Letter Sequence Other |
---|
|
Results
Other: ML21054A051, ML21125A143, ML21125A144, ML21138A852, ML21279A184, ML21279A187, ML21279A190, ML21322A121, ML21322A124, ML21322A127, ML22006A352, ML22006A353, ML22006A354, ML22006A356, ML22055A629, ML22091A162, ML22103A068, ML22104A265, ML22104A266, ML22118A855, ML22118A856, ML22118B144, ML22123A162, ML22123A163, ML22123A207, ML22123A242, ML22123A244
|
MONTHYEARML21054A0512021-02-23023 February 2021 5 of the TRUPACT-II Shipping Package Application, Docket No. 71-9218, and Revision 8 of the Halfpact Shipping Package Application, Docket No. 71-9279 Project stage: Other ML21054A0542021-02-28028 February 2021 CH-TRAMPAC R6 - February 2021 Project stage: Request ML22123A1622021-02-28028 February 2021 Redacted-Revision 25 of the Safety Analysis Report for the Model No TRUPACT-II, February 2021 Project stage: Other ML21138A8522021-05-18018 May 2021 5/5/21, 1:00PM (Est), Summary for Conference Call to Discuss Identfied Request for Supplemental Information, Model Nos. TRUPACT-II, Rev. 26, and Halfpact, Rev. 10 Project stage: Other ML21125A1442021-05-20020 May 2021 Enclosure (Observations) - Application for the Model Nos. Trupact-II and Halfpact Transport Packages - Accepted for Review (EPIDs L-2021-LLA-0033 and L-2021-LLA-0034) Project stage: Other ML21125A1432021-05-20020 May 2021 Transmittal Letter - Application for the Model Nos. Trupact-II and Halfpact Transport Packages - Accepted for Review (EPIDs L-2021-LLA-0033 and L-2021-LLA-0034) Project stage: Other ML21214A1462021-08-11011 August 2021 2. Enclosurequest for Additional Information Model Nos. TRUPACT-II and Halfpact (EPIDs L-2021-LLA-0033 and L-2021-LLA-0034) Project stage: RAI ML21214A1452021-08-11011 August 2021 Transmittal Letter Request for Additional Information, Model Nos Trupact II and Halfpact Transport Packages Project stage: RAI ML21279A1902021-09-28028 September 2021 HPT-REP-0001,Regulatory Hypothetical Accident Condition Type B Testing for the Halfpact Shielded Container Payloads, Rev. 1, September 2021 Project stage: Other ML22123A2072021-10-0606 October 2021 Redacted-Revision 25 of the Safety Analysis Report for the Model No. TRUPACT-II, October 2021 Project stage: Other ML21279A1842021-10-0606 October 2021 CH-TRAMPAC, Revision 6, October 2021 Project stage: Other ML21279A1872021-10-0606 October 2021 CH-TRU Payload Appendices, Revision 5, October 2021 Project stage: Other ML22123A2422021-10-0606 October 2021 Redacted-Revision 8 of the Safety Analysis Report for the Model No. Halfpact Package (Certificate of Compliance No. 9279, Revision 10) - October 2021 Project stage: Other ML21279A1812021-10-0606 October 2021 Transmittal Letter: Response to Request for Additional Information for Revision 25 of the TRUPACT-II Shipping Package Application, Docket No.71-9218,and Revision 8 of the Halfpact Shipping Package Application, Docket No.71-9279 Project stage: Response to RAI ML21322A1212021-11-18018 November 2021 Nuclear Waste Partnership, Revision 25 of the TRUPACT-II Shipping Package Application, Docket No. 71-9218, and Revision 8 of the Halfpact Shipping Package Application, Docket No. 71-9279 (Epids L-2021-LLA-0033 and L-2021-LLA-0034) Project stage: Other ML22123A1632021-11-18018 November 2021 Redacted-Revision 25 of the Safety Analysis Report for the Model No. TRUPACT-II, November 2021 Project stage: Other ML22006A3542021-11-29029 November 2021 Enclosure 1: Transmittal Email Dated 11/29/21, Follow Up Questions and Responses Related to Acceptance Tests (Shielded Canisters), Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3502021-11-29029 November 2021, 27 December 2021, 6 January 2022, 8 February 2022, 14 March 2022 12/1/21-Conference Call with Nuclear Waste Partners LLC and the U.S. Department of Energy-Discuss Follow Up Questions Related to Shielding RAIs RAI-Sh-5 and -8, Model Nos. TRUPACT-II and Halfpact (Docket Nos. 71-9218 and 71-9279; EPID L-202 Project stage: Request ML22123A2442021-11-30030 November 2021 Redacted - Revision 8 of the Safety Analysis Report for the Model No. Halfpact Package (Certificate of Compliance No. 9279, Revision 10) - November 2021 Project stage: Other ML21322A1242021-11-30030 November 2021 Nuclear Waste Partnership, CH-TRAMPAC, Revision 6, November 2021 Project stage: Other ML21322A1272021-11-30030 November 2021 Nuclear Waste Partnership, CH-TRU Payload Appendices, Revision 5, November 2021 Project stage: Other ML22103A0642021-12-0909 December 2021, 28 January 2022 Email from S. Burns to N. Garcia Dated January 28, 2021 Responses to RAI Follow Up Questions Related to the Shielding Evaluation for Revision 10 of the Certificate of Compliance for the Model No. Halfpact Package Project stage: Request ML22103A0682021-12-0909 December 2021 NRC Staff Follow Up Questions Related to the Shielding Evaluation for Revision 10 of the Certificate of Compliance for the Model No. Halfpact Package Project stage: Other ML22006A3522021-12-27027 December 2021 Enclosure 3: Email Dated 12/27/21 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Comments on Telephone Call Summary Dated 12/1/21, Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3532021-12-27027 December 2021 Enclosure 2: Attachment to Email Dated 11-29-21, Responses to Follow Up Questions, Acceptance Tests for the Lead Ssield of the Shielded Canisters (Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3512021-12-27027 December 2021 Enclosure 4: Nwp'S (Applicant'S) Comments on the Summary of the Teleconference Dated December 1, 2021 Related to Shielding RAIs (Acceptance Tests), Model Nos. TRUPACT-II and Halfpact Packages Project stage: Meeting ML22006A3562021-12-27027 December 2021 Enclosure 5: Clarification Regarding Testing Performed During the Shielded Container Prototype Testing (Drop Tests, Gamma Scans, Destructive Disassembly), Model Nos. TRUPACT-II and Halfpact Packages Project stage: Other ML22006A3552022-01-0606 January 2022 12/1/21-Conference Call Summary: Follow Up Questions Related to Shielding RAIs RAI-Sh-5 and -8 (Acceptance Tests, Shielded Canisters), Model Nos. TRUPACT-II and Halfpact Packages Project stage: RAI ML22103A0692022-01-28028 January 2022 Email from S. Burns to N. Garcia Dated January 28, 2021 Responses to RAI Follow Up Questions Related to the Shielding Evaluation for Revision 10 of the Certificate of Compliance for the Model No. Halfpact Package Project stage: Response to RAI ML22103A0702022-01-28028 January 2022 Attachment--Email from S. Burns to N. Garcia Dated January 28, 2021 Responses to RAI Follow Up Questions Related to the Shielding Evaluation for Revision 10 of the Certificate of Compliance for the Model No. Halfpact Package Project stage: Response to RAI ML22091A1622022-02-0808 February 2022 Email Dated 2/8/2022 from S. Burns (Nwp) to N. Garcia Santos (Nrc), Estimated Date to Submit Letter with Responses to the Follow Up Questions Discussed on December 1st, 2021 Telephone Call (Model Nos. TRUPACT-II and Halfpact Packages) Project stage: Other ML22055A6292022-02-24024 February 2022 Transmittal Letter: TRUPACT-II Package Application, Revision 25, Docket No. 71-9218, and Halfpact Package Application, Revision 8, Docket No. 71-9279 (Epids L-2021-LLA-0033 and L-2021-LLA-0034) Project stage: Other ML22055A6322022-02-28028 February 2022 Nuclear Waste Partnership, LLC, CH-TRAMPAC, Revision 6 Project stage: Request ML22055A6332022-02-28028 February 2022 Nuclear Waste Partnership, LLC, CH-TRU Payload Appendices, Revision 5 Project stage: Request ML22091A1632022-03-14014 March 2022 Email Dated 3/14/2022, from S. Burns (Nwp) to N. Garcia Santos, Response to NRC Staff'S Follow Up Question on Supplemental RAI Responses Dated 2/24/22 Shielded Container Lid and Bases Lead (Model Nos. TRUPACT-II and Halfpact) Project stage: Supplement ML22118A8562022-04-14014 April 2022 Email Dated 04/14/2022 from S. Burns (Nwp) to N. Garcia Santos (NRC) Subject--Renewal and Courtesy Review Certificate of Compliance Nos. 9279 and 9218 Project stage: Other ML22118B0152022-04-14014 April 2022 Attachment 4 to Email Dated 4/14/22 from Sburns (Nwp) to Ngarcia Santos (NRC) Courtesy Review - Summary Combined Comments from Nwp on Draft Certificate of Compliance No. 9279, Revision 10 Project stage: Draft Other ML22118B0142022-04-14014 April 2022 Attachment 3 to Email Dated 4/14/22 from Sburns (Nwp) to Ngarcia Santos (NRC) Courtesy Review - Comments from Nwp on Draft Certificate of Compliance No. 9218, Revision 26 Project stage: Draft Other ML22118B0132022-04-14014 April 2022 Attachment 2 to Email Dated 4/14/22 from Sburns (Nwp) to Ngarcia Santos (NRC) Courtesy Review - Summary of Combined Comments from Nwp on Draft Certificate of Compliance No. 9279, Revision 10 Project stage: Draft Other ML22118B0122022-04-14014 April 2022 Attachment 1 to Email Dated 4/14/22 from Sburns (Nwp) to Ngarcia Santos (NRC) Courtesy Review - Combined Comments from Nwp on Draft Certificate of Compliance No. 9279, Revision 10 Project stage: Draft Other ML22118A8552022-04-14014 April 2022 Email Dated 04/14/2022 from Sburns (Nwp) to Ngarcia Santos, Subject--Courtesy Review of Certificate of Compliance Nos. 9279 and 9218 Project stage: Other ML22104A2652022-04-28028 April 2022 Enclosure 2 - Revision No. 10 of Certificate of Compliance No. 9279 for the Model No. Halfpact Trasport Packages Project stage: Other ML22104A2662022-04-28028 April 2022 Enclosure 1 - Revision No. 26 of Certificate of Compliance No. 9218 for the Model No. TRUPACT-II Transport Packages Project stage: Other ML22104A2672022-04-28028 April 2022 Enclosure 3 - Safety Evaluation Report, Certificate of Compliance No. 9218, Rev. 26, Model No. TRUPACT-II and Certificate of Compliance No. 9279, Rev. 10, Model No. Halfpact Transport Packages Project stage: Approval ML22118B1442022-04-28028 April 2022 Transmittal: Letter Certificate of Compliance No. 9218, Rev. 26, Model No. TRUPACT-II and Certificate of Compliance No. 9279, Rev. 10, Model No. Halfpact Transport Packages Project stage: Other 2021-05-20
[Table View] |
|
---|
Category:Letter
MONTHYEARML24264A1162024-09-25025 September 2024 Letter - Revision No. 28 of Certificate of Compliance No. 9218 for the Model No. TRUPACT-II Transport Package ML24219A4222024-08-0606 August 2024 Salado Isolation Mining Contractors LLC (Simco) - Certificate of Compliance No. 9218, Model No. Trupact-II Package ML24211A0522024-07-29029 July 2024 Salado Isolation Mining Contractors, LLC (Simco), - Submittal of Report Pursuant to 10 CFR 71.95 Regarding the Use of the Type B Packaging Model Number TRUPACT-II, Serial Number 148 ML24150A1402024-05-30030 May 2024 NRC Fabrication Inspection Report for Doe/Wipp Facility ML24151A3522024-05-30030 May 2024 Salado Isolation Mining Contractors (Simco) - Report Pursuant to 10 CFR 71.95 ML24108A1532024-04-17017 April 2024 Salado Isolation Mining Contractors (Simco) LLC - Report Pursuant to 10 CFR 71.95 ML23137A4412023-06-0202 June 2023 Authorization for Shipment of the Model No. Halfpact Package - Inner Containment Vessel No. 506 ML23117A0722023-04-27027 April 2023 Response to Request for Additional Information on the Halfpact Docket No. 71-9279, Request for Authorization of One-Time Shipment of Model No. Crediting the Outer Confinement Vessel as the Containment ML23095A1102023-04-17017 April 2023 Transmittal letter-RAI for the Letter Authorization for the Model No. Halfpact Package ML23067A4362023-03-16016 March 2023 Application for a Letter Authorization Related to Coc No. 9279, Model No. Halfpact - Accepted for Review - CAC No. 001029, EPID No. L-2023-LLA-0030 ML23046A4542023-02-15015 February 2023 Request for Authorization of One-Time Shipment of Model No. Halfpact Crediting the Outer Confinement Vessel as the Containment Boundary ML22333A7272022-12-14014 December 2022 Review of 2022 Waste Isolation Pilot Plant Biennial Environmental Compliance Report ML22312A4042022-11-21021 November 2022 Transmittal Letter-Revision No. 27 of Certificate of Compliance No. 9218, Model No. TRUPACT-II, and Revision No. 11 of Certificate of Compliance No. 9279, Model No. Halfpact, Transport Packages (EPIDs L-2022-LLA-0123 and L-2022-LLA-122) ML22283A0292022-10-10010 October 2022 Nuclear Waste Partnership, LLC, Response to Request for Additional Information on Revision 26 of the Trupact-II Shipping Package ML22256A3062022-09-19019 September 2022 Transmittal Letter- Request for Additional Information, Model Nos. TRUPACT-II and Halfpact ML22230C9202022-08-18018 August 2022 Nuclear Waste Partnership, LLC, Revision 26 of the Trupact-II Shipping Package Application, and Revision 9 of the Halfpact Shipping Package Application ML22333B0292022-05-0909 May 2022 Report Pursuant to 10 CFR 71.95, Model No. TRUPACT-II Package Unit 188, Incorrect Qualification Related to Flammable Vocs ML22118B1442022-04-28028 April 2022 Transmittal: Letter Certificate of Compliance No. 9218, Rev. 26, Model No. TRUPACT-II and Certificate of Compliance No. 9279, Rev. 10, Model No. Halfpact Transport Packages ML22055A6292022-02-24024 February 2022 Transmittal Letter: TRUPACT-II Package Application, Revision 25, Docket No. 71-9218, and Halfpact Package Application, Revision 8, Docket No. 71-9279 (Epids L-2021-LLA-0033 and L-2021-LLA-0034) ML22014A0202022-01-14014 January 2022 Nuclear Waste Partnership, Report Pursuant to 10 CFR 71.95 Regarding the Use of the Type B Packaging Model Number TRUPACT-II, Serial Number 154 ML21322A1212021-11-18018 November 2021 Nuclear Waste Partnership, Revision 25 of the TRUPACT-II Shipping Package Application, Docket No. 71-9218, and Revision 8 of the Halfpact Shipping Package Application, Docket No. 71-9279 (Epids L-2021-LLA-0033 and L-2021-LLA-0034) ML21279A1812021-10-0606 October 2021 Transmittal Letter: Response to Request for Additional Information for Revision 25 of the TRUPACT-II Shipping Package Application, Docket No.71-9218,and Revision 8 of the Halfpact Shipping Package Application, Docket No.71-9279 ML21214A1452021-08-11011 August 2021 Transmittal Letter Request for Additional Information, Model Nos Trupact II and Halfpact Transport Packages ML21175A0842021-06-14014 June 2021 Nuclear Waste Partnership, LLC - Report Pursuant to 10 CFR 71.95 ML21125A1432021-05-20020 May 2021 Transmittal Letter - Application for the Model Nos. Trupact-II and Halfpact Transport Packages - Accepted for Review (EPIDs L-2021-LLA-0033 and L-2021-LLA-0034) ML21054A0512021-02-23023 February 2021 5 of the TRUPACT-II Shipping Package Application, Docket No. 71-9218, and Revision 8 of the Halfpact Shipping Package Application, Docket No. 71-9279 ML20325A1832020-11-23023 November 2020 Transmittal Letter: Revision No. 25 of Certificate of Compliance No. 9218 for the Model No. TRUPACT-II and Revision No. 9 of Certificate of Compliance No. 9279 for the Model No. Halfpact Transport Packages (EPIDs L-2020-LLA-0173 and L-2020- ML20269A1882020-09-24024 September 2020 Nuclear Waste Partnership, LLC - Certificate of Compliance No. 9279, Model No. Halfpact Package, Docket No. 71-9279 ML20216A4942020-08-0303 August 2020 Nuclear Waste Partnership, LLC, Submittal of Revision 24 of the TRUPACT-II Shipping Package Application, Docket No. 71-9218, and Revision 7 of the Halfpact Shipping Package Application, Docket 71-9279 ML19318E1662019-11-13013 November 2019 Certificate of Compliance No. 9218, Revision No. 24, for the Model No. Trupact-II Transportation Package Transmittal Letter ML19318E1672019-11-13013 November 2019 Enclosure 2-Certificate of Compliance No. 9218, Revision No. 24, for the Model No. Trupact-II Transportation Package Safety Evaluation Report ML19254A6242019-09-0606 September 2019 Letter to T. Sellmer Certificate of Compliance No. 9218, Revision No. 23, for the Model No. TRUPACT-II Transportation Package 2024-09-25
[Table view] |
Text
TS:21:03028 UFC:5822.00 November 18, 2021 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
REVISION 25 OF THE TRUPACT-II SHIPPING PACKAGE APPLICATION, DOCKET NO. 71-9218, AND REVISION 8 OF THE HalfPACT SHIPPING PACKAGE APPLICATION, DOCKET NO. 71-9279 (EPIDS L-2021-LLA-0033 AND L-2021-LLA-0034)
References; 1. Letter from T. E. Sellmer to Document Control Desk dated February 23, 2021, subject: Revision 25 of the TRUPACT-II Shipping Package Application, Docket No. 71-9218, and Revision 8 of the HalfPACT Shipping Package Application, Docket No. 71-9279
- 2. Letter from T. E. Sellmer to Document Control Desk dated June 24, 2021, subject: Amendment to Revision 25 of the TRUPACT-II Shipping Package Application, Docket No. 71-9218, and Revision 8 of the HalfPACT Shipping Package Application, Docket No. 71-9279 (EPIDs L-2021-LLA-0033 AND L-2021-LLA-0034)
- 3. Letter from N. Garcia Santos to T. E. Sellmer dated August 11, 2021, subject: Application for the Model Nos. TRUPACT-II and HALFPACT Transport Packages - Request for Additional Information (EPIDS L-2021-LLA-0033 AND L-2021-LLA-0034)
- 4. Letter from T. E. Sellmer to Document Control Desk dated October 6, 2021, subject: Response to Request for Additional Information for Revision 25 of the TRUPACT-II Shipping Package Application, Docket No. 71-9218, and Revision 8 of the HalfPACT Shipping Package Application, Docket No. 71-9279 (EPIDS L-2021-LLA-0033 and L-2021-LLA-0034)
Dear Sir or Madam:
Nuclear Waste Partnership LLC, on behalf of the U.S. Department of Energy (DOE), hereby submits an amendment to Revision 25 of the application for a Certificate of Compliance (CoC) for the TRUPACT-II Packaging, U.S. Nuclear Regulatory Commission (NRC) Docket No.
71-9218, and Revision 8 to the application for a CoC for the HalfPACT Packaging, NRC Docket No. 71-9279 (References 1 through 4). This amendment includes revisions to Chapter 8 of the HalfPACT Safety Analysis Report (SAR) in response to a telephone conference between Mr. T. E. Sellmer and Ms. N. Garcia Santos (NRC) on November 15, 2021, and consists of the following documents:
P.O. Box 2078 z Carlsbad, New Mexico USA 88221-2078 Phone: (575) 234-7200 z Fax: (575) 234-7083
Document Control Desk TS:21:03028 x TRUPACT-II SAR, Revision 25 x HalfPACT SAR, Revision 8 x Contact-Handled Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC), Revision 6 x CH-TRU Payload Appendices, Revision 5.
New changes are identified in Attachment A, and all technical changes added in this submittal are indicated by right-bars in the margin of the documents (l). Right-bars in the margin of the documents (l) indicating technical changes made to the documents in the original submittal and the amendment of this application in response to the Request for Additional Information (Reference 4) also have been retained.
This submission contains files, one or more of which contains hyperlinks to other files or to Internet websites. These hyperlinks are either inoperable or are not essential to the use of the filing. Any material referenced by hyperlinks to Internet websites that was essential for use of this filing has been submitted as part of the filing. Any material referenced by a hyperlink to another file that was essential for the use of this filing has either been included by reference or submitted as part of this filing.
To facilitate implementation, it is requested that the current package CoCs be valid for use one year from the date of issuance of the revised CoCs.
If you have any questions regarding this submittal, please contact Scott Burns of my staff at (575) 706-7920.
Sincerely, TODD SELLMER Digitally signed by TODD SELLMER (Affiliate)
(Affiliate) Date: 2021.11.18 06:44:01 -07'00' T. E. Sellmer, Manager Packaging and Information Systems TES:clm cc: D. Foreman, CBFO K. E. Princen, CBFO D. Smith, CBFO D. L. Standiford, CBFO M. Toothman, CBFO J. A. Walker, CBFO J. Shuler, EM-4.24 J. Shenk, EM-4.24 L. F. Gelder, SRRC N. Garcia Santos, USNRC B. H. White, USNRC P.O. Box 2078 z Carlsbad, New Mexico USA 88221-2078 Phone: (575) 234-7200 z Fax: (575) 234-7083
Document Control Desk TS:21:03028 The following table summarizes the components of this submittal. No deviations occur from the NRC-prescribed PDF formatting for the submitted files. Please contact Ms. C. L. Morrison at (505) 350-3693 or cindy.morrison@wipp.ws to resolve any discrepancies in this submittal.
File Size Release Submittal File Name (MB) Level Type Publicly 001 Transmittal Letter - November 2021.pdf 0.2 EIE Available Publicly 002 TRUPACT-II SAR R25 - November 2021.pdf 38.7 EIE Available Publicly 003 HalfPACT SAR R8 - November 2021.pdf 40.4 EIE Available Publicly 004 CH-TRAMPAC R6 - November 2021.pdf 6.3 EIE Available 005 CH-TRU Payload Appendices R5 - November Publicly 50.8 EIE 2021.pdf Available P.O. Box 2078 z Carlsbad, New Mexico USA 88221-2078 Phone: (575) 234-7200 z Fax: (575) 234-7083
ATTACHMENT A - Summary of Revisions Summary Pg.
TRUPACT-II SAR, Revision 25 A-2 HalfPACT SAR, Revision 8 A-3 CH-TRAMPAC, Revision 6 A-4 CH-TRU Payload Appendices, Revision 5 A-5 November 2021 A-1
ATTACHMENT A - Summary of Revisions TRUPACT-II SAR, Revision 25, November 2021 Section Page Change Description Justification General Revised header for date. Administrative change. No impact to safety basis.
November 2021 A-2
ATTACHMENT A - Summary of Revisions HalfPACT SAR, Revision 8, November 2021 Section Page Change Description Justification General Revised header for date. Administrative change. No impact to safety basis.
8.1.5 8.1.18 Added description of shielding integrity Shielding integrity acceptance tests added to be acceptance tests for the lead-lined shielded included in Chapter 8 as discussed during containers (SC-30G1, SC-30G2, SC-30G3, and telephone conference between Mr. T.E. Sellmer SC-55G2). (NWP) and Ms. N. Garcia Santos (NRC) on November 15, 2021.
8.2.5 8.2.7 Added description regarding shielding tests for Shielding integrity acceptance tests added to be the lead-lined shielded containers (SC-30G1, included in Chapter 8 as discussed during SC-30G2, SC-30G3, and SC-55G2). telephone conference between Mr. T.E. Sellmer (NWP) and Ms. N. Garcia Santos (NRC) on November 15, 2021.
November 2021 A-3
ATTACHMENT A - Summary of Revisions CH-TRAMPAC, Revision 6, November 2021 Section Page Change Description Justification General Revised header for date. Administrative change. No impact to safety basis.
November 2021 A-4
ATTACHMENT A - Summary of Revisions CH-TRU Payload Appendices, Revision 5, November 2021 Section Page Change Description Justification General Revised header for date. Administrative change. No impact to safety basis.
November 2021 A-5