PSB1-EP

- EP INSP Baseline Inspections Drill/Exercise Performance 09/22/2008 09/26/2008

71151-EP01 IP Baseline Inspections ERO Drill Participation 09/22/2008 09/26/2008

71151-EP02 IP Baseline Inspections Alert & Notification System 09/22/2008 09/26/2008

71151-EP03 IP

OL EXAM

- INITIAL EXAM PREP Not Applicable SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 01/05/2009 01/09/2009

V23297

OL EXAM

- INITIAL EXAM - WEEK 1 Not Applicable SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 02/02/2009 02/06/2009

V23297

OL EXAM

- INITIAL EXAM - WEEK 2 Not Applicable SUMMER/JANUARY 2009 EXAM AT POWER FACILITIES 02/09/2009 02/13/2009

V23297

PSB1EP

- EP EXERCISE EP Baseline Inspection Exercise Evaluation 03/30/2009 04/03/2009

7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 03/30/2009 04/03/2009

7111404 IP Baseline Inspections Drill/Exercise Performance 03/30/2009 04/03/2009

71151-EP01 IP Baseline Inspections ERO Drill Participation 03/30/2009 04/03/2009

71151-EP02 IP Baseline Inspections Alert & Notification System 03/30/2009 04/03/2009

71151-EP03 IP This report does not include INPO and OUTAGE activities.