05000272/LER-1979-051-03, /03L-1:on 790715,during Refueling Outage,Type C Leakage Tests for Eight Valves Showed Initial Leak Rate Greater than Range of Volumetric Test Equipment.Caused by Normal Degradation & Buildup in Valves

From kanterella
Revision as of 11:46, 4 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-1:on 790715,during Refueling Outage,Type C Leakage Tests for Eight Valves Showed Initial Leak Rate Greater than Range of Volumetric Test Equipment.Caused by Normal Degradation & Buildup in Valves
ML19249B480
Person / Time
Site: Salem 
Issue date: 08/29/1979
From: Kapple A
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19249B467 List:
References
LER-79-051-03L, LER-79-51-3L, NUDOCS 7909040442
Download: ML19249B480 (2)


LER-1979-051, /03L-1:on 790715,during Refueling Outage,Type C Leakage Tests for Eight Valves Showed Initial Leak Rate Greater than Range of Volumetric Test Equipment.Caused by Normal Degradation & Buildup in Valves
Event date:
Report date:
2721979051R03 - NRC Website

text