Receipt and Availability of License Renewal Application
ML23293A105
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/14/2023
From: Beverly Smith
NRC/NRR/DNRL
To: Gerfen P
Pacific Gas & Electric Co
Shared Package
ML23293A104 List:
References
Download: ML23293A105 (3)


Text

November 14, 2023 Ms. Paula Gerfen Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424

SUBJECT:

DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 - RECEIPT AND AVAILABILITY OF LICENSE RENEWAL APPLICATION

Dear Ms. Paula Gerfen:

By letter dated November 7, 2023 (Agencywide Documents Access and Management System Accession No. ML23311A154), Pacific Gas and Electric Company (PG&E) submitted an application for the renewal of Facility Operating License Nos. DPR-80 and DPR-82 for Diablo Canyon Nuclear Power Plant (DCPP), Units 1 and 2 to the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is currently performing an acceptance review for docketing of the application in accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 2.101(a)(2) and will notify you of the results of that review.

Should it determine that the application is acceptable for docketing, the NRC staff will establish a schedule for the review, in accordance with 10 CFR 2.102(a).

A notice of receipt of the license renewal application is being sent to the Office of the Federal Register for publication and a copy of that notice is attached.

I am pleased to announce the appointment of Mr. Brian Harris as the project manager for the safety review and Ms. Kimberly Conway as the project manager for the environmental review of the license renewal application. Please forward copies of all license renewal correspondence to Mr. Harris and Ms Conway. Mr. Samson Lee remains responsible for the project management of all issues other than license renewal for DCPP.

P. Gerfen If you have any questions on this matter, please contact Mr. Brian Harris by email at Brian.Harris2@nrc.gov or Ms. Kimberly Conway by email at Kimberly.Conway@nrc.gov.

Sincerely, Lee, Samuel signing on behalf of Smith, Brian on 11/14/23 Brian Smith, Director Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos: 50-275 and 50-323

Enclosure:

Federal Register Notice cc w/encl: Listserv

ML23293A104 (Package)

ML23293A105 (Letter)

ML23293A104 (FRN) *email NRR-106 OFFICE PM:NLRP:DNRL LA:NLIB:DNRL PM:ERLRB:REFS OGC (NLO)

NAME BHarris SGreen* KConway JWatchuka DATE 10/18/2023 10/23/2023 11/02/2023 10/14/2023 OFFICE BC:NLRP:DNRL D:DNRL NAME LGibson BSmith; SLee for DATE 11/02/2023 11/14/23