Letter Sequence Request | |
---|---|
TAC:MF0317, (Approved, Closed) | |
MONTHYEARDCL-12-122, License Amendment Request 12-04, Emergency Revision to Technical Specification 3.7.10, Control Room Ventilation System (Crvs).2012-12-0202 December 2012
[Table View]License Amendment Request 12-04, Emergency Revision to Technical Specification 3.7.10, Control Room Ventilation System (Crvs). Project stage: Request ML12338A0202012-12-0404 December 2012 Issuance of Amendment Nos. 213 and 215, Revise Technical Specification 3.7.10, Control Room Ventilation System (Crvs), Required Action A.1 Completion Time (Emergency Circumstances) Project stage: Approval 2012-12-02 |
ML123380142 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 12/02/2012 |
From: | Allen B S Pacific Gas & Electric Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
DCL-12-122 | |
Download: ML123380142 (25) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Letter
MONTHYEARDCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, “Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024
[Table view]Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, “Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Plants, Units 1 and 2 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 IR 05000275/20240012024-04-23023 April 2024 Integrated Inspection Report 05000275/2024001 and 05000323/2024001 ML24114A2032024-04-22022 April 2024 Request for Information for EP Program and Performance Indicator Verification Inspection (Wolf Creek Nuclear Generating Station) Inspection Report 05000482/2024003 ML24106A2892024-04-18018 April 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of March 2024 Audit Regarding the Environmental Review of the License Renewal Application ML24106A2882024-04-18018 April 2024 License Renewal Application Environmental Review RCIs and RAIs DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24108A1122024-04-15015 April 2024 License Amendment Request 24-02 Request for Approval of DCPP Early Warning System to Meet 10 CFR 73.55(i)(2) and 10 CFR 73.55(e)(9)(vi)(A) DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant ML24082A2592024-03-25025 March 2024 Notice of Enforcement Discretion for Diablo Canyon Power Plant, Unit 2 (EPID L-2024-LLD-0002) - March 25, 2024 ML24081A0462024-03-22022 March 2024 Audit Summary in Support of the License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability ML24081A4052024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability ML24065A1312024-03-20020 March 2024 ISFSI Renewal RAI Transmittal Letter IR 05000275/20244032024-03-12012 March 2024 Cyber Security Inspection Report 05000275/2024403 and 05000323/2024403 (Cover Letter) ML24065A3662024-03-0404 March 2024 Notification of Site Inspection for License Renewal and Request for Information Inspection (05000323/2024011) ML24071A1742024-03-0404 March 2024 Email - (External_Sender) Shutdown Petition to NRC Commissioners DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) IR 05000275/20230062024-02-28028 February 2024 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023006 and 05000323/2023006) ML24056A0022024-02-27027 February 2024 – License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring ML24058A2552024-02-22022 February 2024 Formal Acceptance from Sy Chumash Re Regarding Consultation on the DC NPP ML24058A2562024-02-22022 February 2024 Santa Ynez Band or Chumash Tribe - Consultation Request Diablo Canyon NPP Units 1 and 2 2024-08-08 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEARDCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024
[Table view]License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-040, License Amendment Request 24-02 Request for Approval of DCPP Early Warning System to Meet 10 CFR 73.55(i)(2) and 10 CFR 73.55(e)(9)(vi)(A)2024-04-15015 April 2024 License Amendment Request 24-02 Request for Approval of DCPP Early Warning System to Meet 10 CFR 73.55(i)(2) and 10 CFR 73.55(e)(9)(vi)(A) ML24108A1122024-04-15015 April 2024 License Amendment Request 24-02 Request for Approval of DCPP Early Warning System to Meet 10 CFR 73.55(i)(2) and 10 CFR 73.55(e)(9)(vi)(A) DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-22-059, License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions2022-07-26026 July 2022 License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions DCL-22-010, License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2022-02-16016 February 2022 License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-22-001, Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses2022-01-13013 January 2022 Supplement to License Amendment Request 20-03, Editorial Corrections to Diablo Canyon Power Plant Units 1 and 2 Operating Licenses DCL-21-062, Independent Spent Fuel Storage Installation, License Amendment Request 21-04, Proposed Changes to the Diablo Canyon Power Plant Emergency Plan for Post-Shutdown and Permanently Defueled Condition2021-10-0808 October 2021 Independent Spent Fuel Storage Installation, License Amendment Request 21-04, Proposed Changes to the Diablo Canyon Power Plant Emergency Plan for Post-Shutdown and Permanently Defueled Condition ML21188A2142021-07-0707 July 2021 Emergency License Amendment Request 21-05 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-21-019, Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2021-04-0101 April 2021 Supplement to License Amendment Request 20-03 Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition DCL-21-020, Request for Revision to Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance2021-03-29029 March 2021 Request for Revision to Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance DCL-20-092, License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition2020-12-0303 December 2020 License Amendment Request 20-03, Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition DCL-20-063, Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications2020-08-31031 August 2020 Pacific Gas & Electric Co - License Amendment Request 20-02, Non-Voluntary License Amendment Request to Revise Technical Specifications DCL-20-066, License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System2020-08-12012 August 2020 License Amendment Request 20-01 Exigent Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater System DCL-19-008, License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification2019-02-14014 February 2019 License Amendment Request 19-01, Proposed Changes to the Intake Structure Physical Security Classification DCL-18-100, License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology2018-12-26026 December 2018 License Amendment Request 18-02 - License Amendment Request to Revise Technical Specification 5.6.5b1 Core Operating Limits Report (COLR) for Full Spectrum Loss-of-Coolant Accident Methodology DCL-16-124, Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 52016-11-0909 November 2016 Implementation of Alternative Source Term Summary of Dose Analyses and Results Revision 5 DCL-16-099, License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2016-10-25025 October 2016 License Amendment Request 16-04, Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. DCL-16-090, Supplement to License Amendment Request 15-03, Application of Alternative Source Term.2016-09-15015 September 2016 Supplement to License Amendment Request 15-03, Application of Alternative Source Term. ML16169A2652016-05-18018 May 2016 Technical Report, Implementation of Alternative Source Terms Summary of Dose Analysis and Results, Revision 3 DCL-16-057, License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J.2016-05-12012 May 2016 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J. DCL-16-057, Diablo Canyon Units 1 and 2 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J.2016-05-12012 May 2016 Diablo Canyon Units 1 and 2 License Amendment Request 16-03 Application to Adopt NEI 94-01 Revision 2-A, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J. ML16083A5642016-03-23023 March 2016 License Amendment Request 16-02, License Amendment Request to Revise Technical Specification 3.4.12., Low Temperature Overpressure Protection (Ltop) System. DCL-16-014, Supplement to License Amendment Request 13-03, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)2016-01-28028 January 2016 Supplement to License Amendment Request 13-03, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) DCL-16-001, License Amendment Request 16-01, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01. Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2016-01-21021 January 2016 License Amendment Request 16-01, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01. Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process DCL-15-105, Supplement to License Amendment Request 15-03, Application of Alternative Source Term.2015-08-31031 August 2015 Supplement to License Amendment Request 15-03, Application of Alternative Source Term. DCL-15-091, Submits License Amendment Request Exigent Revision to Technical Specification 3.8.9. Distribution Systems - Operating2015-08-12012 August 2015 Submits License Amendment Request Exigent Revision to Technical Specification 3.8.9. Distribution Systems - Operating DCL-15-080, License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results2015-07-0101 July 2015 License Renewal Severe Accident Mitigation Alternatives Analysis Evaluation of the 2015 Seismic Hazard Results ML15176A5272015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 82015-06-17017 June 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term. Part 1 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 82015-06-17017 June 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 8 DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 82015-06-17017 June 2015 Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 8 DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 82015-06-17017 June 2015 Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 8 DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 82015-06-17017 June 2015 Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 82015-06-17017 June 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 8 DCL-15-069, License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 6 of 82015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 6 of 8 ML15176A5352015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 8 of 8 ML15176A5342015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 7 of 8 ML15176A5312015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 5 of 8 ML15176A5302015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 8 ML15176A5292015-06-17017 June 2015 License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 3 of 8 ML15176A5282015-05-15015 May 2015 License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 DCL-15-069, Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 82015-05-15015 May 2015 Diablo Canyon, Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Summary of Dose Analyses and Results. Part 2 of 8 ML15056A7052015-02-25025 February 2015 Update to the Diablo Canyon Power Plant License Renewal Application(Lra), Amendment 49 and LRA Appendix E, Applicant'S Environmental Report-Operating License Renewal Stage, Amendment 2 DCL-15-023, License Amendment Request 15-01 - Incorporation Into Licensing Basis of Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident2015-02-25025 February 2015 License Amendment Request 15-01 - Incorporation Into Licensing Basis of Pressurizer Filling Analysis for Major Rupture of a Main Feedwater Pipe Accident ML14364A2622014-12-22022 December 2014 10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (Lra), Amendment 48. Part 1 of 2 ML14364A2642014-12-22022 December 2014 10 CFR 54.21(b) Annual Update to the Diablo Canyon Power Plant License Renewal Application (Lra), Amendment 48. Part 2 of 2 ML14364A2652014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 1 of 4 2024-07-31 |