ML20095A549
ML20095A549 | |
Person / Time | |
---|---|
Site: | Three Mile Island |
Issue date: | 12/31/1991 |
From: | Heysek W GENERAL PUBLIC UTILITIES CORP. |
To: | |
Shared Package | |
ML20095A522 | List: |
References | |
NUDOCS 9204170126 | |
Download: ML20095A549 (1) | |
Similar Documents at Three Mile Island | |
---|---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217K4701999-09-30030 September 1999
[Table view]Monthly Operating Rept for Sept 1999 for TMI-1.With ML20211Q3551999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Tmi,Unit 1.With ML20210U4791999-07-31031 July 1999 Monthly Operating Rept for July 1999 for TMI-1.With ML20209H1421999-06-30030 June 1999 Monthly Operating Rept for June 1999 for TMI-1.With ML20195H9261999-05-31031 May 1999 Monthly Operating Rept for May 1999 for TMI-1.With ML20206R0571999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Tmi,Unit 1.With ML20205K6851999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Tmi,Unit 1.With ML20207M8461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for TMI-1.With ML20198B8641998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for TMI-1.With ML20196B7191998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for TMI-1.With ML20154L5541998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for TMI Unit 1.With ML20151V2811998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Tmi,Unit 1.With ML20237C6411998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Tmi,Unit 1 ML20236R2201998-06-30030 June 1998 Monthly Operating Rept for June 1998 for TMI-1 ML20249A1061998-05-31031 May 1998 Monthly Operating Rept for May 1998 for TMI-1 ML20247G0761998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Three Mile Island Nuclear Station,Unit 1 ML20216K1061998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Three Mile Island Nuclear Station,Unit 1 ML20216F0981998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Three Mile Island Nuclear Station,Unit 1 ML20202F8121998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for TMI Nuclear Station, Unit 1 ML20199J3251997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Three Mile Island Nuclear Station,Unit 1 ML20203K4081997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for TMI-1 ML20199E3401997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for TMI-1 ML20198J8121997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for TMI-1 ML20217A8761997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for TMI-1 ML20210K0331997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Three Mile Island, Unit 1 ML20196G8401997-06-30030 June 1997 Monthly Operating Rept for June 1997 for TMI-1 ML20210K0401997-06-30030 June 1997 Revised App B of Monthly Operating Rept for June 1997 for Three Mile Island,Unit 1 Correcting Calculational Error in Shutdown Duration Hours Value ML20141C6521997-05-31031 May 1997 Monthly Operating Rept for May 1997 for TMI-1 ML20141G2801997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for TMI-1 ML20140D6601997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Three Mile Island, Unit 1 ML20136G3891997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Three Mile Island Nuclear Station,Unit 1 ML20134Q2071997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for TMI-1 ML20133G8231996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for TMI-1 ML20132D5431996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Three Mile Island Nuclear Station,Unit 1 (TMI-1) ML20135A8291996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for TMI-1 ML20129B6621996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Three Mile Island Nuclear Station Unit 1 (TMI-1) ML20129C2661996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Three Mile Island Nuclear Station,Unit 1 ML20116N6571996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Three Mile Island Nuclear Station,Unit 1 ML20115E2071996-06-30030 June 1996 Monthly Operating Rept for June 1996 for TMI-1 ML20117M1581996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Three Mile Island Unit 1 ML20112A2171996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Three Mile Island Nuclear Station Unit 1 ML20117D3691996-03-31031 March 1996 Monthly Operating Rept for March 1996 for TMI-1 ML20101C6811996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Three Mile Island Nuclear Station,Unit I ML20149K7551996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for TMI-1 ML20096D5781995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for TMI Nuclear Station ML20095E0521995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for TMI-1 ML20094L7651995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for TMI-1 ML20093E6731995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for TMI-1 ML20092F4401995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for TMI-1 ML20086F5021995-06-30030 June 1995 Monthly Operating Rept for June 1995 for TMI Unit 1 1999-09-30 Category:TEXT-SAFETY REPORT MONTHYEARML20217G1001999-10-14014 October 1999
[Table view]Errata to Safety Evaluation Supporting Amend 215 to FOL DPR-50.Credit Given for Delay in ECCS Leakage ML20217K4701999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for TMI-1.With ML20216F9231999-09-22022 September 1999 Safety Evaluation Supporting Amend 216 to License DPR-50 05000289/LER-1999-010, :on 990830,discovery of Condition Outside UFSAR Design Basis for Flood Protection Was Noted.Caused Because Original Problem Was Not Corrected by Design Change.Flood Procedure Was Immediately Revised.With1999-09-21021 September 1999
1999-09-30 |
Text
.
OPERATING DATA REPORT DOCKET NO.
50-289 DATE COMPLETED BY W G HEYSEK OPERATING STATUS TELEPHONE (717) 948-8191
- 1. UNIT NAME:
THREE MILE ISLAND UNIT 1 NOTES:
- 3. REPORTING PERIOD:
DECEMBER 1991
- 3. LICENSED THERMAL POWER:
2568
- 4. NAMEPLATE RATING (CROSS MWe):
871
- 5. DESIGN ELECTRICAL RATING (NET MWe):
819
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
- 834 780 7 MAXIMUM DEPENDABLE CAPACITY (NET hWe):
- 8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS:
- Retroactive to 11/15/91, the MDC values have been adjusted down by 22 MWe due to MW-Hour meter recalibration and unidentified looses.
9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-To-DATE CUMMULATIVE
- 11. HOUR 3 IN REPORTING PERIOD (HRS) 744.0 8760.0 151921.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL (HRS) 744.0 7566.8 76731.0
-13. REACTOR RESERVE SHUTDOWN HOURS (HRS) 0.0
-0.0 2245,6
- 14. HOURS GENERATOR ON-LINE (HRS) 744.0 7536.5 75656.2
- 15. UNIT RESERVE SHUTDOWN HOURS (HRS) 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1852650 17398714 183869045
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 624088 6033355
-61994259
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 58aE17 5667789 58157220-
- 19. UNIT SERVICE FACTOR
(%)
100.0 86.0 49.8 20 UNIT AVAILABILITY FACTOR
(%)
100.0 86.0 49.8
- 31. UNIT CAPACITY FACTOR (USING KDC NET) 100.7 80.5 48.7
- 32. UNIT CAPACITY FACTOR (USING DER NET) 96.6 79.0 46.7 j.
- 23. UNIT FORCED OUTAGE RATE
(%)
0.0 0.7 44.5 UNIT FORCED OUTAGE HOURS (HRS) 0.0 51.9 60648.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
i i
r
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
l 4
I l
9204170126 920413 i
PDR ADOCK 05000289 l
R PDR