Letter Sequence Other |
---|
EPID:L-2023-CPS-0000, International, Issuance of Materials License SNM-2516 for the HI-STORE Consolidated Interim Storage Facility ISFSI (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Results
Other: ML23268A446, ML23269A176, ML23276B399, ML23338A235, ML23346A016, ML24002B139, ML24024A226, ML24033A181, ML24043A217, ML24046A173, ML24057A387, ML24103A176, ML24103A178, ML24135A260, ML24135A263, ML24193A214, ML24193A244
|
MONTHYEARML23075A1792023-05-0909 May 2023 International, Issuance of Materials License SNM-2516 for the HI-STORE Consolidated Interim Storage Facility ISFSI Project stage: Request ML23132A3042023-05-22022 May 2023 April 11, 2023 Summary of Closed Meeting with Kairos Power, LLC Regarding Consultations Under National Historic Preservation Act Project stage: Request ML23151A7432023-05-31031 May 2023 Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 Project stage: Request ML23158A2652023-06-13013 June 2023 Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes Non-Power Test Reactor Project stage: Request ML23276B3992023-10-0303 October 2023 Email to Kairos Providing the Hermes 2 General Audit Plan Project stage: Other ML23268A4462023-10-0303 October 2023 Hermes 2 General Audit Plan Project stage: Other ML23269A1762023-10-11011 October 2023 Kairos Hermes 2 Construction Permit Application Scheduling and Resource Letter Project stage: Other ML23338A2352023-12-0404 December 2023 Hermes 2 General Audit Questions 7.1-2, 7.1-3, 7.1-4, 7.1-5, and 7.2-3 Project stage: Other ML23346A0162023-12-11011 December 2023 Hermes 2 General Audit Questions 3.5-1, 4.3-1, 5.2-1, 7.4-1, 9.8-1, 11.1-1, 13.1-1 Through 13.1-6, 13.2-1, 14.1-1, and 14.1-2 Project stage: Other ML23349A1472023-12-15015 December 2023 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 Project stage: Request ML23355A1922023-12-21021 December 2023 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 3 and Chapter 5 Project stage: Request ML23355A1612023-12-21021 December 2023 Kairos Power, LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 4 Project stage: Request ML23356A0782023-12-22022 December 2023 Kairos Power, LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 13 and KP-TR-022 Project stage: Request ML24002B1392024-01-0202 January 2024 Hermes 2 General Audit Questions 2.5-2, 2.5-3, 4.3-2, 4.3-3, 4.5-1, 5.1-1, 5.1-2, 5.1-3, 5.2-2, 5.2-3, 5.2-4, 5.2-5, 6.3-1, 9.1-1, 9.1-2, 9.6-1, 13.1-7 Through 10, TR-1, TR-2, TR-3 Project stage: Other ML24003A7652024-01-0303 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapters 4, 5, 7, and 13 Project stage: Request ML24009A2472024-01-0909 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 9 Project stage: Request ML24011A2902024-01-11011 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 9 Project stage: Request ML24025C6852024-01-24024 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 3 and Chapter 9 Project stage: Request ML24024A2262024-01-24024 January 2024 Hermes 2 General Audit Question 13.1-11 Project stage: Other ML24026A2992024-01-26026 January 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 7 Project stage: Request ML24033A1812024-02-0202 February 2024 Hermes 2 General Audit Questions 5.2-6, 5.2-7, 5.2-8, and 5.2-9 Project stage: Other ML24039A1892024-02-0808 February 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 Project stage: Request ML24043A2172024-02-12012 February 2024 Hermes 2 General Audit Questions 5.2-10, 5.2-11, and 5.2-12 Project stage: Other ML24046A1732024-02-15015 February 2024 Hermes 2 General Audit Question 9.3-1 Project stage: Other ML24057A3872024-02-26026 February 2024 Hermes 2 General Audit Questions 5.2-13, 5.2-14, and 5.2-15 Project stage: Other ML24072A2972024-03-12012 March 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 7 Project stage: Request ML24073A3172024-03-13013 March 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 13 and KP-TR-022 Project stage: Request ML24103A1762024-04-12012 April 2024 Transmittal Email from NRC to Kairos Power LLC, Request for Confirmation of Information for the Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24103A1782024-04-12012 April 2024 Request for Confirmation of Information for Hermes 2 PSAR Project stage: Other ML24135A2632024-05-14014 May 2024 Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24135A2602024-05-14014 May 2024 Transmittal Email for Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24193A2142024-07-11011 July 2024 Summary Report for the Regulatory Audit of the Kairos Power Hermes 2 Preliminary Safety Analysis Report - General Audit Project stage: Other ML24193A2442024-07-11011 July 2024 Transmittal Email for the Summary Report for the Regulatory Audit of the Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24200A1172024-07-19019 July 2024 Transmittal Letter for the Hermes 2 Safety Evaluation Project stage: Approval ML24200A1152024-07-19019 July 2024 Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes 2 Non-power Test Reactor Facility Project stage: Approval 2024-01-24
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24135A2632024-05-14014 May 2024 Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report ML24103A1782024-04-12012 April 2024 Request for Confirmation of Information for Hermes 2 PSAR ML23006A1112023-01-14014 January 2023 Hermes PSAR General Audit Questions PSAR Section 6.3 ML22227A1922022-08-0808 August 2022 Final RAI 350 for Air Ingress Into the Primary Heat Transport System ML22227A1802022-08-0808 August 2022 Final RAI 348 on Shutdown Rod Reliability ML22224A2402022-07-29029 July 2022 Hermes CP Application General Audit Question on Load Combinations 2024-05-14
[Table view] |
Text
REQUEST FOR CONFIRMATION OF INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION HERMES 2 CONSTRUCTION PERMIT APPLICATION DOCKET NOS. 50-611 AND 50-612 EPID L-2023-CPS-0000
Request for Confirmation #1
Title 10 of the Code of Federal Regulations (10 CFR) 50.34(a) provides requirements for the information that shall be included in the preliminary safety analysis report (PSAR) submitted as part of a construction permit (CP) application. Paragraph 50.34(a)(3)(ii) states that the PSAR shall contain a description of the proposed facilitys design bases and the relation of the design bases to the principal design criteria (PDC).
Hermes 2 preliminary safety analysis report (PSAR) Section 1.2.3, Design Features and Design Bases, provides the following definition for safety-related structures, systems, and components (SSCs):
Those SSCs that are relied upon to remain functional during normal operating conditions and during and following design basis events to assure:
- The integrity of the portions of the reactor coolant boundary relied upon to maintain coolant level above the active core (see below);
- The capability to shut down the reactor and maintain it in a safe shutdown condition; or
- The capability to prevent or mitigate the consequences of accidents which could result in potential exposures exceeding the limits set forth in 10 CFR 100.11.
Analyses will be performed for the intermediate heat transport system (IHTS) to demonstrate that under all postulated events, including a superheater tube rupture event, the intermediate heat exchanger (IHX) tubes would not need to be classified as a safety- related SSC, based on the Kairos-provided definition above. At a minimum, these analyses will consider the following effects:
o The potential for significant water or steam from the postulated superheater tube rupture to reach the IHX and interact with Flibe, o The potential for Flibe from the primary heat transport system (PHTS) to enter the IHTS in significant quantities and interact with steam in the IHTS, and o The potential for BeNaF ingress into the PHTS that could affect the thermophysical properties of Flibe such that there could be an impact on natural circulation within the reactor vessel that could challenge the decay heat removal function.
Alternatively, if the IHX tubes are relied upon to remain functional during and after a postulated event, Kairos will demonstrate that their failure is not credible considering all relevant factors, such as the time history of postulated events, margin between tube design pressure and stress in the postulated event, potential tube degradation in service, and any augmented quality standards that would be applied to the design, construction, operation and maintenance of the IHX.
Request for Confirmation #2
Title 10 of the Code of Federal Regulations 50.34(a) provides requirements for the information that shall be included in the PSAR submitted as part of a CP application. Paragraph 50.34(a)(3)(ii) states that the PSAR shall contain a description of the proposed facilitys design bases and the relation of the design bases to the PDC.
Section 3.1.1, Design Criteria, of the Hermes 2 PSAR references topical report KP- TR-003- NP-A, "Principal Design Criteria for the Kairos Power Fluoride- Salt Cooled, High Temperature Reactor," Revision 1, for the Hermes 2 test reactor facility PDC. The NRC staff is evaluating the Hermes 2 PHTS against the following PDC from KP-TR-003-NP-A:
- KP- FHR PDC 10, Reactor design, requires the reactor core and associated heat removal systems to have appropriate margin to ensure radionuclide release limits are not exceeded.
- KP- FHR PDC 14, Reactor coolant boundary, requires the safety related portions of the boundary to have an extremely low probability of abnormal leakage, rapid failure, or gross rupture.
- KP- FHR PDC 16, Containment design, requires a functional containment to control release of radioactivity.
- KP- FHR PDC 31, Fracture prevention of reactor coolant boundary, requires safety related portions of the reactor coolant boundary to be designed to account for coolant composition, including contaminants.
To demonstrate how the design bases for the reactor coolant satisfy the PDC listed above for the Hermes 2 design, confirm that the final safety analysis report (FSAR) submitted as part of a future operating license application will demonstrate that the contamination of Flibe in the PHTS by a postulated BeNaF ingress from the IHTS (bounding all postulated events and normal operation) will remain within the purity specification for sodium impurities in topical report KP- TR-005- P-A, Reactor Coolant for the Kairos Power Fluoride Salt -Cooled High Temperature Reactor, or Kairos will provide justification in the FSAR for exceeding the purity specification.