ML12333A119
From kanterella
Revision as of 13:10, 2 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML12333A119 | |
Person / Time | |
---|---|
Site: | Fort Calhoun |
Issue date: | 12/31/2012 |
From: | Wilkins L E Plant Licensing Branch IV |
To: | Cortopassi L P Omaha Public Power District |
Wilkins L E | |
References | |
TAC ME7796 | |
Download: ML12333A119 (18) | |
Similar Documents at Fort Calhoun | |
---|---|
Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARLIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024
[Table view]License Amendment Request (LAR) to Revise License Termination Plan (LTP) LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML21271A5102021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Am-241 Soil Uncertainty Report ML21271A1962021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 3, 1, Omaha Public Power District, Defueled Safety Analysis Report CAC 2 ML21271A1802021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 2 19, Omaha Public Power District, FC-20-012, Fort Calhoun Station Decommissioning Project Radiological Characterization Report ML21271A2102021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 4 3 Omaha Public Power District, Fort Calhoun Station Unit 1, Defueled Safety Analysis Report CAC 2 ML21271A1722021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 2 8 Omaha Public Power District, Offsite Dose Calculation Manual cac2 ML21271A1502021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Defueled Safety Analysis Report ML21271A4802021-08-0303 August 2021 License Amendment Request (LAR) 21-01, C-14 Soil Uncertainty Report ML21271A2652021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 7 FC-20-007, Fort Calhoun Station Potential Radionuclides of Concern CAC2 ML21271A2682021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 12 FC-20-006, Rev 0, End State Concrete Surface Areas Volumes, CAC2 ML21271A5032021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Ce-144 Soil Regression and Correlation Report ML21271A4982021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Ce-144 Soil Uncertainty Report ML21271A1442021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS LTP Rev 0. Final - All ML21271A2582021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 8 Radiation Safety and Control Services, Tsd 21-043, Radionuclides of Concern in Support of the Fort Calhoun -1 ML21271A2672021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 3 Omaha Public Power District, Fort Calhoun Station Unit 1, Defueled Safety Analysis Report CAC2 ML21271A2692021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 19 E. A. Napier, Hanford Environmental Dosimetry Upgrade Project, Gen II the Hanford Environmental Radiation D-1 ML21271A5992021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 8, 12, Omaha Public Power District, FCS-SAF-103, FCS Deconstruction Health and Safety Plan CAC2 ML21271A2612021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 1 Haley & Aldrich, Hydrogeological Conceptual Site Model, Rev. 2, Fort Calhoun Station, Blair, Ne, 2021 CAC2 ML21271A2192021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 5 12 FC-20-007, Fort Calhoun Station Potential Radionuclides of Concern CAC2 ML21271A2622021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 6 2 Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station - F-1 ML21271A2142021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 5 17 Omaha Public Power District, NO-FC-10, Quality Assurance Topical Report CAC2 ML21271A2592021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Copy of Calculations in Support of FCS LTP Chapter 6 Revision 0 ML21271A1932021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 3 18 Omaha Public Power District, FC-20-012, Fort Calhoun Station Decommissioning Project Radiological Character 1 ML21271A1992021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 3 16 Omaha Public Power District, Offsite Dose Calculation Manual CAC 2 ML21271A1832021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 2 11 Omaha Public Power District, Fort Calhoun Station Unit 1, Defueled Safety Analysis Report cac2 ML21271A4082021-08-0303 August 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Insitu Uncertainty Report Eu-152 ML21271A1432021-08-0303 August 2021 License Amendment Request (LAR) 21-01, LIC-21-0005 LTP Cover Letter Final Fisher Signature ML21271A1732021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Omaha Public Power District, FCSD-RA-LT-100, Quality Assurance Project Plan for the License Termination Plan Development~1 ML21271A2002021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 3 14 Backfill Attachment Final CAC 2 ML21271A1532021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 1 7 SUNSI EA 12-10, Flood Assessment HDR Report Placeholder Akb ML21271A1762021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 2 5 Omaha Public Power District, FCSD-RA-LT-200, Characterization Survey Plan CAC2 ML21271A2112021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 5 18 Radiation Safety and Control Services, Tsd 21-043, Radionuclides of Concern in Support of the Fort Calhoun License Termination Plan ML21271A1752021-08-0202 August 2021 License Amendment Request (LAR) 21-01, Chapter 2 14 Radiation Safety and Control Services, Tsd 21-043, Radionuclides of Concern in Support of the Fort Calhoun License Termination Plan ML21271A2602021-07-24024 July 2021 License Amendment Request (LAR) 21-01, Chapter 6 4, Omaha Public Power District, FC-21-002, Description of Embedded Piping, Penetrations, and Buried Pipe to Remain in Fort Calhoun End State ML21271A2082021-07-24024 July 2021 License Amendment Request (LAR) 21-01, Chapter 5, 10, Omaha Public Power District, FC-21-002, Description of Embedded Piping, Penetrations, and Buried Pipe to Remain in Fort Calhoun End State ML21271A1982021-07-24024 July 2021 License Amendment Request (LAR) 21-01, Chapter 3, 6, Omaha Public Power District, FC-21-002, Description of Embedded Piping, Penetrations, and Buried Pipe to Remain in Fort Calhoun End State ML21271A2132021-07-23023 July 2021 License Amendment Request (LAR) 21-01, Chapter 5 9 Oddp FC-20-006 - End State Concrete Surface Areas and Volumes Rev 0 CAC2 ML21271A2062021-07-23023 July 2021 License Amendment Request (LAR) 21-01, Chapter 4 10 Omaha Public Power District FC-20-006 - End State Concrete Surface Areas Volumes, Rev 0 CAC 2 ML21271A4452021-06-0505 June 2021 License Amendment Request (LAR) 21-01, FCS Embedded Pipe Dsr ML21271A2882021-06-0202 June 2021 License Amendment Request (LAR) 21-01, FCS Bfm Insitu Regression and Correlation Report Cm-244 ML21271A4362021-05-17017 May 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Insitu Regression and Correlation Report Pu-240 ML21271A3932021-05-16016 May 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Insitu Uncertainty Report Pu-240 ML21271A4062021-05-15015 May 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Insitu Uncertainty Report Cs-137 ML21271A4072021-05-15015 May 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Insitu Regression and Correlation Report Cs-137 ML21271A4142021-05-14014 May 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Insitu Regression and Correlation Report Np-237 ML21271A4392021-05-14014 May 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Insitu Uncertainty Report Cm-244 ML21271A4232021-05-14014 May 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Insitu Uncertainty Report Np-237 ML21271A3942021-05-13013 May 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Insitu Regression and Correlation Report Fe-55 ML21271A4102021-05-13013 May 2021 License Amendment Request (LAR) 21-01, FCS Buried Pipe Insitu Regression and Correlation Report Pu-239 2024-06-18 Category:Letter MONTHYEARIR 05000285/20240032024-10-29029 October 2024
[Table view]NRC Inspection Report 05000285/2024003 LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) ML24255A0962024-09-12012 September 2024 License Amendment Request to Revise the License Termination Plan - Request Supplemental Information (License No. DPR-40, Docket No. 50-285) IR 05000285/20240022024-08-21021 August 2024 NRC Inspection Report 05000285/2024002 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML24180A2082024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information Letter ML24183A3222024-07-0808 July 2024 Proposed Revision to the Omaha Public Power District Fort Calhoun Station Decommissioning Quality Assurance Plan - Acceptance Review LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) IR 05000285/20240012024-06-0505 June 2024 NRC Inspection Report 05000285/2024001 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, Shpo; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commission'S Analysis of Omaha Public Power District'S Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 2024-09-18 Category:Safety Evaluation MONTHYEARML24019A1682024-01-31031 January 2024
[Table view]Safety Evaluation Report for Approval of License Termination Plan ML21271A5992021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 8, 12, Omaha Public Power District, FCS-SAF-103, FCS Deconstruction Health and Safety Plan CAC2 ML20056E4872020-02-26026 February 2020 Staff Review of Fort Calhoun Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguard Contingency Plan, Revision 0 and the Verification of Additional Security Measures (ASM) ML19297D6742019-12-0909 December 2019 FCS ISFSI Only Tech Specs SER ML18017B0052018-03-30030 March 2018 Review of the Irradiated Fuel Management Plan (CAC No. MF9553; EPID L-2017-LLL-0009) ML18047A6612018-03-28028 March 2018 Issuance of Amendment No. 298, Request to Modify License Condition 3.C to Delete Requirement for Commission-Approved Cyber Security Plan (CAC No. MF9850; EPID L-2017-LLA-0236) ML18010A0872018-03-0606 March 2018 Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192) ML17338A1722018-01-19019 January 2018 Issuance of Amendment No. 296, Revise Technical Specifications (TS) to Delete Dry Spent Fuel Cask Loading Limits from TS 3.8.3(6), Figure 2-11, Table 3-4, Table 3-5, and TS 4.3.1.3 (CAC No. MF9831; EPID L-2017-LLA-0235) ML17276B2862017-12-12012 December 2017 Issuance of Amendment No. 295, Revise the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MF8951; EPID L-2016-LLA-0036) ML17263B1982017-12-11011 December 2017 Letter and Safety Evaluation, Request for Exemption from 10 CFR 50.47 and 10 CFR 50 Appendix E to Reduce Emergency Planning Requirements for Permanently Defueled Condition (CAC MF9067; EPID L-2016-LLE-0003) ML17289A0602017-11-22022 November 2017 Issuance of Amendment No. 294, Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9559; EPID L-2017-LLA-0184) ML17275A2642017-11-21021 November 2017 Safety Evaluation Input on Fort Calhoun Station Request for Approval of Permanently Defueled Emergency Plan and Emergency Action Level Scheme, Docket No. 50-285 ML17278A6072017-11-17017 November 2017 Issuance of Amendment No. 293, Request to Revise Current Licensing Basis for the Auxiliary Building to Use American Concrete Institute Ultimate Strength Requirements (CAC No. MF8525; EPID L-2016-LLA-0013) ML17165A4652017-07-28028 July 2017 Fort Calhoun Station, Unit 1 - Issuance of Amendment No. 292, Revise Technical Specifications to Align Staffing Requirements to Those Required for Decommissioning (CAC No. MF8437) ML17123A3482017-07-27027 July 2017 Issuance of Amendment No. 291, Revise the Radiological Emergency Response Plan for Permanently Defueled Condition ML17144A2462017-06-21021 June 2017 Approval of Certified Fuel Handler Training and Retraining Program to Facilitate Activities Associated with Decommissioning and Irradiated Fuel Handling Management ML17053A0992017-04-0707 April 2017 Issuance of Amendment No. 290, Request to Delete License Condition 3.D., Fire Protection Program, No Longer Needed for Permanently Shutdown and Defueled Condition ML16141A7392016-05-27027 May 2016 Safety Evaluation, Review of Aging Management Program of Reactor Vessel Internals Based on MRP-227-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines ML16104A0742016-04-15015 April 2016 Relief Request, Request to Use a Portion of a Later Edition of the ASME B&PV Code, Section XI, Fourth 10-Year Inservice Inspection Interval ML16084A7552016-04-0505 April 2016 Issuance of Amendment No. 287, Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours/Month, Using CLIIP ML15307A0132016-02-23023 February 2016 Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition ML16041A3082016-02-19019 February 2016 Relief Requests P-1 - LPSI and CS Pumps; P-2 - Adjusting Hydraulic Parameters Consistent W/Code Case OMN-21; G-1 - Test Frequency Consistent W/Code Case OMN-20, Fifth 10-Year Inservice Testing Interval ML15288A0052015-12-15015 December 2015 Issuance of Amendment No. 285, Adopt Emergency Action Level Scheme Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors ML15294A2792015-11-19019 November 2015 Issuance of Amendment No. 284, Request to Revise License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15232A0032015-08-21021 August 2015 Relief Request RR-14, Relief from ASME Code Case N-729-1 Requirements for Reactor Vessel Head Penetration Nozzle Welds, Fourth 10-Year Inservice Inspection Interval ML15209A8022015-08-10010 August 2015 Issuance of Amendment No. 283, Revise Updated Safety Analysis Report to Allow Pipe Stress Analysis to Be Performed in Accordance with ASME Code Section III ML15111A3992015-06-30030 June 2015 Issuance of Amendment No. 282, Revise Updated Safety Analysis Report for Controlling Raw Water Pump Operation and Safety Classification of Components During a Flood ML15035A2032015-03-27027 March 2015 Issuance of Amendment No. 281, Revise Technical Specification 3.1, Table 3-3 to Correct Administrative Error in Surveillance Method for Containment Wide Range Radiation Monitors ML15015A4132015-02-20020 February 2015 Issuance of Amendment No. 280, Revise Technical Specification 3.2, Table 3-5 to Add New Surveillance Requirement ML14356A0122014-12-29029 December 2014 Issuance of Amendment No. 279, Revise Technical Specification Surveillance Requirements for One-Time Extension from Refueling Frequency of Once Per 18 Months to Maximum of 28 Months ML14328A8142014-12-22022 December 2014 Issuance of Amendment No. 278, Revise Technical Specification 2.5, Auxiliary Feedwater (AFW) System to Allow 7-Day Completion Time for Turbine-Driven AFW Pump Based on TSTF-340, Revision 3 ML14323A5992014-12-0202 December 2014 Relief Request RR-13, Relief from Inservice Testing Requirements to Perform Testing of 4 Valves During the April 2015 Refueling Outage ML14316A1672014-11-19019 November 2014 Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building ML14279A2752014-11-0606 November 2014 Issuance of Amendment No. 277, Revise Technical Specification Surveillance Requirement 3.2, Table 3-5, Item 3, for One-Time Extension of Frequency to Maximum of 28 Months ML14209A0272014-08-0707 August 2014 Issuance of Amendment No. 276, Request to Revise Updated Safety Analysis Report for Westinghouse Plant-Specific Leak-Before-Break Analysis ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) ML14003A0032014-01-28028 January 2014 Issuance of Amendment No. 274, Revise Technical Specification 2.16, River Level, and Establish EAL Classification Criteria for External Flooding Events Under Radiological Emergency Response Plan ML13296A5842013-10-25025 October 2013 Issuance of Amendment No. 273, Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks (Exigent Circumstances) ML13203A0702013-07-26026 July 2013 Issuance of Amendment No. 272 - Revise Current Licensing Basis to Adopt Revised Design Basis/Methodology for Addressing Design-Basis Tornado/Tornado Missile Impact (Exigent Circumstances) ML13141A6082013-06-25025 June 2013 Safety Assessment in Response to Request for Information Pursuant to 10 CFR 50.54(f) - Recommendation 9.3 Communications Assessment ML13070A0422013-03-29029 March 2013 Issuance of Amendment No. 271, Relocate Technical Specification LCO 2.17, Miscellaneous Radioactive Material Sources, and Surveillance Requirement 3.13 to Updated Safety Analysis Report ML13043A6612013-02-28028 February 2013 Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits ML13017A4672013-01-31031 January 2013 Approval of Request for Change to the Reactor Vessel Surveillance Capsule Removal Schedule ML12333A1192012-12-31031 December 2012 Issuance of Amendment No. 269, Incorporate New Radial Peaking Factor Definition and Clarify Limiting Condition for Operation (LCO) 2.10.2(6) ML1126204022011-09-30030 September 2011 Issuance of Amendment No. 268, Revise Updated Safety Analysis Report to Relocate Acoustic Position and Tail Pipe Temperature Indication Surveillance Requirements from Technical Specifications ML1118615712011-08-31031 August 2011 Issuance of Amendment No. 267, Revise Technical Specification (TS) 2.15 and TS 3.1 Related to Operability of Secondary Control Element Assembly Position Indication System Channels; Correction to TS 2.10.2(7)c ML1122702902011-08-18018 August 2011 Relief Request RR-12 from Code Case N-722, Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated with Alloy 600/82/182 Materials, Fourth 10-Year Inservice Inspection Interval ML1118010942011-07-27027 July 2011 Issuance of Amendment No. 266, Revise License Condition and Approve Cyber Security Plan and Associated Implementation Schedule ML1022101332010-08-20020 August 2010 Request for Use of Alternative to Depth-Sizing Qualification for Volumetric Examinations of Reactor Pressure Vessel Welds for 4th 10-year Inservice Inspection Interval ML1009100772010-05-14014 May 2010 License Amendment, 264, Revision of Tech Spec Sections 2.0.1 and 2.7 for Inoperable System, Subsystem, or Component Due to Inoperable Power Source and Deletion of Diesel Generator Surveillance Requirement 3.7(1)e 2024-01-31 |
Retrieved from "https://kanterella.com/w/index.php?title=ML12333A119&oldid=444068"