Post Office Box 2000, Decatur, Alabama 35609-2000
April 22, 2024 10 CFR 50.73 10 CFR 50.4(a)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Browns Ferry Nuclear Plant, Unit 3 Renewed Facility Operating License No. DPR-33 NRC Docket No. 50-296
Subject:
Licensee Event Report 50-296/2024-001-00 - Primary Containment Isolation Valve Inoperable due to Incorrect Motor Operated Valve Setup
The enclosed Licensee Event Report provides th e details of an inoperable Primary Containment Isolation Valve on Browns Ferry Nuclear Plant, Unit 3. The Tennessee Valley Authority is submitting this report in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.73(a)(2)(i)(B), as any operation or condition which was prohibited by the plants Technical Specifications.
There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please cont act David J. Renn, Site Licensing Manager, at (256) 729-2636.
Respectfully,
Manu Sivaraman BFN Site Vice President
Enclosure:
Licensee Event Report 50-296/2024-001 Primary Containment Isolation Valve Inoperable due to Incorrect Motor Operated Valve Setup U.S. Nuclear Regulatory Commission Page 2 April 22, 2024
cc (w/ Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant
NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 04/30/2027
(04-02-2024)
Estimated burden per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />. Report ed LICENSEE EVENT REPORT (LER) lessons learned are incorporated into the licensing process and fed back to industry. Send comments (See Page 2 for required number of digits/characters for each block) regarding burden estimate to the FOIA, Library, and Information Collections Branch T-6 A10M), U.S.
(See NUREG-1022, R.3 for instruction and guidance for completing this form Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1022/r3/) Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory Affairs, (3150-0104), Attn: Desk ail: oira_submission@omb.eop.gov. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
- 1. Facility Name 52. Docket Number 3. Page Browns Ferry Nuclear Plant, Unit 3 050 00296 1 OF 7 052
- 4. Title Primary Containment Isolation Valve Inoperab le due to Incorrect Motor Operated Valve Setup
- 5. Event Date 6. LER Number 7. Report Date 8. Other Facilities Involved Month Day Year Year Sequential Revision Facility Name Docket Number Number No. Month Day Year N/A 05000N/A 02 21 2024 2024 - 001 - 00 04 22 2024 Facility Name Docket Number
N/A 05000N/A
- 9. Operating Mode 10. Power Level 5 0
- 11. This Report is Submitted Pursuant to the Requirements of 10 CFR §: (Check all that apply) 10 CFR Part 20 20.2203(a)(2)(vi) 10 CFR Part 50 50.73(a)(2)(ii)(A) 50.73(a)(2)(viii)(A) 73.1200(a)
20.2201(b) 20.2203(a)(3)(i) 50.36(c)(1)(i)(A) 50.73(a)(2)(ii)(B) 50.73(a)(2)(viii)(B) 73.1200(b)
20.2201(d) 20.2203(a)(3)(ii) 50.36(c)(1)(ii)(A) 50.73(a)(2)(iii) 50.73(a)(2)(ix)(A) 73.1200(c)
20.2203(a)(1) 20.2203(a)(4) 50.36(c)(2) 50.73(a)(2)(iv)(A) 50.73(a)(2)(x) 73.1200(d)
20.2203(a)(2)(i) 10 CFR Part 21 50.46(a)(3)(ii) 50.73(a)(2)(v)(A) 10 CFR Part 73 73.1200(e)
20.2203(a)(2)(ii) 21.2(c) 50.69(g) 50.73(a)(2)(v)(B) 73.77(a)(1) 73.1200(f)
20.2203(a)(2)(iii) 50.73(a)(2)(i)(A) 50.73(a)(2)(v)(C) 73.77(a)(2)(i) 73.1200(g)
20.2203(a)(2)(iv) 50.73(a)(2)(i)(B) 50.73(a)(2)(v)(D) 73.77(a)(2)(ii) 73.1200(h)
20.2203(a)(2)(v) 50.73(a)(2)(i)(C) 50.73(a)(2)(vii)
OTHER (Specify here, in abstract, or NRC 366A).
- 12. Licensee Contact for this LER Licensee Contact Phone Number (Include area code)
Justin Garner, Licensing Engineer 256-729-7955
- 13. Complete One Line for each Component Failure Described in this Report Cause System Component Manufacturer Reportable to IRIS Cause System Component Manufacturer Reportable to IRIS N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
- 4. Supplemental Report Expected) Month Day Year
- 15. Expected Submission Date No Yes (If yes, complete 15. Expected Submission Date N/A N/A N/A
- 16. Abstract (Limit to 1326 spaces, i.e., approximately 13 single-spaced typewritten lines)
On February 21, 2024, it was identified that primary containment isolation valve (PCIV)[FCV] 3-FCV-001-0055 Inboard Main Steam Drain Line Isolation Valve may not have been capable of fully closing and adequately sealing during a design basis accident with design basis differential pressure due to the setup of the closing control circuit of the motor operated valve (MOV). While the vulnerability has existed since the initial design of the MOV, per the Past Operability Evaluation (POE), this condition has existed since March 16, 2014. The safety function of containment isolation was maintained by the outboard isolation valve 3-FCV-001-0056, ensuring the function of primary containment was maintained at the affected penetration.
The cause of this condition is a legacy issue related to the close control wiring scheme for 3-FCV-001-0055. This valve has had this control wiring scheme since development of the NRC Generic Letter (GL) 89-10/96-05 MOV Program.
There were two Corrective Actions to Prevent Recurrence or to reduce the probability of similar events occurring in the future: 1)
Engineering Change Package (ECP) BFN-24-12 to remove the close torque switch and LS-16 from the control circuit and use LS-8 as the close limit switch for 3-MVOP-001-0055 has been implemented and 2) reviewed all MOV Program valves in the Tennessee Valley Authority (TVA) nuclear fleet for extent of condition and no additional valves with this issue were identified.
NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 04/30/2027 (04-02-2024) Estimated burden per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />. Reported lessons learned are incorporated into the licensing process and fed back to industry. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U. S.
LICENSEE EVENT REPORT (LER) Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory CONTINUATION SHEET Affairs, (3150-0104), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; e-mail: oira_submission@omb.eop.gov. The NRC may not conduct or (See NUREG-1022, R.3 for instruction and guidance for completing this form sponsor, and a person is not required to respond to, a collection of information unless the document http://www.nrc.gov/reading-rm/doc-co llections/nuregs/staff/sr1022/r3/) requesting or requiring the collection displays a currently valid OMB control number.
- 1. FACILITY NAME 050 2. DOCKET NU EEREV YEAR SEQUENTIAL NUMBER NO.
Browns Ferry Nuclear Plant, Unit 3 00296 052 2024 - 001 - 00
NARRATIVE I. Plant Operating Conditions before the Event
At the time of discovery of this event on February 21, 2024, Browns Ferry Nuclear Plant (BFN)
Unit 3 was in Mode 5 during a refueling outage.
II. Description of Event
A. Event Summary
On February 21, 2024, it was identified that primary containment isolation valve (PCIV) [FCV]
3-FCV-001-0055 may not have been capable of fully closing and adequately sealing during a design basis accident with design basis differential pressure due to the setup of the closing control circuit of the motor operated valve (MOV). While the vulnerability has existed since the initial design of the MOV, per the Past Operability Evaluation (POE), this condition has existed since March 16, 2014.
An issue associated with testing all MOV function s had been previously identified at Sequoyah Nuclear Plant (SQN) and documented in TVAs corre ctive action program in Non-Cited Violation (NCV) Condition Report (CR) 1603101. Although this issue was identified in 2020 at SQN and an extent of condition was performed at other TVA nuclear sites; this issue was not identified on this component at BFN until February 21, 2024.
Unit 3 Technical Specifications (TS) 3.6.1.3, Primary Containment Isolation Valves (PCIVs),
requires primary containment isolation valves, e xcept reactor building-to-suppression chamber vacuum breakers to be operable in Modes 1, 2, and 3. With a PCIV inoperable, TS 3.6.1.3, Action A.1 requires isolating the affected penetration flow path by use of at least one closed and de-activated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured within four hours except for the main steam line. If this action is not met, then the unit must be in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and be in Mode 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
Due to the length of time that 3-FCV-001-0055 was inoperable, the associated TS Actions were not complied with. Additionally, mode changes were made with the PCIV inoperable which is prohibited by TS 3.0.4.
The Tennessee Valley Authority (TVA) is submitting this report in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.73(a)(2)(i)(B), as any operation or condition which was prohibited by the plants Technical Specifications (TS).
NRC FORM 366A (10-01-2023) Page 2 of 7 NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 04/30/2027 (04-02-2024) Estimated burden per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />. Reported lessons learned are incorporated into the licensing process and fed back to industry. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U. S.
LICENSEE EVENT REPORT (LER) Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory CONTINUATION SHEET Affairs, (3150-0104), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; e-mail: oira_submission@omb.eop.gov. The NRC may not conduct or (See NUREG-1022, R.3 for instruction and guidance for completing this form sponsor, and a person is not required to respond to, a collection of information unless the document http://www.nrc.gov/reading-rm/doc-co llections/nuregs/staff/sr1022/r3/) requesting or requiring the collection displays a currently valid OMB control number.
- 1. FACILITY NAME 050 2. DOCKET NU EEREV YEAR SEQUENTIAL NUMBER NO.
Browns Ferry Nuclear Plant, Unit 3 00296 052 2024 - 001 - 00
NARRATIVE B. Status of structures, components, or systems that were inoperable at the start of the event and that contributed to the event
There were no structures, systems, or components (SSCs) whose inoperability contributed to this event.
C. Dates and approximate times of occurrences
DATE AND APPROXIMATE TIMES OCCURRENCE (times are Central Time)
March 16, 2014, at 0408 U3R16 As-Left torque switch setting resulted in negative margin for this issue.
February 21, 2024, CR 1911827 identified 3-FCV-001-0055 is susceptible to the at 2343 condition identified in SQN NCV CR 1603101 and cannot be setup to meet the design requirements.
ECP BFN-24-012 implemented to remove the close torque switch and close torque switch bypass limit switch from the March 2024 control circuit allowing 3-FCV-001-0055 to be setup to meet design requirements and to no longer be susceptible to the condition identified in SQN NCV CR 1603101. Operability was established prior to starting up from the outage.
D. Manufacturer and model number of each component that failed during the event
No components failed during this event.
E. Other systems or secondary functions affected
No other systems or secondary functions were affected.
F. Method of discovery of each component or system failure or procedural error
Engineering evaluation of MOV setup identified that PCIV [FCV] 3-FCV-001-0055 may not have been capable of fully closing and adequately sealing during a design basis accident with design basis differential pressure due to the setup of the closing control circuit of the MOV. This condition was documented in CR 1911827.
G. The failure mode, mechanism, and effect of each failed component
No components failed during this event.
NRC FORM 366A (10-01-2023) Page 3 of 7 NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 04/30/2027 (04-02-2024) Estimated burden per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />. Reported lessons learned are incorporated into the licensing process and fed back to industry. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U. S.
LICENSEE EVENT REPORT (LER) Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory CONTINUATION SHEET Affairs, (3150-0104), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; e-mail: oira_submission@omb.eop.gov. The NRC may not conduct or (See NUREG-1022, R.3 for instruction and guidance for completing this form sponsor, and a person is not required to respond to, a collection of information unless the document http://www.nrc.gov/reading-rm/doc-co llections/nuregs/staff/sr1022/r3/) requesting or requiring the collection displays a currently valid OMB control number.
- 1. FACILITY NAME 050 2. DOCKET NU EEREV YEAR SEQUENTIAL NUMBER NO.
Browns Ferry Nuclear Plant, Unit 3 00296 052 2024 - 001 - 00
NARRATIVE
H. Operator actions
No Operator actions were taken during this event.
I. Automatically and manually initiated safety system responses
There were no automatic or manual safety system responses associated with this event.
III. Cause of the event
A. Cause of each component or system failure or personnel error
The cause of this condition is a legacy issue related to the close control wiring scheme for 3-FCV-001-0055 and failure to identify this valve as being susceptible to the SQN NCV CR 1603101 during the extent of condition review. While the vulnerability has existed since the initial design of the MOV, per the POE, this condition has existed since March 16, 2014.
B. Cause(s) and circumstances for each human performance related root cause
A latent error resulting from failure to modify the close control circuit on 3-FCV-001-0055 resulted in a human performance (HU) error trap due to the condition only being identified on the electrical drawings and in the Motor Op erated Valve Diagnostic Testing procedure.
Because the close torque switch and close torque bypass limit switch were not identified in the MOV Program Database, a more thorough review than that performed would have been required to identify the condition.
The MOV Program Engineer that performed the SQN NCV extent of condition had a missed opportunity to identify this condition as early as 2020.
IV. Analysis of the event
The as-found setup of the MOV circuit did not ensure the valve would close under all design basis conditions. Under Design Basis Accident conditions, if the differential pressure across the valve was great enough to cause the torque switch to open prior to the limit switch opening, the result of the open close torque switch bypass limit switch could be that the valve would not fully close or seal hard enough to prevent seat leakage.
The as-found setup essentially results in this MOV being setup on torque switch control for the close direction. Review of the MOV Program Database evaluation for this condition results in negative margin. Past Operability associated with the As-Found condition was evaluated in CR 1912313.
NRC FORM 366A (10-01-2023) Page 4 of 7 NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 04/30/2027 (04-02-2024) Estimated burden per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />. Reported lessons learned are incorporated into the licensing process and fed back to industry. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U. S.
LICENSEE EVENT REPORT (LER) Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory CONTINUATION SHEET Affairs, (3150-0104), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; e-mail: oira_submission@omb.eop.gov. The NRC may not conduct or (See NUREG-1022, R.3 for instruction and guidance for completing this form sponsor, and a person is not required to respond to, a collection of information unless the document http://www.nrc.gov/reading-rm/doc-co llections/nuregs/staff/sr1022/r3/) requesting or requiring the collection displays a currently valid OMB control number.
- 1. FACILITY NAME 050 2. DOCKET NU EEREV YEAR SEQUENTIAL NUMBER NO.
Browns Ferry Nuclear Plant, Unit 3 00296 052 2024 - 001 - 00
NARRATIVE
The extent of condition review concluded that th is condition is limited to 3-FCV-001-0055.
V. Assessment of Safety Consequences
The nuclear safety function of the Primary Contai nment Isolation System (PCIS)[JM] is to provide timely protection against the onset and consequences of accidents involving the gross release of radioactive materials from the fuel and nuclear system process barrier, the PCIS initiates automatic isolation of appropriate pipelines which penetrate the primary containment whenever monitored variables exceed preselected operational limits.
For a gross failure of the fuel, the PCIS initiates isolation of the reactor vessel to contain released fission products. For a gross breach in the nuclear system process barrier outside the primary containment, the isolation system acts to interpose additional barriers (isolation valve plugs) between the reactor and the breach, thus stopping the release of radioactive materials and conserving reactor coolant. The Main Steam Drain Line penetrates primary containment and has inner and outer automatic operated PCIVs (3-FCV-001-0055 and 3-FCV-001-0056).
For gross breaches in the nuclear system proces s barrier inside the primary containment, the PCIS acts to close off release routes through t he primary containment barrier, thus trapping the radioactive material coming through the breach inside the primary containment.
Based on a review over the past three years, Inboard Main Steam Drain Line Isolation Valve 3-FCV-001-0055 was determined to be open over four separate occasions for a total of 182 hours0.00211 days <br />0.0506 hours <br />3.009259e-4 weeks <br />6.9251e-5 months <br /> to support the High-Pressure Coolant Injection Syst em (HPCI)[BJ] and/or Reactor Core Isolation Coolant System (RCIC)[BN] and associated equipm ent maintenance. This leaves the plant in a single point vulnerability of degrading primary containment isolation having to rely on the outboard isolation valve 3-FCV-001-0056. The redundant outboard isolation valve 3-FCV-001-0056 remained operable during the period of time when the inboard isolation valve 3-FCV-001-0055 was inoperable.
According to the BFN Probabilistic Risk Analysis (P RA) - Risk Evaluation of MOVs calculation, the Inboard Main Steam Drain Line Isolation Valve BFN-3-FCV-001-0055 is modeled in the BFN PRA Computer Aided Fault Tree Analysis (CAFT A) model. In the BFN PRA model, MOVs are modeled according to the most significant failure m odes (fails to open, fails to close, spurious operation, plug, etc.) to the system being modeled. Specifically, basic event MOCFC3FCV_0010055 valve 3-FCV-1-55 fail to close on demand is modeled. The results of the model indicate that this event would be low sa fety significance with a Max Risk Achievement Worth (RAW) of 1 and Max Fussell-Vesley (F-V) of 0.00E+00.
NRC FORM 366A (10-01-2023) Page 5 of 7 NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 04/30/2027 (04-02-2024) Estimated burden per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />. Reported lessons learned are incorporated into the licensing process and fed back to industry. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U. S.
LICENSEE EVENT REPORT (LER) Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory CONTINUATION SHEET Affairs, (3150-0104), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; e-mail: oira_submission@omb.eop.gov. The NRC may not conduct or (See NUREG-1022, R.3 for instruction and guidance for completing this form sponsor, and a person is not required to respond to, a collection of information unless the document http://www.nrc.gov/reading-rm/doc-co llections/nuregs/staff/sr1022/r3/) requesting or requiring the collection displays a currently valid OMB control number.
- 1. FACILITY NAME 050 2. DOCKET NU EEREV YEAR SEQUENTIAL NUMBER NO.
Browns Ferry Nuclear Plant, Unit 3 00296 052 2024 - 001 - 00
NARRATIVE A. Availability of systems or components that could have performed the same function as the components and systems that failed during the event
The condition described for 3-FCV-001-0055 was the result of a design inadequacy in the closing control scheme and MOV diagnostic setup procedure for the subject MOV. Based on a review of the past three years, the redundant MOV 3-FCV-001-0056 in the same system was operable and available to perform the required safety function. 3-FCV-001-0056 control scheme did not have the same design deficien cy as 3-FCV-001-0055. The redundant MOV closing control scheme consists of a single closed limit switch with the torque switch disabled.
Additionally, the redundant MOV had met all its required surveillances and satisfied all acceptance criteria and met all program requirements including the Appendix J, In-Service Testing (IST) and the MOV program.
The redundant outboard isolation valve 3-FCV-001-0056 remained operable during the period of time when the inboard isolation valve 3-FCV-001-0055 was inoperable during the last three years, ensuring the function of primary containment was maintained at the affected penetration.
B. For events that occurred when the reactor was shut down, availability of systems or components needed to shutdown the reactor and maintain safe shutdown conditions, remove residual heat, control the release of radioactive material, or mitigate the consequences of an accident
The condition was identified in Mode 5 during a refueling outage; however, the valve 3-FCV-001-0055 is only required to be operable in Modes 1, 2, and 3.
C. For failure that rendered a train of a safety system inoperable, estimate of the elapsed time from discovery of the failure until the train was returned to service
This condition was discovered on February 21, 2024, during a shutdown in a mode where it was not required. The valve 3-FCV-001-0055 was returned to operability before reaching a mode where it was required (Modes 1, 2, or 3) in March 2024.
VI. Corrective Actions
Corrective Actions are being managed by the TVA corrective action program under CRs 1911827 and 1912313.
A. Immediate Corrective Actions
There were no Immediate Corrective Actions for this event.
NRC FORM 366A (10-01-2023) Page 6 of 7 NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0104 EXPIRES: 04/30/2027 (04-02-2024) Estimated burden per response to comply with this mandatory collection request: 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />. Reported lessons learned are incorporated into the licensing process and fed back to industry. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U. S.
LICENSEE EVENT REPORT (LER) Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory CONTINUATION SHEET Affairs, (3150-0104), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503; e-mail: oira_submission@omb.eop.gov. The NRC may not conduct or (See NUREG-1022, R.3 for instruction and guidance for completing this form sponsor, and a person is not required to respond to, a collection of information unless the document http://www.nrc.gov/reading-rm/doc-co llections/nuregs/staff/sr1022/r3/) requesting or requiring the collection displays a currently valid OMB control number.
- 1. FACILITY NAME 050 2. DOCKET NU EEREV YEAR SEQUENTIAL NUMBER NO.
Browns Ferry Nuclear Plant, Unit 3 00296 052 2024 - 001 - 00
NARRATIVE B. Corrective Actions to Prevent Recurrence or to reduce the probability of similar events occurring in the future
There were two Corrective Actions to Prevent Recurrence or to reduce the probability of similar events occurring in the future:
- 1) ECP BFN-24-12 to remove the close torque switch and LS-16 from the control circuit and use LS-8 as the close limit switch for 3-FCV-001-0055 has been implemented.
- 2) Reviewed all MOV Program valves in the TV A nuclear fleet for extent of condition and no additional valves with this issue were identified.
VII. Previous Similar Events at the Same Site
A search of LERs from BFN, Units 1, 2, and 3 over the last five years identified no similar events.
VIII. Additional Information
There is no additional information.
IX. Commitments
There are no new commitments.