Letter Sequence RAI |
---|
|
|
MONTHYEARDCL-21-048, Response to Request for Additional Information on Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, 'Auxiliary Saltwater (Asw) System'2021-07-0707 July 2021 Response to Request for Additional Information on Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, 'Auxiliary Saltwater (Asw) System' Project stage: Response to RAI ML21188A2142021-07-0707 July 2021 Emergency License Amendment Request 21-05 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System Project stage: Request ML21188A0382021-07-0707 July 2021 (External_Sender) DCPP Draft Emergency LAR - Asw Project stage: Draft Other ML21189A0662021-07-0707 July 2021 NRR E-mail Capture - Additional Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System Project stage: Draft RAI ML21189A0462021-07-0707 July 2021 NRR E-mail Capture - Draft Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System Project stage: Draft RAI ML21188A0362021-07-0707 July 2021 Draft PG&E Letter DCL-21-046 - Diablo Canyon Unit 1: Emergency License Amendment Request 21-05, Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System Project stage: Draft Request ML21189A0442021-07-0707 July 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Emergency Amendment Request to Revise Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System Project stage: RAI DCL-21-046, Email for Emergency LAR for TS 3.7.8, Auxiliary Saltwater (Asw) System2021-07-0707 July 2021 Email for Emergency LAR for TS 3.7.8, Auxiliary Saltwater (Asw) System Project stage: Other ML21188A3452021-07-0808 July 2021 Issuance of Amendment No. 238 Revision to TS 3.7.8, Auxiliary Saltwater (Asw) System (Emergency Circumstances) Project stage: Approval ML22319A2282022-08-18018 August 2022 Redacted - August 2022, Revision No. 26 of the Safety Analysis Report for the Model No. TRUPACT-II Package (Docket No. 71-9218) Project stage: Other ML22319A2292022-08-18018 August 2022 Redacted - August 2022, Revision No. 9 of the Safety Analysis Report for the Model No. Halfpact Package (Docket No. 71-9279) Project stage: Other ML22230C9202022-08-18018 August 2022 Nuclear Waste Partnership, LLC, Revision 26 of the Trupact-II Shipping Package Application, and Revision 9 of the Halfpact Shipping Package Application Project stage: Other ML22278A0072022-09-0808 September 2022 Email from T.E. Sellmer (Nwp) to N. Garcia Santos (NRC) Acknowledgement of Application for CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact Packages Project stage: Request ML22256A3052022-09-19019 September 2022 Enclosure- Request for Additional Information Model Nos. TRUPACT-II and Halfpact Project stage: RAI ML22256A3062022-09-19019 September 2022 Transmittal Letter- Request for Additional Information, Model Nos. TRUPACT-II and Halfpact Project stage: RAI ML22278A0012022-10-0404 October 2022 Email from T. Sellmer (Nwp) to N. Garcia Santos (NRC) Et Al., Delay of RAI Response-CoC, Revision 27, Model No. TRUPACT-II and CoC, Revision 11, Model No. Halfpact CoCs Project stage: Other ML22283A0292022-10-10010 October 2022 Nuclear Waste Partnership, LLC, Response to Request for Additional Information on Revision 26 of the Trupact-II Shipping Package Project stage: Response to RAI ML22319A2312022-10-10010 October 2022 Redacted - October 2022, Revision No. 9 of the Safety Analysis Report for the Model No. Halfpact Package (Docket No. 71-9279) Project stage: Other ML22319A2302022-10-10010 October 2022 Redacted - October 2022, Revision No. 26 of the Safety Analysis Report for the Model No. TRUPACT-II Package (Docket No. 71-9218) Project stage: Other ML22320A1042022-11-14014 November 2022 Nuclear Waste Partnership, LLC (Applicant), T Sellmer Comments on Draft Certificate of Compliance No. 9279, Revision 11 Project stage: Draft Other ML22320A1032022-11-15015 November 2022 Email from S. Burns (Nwp) to N. Garcia Santos (Nrc), Subject-IMPORTANT, Courtesy Review, Revised Draft CoCs for the TRUPACT-II and Halfpact Packages Project stage: Draft Other ML22312A4042022-11-21021 November 2022 Transmittal Letter-Revision No. 27 of Certificate of Compliance No. 9218, Model No. TRUPACT-II, and Revision No. 11 of Certificate of Compliance No. 9279, Model No. Halfpact, Transport Packages (EPIDs L-2022-LLA-0123 and L-2022-LLA-122) Project stage: Other ML22312A4052022-11-21021 November 2022 Enclosure 2 - Revision No. 11 of Certificate of Compliance No. 9279, Model No. Halfpact Project stage: Other ML22312A4062022-11-21021 November 2022 Enclosure 1 - Revision No. 27 of Certificate of Compliance No. 9218, Model No. TRUPACT-II Project stage: Other ML22312A4032022-11-21021 November 2022 Enclosure 3 - Safety Evaluation Report-Revision No. 27 of Certificate of Compliance No. 9218, Model No. TRUPACT-II, and Revision No. 11 of Certificate of Compliance No. 9279, Model No. Halfpact, Transport Packages Project stage: Approval 2022-11-14
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML23095A1112023-04-17017 April 2023 Enclosure - Requests for Additional Information for the Letter Authorization for the Model No. Halfpact Package ML23089A2572023-03-29029 March 2023 Email from Ngarcia Santos (NRC) to T.E. Sellmer (Simco), Subject: Structural and Operations - Staggered RAIs Pertaining to the Halfpact Letter Authorization ML23089A2582023-03-29029 March 2023 Email Attachment, Staggered Request for Additional Information (Structural Evaluation and Operating Procedures), Model No. Halfpact - One-time Letter Authorization ML22256A3052022-09-19019 September 2022 Enclosure- Request for Additional Information Model Nos. TRUPACT-II and Halfpact ML22006A3512021-12-27027 December 2021 Enclosure 4: Nwp'S (Applicant'S) Comments on the Summary of the Teleconference Dated December 1, 2021 Related to Shielding RAIs (Acceptance Tests), Model Nos. TRUPACT-II and Halfpact Packages ML21214A1462021-08-11011 August 2021 2. Enclosurequest for Additional Information Model Nos. TRUPACT-II and Halfpact (EPIDs L-2021-LLA-0033 and L-2021-LLA-0034) ML21214A1452021-08-11011 August 2021 Transmittal Letter Request for Additional Information, Model Nos Trupact II and Halfpact Transport Packages 2023-04-17
[Table view] |
Text
Request for Additional Information Nuclear Waste Partnership Docket Nos. 71-9218 and 71-9279 Certificate of Compliance Nos. 9218 and 9279 Model Nos. TRUPACT-II and HalfPACT By letter dated August 18, 2022 (Agencywide Documents Access and Management System Accession No. ML22230C920), the Nuclear Waste Partnership, LLC (the applicant) requested that the U.S. Nuclear Regulatory Commission (NRC) staff perform a review of the proposed changes to Model Nos. HalfPACT and TRUPACT-II transport packages.
This request for additional information (RAI) identifies information needed by the NRC staff in connection with its review of the application. The requested information is listed by chapter number and title in the application. The NRC staff used NUREG-2216, Standard Review Plan for Transportation Packages for Spent Fuel and Radioactive Material: Final Report, in its review of the application.
Each question describes information needed by the staff for it to complete its review of the application and to determine whether the applicant has demonstrated compliance with regulatory requirements.
MATERIALS EVALUATION (M)
RAI-M-1 Revise the wording in Note 33 (Drawing No. 2077-500SNP, Revision AB for TRUPACT-II and Drawing No. 707-SAR, Revision 11 for HalfPACT) to clarify if the intent of optional was to be a non-metallic tube, a coating, or not be present after foam pour.
The proposed wording could be interpreted such that the package could have neither a tube nor a coating on the foam and still be in accordance with the drawing requirements.
The outer containment vessel (OCV) vent port access tube is classified as a Category C component per NUREG-6407, Classification of Transportation Packaging and Dry Spent Fuel Storage System Components According to Importance to Safety, according to the application. The requested change appears to indicate that the tube is optional after foam pour, i.e., it is not needed. This appears to conflict with the definition of an important to safety component - it cannot be considered optional if relied on for a safety function. There could be options for choice of materials, but not the existence of an important to safety component.
The staff needs this information to determine compliance with Title 10 Code of Federal Regulations (10 CFR) 71.33(a).
RAI-M-2 Provide additional information in the safety analysis report regarding the coating discussed in the proposed change.
If the coating is intended to replace a NUREG-6407 Category C component, then it is also a Category C component. Specify the coating materials, the acceptance Enclosure
criteria for this coating, and the inspection and maintenance program associated with the coating, in order to ensure that the coating remains able to perform its important to safety function.
The staff needs this information to determine compliance with 10 CFR 71.31(c) and 10 CFR 71.87(b).
RAI-M-3 Revise Sections 1.2.1.1.1, 1.2.1.4, and 1.3.2 in the safety analysis report to remove references to fiberglass as the material for the connecting tube/OCV vent port access tube.
Sections 1.2.1.1.1, 1.2.1.4, and 1.3.2 all refer to the tube as fiberglass. To be consistent with the requested changes to the drawing, please update these sections accordingly.
Furthermore, please clarify that both the non-metallic tube and the polymer resin surface coating described in the application are compatible with the surrounding materials and will not cause any reactions contrary to 10 CFR 71.43(d).
The staff needs this information to determine compliance with 10 CFR 71.43(d).