MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to ABB C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20134H3771996-11-0606 November 1996 Proposed Tech Specs of Appendix a Re Cooling Water Sys ML20134E4551996-10-25025 October 1996 Proposed Tech Specs Changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2591996-09-24024 September 1996 Proposed Tech Specs,Changing TS 4.12 to Incorporate Revised Acceptance Criteria for SG Tubes W/Degradation in Tubesheet Region ML20117P4311996-09-11011 September 1996 Proposed Tech Specs,Revising Plant TS Governing Cw Sys ML20117B2381996-08-15015 August 1996 Proposed Tech Specs 3.3.B.2 Re Containment Cooling Sys & Bases to Conform to Supporting Analyses ML20115G8121996-07-15015 July 1996 Proposed Tech Specs Re Moveable Incore Detector Thimble Reduction ML20095J7951995-12-14014 December 1995 Proposed Tech Specs for Conformance of Administrative Controls Section 6 to Guidance of STS ML20094S2791995-11-28028 November 1995 Proposed Tech Specs Re Radiological Effluent TS Conformance ML20087F3571995-08-0909 August 1995 Proposed Tech Specs Table TS 3.15-1,Pages 1 & 2 & Bases Page B.3.15-1 Marked Up to Implement License Amend Request 1999-08-31
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to ABB C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20195F1391998-10-0808 October 1998 Non-proprietary Version of Rev 1 to NSPNAD-97002, Steam Line Break Methodology ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20151Z9181998-08-0303 August 1998 Rev 0 to 5AWI 6.1.2, Design Outputs,Review & Verification ML20151Z9011998-08-0303 August 1998 Rev 2 to 5AWI 6.1.0, Design Change General ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20248M1421998-04-0606 April 1998 Draft NRC Insp Manual Temporary Instruction 2515/XXX Fire Protection Functional Insp (Fpfi) ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20151Z9561998-01-0505 January 1998 Rev 0 to 5AWI 6.1.7, Design Change Work Orders ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20151Z9441997-10-20020 October 1997 Rev 0 to 5AWI 6.1.6, Design Review & Approval ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20136H0101997-01-29029 January 1997 Rev 12 to Abnormal Procedure AB-3, Earthquakes ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20138G8751996-11-0808 November 1996 Rev 2 to TN-40 Cask Unloading Procedure 1999-08-31
[Table view] |
Text
_,. _
1 TS.3.1-5 3.1. A.2.c. (2). (a) One PORV'may be inoperable for 7 days.
If these conditions cannot be met, depressurize and vent the reactor coolant system through at least a 3 square inch vent within the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
(b) With both PORVs inoperable, complete depressurization and venting of the RCS through at least a 3 square inch vent within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
(3) Reactor Coolant System average temperature below the temperature specified in the PTLR for disabling both safety injection pumps With Reactor Coolant System temperature less than the temperature specified in the PTLR for disabling both safety injection pumps, when the head is on the reactor vessel and the reactor coolant system is not vented through a 3 square inch or larger vent; both Pressurizer power operated relief valves (PORVs) shall be OPERABLE (except as specified in 3.1. A.2.c. (3). (a) and 3.1. A. 2. c. ( 3 ). (b) below) with the Over Pressure Protection System enabled, the associated block valve open, and the associated backup air supply charged.
(a) One PORV may be inoperable for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
If these conditions cannot be met, depressurize and vent the reactor coolant system through at least a 3 square inch vent within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
(b) With both PORVs inoperable, complete depressurization and venting of the RCS through at least a 3 square inch vent within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
3.1.A.3 Reactor Coolant Vent System
- a. A reactor shall not be made or maintained critical nor shall reactor coolant system average temperature exceed 200*F unless Reactor Coolant Vent System paths from both the reactor vessel head and pressurizer steam space are OPERABLE and closed (except as specified in 3.1.A.3.b and 3.1.A.3.c below).
j
- b. During STARTUP OPERATION and POWER OPERATION, any one of the following conditions of inoperability may exist for each unit provided STARTUP OPERATION is discontinued until OPERABILITY is restored.
If any one of these conditions is not restored to an OPERABLE status within 30 days, be in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> (1) Bitherraboth of the parallel vent valves in the reactor vess' ~1'hsad vent path aresinoperable, or therassociated' vent e
^~ "
path;3egmentgisjnoper,ablegor
' ~ '
~
(2) EitherFaboth of the parallel vent valves in the pressurizer iienG5tli areyinoperable, ortthetassociatedmventepathtsegment isylinoperablejgor
~"
~~'"
" * " ' ~
~~
(3) The vent valve to the pressurizer relief tank discharge line or;the; associate _d gentgpath;segmentgisjinoperable, or (4) The vent valve to the containment atmospheric discharge line OEthe:assogiated;ventfpathisegment71sjinoperable.
- c. With no Reactor Coolant Vent System path OPERABLE, restore at least one vent path to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
9909100367 990904 I PDR ADOCK 050002821 P
PDR L
TS.4.18-1 4.18 REACTOR COOLANT VENT SYSTEM PATHS Applicability Applies to the surveillance performed on the Reactor Coolant Vent System paths to verify OPERABILITY.
Objective To assure that the capability exists to vent noncondensible gases from the Reactor Coolant System that could inhibit natural circulation core cooling.
Specification n
t.rm_.. b_
n_,*w nm.. w 41 4.
-r --
2 D _M s_'t _b.
D n,,g
_*,g y O_ A_A__=kw, b_
t.f,m M b_
,F M b A_ pmq,9, 's b_
,9 b_ n_
_ a fut A M____b__tr*8%b_n__
O D_ _DD_h_D_ i_ D_
d Ot M
_ _I a_ _e b_ e_,
e= e
- =_ m,e I n,w
_O*P_h_D.W_ _T_MA_ M_ DD_h_T_ T_ A_ M _..s._= m_.n_ _s,= w. n_ s_ a_t n_1 4 +
,w b_,,
e, ma
'fe ri f'/ n; 211
-'"u 21 I"^12ti^-' 21'*e r in e2c' fent p2th 2r-bl^rk-d 1.
,., a
,,..a a_.
s,._ _, -. _.
,.,~___t._.a,,_ _.
- 2. "'fcli"O 02r
" ^ 1 - " ^ 1 '8 ^per2ted
'21'f e i n t he 'f ^" t p 2 t h " t hrough 2t h
ic2't
^"r re plete r cle of full tr2fel frer *'r re"trrl ree-
/
D_.
c.,.,,b_.-.
D_,m_..
m_,,._.im_.,,,
D 1_ _...
m_ w,1_,_
u_ m_,, m_. _4 s_ _4 m_ a_
___--w.m.
m,w m_ _, _ w D__,,,._.,,,__n_m__3__,._*_
t.rm_ *..e,,,.__.-. _
m _, b_ u.
7. _
_s,,,,m_..,4,,,.,
.__,,,t_,
_c._ m_ 3_ 4 -_ _,.
E,_ac_h! React.orP C0_,0_1..a_ntlS.ym_ tem'v_en....t.i. Eat _h._i s_hal...lTh.e.. rdemon,_str.ated_ O_PE..R. AB. L.E. rat 71e..a._s_t.?_on.,ce, s
m e
a -.
. ~~
.m mx e..
e.
,s.
I ar 4
1 B
wm a. '_.E v_er. i f Ying,.ral. P m.. an_ual.mi_sola.. ti_om v. alves rin? each.n entT p~a thvar.e,~ b, lock. ed : and-Gaw tv
~
n
+.
ta. gge. d_?i_m._he ' oP_en. ? Rom.it_io._n -1 mt N
"Trm br.2sy.c., ling;each._tsol. enoid.~ rop. era._te.d...:va.. lv~e rin :ea.~ch ven. t? path 3..t. hrough.."at71ea,st c
~
~
-~~
~~ -
um aa
+
o.ne.com. plet.e.; cycle. :..of 7fu.111,~travelv.~f ro.m.n.the ' co.n. trol room;T and.
h, re W cr y Verifying [flowithrougg eachVReactor: Coo.la.ntrSy.s. tem ve.n.t.^ path..
tasw-
~ -
l 4
l i
l i
I e
4
s' i
B.4.18-1 I
4.18 REACTOR COOLANT VENT SYSTEM PATHS Bares 1
The manual valves in the Reactor Coolant Vent System are blocked and
. tagged in the open position to eliminate the possibility that operation i
of the system could be blocked by the inadvertent closure of any of the system manual valves.
The cycling of each solenoid operated vent valve once each refueling j
CYCA*ligte5valfgensures the ability of these valves to open if required to vent the Reactor Coolant System. More frequent cycling of the valves is not practical because they cannot be isolated from the Heactor j
Coolant System while the plant is operating.
Reactor Coolant Vent System flow will be determined qualitatively as prrt cf " e ercri fill - " fert prece urer felle:>1n; erch refuelir;.
d Thir :1111 tomassure that there are no blockages in the Reactor Coolant s #
Vent Sys tem piping. L*Thi. s s ma.y~it be edo.._n..e.,m+1_nraa' p.i_ece..m_ef _f a_shi_onn...w.h. ere4.t.._he.
wis
~
m.
- P flow verif ~ic. ation~if or'di.. f f.~e.r,e..n. e.~rP pe " segme.. nts:.maYn:r be.> n,perf orme. d 9b.Y i--
u- ~. w -
c
~-
d_if f_e_re_nt. ? pro._ced.u._res.t_usin...g _di_f f_eren..t.rfl.u_id_s 1
.~
m
-~
I i
J s
i
i EXHIBIT C PRAIRIE ISLAND NUCLEAR GENERATING STATION License Amendment Request dated September 4,1998 Appendix A, Technical Specification Pages Revised Pages TS.3.1-5 TS.4.18-1 B.4.18-1 l
l 1
1
c TS.3.1-5 de 3.1. A.2.c. (2). (a) One PORV may be inoperable for 7 days.
If these conditions cannot be met, depressurize and vent the reactor coolant system through at least a 3 square inch vent within the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
l (b) With both PORVs inoperable, complete depressurization and Venting of the RCS through at least a 3 square inch vent within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
(3) Reactor Coolant System average temperature below the temperature specified in the PTLR for disabling both safety injection pumps With Reactor Coolant System temperature less than the temperature specified in the PTLR for disabling both safety injection pumps, l
when the head is on the reactor vessel and the reactor coclant system is not vented through a 3 square inch or larger vent; both Pressurizer power operated relief valves (PORVs) shall be OPERABLE (except as specified in 3.1. A.2.c. (3). (a) and 3.1. A. 2. c. (3). (b) below) with the Over Pressure Protection System enabled, the associated block valve open, and the associated backup air supply charged.
(a) One PORV may be inoperable for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
If these conditions cannot be met, depressurize and vent the reactor coolant system through at least a 3 square inch vent within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
(b) With both PORVs inoperable, complete depressurization and venting of the RCS through at least a 3 square inch vent within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
3.1.A.3 Reactor Coolant Vent System
- a. A reactor shall not be made or maintained critical nor shall reactor coolant system average temperature exceed 200*F unless Reactor Coolant Vent System paths from both the reactor vessel head and pressurizer steam space are OPERABLE and closed (except as specified in 3.1.A.3.b and 3.1.A.3.c below).
- b. During STARTUP OPERATION and POWER OPERATION, any one of the following conditions of inoperability may exist for each unit provided STARTUP OPERATION is discontinued until OPERABILITY is restored.
If any one of these conditions is not restored to an OPERABLE status within 30 days, be in at least HOT SHUTDOWN within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />s:
(1) Either both of the parallel vent valves in the reactor-vessel head vent path are inoperable, or the associated vcnt path segment is inoperable, or (2) Either both of the parallel vent valves in the pressurizer vent path are inoperable, or the asnociated vent path segment is inoperable, or (3) The vent valve to the pressurizer relief tank discharge line or the associated vent path segment is inoperable, or j
(4) The vent valve to the containment atmospheric discharge line or the associated vent path segment is inoperable.
l
- c. With no Reactor Coolant Vent System path OPERABLE, restore at least one vent path to OPER?BLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within tha next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN l
within the following 30 hourt.
l l
l
.m m..
1 TS.4.18-1 i
('
,. 4.18 REACTOR COOLANT VENT SYSTEM PATHS i
Applicability i.'
Applies to.the surveillance performed on the Reactor Coolant Vent System
.l paths to verify OPERABILITY, Objective a
To assure that the capability exists'to vent noncondensible gases from the i
i Reactor Coolant System that could inhibit natural circulation core cooling.
5 Specification Each Reactor Coolant System vent path shall be demonstrated OPERABLE.at least once each refueling cycle interval by:
. Verifying all manual isolation valves in each vent path are blocked and j
a.
i tagged in the open position, l
b.
Cycling each solenoid operated valve in each vent path through at least one complete cycle of full travel from the control room, and
{
c.
Verifying' flow through each Reactor Coolant System vent path.
h I
i p
i',
I h
4.-
$e 4-4, i 4
i e
Y
. ~.. -. - ~. ~. - _..... _.. _. _ _. _. - -.... -.
', *....g,
B.4.18-1 t
4.18 REACTOR COOLANT VENT SYSTEM PATHS e
Bases The' manual valves in the Reactor Coolant Vent System are blocked and tagged in the open position to eliminate the possibility that operation of the system could be blocked by the inadvertent closure of any of the F
system manual valves.
.The cycling of each' solenoid operated vent valve once each refueling cycle interval ensures the ability of these valves to open if required l
to' vent the Reactor Coolant System. More frequent cycling of the. valves is not practical because they cannot be isolated from the Reactor i
Coolant System while the plant is operating.
- ~
Reactor Coolant Vent System flow will'be determined qualitatively to l
assure that there are no blockages in the Reactor Coolant Vent Systen
~
piping. This may be done in a piecewise fashion, where the flow verification for different pipe segments may be performed by different
( -
procedures using different fluids.
s i
1 1
l 1
l 1
4 a
1'
-