Similar Documents at Salem |
|---|
|
LER-1979-076, /03L-0:on 791220,while Taking Chemical & Vol Control Sys Holdup Tank 11 Off Recirculation & Putting Tank 12 on Recirculation,Recirculation Pump Was Not Changed, Causing Tank Deformation.Design Mods Implemented |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2721979076R03 - NRC Website |
|
text
__, -*
Report Number:
Report Date:
Occurrence Date:
Facility:
79-76/03L 1/15/80 12/20/79 Salem Generating Station Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:
Partial Collapse of 12 CVCS Holdup Tank CONDITIONS PRIOR TO OCCURRENCE:
Operational Mode 5 DESCRIPTION OF OCCURRENCE:
At 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> on 12/19/79, 11 eves Holdup Tank (HUT) was placed on recirculation and at 1720 hours0.0199 days <br />0.478 hours <br />0.00284 weeks <br />6.5446e-4 months <br />, the tank was sampled for boron.
Late on the 1600 to 2400 hour0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> shift, 11 eves HUT was taken off of recirculation and 12 eves HUT was placed on recirculation.
Tank levels at this time were 11 eves HUT -
92%, 12 eves HUT -
84% and 13 CVCS HUT -
31%..
At 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br />, 12/20/79, the Equipment Operator (EO) in the Auxiliary Building reported both gas compressors running and a vent header pressure of 7 psig.
A check of the valve lineup showed 1BR78 positioned to 11 CVCS HUT.
With 1BR78 in this position, the recirculation pump taking suction from 12 eves HUT was discharging to 11 eves HUT.
Tank levels at this time were 11 eves HUT -
100%,
12 eves iliUT -
60% and 13 eves HUT -
44%.
1BR78 was repositioned to discharge flow to 12 CVCS HUT and the vent header pressure decreased to 4 psig.
The gas compressors tripped off and when the com~ressor moisture separator tanks were checked, both tanks indicated ~JO%.
The EO was instructed to pump from 11 CVCS HUT to 12 CVCS HU~ until the level in 11 CVeS HUT decreased to less than 100%.
When the recirculation pump was started, a noise was heard from the vicinity of 12 eves HUT.
The pump was stopped and 12 eves HUT was found with a dished in area approximately 3 feet deep along the length of the tank about 30 degrees off centerline and several smaller indentations around the tank.
The valve lineup was checked and found satisfactory.
Air surveys taken in the tank area showed normal activity.
11 and 12 CVCS HUT's were drained to 12 Waste Holdup Tank to establish positive tank levels.
Positive tank pressure was maintained on both tanks while draining.
DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:
The cause of this occurrence was personnel error.
When 11 eves HUT was taken off of recirculation and 12 eves HUT was placed on r~circu lation, the recirculation pump discharge was not switched to 12 eves HUT.
Consequently, water was pumped from 12 CVCS HUT to 11 CVCS HUT.
LER 79-76/03L When 11 eves HUT became full, water was forced through the common vent header to 12 and 13 eves HUT's.
With water in the vent header, 12 eves HUT was unable to equalize pressure resulting in the tank indentations.
The event investigation concluded that the noise heard at 0015 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> was probably the partial reforming of the tank when the system was realigned to pump water back into 12 eves HUT.
The eves Holdup Tanks are part of the recycle portion of the eve System.
These tanks receive borated radioactive letdown and clean borated radioactive drains for processing or disposal.
The deformation of the 12 eves HUT did not cause any leakage of liquid or gas from the tank and did not constitute a hazard to the health and safety of the general public.
CORRECTIVE ACTION
A design change has been initiated to structurally re-enforce the eves Holdup Tanks.
This modification has been accomplished on 13 eves HUT and will be included in the main~enance action for 11 and 12 eves HUT's.
A design change to install vacuum breakers for each of the tanks has been approved and will be done during normal plant operations by removing one tank at a time from service and performing the modification.
FAILURE DATA:
eves Holdup Tank Manufacturer -
Richmond Engineering Company Design Temperature -
200°F Design Pressure -
15 psig Volume -
8500 ft3 Operating Pressure -
0.5 -
3.0 psig Operating Temperature -
130°F Seismic/Nuclear Class -
2/3 Material of Construction - Austenitic Stainless Steel Code -
ASME Section III - Class C Prepared By A. W. Kapple SORe Meeting No.
96-79
NRC.f_ORM,~6 (7-771 9cENSEE EVENT REPORT U.S. NUCLEAR REGULATURY COMMISSION l n e
CONTROL BLOCK:
'""I -~-----....._-!!18 1
6 (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)
[ilIJ IN IJ Is I G Is I 1 101 o I o I -1 o Io I o I o Io I - I o Io 1014 I 1I1I1 I 1101 I I© 7
B 9
LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE JO 57 CAT 58 CON'T [IT2J 7
B
~~~~~~ LlJ© I o I s I o I o I o I 2 I 7 I 2 10)11 I 2 I 2 I o I 7 I 9 I© I o I i I i Is I s Io I G) 60 61 DOCKET NUMBER 68 69 EVENT DATE 74
. 75 REPORT DATE BO EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@
[]JI] I During normal shutdown operation, while taking 11 eves Holdup Tank (HUT) off of
((ill l.__ __
r_e_c_i_* r_c_u_l_a_t_i_o_n_a_n_d_;..p_u_t_t_i_n_g,__1_2_e_v_e_s_H_U_T_o_n __
r_e_c_i_r_c_u_l_a_t_i_* o_n...:..,_t_h_e_r_e_c_i_r_c_.__..P..... u_m_,p'--"------'
m::IJ [ill]
[ill]
discharge was not changed from 11 to 12 eves HUT.
While pumping, the 12 eves HUT could not equalize pressure and deformation of the tank resulted.
This occurrence did not cause leakage of any liguid or gas to the atmosphere and [ill] l.___.::.p'-r_e_s_e_n_t_e_d_n_o_h_a_:z:_a_r_d_t_o_t_h_e_h_e_a_l_t_h_a_n_d_s_a_f_e_t..::.y_o_f_t_h_e_g.;;._e_n_e_r_a_l___;p_u_b_l_i_c_. __ T_h_i_* s_i_* _s __ ___,
.[)))) ~l __
t_h_e_s_e_c_o_n_d_o_c_c_u_r_r_e_n_c_e_o_f_t_h_i_s __
t~y~p~e __
(7 __
9_-_6_7_)_. _____________________________ ~*I 7
B 9 80 TI:m 7
8 SYSTEM CODE I Cl GI@
9 10 C\\ LE A 'AO CV ENT YE".R
~
REPORT I 7 I 9 I NUMBER 21 22
CAUSE
CAUSE CODE SU8CODE COMPONENT CODE
~@ ~@
.1 VI El SI SjE IL I@
n 12 13 18 SEQUENTIAL OCCURRENCE REPORT NO.
CODE I I I o I 71 6 I I......-1 I o I 31 23 24 26 27 28 29 COMP.
SUB CODE
~
19 REPORT TYPE
~
30 VALVE SUBCODE LB@
20 l=1 31 REVISION NO. w 32 ACTION FUTURE EFFECT SHUTDOWN
~
ATIACHMENT TAKEN ACTION ON PLANT METHOD HOURS ~ SUBMITIED NPRD4 FORM SUB.
PRIME COMP.
SUPPLIER COMPONENT MANUFACTURER L!Ll@lLJ@)
UJ@
I o I o I o Io I Ll]@
33 34 35 36 37 40 41 L!!l W IR 121 8 I 0 I@
CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @
42 43 44 47 o:I2J I While inadvertently pumping from 12 eves HUT to 11 eves HUT, 11 eves HUT became full and flooded the common vent header, resulting in a negative pressure in o:rrJ 12 eves HUT.
Design changes to strengthen the HUT's and to provide vacuum o::rIJ
._I __
b_r_e_a_k_e_r-"'p_r_o_t_e_c_t_i_o_n_h_a_v_e_b_e_e_n_i_m_p'-l_e_m_e_n_t_e_d_a_n_d_w_i_* l_l_b_e_w_o_r_k_e_d __
d_u_r_i_n....
g~n_o_r_m_a_l __
p_l_a_n_t __
CII!J
~l _ __;;o~p~e~r~a~t_i~*o_n_s_. ____________________________________......
7 B
9 FACILITY
'3°0' STATUS
% POWER OTHER STATUS v::;J [ill] l£J@ I 0 I 0 I 0 l@.... I ----'N_.../-.;A;...._ __
BO METHOD OF DISCOVERY DESCRIPTION @
DISCOVERY
~' Noise in Area B
9 10 12 1'3 ACTIVITY CONTENT Q\\
RELEASED OF RELEASE AMOUNT OF ACTIVITY ITfil L!J@ l!J@)I N/A 7
B 9
10 11 44 45 46 BO LOCATION OF RELEASE @
N.:::'.:A 44 45 BO 7
PERSONNEL EXPOSURES r:;;::,_
NUMBER
(.;:;\\TYPE f.::\\ DESCRIPTION ITEJ I o Io I o lW~ ___
N
__ /_A _____________________
7 B
9 11 12 13 PERSONNEL INJURIES r;";\\
BO NUMBER DESCRIPTION~
EID I ol ol ol@).__ _____ N~A~--------------------------'
7 8
9 11 12 LOSS OF OR DAMAGE TO FACILITY '4J'\\
TYPE
DESCRIPTION
'.::.;:J so EII1 W@
NA 7
B 91
~0-------------------------------------------------------B-0 PUBLICITY C\\
ISSUEDt.::;\\ DESCRIPTION~
NRC USE ONLY ITfil LzJ~
N A I I I I I I I I I I I !_J 7
.. o __________________________________
__,6B 69 80 NAMEOFPREPARER-----A_. ___
w_._K_a~p-p'-l __ e ___ ~*
PHONE: (609)365-7000 Salen Ext.
628
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000272/LER-1979-001-03, /03L-0 on 790102:during Normal Operation,The No 12 Containment Fan Coil Unit Shifted to Slow Speed,But No Indication of Svc Water Flow Was Noted.Caused by Burned Out Coil in Solenoid SV-624,supplying Control Air for 12SW223 | /03L-0 on 790102:during Normal Operation,The No 12 Containment Fan Coil Unit Shifted to Slow Speed,But No Indication of Svc Water Flow Was Noted.Caused by Burned Out Coil in Solenoid SV-624,supplying Control Air for 12SW223 | | | 05000272/LER-1979-001, Supplemental LER 79-001/03X-1:on 790102,during Normal Operations,Containment Fan Coil 12 Shifted to Slow Speed. Operator Noticed No Indication of Svc Waterflow.Caused by Burned Out Coil in Solenoid Valve SV-624.Coil Replaced | Supplemental LER 79-001/03X-1:on 790102,during Normal Operations,Containment Fan Coil 12 Shifted to Slow Speed. Operator Noticed No Indication of Svc Waterflow.Caused by Burned Out Coil in Solenoid Valve SV-624.Coil Replaced | | | 05000272/LER-1979-002-03, /03L-0 on 790103:excessive Leak Rate in W1 100 Air Lock Noted.Doors Were Reworked & Airlock Returned to Operation.Seals Failed Due to Split at Vulcanized Seam. Door Seals Were Replaced | /03L-0 on 790103:excessive Leak Rate in W1 100 Air Lock Noted.Doors Were Reworked & Airlock Returned to Operation.Seals Failed Due to Split at Vulcanized Seam. Door Seals Were Replaced | | | 05000272/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000272/LER-1979-003, Forwards LER 79-003/03L-0 | Forwards LER 79-003/03L-0 | | | 05000272/LER-1979-003-03, /03L-0 on 790103:containment Pressure Exceeded Tech Spec Max.Caused by Isolation of Pressure/Vacuum Relief System for Rework of 1CV6 | /03L-0 on 790103:containment Pressure Exceeded Tech Spec Max.Caused by Isolation of Pressure/Vacuum Relief System for Rework of 1CV6 | | | 05000272/LER-1979-004, Forwards Updated LER 79-004/03X-1 | Forwards Updated LER 79-004/03X-1 | | | 05000272/LER-1979-004-03, /03L-0 on 790103:Loop 4 Channel IV Was 100 Psi Too High.Caused by Steam Pressure Transmitter Being Frozen by an Outside Air Damper Directing Cold Air Onto the Sensing Lines | /03L-0 on 790103:Loop 4 Channel IV Was 100 Psi Too High.Caused by Steam Pressure Transmitter Being Frozen by an Outside Air Damper Directing Cold Air Onto the Sensing Lines | | | 05000272/LER-1979-005-03, /03L-0 on 790104:during Normal Operations,Position Indication for Rod 2D5 Began Oscillating.Rod Position within 12 Steps of Bank D.Caused Traced to Rod Indication Coil Stack on Reactor.Repairs Planned for Next Reactor Outage | /03L-0 on 790104:during Normal Operations,Position Indication for Rod 2D5 Began Oscillating.Rod Position within 12 Steps of Bank D.Caused Traced to Rod Indication Coil Stack on Reactor.Repairs Planned for Next Reactor Outage | | | 05000272/LER-1979-005, Supplemental LER 79-05L/03X-1:on 790104,during Normal Operation,Individual Rod Position Indication for Rod 2D5 Began Oscillating.Cause Could Not Be Identified.Connectors Checked & RPI Coil Stack Replaced | Supplemental LER 79-05L/03X-1:on 790104,during Normal Operation,Individual Rod Position Indication for Rod 2D5 Began Oscillating.Cause Could Not Be Identified.Connectors Checked & RPI Coil Stack Replaced | | | 05000272/LER-1979-006-03, /03L-0 on 790102:inservice Insp Data Packages Not Being Reviewed.Cause Was Lack of Administrative Control to Correlate Responsibilities of Two Station Depts.Dept Review Procedures Have Been Rewritten | /03L-0 on 790102:inservice Insp Data Packages Not Being Reviewed.Cause Was Lack of Administrative Control to Correlate Responsibilities of Two Station Depts.Dept Review Procedures Have Been Rewritten | | | 05000272/LER-1979-006, Forwards LER 79-006/03L-0 | Forwards LER 79-006/03L-0 | | | 05000272/LER-1979-007, Forwards LER 79-007/03L-0 | Forwards LER 79-007/03L-0 | | | 05000272/LER-1979-007-03, /03L-0 on 790126:while Performing Channel Check of Pressurizer Level,Channel II Found 5% Lower than Others. Caused by Instrument Drift Resulting in Zero Shift in Transmitter Output | /03L-0 on 790126:while Performing Channel Check of Pressurizer Level,Channel II Found 5% Lower than Others. Caused by Instrument Drift Resulting in Zero Shift in Transmitter Output | | | 05000272/LER-1979-008-03, /03L-0 on 790111:during Normal Operation While Refilling Boric Acid Storage Tanks,Operator Added Improper Batch of Acid to Tanks & Pumped Concentrates Tank to Storage Tanks.Caused by Personnel Error | /03L-0 on 790111:during Normal Operation While Refilling Boric Acid Storage Tanks,Operator Added Improper Batch of Acid to Tanks & Pumped Concentrates Tank to Storage Tanks.Caused by Personnel Error | | | 05000272/LER-1979-008, Forwards LER 79-008/03L-0 | Forwards LER 79-008/03L-0 | | | 05000272/LER-1979-009-03, /03L-0 on 790112:No 13 Auxiliary Bldg Exhaust Fan Removed from Svc to Replace Motor.Caused by Worn Keyway in Drive Motor Shaft | /03L-0 on 790112:No 13 Auxiliary Bldg Exhaust Fan Removed from Svc to Replace Motor.Caused by Worn Keyway in Drive Motor Shaft | | | 05000272/LER-1979-009, Forwards LER 79-009/03L-0 | Forwards LER 79-009/03L-0 | | | 05000272/LER-1979-011, Forwards LER 79-011/01X-2 | Forwards LER 79-011/01X-2 | | | 05000272/LER-1979-011-01, /01X-2 on 790116:RMS Channel Which Had Alarmed & Cleared Had Been Reset at Control Console But Not at RMS Panel.Caused by Procedure Inadequacy.Procedure Changed Initiated to Clarify Functions | /01X-2 on 790116:RMS Channel Which Had Alarmed & Cleared Had Been Reset at Control Console But Not at RMS Panel.Caused by Procedure Inadequacy.Procedure Changed Initiated to Clarify Functions | | | 05000272/LER-1979-012, Forwards LER 79-012/03L-0 | Forwards LER 79-012/03L-0 | | | 05000272/LER-1979-012-03, /03L-0 on 790115:No 11 Steam Generator Steam Flow Channel II Failed Low.No Cause Found.Operator Took Manual Control & re-established Steam Generator Level.Channel Indication Normalized within 10 Minutes | /03L-0 on 790115:No 11 Steam Generator Steam Flow Channel II Failed Low.No Cause Found.Operator Took Manual Control & re-established Steam Generator Level.Channel Indication Normalized within 10 Minutes | | | 05000272/LER-1979-013-04, /04L on 790102:non-radioactive Waste Effluent Total Suspended Solids Exceeded Tech Specs.Caused by Abnormally High Number of Demineralized Regenerations Supporting Initial Flushes for Startup Preparation | /04L on 790102:non-radioactive Waste Effluent Total Suspended Solids Exceeded Tech Specs.Caused by Abnormally High Number of Demineralized Regenerations Supporting Initial Flushes for Startup Preparation | | | 05000272/LER-1979-013, Supplemental LER 79-013/04X-1:on 790102,during Preparation of Annual Nonradioactive Environ Operating Rept,Average 1978 Suspended Solids Concentrate in Discharge Exceeded Limit. Caused by Abnormally High Demineralizer Regenerat | Supplemental LER 79-013/04X-1:on 790102,during Preparation of Annual Nonradioactive Environ Operating Rept,Average 1978 Suspended Solids Concentrate in Discharge Exceeded Limit. Caused by Abnormally High Demineralizer Regenerations | | | 05000272/LER-1979-014-03, /03L-0 on 790220:during Normal Operation,Radiation Monitoring Sys Channel 1R 12B Alarms Found Not Operating. Channel Later Returned to Svc & Operated Properly.Caused by Unknown Factor | /03L-0 on 790220:during Normal Operation,Radiation Monitoring Sys Channel 1R 12B Alarms Found Not Operating. Channel Later Returned to Svc & Operated Properly.Caused by Unknown Factor | | | 05000272/LER-1979-014, Forwards LER 79-014/03L-0 | Forwards LER 79-014/03L-0 | | | 05000272/LER-1979-015, Forwards LER 79-015/03L-0 | Forwards LER 79-015/03L-0 | | | 05000272/LER-1979-015-03, /03L-0 on 790212:during Normal Operation,Noted Required Surveillance to Be Performed Every 78-h Had Not Been Done on 790210 When Scheduled.Caused by Personnel Error.Entry Made in Log Instructing Supervisor | /03L-0 on 790212:during Normal Operation,Noted Required Surveillance to Be Performed Every 78-h Had Not Been Done on 790210 When Scheduled.Caused by Personnel Error.Entry Made in Log Instructing Supervisor | | | 05000272/LER-1979-016, Forwards LER 79-016/03L-0 | Forwards LER 79-016/03L-0 | | | 05000272/LER-1979-016-03, /03L-0 on 790220:control Operator Observed Zero Svc Water Flow Through Unit.Caused by Burned Out Coil in Solenoid Valve.Coil Replaced | /03L-0 on 790220:control Operator Observed Zero Svc Water Flow Through Unit.Caused by Burned Out Coil in Solenoid Valve.Coil Replaced | | | 05000272/LER-1979-017, Forwards LER 79-017/03L-0 | Forwards LER 79-017/03L-0 | | | 05000272/LER-1979-017-03, /03L-0 on 790219:gross Activity Surveillance of Coolant Sys & Steam Generators Was Not Performed.Caused by Personnel Error in Not Returning Gas Bottles to Storage.New Bottle Storage Pad Will Be Built | /03L-0 on 790219:gross Activity Surveillance of Coolant Sys & Steam Generators Was Not Performed.Caused by Personnel Error in Not Returning Gas Bottles to Storage.New Bottle Storage Pad Will Be Built | | | 05000272/LER-1979-018, Forwards LER 79-018/03L-0 | Forwards LER 79-018/03L-0 | | | 05000272/LER-1979-018-03, /03L-0 on 790223:auxiliary Feedwater Pump Breaker Cubicle Was Hot.Caused by Burned Out Closing Spring Charging Motor.Motor & Breaker Replaced | /03L-0 on 790223:auxiliary Feedwater Pump Breaker Cubicle Was Hot.Caused by Burned Out Closing Spring Charging Motor.Motor & Breaker Replaced | | | 05000272/LER-1979-020-03, /03L-0 on 790225:pressurizer Level Channel II Was Declared Inoperable.Caused by non-linearity of Strain Gauge in Level Sensor Transmitter.Strain Gauge Replaced Along W/ Zero & Span Potentiometers.Transmitter Recalibrated | /03L-0 on 790225:pressurizer Level Channel II Was Declared Inoperable.Caused by non-linearity of Strain Gauge in Level Sensor Transmitter.Strain Gauge Replaced Along W/ Zero & Span Potentiometers.Transmitter Recalibrated | | | 05000272/LER-1979-021, Forwards LER 79-021/03L-0 | Forwards LER 79-021/03L-0 | | | 05000272/LER-1979-021-03, /03L-0 on 790302:overhead Annuciators in Control Room Alarmed,Indicating Power Range Nuclear Instrumentation Channel Failure.Caused by Failure of N41 Channel High Voltage Power Supply.Failed Power Supply Replaced | /03L-0 on 790302:overhead Annuciators in Control Room Alarmed,Indicating Power Range Nuclear Instrumentation Channel Failure.Caused by Failure of N41 Channel High Voltage Power Supply.Failed Power Supply Replaced | | | 05000272/LER-1979-022-03, /03L-0 on 790221:during Normal Operations,While Conducting Routine Insp,Nrc Inspector Found Missed Tech Spec Surveillance Reading.Caused by Personnel Error.Surveillance Posted on Plant Status Board | /03L-0 on 790221:during Normal Operations,While Conducting Routine Insp,Nrc Inspector Found Missed Tech Spec Surveillance Reading.Caused by Personnel Error.Surveillance Posted on Plant Status Board | | | 05000272/LER-1979-022, Forwards LER 79-022/03L-0 | Forwards LER 79-022/03L-0 | | | 05000272/LER-1979-024, Forwards LER 79-024/03L-0 | Forwards LER 79-024/03L-0 | | | 05000272/LER-1979-024-03, /03L-0 on 790313:air Particulate Monitor Was Declared Inoperable.Caused by Failing Motor Bearings Which Led Filter Paper Drive to Slow & Activate Failed Filter Alarm.Motor Was Cleaned & Bearing Replaced | /03L-0 on 790313:air Particulate Monitor Was Declared Inoperable.Caused by Failing Motor Bearings Which Led Filter Paper Drive to Slow & Activate Failed Filter Alarm.Motor Was Cleaned & Bearing Replaced | | | 05000272/LER-1979-025, Forwards LER 79-025/03L-0 | Forwards LER 79-025/03L-0 | | | 05000272/LER-1979-025-03, /03L-0 on 790315:during Normal Operation on 790302,retest Not Performed After 790302 Maint on Chilled Water Pump 11.Caused by Personnel Error.Procedure Reviewed & Rewritten | /03L-0 on 790315:during Normal Operation on 790302,retest Not Performed After 790302 Maint on Chilled Water Pump 11.Caused by Personnel Error.Procedure Reviewed & Rewritten | | | 05000272/LER-1979-026, Forwards LER 79-026/03L-0 | Forwards LER 79-026/03L-0 | | | 05000272/LER-1979-026-03, /03L-0 on 790318:No 13 Reactor Coolant Loop Protection Channel III Inoperable.Caused by Faulty Channel Summator Module.Summator Was Replaced | /03L-0 on 790318:No 13 Reactor Coolant Loop Protection Channel III Inoperable.Caused by Faulty Channel Summator Module.Summator Was Replaced | | | 05000272/LER-1979-027-01, /01X-1 on 790325:while Providing Backup Protection to Hope Creek,Facility Fresh Water Tanks Were Below Tech Spec Required Levels.Caused by Poor Communications Between Facilities.Water Level Restored | /01X-1 on 790325:while Providing Backup Protection to Hope Creek,Facility Fresh Water Tanks Were Below Tech Spec Required Levels.Caused by Poor Communications Between Facilities.Water Level Restored | | | 05000272/LER-1979-027, Forwards LER 79-027/01X-1 | Forwards LER 79-027/01X-1 | | | 05000272/LER-1979-028, Has Been Voided | Has Been Voided | | | 05000272/LER-1979-029-03, /03L-0 on 790320:during Channel Functional Test High Voltage Was Found to Be Low.Caused by Breakdown of Diode in High Voltage Power Supply.Diode Was Replaced & Channel Functional Was Completed | /03L-0 on 790320:during Channel Functional Test High Voltage Was Found to Be Low.Caused by Breakdown of Diode in High Voltage Power Supply.Diode Was Replaced & Channel Functional Was Completed | | | 05000272/LER-1979-029, Forwards LER 79-029/03L-0 | Forwards LER 79-029/03L-0 | |
|