Security Baseline Inspection Report 05000338/2024401, 05000339/2024401 and 07200016/2024401
ML24068A097
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/08/2024
From: Jannette Worosilo
Division of Reactor Safety II
To: Carr E
Virginia Power (Virginia Electric & Power Co)
References
IR 2024401
Download: ML24068A097 (2)


Text

SUBJECT:

NORTH ANNA POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000338/2024401, 05000339/2024401 AND 07200016/2024401

Dear Eric S. Carr:

On February 8, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at North Anna Power Station and discussed the results of this inspection with Ms. Lisa Hilbert, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low security significance (Green) is documented in this report. This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at North Anna Power Station.

The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [H.12] - Avoid Complacency.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at North Anna Power Station.March 8, 2024 This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000338, 05000339 and 07200016 License Nos. NPF-4 and NPF-7 Enclosure:

As stated cc w/o encl: Distribution via LISTSERV cc w/ encl: Distribution in accordance with OUO-SRI recipients on the NRR Licensee Roster Signed by Worosilo, Jannette on 03/08/24