ML15023A214

From kanterella
Revision as of 02:33, 28 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2015/01/23 NRR E-mail Capture - Diablo Canyon, Units 1 and 2 - Acceptance Review for the Application of Leak-Before-Break in the Fuel Structural Analysis to Satisfy 10 CFR 50.46(b)(4) (TAC Nos. MF4988 and MF4989)
ML15023A214
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/23/2015
From: Lingam S P
Plant Licensing Branch IV
To: Richardson M
Pacific Gas & Electric Co
References
TAC MF4988, TAC MF4989
Download: ML15023A214 (2)