ML22256A306
Letter Sequence RAI | |
---|---|
EPID:L-2021-LLA-0123, Emergency License Amendment Request 21-05 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System (Approved, Closed) EPID:L-2022-LLA-0122, (Approved, Closed) | |
Initiation
Administration | |
MONTHYEARML20209A3722020-07-27027 July 2020
[Table View]Notice of Partially Closed Third Pre-Application Meeting with Tn Ammericas LLC for Model No. TN-EAGLE Transportation Package Project stage: Meeting ML21188A0382021-07-0707 July 2021 (External_Sender) DCPP Draft Emergency LAR - Asw Project stage: Draft Other ML21189A0662021-07-0707 July 2021 NRR E-mail Capture - Additional Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System Project stage: Draft RAI ML21189A0462021-07-0707 July 2021 NRR E-mail Capture - Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System Project stage: Draft RAI ML21188A0362021-07-0707 July 2021 Draft PG&E Letter DCL-21-046 - Diablo Canyon Unit 1: Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System Project stage: Draft Request ML21189A0442021-07-0707 July 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System Project stage: RAI DCL-21-046, Emergency License Amendment Request 21-05 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2021-07-0707 July 2021 Emergency License Amendment Request 21-05 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System Project stage: Request DCL-21-048, Response to Request for Additional Information on Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2021-07-0707 July 2021 Response to Request for Additional Information on Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System Project stage: Response to RAI ML21188A3452021-07-0808 July 2021 Issuance of Amendment No. 238 Revision to TS 3.7.8, Auxiliary Saltwater (Asw) System (Emergency Circumstances) Project stage: Approval ML22005A3462021-12-14014 December 2021 Transmittal Letter from A. M. Al-Daouk to U.S. Nuclear Regulatory Commission, Renewal Request of the Certificate of Compliance No. 9329 for the Model No. S300 Package Project stage: Request ML22005A3502021-12-14014 December 2021 Email from D. Ortega (NNSA) to N. Garcia (U.S. NRC) Renewal of Certificate of Compliance (CoC) No. 9329 for the Model No. S300 Package Project stage: Other ML22006A3562021-12-27027 December 2021 Enclosure 5: Clarification Regarding Testing Performed During the Shielded Container Prototype Testing (Drop Tests, Gamma Scans, Destructive Disassembly), Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3532021-12-27027 December 2021 Enclosure 2: Attachment to Email Dated 11-29-21, Responses to Follow Up Questions, Acceptance Tests for the Lead Ssield of the Shielded Canisters (Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3522021-12-27027 December 2021 Enclosure 3: Email Dated 12/27/21 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Comments on Telephone Call Summary Dated 12/1/21, Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3552022-01-0606 January 2022 12/1/21-Conference Call Summary: Follow Up Questions Related to Shielding RAIs RAI-Sh-5 and -8 (Acceptance Tests, Shielded Canisters), Model Nos. TRUPACT-II and Halfpact Packages Project stage: RAI ML22020A1872022-01-25025 January 2022 Enclosure 2 - Safety Evaluation Report: Renewal for Certificate of Compliance, Revision 6, the Model No. S300 Package Project stage: Approval ML22020A1862022-01-25025 January 2022 Transmittal Letter (Markings) - Certificate of Compliance, Revision 6, and Renewal for the Model No. S300 Project stage: Other ML22020A1852022-01-25025 January 2022 Enclosure 1 - Certificate of Compliance, Revision 6, Model No. S300 Package (Renewal) Project stage: Other ML22319A2282022-08-18018 August 2022 Redacted - August 2022, Revision No. 26 of the Safety Analysis Report for the Model No. TRUPACT-II Package (Docket No. 71-9218) Project stage: Other ML22319A2292022-08-18018 August 2022 Redacted - August 2022, Revision No. 9 of the Safety Analysis Report for the Model No. Halfpact Package (Docket No. 71-9279) Project stage: Other ML22230C9202022-08-18018 August 2022 Nuclear Waste Partnership, LLC, Revision 26 of the Trupact-II Shipping Package Application, and Revision 9 of the Halfpact Shipping Package Application Project stage: Other ML22278A0072022-09-0808 September 2022 Email from T.E. Sellmer (Nwp) to N. Garcia Santos (NRC) Acknowledgement of Application for CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact Packages Project stage: Request ML22256A3052022-09-19019 September 2022 Enclosure- Request for Additional Information Model Nos. TRUPACT-II and Halfpact Project stage: RAI ML22256A3062022-09-19019 September 2022 Transmittal Letter- Request for Additional Information, Model Nos. TRUPACT-II and Halfpact Project stage: RAI ML22278A0012022-10-0404 October 2022 Email from T. Sellmer (Nwp) to N. Garcia Santos (NRC) Et Al., Delay of RAI Response-CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact CoCs Project stage: Other ML22283A0292022-10-10010 October 2022 Nuclear Waste Partnership, LLC, Response to Request for Additional Information on Revision 26 of the Trupact-II Shipping Package Project stage: Response to RAI ML22319A2302022-10-10010 October 2022 Redacted - October 2022, Revision No. 26 of the Safety Analysis Report for the Model No. TRUPACT-II Package (Docket No. 71-9218) Project stage: Other ML22319A2312022-10-10010 October 2022 Redacted - October 2022, Revision No. 9 of the Safety Analysis Report for the Model No. Halfpact Package (Docket No. 71-9279) Project stage: Other ML22320A1042022-11-14014 November 2022 Nuclear Waste Partnership, LLC (Applicant), T Sellmer Comments on Draft Certificate of Compliance No. 9279, Revision 11 Project stage: Draft Other ML22320A1032022-11-15015 November 2022 Email from S. Burns (Nwp) to N. Garcia Santos (Nrc), Subject-IMPORTANT, Courtesy Review, Revised Draft CoCs for the TRUPACT-II and Halfpact Packages Project stage: Draft Other ML22312A4062022-11-21021 November 2022 Enclosure 1 - Revision No. 27 of Certificate of Compliance No. 9218, Model No. TRUPACT-II Project stage: Other ML22312A4032022-11-21021 November 2022 Enclosure 3 - Safety Evaluation Report-Revision No. 27 of Certificate of Compliance No. 9218, Model No. TRUPACT-II, and Revision No. 11 of Certificate of Compliance No. 9279, Model No. Halfpact, Transport Packages Project stage: Approval ML22312A4052022-11-21021 November 2022 Enclosure 2 - Revision No. 11 of Certificate of Compliance No. 9279, Model No. Halfpact Project stage: Other ML22312A4042022-11-21021 November 2022 Transmittal Letter-Revision No. 27 of Certificate of Compliance No. 9218, Model No. TRUPACT-II, and Revision No. 11 of Certificate of Compliance No. 9279, Model No. Halfpact, Transport Packages (EPIDs L-2022-LLA-0123 and L-2022-LLA-122) Project stage: Other ML23046A4542023-02-15015 February 2023 Request for Authorization of One-Time Shipment of Model No. Halfpact Crediting the Outer Confinement Vessel as the Containment Boundary Project stage: Request ML23067A4362023-03-16016 March 2023 Application for a Letter Authorization Related to Coc No. 9279, Model No. Halfpact - Accepted for Review - CAC No. 001029, EPID No. L-2023-LLA-0030 Project stage: Other ML23003A0462023-03-29029 March 2023 Response to Request for Reviewing a Position Paper from Nuclear Fuel Services, Inc. Related to Applicability of 10 CFR 71.15(C) to Shipment(S) Project stage: Other ML23089A2582023-03-29029 March 2023 Email Attachment, Staggered Request for Additional Information (Structural Evaluation and Operating Procedures), Model No. Halfpact - One-time Letter Authorization Project stage: RAI ML23333A1052023-04-28028 April 2023 Enclosure 3-2 (Redacted), Email from Tholly (NFS) to Ngarcia Santos (Nrc), NFS Follow Up Questions on NRCs Response to NFS Position Paper on the Applicability of 10 CFR 71.15 to Shipments, Conference Call Summary on 5/22/23 (Docket No. 70-1 Project stage: Other ML23131A1752023-05-15015 May 2023 Notice-Closed Meeting on May 22, 2023 to Discuss Questions About NRCs Response on the Applicability of 10 CFR 71.15 to a Shipment Project stage: Meeting ML23333A0352023-05-22022 May 2023 Enclosure 2, Meeting Agenda, Conference Call Summary, NRC and NFS Closed Meeting on 5/22/23 to Discuss Questions Related to NRCs Response to NFS Position Paper on Applicability of 10 CFR 71.15 to Shipments (Docket No. 70-143) Project stage: Meeting ML23333A0392023-05-22022 May 2023 Conversation Record NRC Form 699, Conference Call Summary, NRC and NFS Closed Meeting on 5/22/2023 to Discuss Questions Related to NRCs Response to NFS Position Paper on Applicability of 10 CFR 71.15 to Shipments (Docket No. 70-143) Project stage: Meeting ML23333A0332023-05-30030 May 2023 Email Dated 5-30-23 from T Holly (NFS) to Ngarcia Santos (Nrc), Transmittal of Affidavit Related to Fissile Material Exemption (10 CFR 71.15 (C), Follow Up Questions and Additional Comments (Docket No. 70-143) Project stage: Request ML23333A0382023-05-30030 May 2023 Conversation Record NRC Form 699, Conference Call Summary, NRC and NFS Meeting on 5/30/23 to Discuss Follow Up Questions on 5/22/23 Meeting - NFS Position Paper on Applicability of 10 CFR 71.15 to Shipments (Docket No. 70-143) Project stage: Meeting ML23333A1002023-05-30030 May 2023 Enclosure 4-2 (Redacted), Affidavit, Trade Secrets or Commercial Information, NFS Follow Up Questions on NRCs Response to NFS Position Paper on the Applicability of 10 CFR 71.15 to Shipments Project stage: Other ML23333A0342023-05-31031 May 2023 Enclosure 1 - Meeting Attendees - Conference Call Summary, NRC and NFS Closed Meeting on 5/22/23 to Discuss Questions Related to NRCs Response to NFS Position Paper on Applicability of 10 CFR 71.15 to Shipments (Docket No. 70-143) Project stage: Meeting ML23137A4412023-06-0202 June 2023 Authorization for Shipment of the Model No. Halfpact Package - Inner Containment Vessel No. 506 Project stage: Other ML23220A1562023-07-21021 July 2023 Road Map for Changes to the Safety Analysis Report Related for Certificate of Compliance No. 9355, Revision 4, Model No 435-B Project stage: Other ML23220A1572023-07-21021 July 2023 Transmittal Letter from Ahmad M. Al-Daouk (NNSA) to Ngarcia Santos (NRC) Related to the Application for Certificate of Compliance No. 9355, Revision 4, Model No. 435-B Project stage: Request ML23229A2072023-08-17017 August 2023 Notice for a Partially Closed Pre-application Meeting with NAC International to Discuss the NAC Lwt Pre-application Project stage: Meeting 2022-08-18 |
ML22256A306 | |
Person / Time | |
---|---|
Site: | 07109218, 07109279 |
Issue date: | 09/19/2022 |
From: | Garcia-Santos N Storage and Transportation Licensing Branch |
To: | Sellmer T Nuclear Waste Partnership |
Norma Garcia Santos NMSS/DFM/STLB | |
Shared Package | |
ML22256A304 | List: |
References | |
EPID L-2021-LLA-0123, EPID L-2022-LLA-0122 | |
Download: ML22256A306 (1) | |
Category:Letter
MONTHYEARML24264A1162024-09-25025 September 2024
[Table view]Letter - Revision No. 28 of Certificate of Compliance No. 9218 for the Model No. TRUPACT-II Transport Package ML24219A4222024-08-0606 August 2024 Salado Isolation Mining Contractors LLC (Simco) - Certificate of Compliance No. 9218, Model No. Trupact-II Package ML24211A0522024-07-29029 July 2024 Salado Isolation Mining Contractors, LLC (Simco), - Submittal of Report Pursuant to 10 CFR 71.95 Regarding the Use of the Type B Packaging Model Number TRUPACT-II, Serial Number 148 ML24150A1402024-05-30030 May 2024 NRC Fabrication Inspection Report for Doe/Wipp Facility ML24151A3522024-05-30030 May 2024 Salado Isolation Mining Contractors (Simco) - Report Pursuant to 10 CFR 71.95 ML24108A1532024-04-17017 April 2024 Salado Isolation Mining Contractors (Simco) LLC - Report Pursuant to 10 CFR 71.95 ML23137A4412023-06-0202 June 2023 Authorization for Shipment of the Model No. Halfpact Package - Inner Containment Vessel No. 506 ML23117A0722023-04-27027 April 2023 Response to Request for Additional Information on the Halfpact Docket No. 71-9279, Request for Authorization of One-Time Shipment of Model No. Crediting the Outer Confinement Vessel as the Containment ML23095A1102023-04-17017 April 2023 Transmittal letter-RAI for the Letter Authorization for the Model No. Halfpact Package ML23067A4362023-03-16016 March 2023 Application for a Letter Authorization Related to Coc No. 9279, Model No. Halfpact - Accepted for Review - CAC No. 001029, EPID No. L-2023-LLA-0030 ML23046A4542023-02-15015 February 2023 Request for Authorization of One-Time Shipment of Model No. Halfpact Crediting the Outer Confinement Vessel as the Containment Boundary ML22333A7272022-12-14014 December 2022 Review of 2022 Waste Isolation Pilot Plant Biennial Environmental Compliance Report ML22312A4042022-11-21021 November 2022 Transmittal Letter-Revision No. 27 of Certificate of Compliance No. 9218, Model No. TRUPACT-II, and Revision No. 11 of Certificate of Compliance No. 9279, Model No. Halfpact, Transport Packages (EPIDs L-2022-LLA-0123 and L-2022-LLA-122) ML22283A0292022-10-10010 October 2022 Nuclear Waste Partnership, LLC, Response to Request for Additional Information on Revision 26 of the Trupact-II Shipping Package ML22256A3062022-09-19019 September 2022 Transmittal Letter- Request for Additional Information, Model Nos. TRUPACT-II and Halfpact ML22230C9202022-08-18018 August 2022 Nuclear Waste Partnership, LLC, Revision 26 of the Trupact-II Shipping Package Application, and Revision 9 of the Halfpact Shipping Package Application ML22333B0292022-05-0909 May 2022 Report Pursuant to 10 CFR 71.95, Model No. TRUPACT-II Package Unit 188, Incorrect Qualification Related to Flammable Vocs ML22118B1442022-04-28028 April 2022 Transmittal: Letter Certificate of Compliance No. 9218, Rev. 26, Model No. TRUPACT-II and Certificate of Compliance No. 9279, Rev. 10, Model No. Halfpact Transport Packages ML22055A6292022-02-24024 February 2022 Transmittal Letter: TRUPACT-II Package Application, Revision 25, Docket No. 71-9218, and Halfpact Package Application, Revision 8, Docket No. 71-9279 (Epids L-2021-LLA-0033 and L-2021-LLA-0034) ML22014A0202022-01-14014 January 2022 Nuclear Waste Partnership, Report Pursuant to 10 CFR 71.95 Regarding the Use of the Type B Packaging Model Number TRUPACT-II, Serial Number 154 ML21322A1212021-11-18018 November 2021 Nuclear Waste Partnership, Revision 25 of the TRUPACT-II Shipping Package Application, Docket No. 71-9218, and Revision 8 of the Halfpact Shipping Package Application, Docket No. 71-9279 (Epids L-2021-LLA-0033 and L-2021-LLA-0034) ML21279A1812021-10-0606 October 2021 Transmittal Letter: Response to Request for Additional Information for Revision 25 of the TRUPACT-II Shipping Package Application, Docket No.71-9218,and Revision 8 of the Halfpact Shipping Package Application, Docket No.71-9279 ML21214A1452021-08-11011 August 2021 Transmittal Letter Request for Additional Information, Model Nos Trupact II and Halfpact Transport Packages ML21175A0842021-06-14014 June 2021 Nuclear Waste Partnership, LLC - Report Pursuant to 10 CFR 71.95 ML21125A1432021-05-20020 May 2021 Transmittal Letter - Application for the Model Nos. Trupact-II and Halfpact Transport Packages - Accepted for Review (EPIDs L-2021-LLA-0033 and L-2021-LLA-0034) ML21054A0512021-02-23023 February 2021 5 of the TRUPACT-II Shipping Package Application, Docket No. 71-9218, and Revision 8 of the Halfpact Shipping Package Application, Docket No. 71-9279 ML20325A1832020-11-23023 November 2020 Transmittal Letter: Revision No. 25 of Certificate of Compliance No. 9218 for the Model No. TRUPACT-II and Revision No. 9 of Certificate of Compliance No. 9279 for the Model No. Halfpact Transport Packages (EPIDs L-2020-LLA-0173 and L-2020- ML20269A1882020-09-24024 September 2020 Nuclear Waste Partnership, LLC - Certificate of Compliance No. 9279, Model No. Halfpact Package, Docket No. 71-9279 ML20216A4942020-08-0303 August 2020 Nuclear Waste Partnership, LLC, Submittal of Revision 24 of the TRUPACT-II Shipping Package Application, Docket No. 71-9218, and Revision 7 of the Halfpact Shipping Package Application, Docket 71-9279 ML19318E1662019-11-13013 November 2019 Certificate of Compliance No. 9218, Revision No. 24, for the Model No. Trupact-II Transportation Package Transmittal Letter ML19318E1672019-11-13013 November 2019 Enclosure 2-Certificate of Compliance No. 9218, Revision No. 24, for the Model No. Trupact-II Transportation Package Safety Evaluation Report ML19254A6242019-09-0606 September 2019 Letter to T. Sellmer Certificate of Compliance No. 9218, Revision No. 23, for the Model No. TRUPACT-II Transportation Package 2024-09-25 |
Text
T. E. Sellmer, Manager Packaging and Information Systems Nuclear Waste Partnership, LLC P.O. Box 2078 Carlsbad, NM 88221
SUBJECT:
APPLICATION FOR THE MODEL NOS. TRUPACT-II AND HALFPACT TRANSPORT PACKAGES - REQUEST FOR ADDITIONAL INFORMATION (EPIDs L-2022-LLA-0122 and L-2022-LLA-0123)
Dear T.E. Sellmer:
By letter dated August 18, 2022 (Agencywide Documents Access and Management System Accession No. ML22230C920), the Nuclear Waste Partnership, LLC (the applicant) requested that the U.S. Nuclear Regulatory Commission staff performs a review of the proposed changes to Model Nos. HalfPACT and TRUPACT-II transport packages.
In connection with our review, we need the information identified in the enclosure to this letter.
The request for additional information (RAI) requested in this letter should be submitted in the form of revised safety analysis report pages. Please provide your response within 21/2 weeks from the date of this letter.
Please reference Docket Nos. 71-9218 and 71-9279, and Enterprise Project Identifier (EPID)
Nos. L-2022-LLA-0122 and L-2021-LLA-0123, respectively, in future correspondence related to this request. The staff is available to meet to discuss your proposed responses. If you have any questions regarding this matter, please contact me at (301) 415-6999 or Norma.GarciaSantos@nrc.gov.
Sincerely, Norma Garcia Santos, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket Nos. 71-9218 and 71-9279 EPIDs L-2022-LLA-0122 and L-2021-LLA-0123
Enclosure:
RAI September 19, 2022 Signed by Garcia Santos, Norma on 09/19/22