LLC, Revision 1 to Standard Design Approval Application, Part 2, Chapter 6, Engineered Safety Features
ML23304A345
Person / Time
Site: 05200050
Issue date: 10/31/2023
From:
NuScale
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23306A033 List: ... further results
References
LO-151262
Download: ML23304A345 (1)


Text

ale US460 Plant ard Design Approval Application pter Six ineered Safety tures Safety Analysis Report n 1 uScale Power LLC. All Rights Reserved

document bears a NuScale Power, LLC, copyright notice. No right to disclose, use, or copy of the information in this document, other than by the U.S. Nuclear Regulatory Commission C), is authorized without the express, written permission of NuScale Power, LLC.

NRC is permitted to make the number of copies of the information contained in these reports ded for its internal use in connection with generic and plant-specific reviews and approvals, well as the issuance, denial, amendment, transfer, renewal, modification, suspension, ocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 R 2.390 regarding restrictions on public disclosure to the extent such information has been tified as proprietary by NuScale Power, LLC, copyright protection notwithstanding.

arding nonproprietary versions of these reports, the NRC is permitted to make the number of itional copies necessary to provide copies for public viewing in appropriate docket files in lic document rooms in Washington, DC, and elsewhere as may be required by NRC ulations. Copies made by the NRC must include this copyright notice in all instances and the prietary notice if the original was identified as proprietary.

APTER 6 ENGINEERED SAFETY FEATURES . . . . . . . . . . . . . . . . . . . . . . . . . 6.1-1 6.1 Engineered Safety Feature Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.1-1 6.1.1 Metallic Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.1-1 6.1.2 Organic Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.1-5 6.2 Containment Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-1 6.2.1 Containment Functional Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-1 6.2.2 Containment Heat Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-17 6.2.3 Secondary Containment Functional Design . . . . . . . . . . . . . . . . . . . . . . 6.2-21 6.2.4 Containment Isolation System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-21 6.2.5 Combustible Gas Control in the Containment Vessel . . . . . . . . . . . . . . 6.2-38 6.2.6 Containment Leakage Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-42 6.2.7 Fracture Prevention of Containment Vessel. . . . . . . . . . . . . . . . . . . . . . 6.2-47 6.2.8 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-48 6.3 Emergency Core Cooling System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.3-1 6.3.1 Design Basis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.3-2 6.3.2 System Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.3-5 6.3.3 Performance Evaluations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.3-13 6.3.4 Tests and Inspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.3-18 6.3.5 Instrumentation Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.3-18 6.3.6 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.3-19 6.4 Control Room Habitability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.4-1 6.4.1 Design Bases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.4-1 6.4.2 System Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.4-2 6.4.3 System Operation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.4-3 6.4.4 Design Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.4-4 6.4.5 Testing and Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.4-5 6.4.6 Reference. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.4-6 6.5 Fission Product Removal and Control Systems . . . . . . . . . . . . . . . . . . . . . . . 6.5-1 6.5.1 Engineered Safety Features Filter Systems . . . . . . . . . . . . . . . . . . . . . . . 6.5-1 6.5.2 Containment Spray Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.5-1 6.5.3 Fission Product Control Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.5-1 6.5.4 Ice Condenser as a Fission Product Cleanup System . . . . . . . . . . . . . . . 6.5-2 cale US460 SDAA i Revision 1

6.5.5 Pressure Suppression Pool as a Fission Product Cleanup System . . . . . 6.5-2 6.6 Inservice Inspection and Testing of Class 2 and 3 Systems and Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.6-1 6.6.1 Components Subject to Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.6-2 6.6.2 Accessibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.6-2 6.6.3 Examination Techniques and Procedures . . . . . . . . . . . . . . . . . . . . . . . . 6.6-3 6.6.4 Inspection Intervals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.6-4 6.6.5 Examination Categories and Requirements . . . . . . . . . . . . . . . . . . . . . . . 6.6-4 6.6.6 Evaluation of Examination Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.6-5 6.6.7 System Pressure Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.6-5 6.6.8 Augmented Inservice Inspection to Protect Against Postulated Piping Failures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.6-5 6.6.9 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.6-6 6.7 Main Steamline Isolation Valve Leakage Control System (BWR) . . . . . . . . . 6.7-1 cale US460 SDAA ii Revision 1

le 6.1-1: Material Specifications for ESF Components . . . . . . . . . . . . . . . . . . . . . . . 6.1-6 le 6.1-2: Material Specifications for Containment Vessel Related non-Engineered Safety Feature Components . . . . . . . . . . . . . . . . . . . . . . . 6.1-8 le 6.1-3: Pressure Retaining Materials for Reactor Coolant Pressure Boundary and Engineered Safety Feature Valves. . . . . . . . . . . . . . . . . . . . 6.1-9 le 6.2-1: Containment Design and Operating Parameters . . . . . . . . . . . . . . . . . . . . 6.2-50 le 6.2-2: Containment Response Analysis Results . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-51 le 6.2-3: Containment Penetrations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-52 le 6.2-4: Containment Isolation Valve Information . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-54 le 6.2-5: Failure Modes and Effects Analysis Containment System . . . . . . . . . . . . 6.2-55 le 6.2-6: Sequence of Events - Peak Containment Vessel Pressure and Temperature Case . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-57 le 6.2-7: Classification of Structures, Systems, and Components . . . . . . . . . . . . . . 6.2-58 le 6.2-8: Peak Containment Pressure and Temperature Transient Total Mass and Energy Release Rates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-60 le 6.3-1: Emergency Core Cooling System Actuation Values . . . . . . . . . . . . . . . . . 6.3-20 le 6.3-2: Emergency Core Cooling System Valve and Actuator Design and Operating Parameters. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.3-21 le 6.3-3: Emergency Core Cooling System Failure Modes and Effects . . . . . . . . . . 6.3-22 le 6.3-4: Classification of Structures, Systems, and Components . . . . . . . . . . . . . . 6.3-29 le 6.4-1: Control Room Habitability System Design Parameters . . . . . . . . . . . . . . . . 6.4-7 le 6.4-2: Main Control Room Temperature under Passive Cooling Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.4-8 le 6.4-3: CRHS Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.4-9 le 6.4-4: Classification of Structures, Systems, and Components . . . . . . . . . . . . . . 6.4-10 le 6.5-1: Containment Vessel Key Attributes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.5-3 cale US460 SDAA iii Revision 1

ure 6.2-1: Containment System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-62 ure 6.2-2a: Containment Vessel Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-63 ure 6.2-2b: Containment Vessel Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-64 ure 6.2-3: Containment System Piping and Instrumentation Diagram . . . . . . . . . . . . 6.2-65 ure 6.2-4: Primary System Containment Isolation Valves Dual Valve, Single Body Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-66 ure 6.2-5a: Main Steam Isolation Valve with Bypass Valve and Actuator Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-67 ure 6.2-5b: Feedwater Isolation Valve with Nozzle Check Valve and Actuator Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-68 ure 6.2-6: Containment Isolation Valve Actuator Hydraulic Schematic . . . . . . . . . . . 6.2-69 ure 6.2-7: Maximum Containment Internal Pressure - Peak Containment Vessel Pressure Case . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-70 ure 6.2-8: Integrated Break and Emergency Core Cooling System Mass Release Rate - Peak Containment Vessel Pressure Case . . . . . . . . . . . . 6.2-71 ure 6.2-9: Integrated Break and Emergency Core Cooling System Energy Release Rate - Peak Containment Vessel Pressure Case . . . . . . . . . . . . 6.2-72 ure 6.2-10: Maximum Containment Wall Temperature - Peak Containment Vessel Temperature Case . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-73 ure 6.2-11: Integrated Break and Emergency Core Cooling System Mass Release Rate - Peak Containment Vessel Temperature Case . . . . . . . . . 6.2-74 ure 6.2-12: Integrated Break and Emergency Core Cooling System Energy Release Rate - Peak Containment Vessel Temperature Case . . . . . . . . . 6.2-75 ure 6.2-13: Break and ECCS Mass Release Rate - Peak Containment Pressure and Temperature Case. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-76 ure 6.2-14: Break and ECCS Energy Release Rate - Peak Containment Pressure and Temperature Case. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2-77 ure 6.3-1: Emergency Core Cooling System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.3-30 ure 6.3-2: Emergency Core Cooling System Operation . . . . . . . . . . . . . . . . . . . . . . . 6.3-31 ure 6.3-3: Simplified Reactor Vent Valve Diagram. . . . . . . . . . . . . . . . . . . . . . . . . . . 6.3-32 ure 6.3-4: Simplified Reactor Recirculation Valve Diagram . . . . . . . . . . . . . . . . . . . . 6.3-33 ure 6.6-1: ASME Class Boundaries for NuScale Power Module Piping Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.6-7 cale US460 SDAA iv Revision 1

Engineered Safety Feature Materials 1 Metallic Materials This section provides information on engineered safety feature (ESF) component material selection and fabrication methods and discusses compatibility with fluids that the component may be exposed to during normal, accident, maintenance, and testing conditions.

Design, fabrication, erection, and testing of ESF system components conforms to quality standards commensurate with the importance of their intended safety functions (General Design Criterion [GDC 1]).

The ESF systems include the containment system (CNTS), emergency core cooling system (ECCS), and decay heat removal system (DHRS). Section 6.3 and Section 6.2 describe details of the ECCS and CNTS, respectively. Section 5.4.3 describes the DHRS.

Material selection and fabrication methods ensure ESF component compatibility with the environmental conditions associated with normal operation, maintenance, testing, and postulated accidents, including loss-of-coolant accidents (LOCAs). In addition, ESF pressure-retaining component materials have a low probability of abnormal leakage, rapidly propagating failure, or gross rupture (non-brittle) considering the design operational parameters (GDC 4, GDC 14, GDC 16, GDC 31, principal design criteria 35 and 41, 10 CFR 50.55a, and Appendix B to 10 CFR Part 50, Criteria IX and XIII). Chapter 3 provides further details of code and regulatory applicability.

This section also provides information on materials within the containment vessel (CNV) that are associated with non-ESF systems. Figure 6.2-3 depicts the reactor coolant system (RCS), steam generator system (SGS) and control rod drive system (CRDS) have lines inside the CNV. The materials for these systems ensure compatibility with the environmental conditions associated with normal operation and postulated accidents within the CNV, including those that expose the components to reactor coolant water chemistry.

1.1 Material Selection and Fabrication The ESF components have a 60-year design life and use materials permitted by American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC),Section III, Division 1. Table 6.1-1, Material Specifications for ESF Components, provides a list of the components, their material grade, and material type. The ESF pressure boundary materials, including weld materials, and associated supports conform to the fabrication, construction, and testing requirements of ASME BPVC, Sections II and III and meet the requirements of NB-2000, NC-2000 or NF-2000, as applicable. Selection of these materials ensures compatibility with the coolant system fluids and their selection is cale US460 SDAA 6.1-1 Revision 1

The design, fabrication, and materials of construction of the CNV includes sufficient margin that provides reasonable assurance that the CNV pressure boundary avoids brittle fracture. The margin minimizes the probability of a rapidly propagating fracture under operating, maintenance, testing, and postulated accident conditions for the 60-year design life. Code Case N-759-2 is used for the CNV (Section 5.2).

Selection of materials used in regions of the CNV subjected to neutron irradiation ensures their resistance to neutron embrittlement over the design life of the plant.

Austenitic stainless steel demonstrates good resistance to neutron embrittlement when exposed to neutron fluence levels below 1E19 n/cm2 for energies greater than 1 MeV.

Austenitic stainless steel, which has a 60-year design life peak fluence of less than 1E19 n/cm2 (>1MeV), comprises the core region of the CNV. The region of the CNV that is fabricated from martinsitic stainless steel has a peak fluence of less than 1E17 n/cm2. Section 6.2.1 provides additional CNV design detail.

The fracture toughness properties of the ferritic pressure retaining ESF components and associated supports comply with the requirements of ASME BPVC,Section III, Subsections NB-2300, NC-2300 and NF-2300, as applicable.

The stainless steels and nickel-base alloys in Table 6.1-1 and Table 6.1-2 that may be exposed to reactor coolant have been used by the operating nuclear power plants. Operating plant experience shows that there is minimal degradation concern for these materials.

The lower CNV shell above the RPV flange elevation, the lower flange, upper flange, upper shell, and top head are fabricated from martensitic stainless steel.

The use of F6NM is consistent with applicable regulations cited in SRP 6.1.

RG 1.84, Rev. 39, which is incorporated by reference into 10 CFR 50.55a, includes Code Case N-774, which permits the use of F6NM materials for forgings in excess of 10,000 lbm. Therefore, the use of SA-336 Gr F6NM for the CNV meets the requirements of 10 CFR 50.55a. The lower shell, bottom head and associated supports are fabricated from solution annealed austenitic stainless steel forgings.

The allowable CNV materials including weld filler metals are listed in Table 6.1-1.

The allowable materials for ESF valves are listed in Table 6.1-3. When welding together different material types there may be a need for a dissimilar metal weld (DMW) weld joint. When a DMW is necessary, a suitable weld material will be used that is of adequate strength and composition for the design and operating conditions. The design and fabrication of the weld meet the applicable Code sections as required.

cale US460 SDAA 6.1-2 Revision 1

unstabilized austenitic stainless steel of the American Iron and Steel Institute (AISI) Type 3XX series undergoes solution treatment per the guidance of RG 1.44, which describes acceptable criteria for preventing intergranular corrosion of stainless steel components. During post weld heat treatment, when austenitic stainless steel materials undergo sensitizing temperatures for greater than 60 minutes, testing in accordance with American Society for Testing and Materials (ASTM) A262, Practice A or E verifies non-sensitization of the materials.

ESF components do not use furnace-sensitized austenitic stainless steel.

Delta ferrite content of stainless steel weld filler material conforms to the guidelines stipulated in ASME BPVC,Section III, Subsections NB-2433, NC-2433 or NF-2433 and RG 1.31, ensuring sufficient ferrite content to avoid microfissures in welds, offset dilution, and reduce thermal aging. The delta ferrite content in stainless steel weld metal is between ferrite number 5 and 20. Alloy 52/152/52M filler metals are used for welding Alloy 690 to provide a high level of corrosion resistance.

Information regarding pressure retaining bolting material is in Section 3.13.

Minimal cold-working of austenitic stainless steel surfaces from abrasive work, such as grinding or wire brushing, reduces the potential for stress corrosion cracking. When abrasive work occurs, control of the tools ensures that there are no ferritic carbon steel contaminants. The design avoids the use of cold worked austenitic stainless steel. If cold work occurs, the limit for yield strength as determined by the 0.2 percent offset method is 90 ksi maximum.

There is no thermal insulation (metallic or non-metallic) inside the CNV. Any insulation on the CNV is above the reactor pool level and uses reflective metallic insulation. There are no fibrous insulation materials.

The qualification of welders for making welds in areas with limited access, and the methods for monitoring and certifying such welds, are in accordance with RG 1.71.

Cleanliness controls for fabrication, pre-operational and during the operational phases meet and satisfy the applicable requirements of ASME NQA-1.

Controls established for special processes such as welding, heat treating and non-destructive testing of the CNV and ESF materials satisfy the applicable requirements of 10 CFR 50, Appendix B Criterion IX.

Controls established for the handling, storage, shipping, cleaning and preservation of CNV and ESF materials and equipment to prevent damage or deterioration meet the applicable requirements of 10 CFR 50, Appendix B Criterion XIII. Regulatory Guide 1.28 provides quality assurance criteria for cleaning fluid systems and associated components that comply with 10 CFR 50, Appendix B. The design for threaded fasteners meets the cleaning criteria in RG 1.28.

cale US460 SDAA 6.1-3 Revision 1

The CNTS includes the CNV and containment isolation valves. This section addresses the compatibility of the CNV and pressure retaining portion of the containment isolation valves with their environment in supporting the ESF function and also the portions of the additional non-ESF functional systems (containment flooding and drain system, chemical and volume control system, main stream, feedwater and reactor component cooling water system) that penetrate the CNV boundary and become part of the RCS, CNTS, SGS, and CRDS inside the CNV.

The ECCS includes two reactor vent valves (RVVs) attached to the reactor vessel head and two reactor recirculation valves (RRVs) that are attached to the reactor vessel shell with associated remote solenoid trip and reset actuators (connected by hydraulic line) attached to the exterior of the CNV upper shell. The RCS or reactor pool water covers the RRVs and their hydraulic lines during periodic shutdown, cooldown, and refueling operations and during ECCS operation. The RVVs are subjected to high temperature RCS steam during ECCS actuation. The actuator assemblies for the RVVs and RRVs are normally immersed in the reactor pool. The ECCS reactor vent valves, RRVs, their actuators, and the connecting hydraulic lines are compatible with the RCS chemistry under LOCA conditions or intermittent exposure to reactor pool water. Section 6.3 provides a more detailed discussion and description of the ECCS.

The DHRS consists of two redundant trains, each including a passive condenser with piping. With the exception of some portions of the steam side piping, the DHRS is submerged in the reactor pool. The DHRS piping including the portion that penetrates the CNV boundary meets ASME Class 2 criteria. Compatibility with the secondary fluid in contact with the DHRS components and with borated water present in the RCS and the reactor pool informs the selection of the DHRS piping material internal and external to the CNV. Section 5.4 provides a more detailed discussion and description of the DHRS.

Exposure to borated RCS or reactor pool water occurs to the interior and exterior surfaces of ESF components, with the exception of the CNV head exterior, and the non-ESF piping and components within the CNV over the life of the plant. The CNV is partially immersed and DHRS condensers as well as the ECCS valve actuator assemblies are submerged in the reactor pool.

There are no socket welds on lines larger than 3/4 inch NPS for the Class 1 lines in Table 6.1-1. Socket welds used on piping less than 3/4 inch NPS conform to 10 CFR 50.55a(b)(1)(ii) and ASME B16.11. There are no socket welds on piping in Table 6.1-2, including piping of NPS 2 or less in size.

During normal power operations the interior environment of the CNV is dry, at a partial vacuum. Reactor pool water partially floods the CNV during cooldown before the movement of a NuScale Power Module for refueling operations.

Reactor coolant discharging into the CNV facilitates emergency core cooling for the NuScale Power Module. Reactor coolant chemistry is consistent with the guidance found in the Electric Power Research Institute Pressurized Water cale US460 SDAA 6.1-4 Revision 1

components are exposed to the same chemistry controlled coolant that is used in day- to-day operations. ESF component materials that undergo exposure to primary reactor coolant (internally or externally) are compatible with reactor coolant chemistry. The design prohibits the use of materials within the CNV that alters post-accident coolant chemistry. Section 5.2.3 contains additional information on reactor coolant water chemistry.

The materials for ESF components that are partially immersed within the reactor pool are compatible with the reactor pool chemistry conditions in the pool. Based on the purity of the reactor pool water outside of the CNV and the material selection of the CNV, there is no expectation of significant corrosion.

Section 9.1.3 describes operation of the pool cleanup system that maintains reactor pool water chemistry within the expected range of values shown on Table 9.1.3-4. There is no corrosion allowance for ESF materials exposed to process fluids or reactor pool chemistry.

Piping, supports, and components associated with the containment flooding and drain system and located in the CNV interior but defined as part of the CNTS are compatible with the reactor coolant chemistry that occurs under operation of ECCS conditions. The CNTS piping, fittings, pipe supports and components are austenitic stainless steel with a carbon content not exceeding 0.03 percent to mitigate intergranular attack; if they are exposed to temperature range 800 to 1500 degree F after final solution anneal. Table 6.1-2 lists non-ESF components in the CNV.

Piping, supports, and components associated with the functional systems that communicate through the CNV boundary and defined as part of the RCS or SGS are compatible with the reactor coolant chemistry present under ECCS operation conditions. Table 6.1-2 lists the applicable sections that describe materials used for these systems.

No materials, paint, or coatings in the CNV contribute to corrosion-related hydrogen production or alter post-LOCA coolant chemistry that would enhance stress corrosion cracking of austenitic stainless steel.

2 Organic Materials Protective coatings are not permitted on the inside or outside surface of the CNV, or on any other ESF or non-ESF system components located within the CNV.

Cabling that runs through the CNV is unpainted corrosion resistant, seamless construction, type 304L, stainless steel jacketed, mineral (silicon dioxide) insulated cabling. The cable material is free of organic material in the insulation and sheath.

cale US460 SDAA 6.1-5 Revision 1

Component Specification Grade/Type/Class tainment Vessel (CNV) ower Vessel Support Skirt SA-182 F304 (Note 1) ower Vessel (Lower Head, Core Region Shell, SA-965 FXM-19 (Note 2)

Transition Shell) ower Vessel (Flange, Lower Shell); Code Case F6NM Upper Vessel (Flange, Shells, Upper Head, and N-774 (SA-Manway Nozzles) 336)

CNV Top Head Cover; Covers for CNV Manways SA-182 F6NM nd Access Ports CNV Safe-Ends and Fittings SA-182 F304 and F316 (Note 1)

CNV Thermowells SA-479 Type 304 (Note 1)

CNV Seismic Support Lugs; CNV-RPV Supports SB-168 UNS N06690 Gussets, Plates, and Lugs) eak Detection Ports SA-312 TP316L SMLS (Note 1)

CRDM Support Frame SA-240 Type 304 (Note 1)

SA-479 Type 304 (Note 1)

Bolting Main Flange Closure SB-637 UNS N07718 (Note 3)

Other Than Main Flange Closure SA-193 Grade B8 Class 1 SA-194 Grade 8 SA-564 Type 630, H1100 SB-637 UNS N07718 (Note 3)

Top Support Structure Support SA-182 F6NM SA-240 Type 304 (Note 1)

SA-312 TP 304 (Note 1)

SA-479 Type 304 (Note 1)

Bolting SA-193 Grade B8 Class 1 SA-194 Grade 8 SA-564 Type 630, H1100 SB-637 UNS N07718 (Note 3) d Filer Metals for CNV and CNV Top Support Structure XX Austenitic Stainless Steel Weld Filler Metals SFA-5.4 E209, E240 (Note 2)

SFA-5.9 ER209, ER240 (Note 2)

XX Austenitic Stainless Steel Weld Filler Metals SFA-5.4 E308, E308L, E309, E309L, E316, E316L (Note 4)

SFA-5.9 ER308, ER308L, ER309, ER309L, ER316, ER316L (Note 4)

SFA-5.22 E308, E308L, E309, E309L, E316, E316L (Note 4)

XX Materialistic Stainless Steel Weld Filler Metals SFA-5.4 E410NiMo SFA-5.9 ER410NiMo Nickel-Base Alloy Weld Filler Metals SFA-5.11 ENiCrFe-7 SFA-5.14 ERNiCrFe-7, ERNiCRFE-7A, EQNiCrFe-7, EQNiCrFe-7A cale US460 SDAA 6.1-6 Revision 1

Component Specification Grade/Type/Class tainment System (CNTS) Piping CNTS Chemical and Volume Control Injection Piping Assembly CNTS Chemical and Volume Control Discharge Piping Assembly CNTS Pressurizer Spray Piping Assembly CNTS Reactor Pressure Vessel High Point Degasification Piping Assembly Pipe SA-312 TP316 SMLS, TP304 SMLS (Note 1)

Pipe Fitting SA-182 F304, F316 (Note 1)

SA-403 WP304 SMLS, WP316 SMLS (Note 1) rgency Core Cooling System (ECCS) Piping Assembly Tube SA-213 TP316 (Note 1)

Tube Fitting SA-182 F316 (Note 1)

SA-479 Type 316, Type 316L (Note 1) 0.03 percent maximum carbon if unstablized Type 3XX base metals are welded or exposed to temperature range of 800 °F to 1500 °F subsequent to final solution anneal.

0.04 percent maximum carbon for FXM-19 and Type 2XX weld filler metals.

SB-637 UNS N07718 solution treatment temperature of range before precipitation hardening treatment restricted to "1800 °F to 1850 °F.

0.03 percent maximum carbon for unstablized AISI Type 3XX weld filler metals; ferrite number in the range of 5FN to 20FN, except 5FN to 16FN for Type 316 and Type 316L.

cale US460 SDAA 6.1-7 Revision 1

non-Engineered Safety Feature Components ponent Material/Grade/Type CNTS outside containment ng Materials SA-312 TP304 SMLS, TP 316 SMLS SA-182 F304 SA-479 Type 316, Type 316L, Type 304, Type 304L, SA-403 WP304 SMLS, WP316 SMLS S Piping Materials SA-479 Type 316, Type 316L SA-182, F316, F304 (Note 1)

SA-312 TP304 SMLS, TP316 SMLS (Note 1)

SA-213, TP316 SA-403 WP304 SMLS, WP 316 SMLS (Note 1)

S Piping Bolting Materials SA-193, B8MN Class 2 SA-194, 8M ASTM A-240 UNS S41000 m Generator System Table 5.2-3 d Filler Materials Table 5.2-3 inless steel to be compatible with base material) nment Pins SA-564, Type 630, Condition H1100 0.03 percent max carbon content cale US460 SDAA 6.1-8 Revision 1

and Engineered Safety Feature Valves ponent Specification Grade/Type/Class y and Bonnet SA-182 F304, F316, F316L (Note 1)

SA-351 CF3, CF8 (Note 2)

SA-479 Type 304, Type 316, Type 316L (Note 1) and Disc SA-182 F304, F316 (Note 1)

SA-479 Type 304, Type 316 (Note 1)

SA-564 Type 630 H1100 or H1150 SA-638 Grade 660 SA-637 UNS N07718 t A-182 or SA-182 F304, F316 (Note 1)

A-276 or SA-276 UNS S21800 A-479 or SA-479 Type 304, Type 316 (Note 1)

UNS S21800 B-637 or SB-637 UNS N07718 m A-276 or SA-276 UNS S21800 A-479 or SA-479 Type 316 Strain-Hardened Level 1 or Level 2 XM-19 Annealed or Hot-Rolled or Strain-Hardened UNS S21800 B-637 or SB-637 UNS N07718 A-564 or SA-564 Type 630 H1100 or H1150 SA-193 Grade B8 Class 1, Grade 8M Class 1 SB-637 UNS N07718 (Note 3)

SA-194 Grade 6, Grade 8, Grade 8R, Grade 8RA SB-637 UNS N07718 (Note 3) enitic Stainless Steel Weld Filler Metals SFA-5.4 E308, E308L, E309, E309L, E316, E316L (Note 4)

SFA-5.9 ER308, ER308L, ER309, ER309L, ER316, ER316L (Note 4)

.03 percent maximum carbon if unstablized Type 3XX base metals are welded or exposed to temperature range f 800°F to 1500°F subsequent to final solution anneal.

.03 percent maximum carbon, and 20 percent maximum delta ferrite for Grade CF3 and Grade CF8 austenitic tainless steel casting.

SB-637 UNS N07718 solution treatment temperature of range before precipitation hardening treatment restricted o "1800°F to 1850°F.

.03 percent maximum carbon for unstablized AISI Type 3XX weld filler metals; ferrite number in the range of 5FN o 20FN, except 5FN to 16FN for Type 316 and Type 316L.

cale US460 SDAA 6.1-9 Revision 1

1 Containment Functional Design The containment is an integral part of the NuScale Power Module (NPM) and provides primary containment for the reactor coolant system (RCS). The containment system (CNTS) includes the containment vessel (CNV), CNV supports, containment isolation valves (CIVs), passive containment isolation barriers, and containment instruments (Figure 6.2-1).

1.1 Containment Structure 1.1.1 Design Bases The CNV is an evacuated pressure vessel fabricated with a combination of martensitic and austenitic stainless steel that houses, supports, and protects the reactor pressure vessel (RPV) from external hazards and provides a barrier to the release of fission products. The CNV is partially immersed in a below grade, borated-water filled, stainless steel lined, reinforced concrete pool to facilitate heat removal. The CNV is an American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC) Class MC (steel) containment whose design, analysis, fabrication, inspection, testing, and stamping conform to ASME BPVC Class 1 pressure vessel requirements in accordance with Section III, Subsection NB as permitted by NCA-2134(c).

Overpressure protection is provided in accordance with ASME BPVC,Section III, Article NE-7000.

The CNTS provides a barrier that accommodates, without exceeding the design leakage rate and with sufficient margin, the calculated pressure and temperature conditions resulting from any loss-of-coolant accident (LOCA)

(General Design Criterion [GDC] 50). As a minimum, pressure retaining components that comprise the CNTS have a design pressure and temperature as indicated in Table 6.2-1, which bounds the calculated pressure and temperature conditions for any design-basis event (DBE). In concert with the CIVs and passive containment isolation barriers discussed in Section 6.2.4, the CNV serves as a final barrier to the release of radioactivity and radiological contaminants to the environment (GDC 16).

The supporting analyses methodology is in the Loss-of-Coolant Accident Evaluation Model (Reference 6.2-1). Limiting analysis results are summarized in Section 6.2.1.1.3.

Section 6.2.5 describes combustible gas control for the CNV. The CNV design includes no internal subcompartments, which eliminates the potential for localized collection of combustible gases and differential pressures resulting from postulated primary release events within containment.

The structural and pressure retaining components of the CNV consist of the closure flanges and bolting, vessel shells, vessel top and bottom heads, nozzles and penetrations for piping and instrumentation, access and cale US460 SDAA 6.2-1 Revision 1

(ECCS) trip and reset valve assemblies, and the NPM top support structure mounting assemblies. Section 3.8.2 provides additional design detail that includes a physical description of the geometry of the CNV and supports, plan views, and design criteria relating to construction techniques, static loads, and seismic loads. Table 6.1-1 describes the materials used for fabrication of the CNV and associated components.

Instrumentation monitors containment parameters for normal operation, anticipated operational occurrences, and accidents to include temperature, pressure, isolation valve position, and liquid level (GDC 13 and 64).

Section 7.1 discusses the monitored containment parameters.

The integrated design of the RPV and CNV ensures that RCS leakage collects within the CNV. In the event of primary system releases (e.g., LOCAs or valve opening events), the CNV retains adequate reactor coolant inventory to prevent core uncovery or loss of core cooling. Section 6.3 describes that the reactor coolant water collecting in the CNV returns passively to the reactor vessel by natural circulation via the ECCS.

Under these conditions, the CNV transfers the sensible and core decay heat through its walls to the ultimate heat sink (UHS) and provides effective passive, natural circulation emergency core cooling flow. The containment reduces CNV pressure and temperature and maintains them at acceptably low levels following postulated mass and energy releases, including LOCA, into containment (principal design criterion [PDC] 38, Section 3.1.4). In postulated events, containment pressure reduces to less than 50 percent of the peak calculated pressure in less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Section 6.2.2 describes the containment heat removal function.

The containment and associated systems are designed to establish an essentially leak-tight barrier against an uncontrolled release of radioactivity to the environment and ensure that conditions important to safety are not exceeded for as long as the postulated accident conditions require (GDC 16).

The CNV is designed to accommodate the effects of and be compatible with the internal and external environmental conditions associated with normal operation, maintenance, testing, and postulated accidents and to protect against the dynamic effects that may result from external events (GDC 4). A discussion of these design considerations is provided in Chapter 3.

Chapter 3 includes additional information discussing protection from natural phenomena, environmental and dynamic effects, effects of missile impact, sharing of safety related structures, testing and inspection, adequacy of mechanical components and environmental qualification associated with the CNV functional design-basis considerations.

Chapter 15 provides information discussing offsite and control room dose consequences associated with the containment functional design, and cale US460 SDAA 6.2-2 Revision 1

The evaluation methodology used to determine CNV peak pressure and peak temperature is in Reference 6.2-1. Table 6.2-2 presents the results of the base case and limiting CNV pressure and wall temperature analyses for primary release (LOCA and valve opening events), and limiting secondary system break scenarios.

Regarding 10 CFR 50.34(f)(3)(iv), the CNV does not include one or more dedicated containment penetrations, equivalent in size to a single 3-foot diameter opening, to accommodate future installation of systems to prevent containment failure. As discussed in this section, the calculated peak containment pressures for DBEs remain less than the CNV internal design pressure. As discussed in Section 19.2.3, peak containment pressures do not challenge vessel integrity for any analyzed severe accident progression.

Therefore, 10 CFR 50.34(f)(3)(iv) is not technically relevant to the NuScale Power Plant design.

1.1.2 Design Features The CNTS includes the CNV, top support structure, CNV supports, control rod drive mechanism (CRDM) support, CIVs, and containment instruments.

The CNTS design features support

  • enclosure of the RPV, RCS, and associated components.
  • containment of the postulated mass and energy releases (LOCA and non-LOCA) inside containment.
  • operation of the ECCS by the retention of reactor coolant and the transfer of sensible and core heat to the UHS.

The CNV is a compact, steel pressure vessel that consists of an upright cylinder with top and bottom head closures. A below-grade reactor pool partially immerses the CNV, which provides a passive heat sink and has no internal sumps or subcompartments that entrap water or gases. The CNV and the reactor pool are within the Reactor Building (RXB).

The RXB provides vertical and lateral support for the CNV via a support skirt at the bottom of the vessel. The reactor bay pool walls provide lateral support for the CNV through the lateral support lugs on the upper CNV shell. The CNV houses and supports the RPV and associated piping systems and valves.

Table 6.2-1 provides a list of design and operating parameters relevant to the CNV. Figure 6.2-1 depicts the containment general arrangement.

cale US460 SDAA 6.2-3 Revision 1

water in the CNV (e.g., primary and secondary system leakage, ECCS actuation, component cooling system leakage, or module disassembly and refueling).

Maintaining the containment at a vacuum has benefits for both normal operation and post mass and energy release events. A vacuum precludes the need for thermal insulation inside containment because there is minimal convective heat transfer from the reactor vessel during normal reactor operation. The containment evacuation system (CES) can detect leakage when the CNV vacuum is below saturation pressure of the CNV wall temperature.

The NPM moves via the reactor building crane to and from the refueling area without loss of reactor coolant inventory, and is refueled in a partially flooded condition, precluding operation with reduced inventory conditions.

Section 9.2.5 discusses core decay heat removal during this process.

In the event of a mass and energy release into CNV, a process of condensation and retention within the CNV facilitates the transfer of the energy to the UHS.

Reactor coolant released from the RPV, from a chemical and volume control system (CVCS) pipe break, reactor safety valves (RSVs), or through the ECCS valves, and main steam (MS) or feedwater (FW) pipe break released from the secondary system condenses on the relatively cool inner surface of the CNV wall. The resulting condensate flows down the inner CNV wall and collects in the bottom of the CNV shell. The vapor condensation and heat removal from containment is accomplished passively by transferring the energy through the CNV wall to the reactor pool.

For releases from the RPV with ECCS actuation, when RPV and CNV pressures approach equilibrium and the accumulated level in the CNV shell reaches a level where sufficient driving head is available, coolant flow from the CNV returns to the RPV through the ECCS recirculation valves for core cooling. Opening of the reactor vent valves (RVVs) and reactor recirculation valves (RRVs) establishes the CNV shell as the outer boundary of the coolant circulation flow path. Section 6.2.2 describes this method of passive coolant circulation and heat removal.

The CNTS design provides for the isolation of process systems that penetrate the CNV. The design allows for the normal or emergency passage of fluids, vapor or gases through the containment boundary while preserving the ability of the boundary to prevent or limit the escape of fission products in postulated events. Section 6.2.4 describes the CIVs.

The design of the CNV components and appurtenances ensure pressure boundary integrity for the life of the plant when considering fatigue, corrosion and wear. The CNV pressure boundary components include the CNV, cale US460 SDAA 6.2-4 Revision 1

the pressure boundary materials of valves required to isolate the system and provide a pressure boundary for the containment function. The CNV components and penetrations (piping, electrical and instrumentation and controls (I&C)) are designed and tested to harsh environment conditions (temperature, pressure, radiation, and submergence). Chapter 3 contains additional component design detail.

The CNV inspection and testing of its appurtenances ensure maintenance of leak tightness and functional capability under calculated design-basis conditions. The CNV supports the leakage testing requirements of 10 CFR 50 Appendix J, with the exception of Type A testing as discussed in Section 3.1.5, Section 6.2.6, and Technical Report TR-123952. Access allows for inspections, testing and maintenance of components contained within the CNTS that are within the scope of the inservice inspection (ISI) program and the inservice testing (IST) program during the life of the plant.

The CNV design allows for the inspection, testing, and maintenance of equipment and structural features inside containment (control rod drives, ECCS valves (including their venturis), RSVs, pressurizer heaters, instruments, electrical connections, welds, supports, and piping inside containment).

The CNTS components, and their associated supports, facilitate the ASME BPVC,Section XI (Reference 6.2-5) inspection requirements for Class 1, Class 2, and Class MC, including the preservice inspection requirements.

Section 3.8.2 provides the CNV design information addressing structural loads and loading combinations.

1.1.3 Design Evaluation Design specific analyses demonstrate the functional capabilities of the containment to provide

  • a leak-tight barrier that can withstand worst-case accident conditions for the duration of postulated accidents.
  • a heat removal capability sufficient to maintain peak calculated containment pressures and temperatures following a postulated mass and energy release inside containment to less than design values and without exceeding the containment's design leak rate.
  • sufficient heat removal capability to rapidly reduce containment pressure following postulated mass and energy releases to less than 50 percent of the peak calculated pressure for the worst-case event within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and maintain at acceptably low levels.
  • the capability to withstand the maximum expected external pressure.

cale US460 SDAA 6.2-5 Revision 1

  • instrumentation capable of operating in a post-accident environment to monitor the containment such that automatic actions can be monitored or the appropriate manual action(s) can be taken.

Section 3.8.2 addresses the applicable codes, standards, and guides that apply to the containment design. Table 6.2-1 lists the CNV design and operating parameters, and a general arrangement drawing of the CNV is provided by Figure 6.2-1. Section 3.6 discusses consideration in the structural design of the dynamic effects of mass and energy releases into containment resulting from primary system release events are considered in the structural design.

Evaluation of the pressure and temperature response of the CNV is accomplished through the analysis of a variety of primary system and secondary system release events that bound all LOCA events, other primary system release events, and secondary system pipe break events. The postulated primary and secondary release events that are considered include the following:

  • RSVs opening
  • inadvertent ECCS (RVV or RRV) valve opening
  • inadvertent ECCS actuation
  • secondary system pipe breaks inside containment with postulated loss of augmented direct current power system (EDAS)

The peak containment pressure and temperature resulting from a mass and energy release in containment depends on the nature, size, and location of the postulated breach. The CNV contains the energy discharged from a worst-case event.

The NRELAP5 code, based on RELAP5-3D with the application of conservative initial and boundary conditions that reflect the design, predicts the mass and energy releases and the bounding CNV pressures and temperatures. The evaluation methodology addresses applicable regulatory guidance contained in Design Specific Review Standard Section 6.2.1 as discussed by Reference 6.2-1. The results are within the design pressure and design temperature of the CNV. Figure 6.2-7 through Figure 6.2-12 shows graphical results for the limiting CNV pressure, temperature, and mass and energy release rates. Table 6.2-6 provides the sequence of events for the CNV peak pressure and peak temperature cases, respectively. Table 6.2-8 provides the instantaneous mass and energy releases for the limiting containment pressure and temperature event.

cale US460 SDAA 6.2-6 Revision 1

sizes, and types of mass and energy releases. The spectrum of mass and energy release events analyzed to determine the limiting results for the design includes the following:

  • RCS discharge line break
  • RCS injection line break
  • RPV high point vent degasification supply line break
  • inadvertent opening of a single RVV or RRV
  • inadvertent ECCS actuation
  • steam line break with a postulated loss of EDAS supply
  • feedwater line break (FWLB) with a postulated loss of EDAS supply The above spectrum of postulated release events bound the primary and secondary release events for the NPM.

Reference 6.2-1 describes the selection process used to determine initial conditions and boundary condition assumptions reflecting the design that are used for evaluation of containment response to postulated primary and secondary system mass and energy releases into containment. These initial conditions and assumptions are based on the range of normal operating conditions with consideration given to maximizing the calculated peak containment pressure and temperature.

Reference 6.2-1 describes analysis of each mass and energy release event, including consideration of the worst-case single active failure as identified by sensitivity cases and a determination of how the availability of normal alternating current (AC) and EDAS power affects the results.

The overall limiting peak calculated containment pressure and temperature, based on the mass and energy release spectrum analyses, occurs as the result of the RCS discharge line break event. The analysis models an expansion of the RCS fluid into the CNV volume and includes all relevant energy input from RCS, secondary, and fuel stored energy sources, along with conservatively modeled core power and decay heat. The limiting containment peak pressure is more than ten percent below the design pressure. Additional assumptions applied in the limiting peak containment pressure case include

  • loss of normal AC power at event initiation.
  • EDAS power supply is available.
  • no single active failure.
  • ECCS actuation on low RPV riser level, biased to high end of range.

cale US460 SDAA 6.2-7 Revision 1

  • no signal active failure.
  • ECCS actuation on low RPV riser level is biased to high end of the range.

Table 6.2-2 lists the peak calculated pressure and temperature for each event.

Figure 6.2-7 through Figure 6.2-12 depict graphical results for the limiting CNV pressure, temperature and mass and energy releases. Table 6.2-6 provides the sequence of events for the CNV peak pressure and peak temperature cases, respectively. The CNV design pressure and temperature provide margin to the peak calculated temperature and pressure for the limiting event.

A double-ended steam line break inside containment results in the peak calculated containment pressure and temperature for secondary side release events. Table 6.2-2 lists the peak calculated pressures and temperatures.

The primary system mass and energy release events bound the secondary system mass and energy release event results.

The basis for the CNV external design pressure listed in Table 6.2-1 is an internal pressure of 0 psia and an external pressure resulting from pool water hydrostatic pressure for the normal operating pool level in Table 9.2.5-1.

Section 3.11 discusses the environmental qualification of mechanical and electrical equipment exposed to the containment environment following a primary or secondary system mass and energy release inside containment.

Chapter 7 and Section 3.11 discuss the CNV instrumentation that monitors and records the required containment parameters and the capability to operate in post-accident environments.

1.2 Containment Subcompartments A subcompartment design-basis and supporting analysis for mass and energy release is not relevant to the CNV because the CNV has no interior subcompartments.

1.3 Mass and Energy Release Analyses for Primary System Release Events The containment receives the primary system mass and energy released following a postulated rupture of piping containing reactor coolant or opening of an ECCS valve or RSV. The CNV response analysis methodology (Reference 6.2-1) is an extension of the NuScale LOCA evaluation model that was developed in accordance with the guidance of Regulatory Guide (RG) 1.203, "Transient and Accident Analysis Methods," December 2005. Reference 6.2-1 discusses development of the containment response methodology from the LOCA evaluation model.

cale US460 SDAA 6.2-8 Revision 1

outside diameter to the reactor pool, to ensure a bounding peak CNV pressure and temperature response following a LOCA. The methodology includes the following elements:

  • high initial CNV pressure, maximum non-condensable gas concentration within the CNV, and maximum non-condensable gas release from the RPV to the CNV during a LOCA or RRV opening event
  • heat transfer from RPV outside diameter including convection and boiling heat transfer to the fluid in the CNV
  • condensation on CNV inside diameter including the effects of non-condensable gas
  • conservative reactor pool level
  • conservative reactor pool temperature
  • conservative low CNV free volume assumption, which accounts for RCS thermal expansion and includes an allowance for piping, valves, cabling and miscellaneous components, such as platforms and ladders Reference 6.2-1 shows the heat transfer correlations and models for of the processes that could impact the CNV peak pressure and temperature response.

The CNV modeling in the LOCA containment response analysis model starts with the LOCA evaluation model (Reference 6.2-1), with assumptions that maximize the mass and energy release and consequential containment pressure and temperature. The CNV and reactor pool models for secondary system pipe break containment response analysis methodology match the modeling for primary release events.

Reference 6.2-1 provides simplified diagrams of the nodalization used in the containment response analysis methodology.

The LOCA evaluation model (Reference 6.2-1) divided the NuScale Power Module LOCA scenarios into two phases for phenomena identification: LOCA blowdown phase (Phase 1a) and ECCS actuation (Phase 1b).

For primary system mass release events, the blowdown phase begins at break initiation or valve opening. Reactor coolant released into the containment volume pressurizes the containment volume and depressurizes the RPV. Pressurization of the containment and the decreased inventory within the RPV results in reactor trip and closure of the CIVs. The blowdown phase ends when the ECCS actuates the RVVs and the RRVs.

The ECCS actuation occurs as a result of a module protection system (MPS) signal as discussed in Chapter 7 or a postulated loss of EDAS power.

cale US460 SDAA 6.2-9 Revision 1

  • If the pressure differential across the RRVs is greater than the inadvertent actuation block (IAB) threshold when the ECCS signal actuates, then the RRVs stay closed until the pressure differential decreases to below the IAB release pressure.
  • If the pressure differential across the RRVs decreases to below the IAB threshold pressure when the ECCS signal actuates, then the RRVs open at that time.
  • If the pressure differential across the valves is less than the valve opening spring force (approximately 15 psid), then the valves open even without an ECCS actuation signal.

The RVVs open immediately upon removal of power to the ECCS valve actuator solenoid valves. The RVVs do not have an IAB.

Opening of the RVVs increases the depressurization rate, and the primary system and CNV pressures approach equalization. As the pressures equalize, the break and valve flow decreases. With pressure equalization and the increase in the CNV pool level, flow through the RRVs into the reactor vessel starts to provide long-term cooling (LTC) via recirculation. Pressure equalization terminates the reactor vessel level decrease before core uncovery. Heat transfer to the CNV wall and to the reactor pool eventually exceeds the energy addition from the break flow and the RVV flow. When this occurs, it completes the period of peak containment pressure and temperature, and a gradual depressurization and cooling phase begins.

Sensitivity cases determine the effect of loss of power (AC or DC) scenarios, as well as postulated single failures, on the primary system mass and energy release scenarios considered by the containment response analysis methodology.

Reference 6.2-1 discusses insights from the results of the sensitivity cases; these insights determine the limiting cases for CNV pressure and temperature.

1.3.1 Mass and Energy Release Data - Primary System Release Events Conservatively modeling the mass and energy release and minimizing the performance of the containment heat removal function of containment determines the maximum containment peak pressure and peak temperature scenarios.

Reference 6.2-1 provides representative results of analyses of the spectrum of the primary system mass and energy release scenarios for the NPM.

Applying the Reference 6.2-1 methodology, the limiting primary system release event CNV pressure, temperature, and mass and energy release rates are determined and are depicted by Figure 6.2-7 through Figure 6.2-12.

The limiting peak pressure and temperature results are below the CNV design pressure and temperature.

cale US460 SDAA 6.2-10 Revision 1

The containment response analysis methodology (Reference 6.2-1) models available energy sources identified by 10 CFR Part 50, Appendix K, paragraph I.A, with the exception of energy associated with fuel clad metal-water reaction, because calculated cladding temperatures for design-basis LOCAs remain below the threshold for cladding oxidation.

Energy sources addressed in the containment response analysis analyses include

  • core power initialized at 102 percent of rated thermal power.
  • decay heat modeled using the 1979 ANS standard decay heat model with a 1.2 multiplier.
  • RCS stored energy based on conservative initial conditions of pressure, average RCS temperature, and pressurizer level that consider the normal operating range including instrumentation uncertainties and deadband.
  • stored energy in vessel internal structures.
  • RCS piping inside containment.
  • stored fuel energy.
  • stored secondary energy (steam generator [SG] tubes, MS, and FW piping inside containment) based on conservative initial conditions of steam pressure and FW temperature that consider the normal operating range including instrumentation uncertainties and deadband.

1.3.3 Description of the Blowdown Model - Primary System Release Events The previous sections describe the maximum containment peak pressure and temperature scenarios that result from modeling the mass and energy release and minimizing the heat removal of containment.

Engineering information, drawings, and associated reference documents inform development of a thermal-hydraulic simulation model that calculates the mass and energy released from the RCS during blowdown.

The containment response analysis methodology (Reference 6.2-1) assumes an initial power level of 1.02 times the licensed power level. The initial RCS volume and mass are consistent with that power level.

The mass and energy release determined by the containment response analysis methodology is from the NRELAP5 computer code, and the modeling approach is very similar to the LOCA evaluation model that complies with the applicable portions of 10 CFR 50 Appendix K. Reference 6.2-1 describes specific changes to the LOCA evaluation model required to model primary system mass release events. The model applies a discharge coefficient of 1.0 to the applicable critical flow correlation. Reference 6.2-1 demonstrates the adequacy of the LOCA evaluation model two-phase and single-phase choked and unchoked flow models for predictions of mass and energy release cale US460 SDAA 6.2-11 Revision 1

The LOCA evaluation model report demonstrates these correlations are applicable to the NPM design (Reference 6.2-1).

1.3.4 Description of the Emergency Core Cooling System Actuation Model The containment response analysis methodology (Reference 6.2-1) models the applicable phenomena that contribute to maximizing the mass and energy release into containment and the resulting pressure and temperature during the ECCS recirculation phase.

The methodology applied during the ECCS actuation phase is the same as previously described for the blowdown phase.

Section 6.3 further discusses operation of the ECCS.

1.3.5 Description of the Long-Term Cooling Model The containment response analyses demonstrate that the CNV pressure and temperature rapidly reduce and remain at acceptably low levels following postulated mass and energy releases, including LOCA, into containment (PDC 38 [Section 3.1.4]). The previously described methodology and model serve this purpose. Section 15.0.5 discusses long-term cooling analyses that demonstrate ECCS recirculation and CNV heat removal for at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

This demonstrates adequate long term containment heat removal.

1.3.6 Single-Failure Analysis This containment response analysis considers potential single failures, and when including the worst-case single failure, the results of each case meet the necessary safety function. Reference 6.2-1 discusses insights obtained from the sensitivity studies that determine single failures that create a bounding set of assumptions that result in limiting CNV peak temperature and pressure for primary release events. The sensitivity results demonstrate that in some scenarios the consideration of no single failure provides a more limiting result.

1.3.7 Metal-Water Reaction Because of the absence of significant post-LOCA cladding heat-up, the methodology does not model additional energy resulting from cladding metal-water reaction (Reference 6.2-1).

1.3.8 Energy Inventories - Loss-of-Coolant Accident Figure 6.2-8, Figure 6.2-9, Figure 6.2-11, Figure 6.2-12, Figure 6.2-13, and Figure 6.2-14 provide integrated and transient mass and energy release rates for the primary system release pressure and temperature limiting events.

cale US460 SDAA 6.2-12 Revision 1

Table 6.2-1 and Figure 6.2-8 through Figure 6.2-12 provide information supporting confirmatory analysis.

Reference 6.2-1 provides tabulated mass and energy data for representative results.

1.4 Mass and Energy Release Analysis for Secondary System Pipe Ruptures Inside Containment Main steam and feedwater line breaks are not required to be postulated for dynamic effects in Section 3.9.1. They are required to be postulated to determine limiting peak temperature and pressure. The containment receives the secondary system mass and energy released following a postulated MSLB or FWLB. The containment response analysis methodology (Reference 6.2-1) is developed in accordance with the guidance of RG 1.203, "Transient and Accident Analysis Methods," December 2005.

The limiting MSLB event and FWLB event are double-ended ruptures of the largest MS line and FW line pipes. The limiting MSLB and FWLB events include postulated loss of EDAS power supply, which results in ECCS actuation, adding primary side mass and energy release into containment during the secondary side mass and energy release.

Secondary system mass and energy releases consist of the MSLB and FWLB events with the asymmetric responses in SGs included. The affected SG blows down into the CNV, and the FW supply and MS lines isolate.

Conservative modeling of secondary system mass and energy release scenarios ensures a bounding analysis. All breaks consider a maximum break size at each location.

The containment response analysis methodology (Reference 6.2-1) uses the heat transfer correlation package in the NRELAP5 computer code for secondary system pipe break analysis. The LOCA and non-LOCA transient analysis methodology reports demonstrate these correlations are applicable to the NPM design (Reference 6.2-1 and Reference 6.2-2). The local fluid conditions and the local heat structure surface temperatures determine the heat transfer mode.

Nucleate boiling heat transfer is in the code and applies if the local conditions are appropriate. For the helical coil SG, other heat transfer modes exist as the coolant enters as subcooled liquid and exits as superheated steam. Initial and boundary conditions maximize containment pressure and temperature response.

Reference 6.2-1 provides a description of each postulated secondary system mass and energy release event. Table 6.2-2 provides results of the limiting analyses. The primary system limiting events bound the secondary system mass and energy analyses.

cale US460 SDAA 6.2-13 Revision 1

Similar to primary system mass and energy release scenarios, conservative modeling of the mass and energy release and minimizing the performance of the heat removal function of containment, determine the maximum containment peak pressure and peak temperature scenarios for secondary system releases into containment (Reference 6.2-1).

1.4.2 Single-Failure Analysis - Secondary System The containment response analysis methodology considers potential single failures. Due to the simplicity of the NPM design, there are few candidate single failures for the secondary system mass and energy release scenarios.

The scenario where ECCS valves fail to open reduces the mass and energy release, which removes the scenario from consideration. Sensitivity studies consider failures of main steam isolation valves (MSIVs) or feedwater isolation valves (FWIVs) to close.

1.4.3 Initial and Boundary Conditions - Secondary System Initial conditions for secondary system line break containment response analyses, as described in Reference 6.2-1, ensure a conservative CNV peak pressure and peak temperature result. Selection of the initial conditions follows applicable design specific review standard guidance. The selection process ensures maximization of energy sources and minimization of energy sinks. Initial and boundary conditions associated with primary side parameters for MSLB and FWLB analyses are similar to those described for the primary mass and energy release events, with exceptions noted by Reference 6.2-1.

Boundary conditions for secondary system line break containment response analyses ensure a conservative CNV peak pressure and peak temperature result. The process of selecting the boundary conditions is consistent with applicable design specific review standard guidance. The selection process ensures maximization of energy sources and minimization of energy sinks.

Boundary conditions assumed by MSLB and FWLB analyses are the same as those used in primary release event analyses except for those listed in Reference 6.2-1.

1.4.4 Description of Blowdown Model - Secondary System Modeling of the MSLB considers a double-ended break of an MS line inside the CNV that depressurizes the secondary system and pressurizes the CNV.

Cross-connected MS lines downstream of the MS isolation results in both SGs discharging to containment until the steam lines isolate because of a secondary side isolation signal or containment isolation signal. A low steam line pressure signal or high containment pressure signal results in closure of the MSIVs and FWIVs, and reactor trip. Subsequently, the decay heat removal system (DHRS) actuates after FW isolation. Closure of the FW regulating valve mitigates a single failure of the FWIV to close on the affected SG. After the initiation of the break, there are two potential limiting events depending on the evolution of the scenario: a scenario that assumes continued AC power or cale US460 SDAA 6.2-14 Revision 1

power results in the peak CNV pressure and peak CNV temperature results.

The FWLB is a double-ended break of the largest FW pipe inside containment that results in a depressurization of the affected SG and pressurization of the CNV. A high containment pressure signal results in closure of the MSIVs and FWIVs and reactor trip. The DHRS actuation occurs subsequently after FW isolation. Actuation of DHRS establishes long-term decay heat removal using the unaffected SG and the DHRS. A single failure of the MSIV to close on the affected SG allows more high energy steam to be discharged out of the FWLB before secondary side isolation than would occur if the associated FWIV failed to close. The limiting case, also assumes a loss of normal AC and EDAS power at event initiation, which results in ECCS actuation and blowdown from the RPV into the CNV. The maximum CNV pressure and temperature occurs after the ECCS valves open.

1.4.5 Energy Inventories - Secondary System The energy inventories in the secondary system match those evaluated for the primary system mass and energy releases with the exception of the additional conservatisms applied in the initial and boundary condition assumptions applied to the secondary system components, as described in Section 6.2.1.4.3.

1.4.6 Additional Information Required for Confirmatory Analyses - Secondary System Information supporting confirmatory analysis for representative secondary side break event progressions is provided in Reference 6.2-1.

1.5 Minimum Containment Pressure Analysis for Performance Capability Studies of the Emergency Core Cooling System The ECCS operation directly connects the RPV and CNV volumes and relies on the equalization of pressures within the two volumes. The ECCS flow consists of the RCS vapor flow through the vent valves, that condenses and collects within the CNV volume returning to the RPV. The driving force for the condensate flow back to the RPV through the recirculation valves is the hydrostatic head of coolant in the CNV that collects above the ECCS reactor recirculation valves. In the event of large coolant leaks (e.g., LOCAs, valve opening events), the CNV provides for the retention of adequate reactor coolant inventory to prevent core uncovery or loss of core cooling. The ECCS long-term cooling analyses performed in accordance with Reference 6.2-3, consider a range of boundary conditions that affect CNV heat removal, RPV and CNV internal pressure, and ECCS performance. Chapter 15 presents the ECCS long-term cooling results.

cale US460 SDAA 6.2-15 Revision 1

The ISI and IST programs identify the required inspections, tests, frequencies, and acceptance criteria for the applicable components and systems.

Section 3.8.2.7 addresses the testing and ISI requirements with respect to compliance with the ASME BPVC for fabrication and preservice examinations used to inspect and test the steel CNV and the other components relied on for containment integrity. Additional information is in Section 14.2 describing the test programs that control initial plant testing (pre-operational and startup) conducted on the CNV and associated structures, systems, and components.

As described in Section 3.8.2.7, fabrication and preservice testing and inspection of the CNV meets ASME BPVC Section III and Section XI requirements for a metallic containment.

Section 3.8.2.7 describes hydrostatic testing of the CNV.

Based on the high pressure and the safety functions of the CNV, enhanced inspection requirements are provided for it that are beyond the Class MC requirements of Reference 6.2-5 Subsection IWE. Specifically, rather than just a visual examination for an ASME BPVC Class MC containment, the upper head-to-shell, lower head-to-shell, and lower shell-to-lower transition shell welds of the CNV require a volumetric examination performed per Reference 6.2-5, Article IWB-2000. Reference 6.2-4 contains further information on CNV inspection requirements.

Periodic inservice inspection of the containment heat removal surfaces ensures compliance with GDC 39 to assess for surface fouling or degradation that could potentially impede heat transfer from the CNV.

Section 6.6 provides a description of the ISI requirements for Class 2 and 3 components.

1.7 Instrumentation Requirements Instrumentation monitors the conditions inside the containment and actuates the appropriate engineered safety features (ESFs), should those conditions exceed predetermined levels. Instruments measure containment pressure, temperature, and water level. Section 5.2.5 describes instrumentation that monitors RCS leakage into containment and compliance with RG 1.45.

Containment pressure instrumentation provides control room indication to monitor containment pressure boundary integrity, RCS pressure boundary integrity, ECCS performance, and to support the actuation of critical safety functions as further discussed in Chapter 7.

Four narrow range safety-related instruments and two wide range nonsafety-related instruments measure and monitor containment pressure. The narrow range sensors (transducer/transmitter type) are inside the CNV wall cale US460 SDAA 6.2-16 Revision 1

(transducer/transmitter type) are inside the CNV wall enclosure near the top of containment. There are two independent channels of wide range CNV pressure instrumentation.

Containment water level instrumentation provides control room indication to monitor containment pressure boundary integrity, RCS pressure boundary integrity and ECCS performance.

Four instruments that measure and monitor containment water level (digital type) are at the reactor pressure boundary interface. There are four independent channels of CNV water level instrumentation.

Containment air temperature instrumentation provides control room indication to monitor the environment in containment.

Two nonsafety-related instruments measure and monitor containment air temperature. The sensors (resistance temperature detector type) are inside the CNV near the top of the CNV head. There are two independent channels of CNV air temperature instrumentation.

Chapter 7 provides additional containment instrumentation design detail addressing power supplies, actuation logic, and initiation signals for the engineering safety feature functions.

1.8 Containment Vessel Bolted Closures The CNV closure studs, nuts, and washers use the material indicated in Table 6.1-1. Section 3.13.1.1 contains details on threaded fastener design considerations.

For the CNV main flange connection, lock plates perform a tooling function holding the CNV main flange nut in place on top of the flange after flange stud removal or during flange stud installation. The lock plates are not part of the RCPB. The lock plates resist the minor friction loads and forces resulting from inserting and threading the studs into the nuts. The lock plates do not resist the forces applied to tension the stud or for the removing and detensioning the studs.

Studs are threaded into the top flange of the CNV. These studs are non structural per ASME BPVC Section NB-1132.1(c)(2), similar to insulation supports.

There are no inservice exam requirements for the lock plate studs or the lock plates.

2 Containment Heat Removal The CNV material selection and the physical configuration of the NuScale Power Plant design forms the basis for containment heat removal for accident conditions.

The reactor pool partially immerses the steel CNV and heat transfers to the water cale US460 SDAA 6.2-17 Revision 1

and passive means for containment heat removal. The large inventory of water in the UHS ensures a supply sufficient for long-term containment heat removal.

Under normal operating conditions, the interior of the CNV is in a dry condition under vacuum (<1 psia). The primary method of heat transfer from the outer surfaces of the RPV through the containment volume to the inner containment wall is via radiation.

The radiated heat energy conducts through the CNV wall to the exterior surface where it transfers via convection into the reactor pool water or into ambient air above the pool. Table 9.2.5-1 lists the water level in the pool during normal operations. Most of the CNV is in contact with the pool water and removes containment heat during operations. Section 9.1.3 describes the removal of the heat from the pool water by the active reactor pool cooling system.

Section 9.3.6 discusses how the CES maintains containment vacuum during normal operation. Maintaining the containment under a vacuum during normal operation minimizes heat transfer from the RPV to the CNV and minimizes the associated loss of efficiency and is used as a method to measure leakage.

During postulated primary and secondary release events into containment, the CNV collects and accumulates released inventory. Actuation of the ECCS (opening of the RVVs and RRVs) and containment isolation provides for a natural circulation coolant pathway that circulates reactor coolant inventory through the containment volume back to the RPV and through the reactor core.

In the event of a postulated MSLB or FWLB inside containment, the mass and energy released into the containment consists of the inventory present in the train with the break, including the content of the attached DHRS. The total inventory released considers the automatic isolation of the MS and FW lines and single failures. The inventory released into containment flashes, condenses, and accumulates within the CNV.

The steel wall of the CNV provides for the direct (passive) transfer of containment heat (normal, transient, or accident conditions) to the UHS. There is no reliance on active components or electrical power. The design configuration provides the ability to reliably remove containment heat immediately in an accident and for at least 30 days as described in Section 9.2.5. Section 3.1.1 and Section 9.2.5 address conformance with GDC 5.

A description of the design and operation of the ECCS is in Section 6.3. A description of the UHS design and operation is in Section 9.2.5.

2.1 Design Bases The CNV is partially immersed which facilitates removal of thermal energy from the containment for accident conditions. Following a DBE that results in containment pressurization, containment pressure rapidly reduces and remains below the design value without operator action as discussed in Reference 6.2-1.

For the postulated DBEs described in Chapter 15, containment pressure reduces cale US460 SDAA 6.2-18 Revision 1

after an accident.

The CNTS and UHS also provide LTC that removes sensible and decay heat from the reactor core and containment atmosphere following DBEs. With the exception of the backup secondary isolation valves, the containment heat removal function does not require use of nonsafety-related systems or operator support for long periods of time following an event. The containment volume predominantly operates at less than two percent of CNV design pressure during LTC, which limits the cumulative leakage of coolant inventory from the pressure boundary of the CNV.

The RXB, which is designed to withstand the effects of natural phenomena such as earthquakes, winds, tornadoes, or floods, protects the NPMs and the UHS.

The CNTS structures, systems, and components design and construction meet Seismic Category I classification guidance per RG 1.29.

The components of the CNTS that perform containment heat removal allow inspection in accordance with the intervals specified in Reference 6.2-5. The CNV design meets GDC 39 and permits appropriate periodic examinations that ensure continuing integrity and capability for heat transfer (i.e., the design allows inspection of the interior and exterior surfaces for fouling or degradation that could potentially impede heat transfer from the CNV).

The passive cooling of a CNV does not include or require active components to perform the containment heat removal function. The CNV provides a large heat transfer surface with no active components needed for heat removal to the UHS water. Reference 6.2-1 and Reference 6.2-3 describe testing of the passive containment heat removal function for LOCA conditions. The design supports an exemption from GDC 40. Section 3.1.4 addresses the exemption from GDC 40.

2.2 System Design Direct communication between two safety-related systems, the CNTS and the UHS, accomplishes passive containment cooling. The passive containment cooling function uses the steel CNV and the UHS water that surrounds most of the CNV except at the top. Containment heat removal consists of heat flow through the CNV wall to the water in the UHS. For normal operations, the UHS transfers the heat energy to the active reactor pool cooling system as described in Section 9.1.3. For accident conditions, the CNV transfers heat to the UHS, and the UHS transfers the heat to the environment as described in Section 9.2.5. For CNV cooling during accident conditions, the UHS includes the inventory of water in the reactor pool and the refueling pool and the water in the spent fuel pool above the top of the weir. Without active cooling, the water in these pools heats and evaporates into the RXB air space before release through the RXB heating, ventilation, and air conditioning system. Heat removal by the water in the UHS during passive containment cooling does not credit heat transfer to the RXB atmosphere or to the heat sinks within the RXB, such as the reactor pool liner or pool concrete. As described in Section 6.2.1, the transfer of heat energy prevents cale US460 SDAA 6.2-19 Revision 1

Section 3.8.2 describes the design features of the CNV including the dimensions, materials, penetrations, and attachments.

Protective coatings are not used or allowed in the CNV, therefore, the effects of post-accident debris generated by coatings are precluded in the design.

Section 6.3.2.4 describes conformance with RG 1.82 and the approach used to address Generic Safety Issue 191, Assessment of Debris Accumulation on Pressurized Water Reactor Sump Performance.

2.3 Design Evaluation The safety-related systems that provide passive containment cooling are the CNTS and the UHS. These systems are in the RXB, which is designed to withstand the effects of natural phenomena hazards such as earthquakes, winds, tornadoes, or floods while protecting the systems inside. In addition, the CNV and UHS withstand the safe shutdown earthquake.

Removal of heat by the CNV for an accident in an NPM occurs as the accident progresses with no operator actions required. The inventory of water in the UHS pool during power operations ensures sufficient containment heat removal capability at the start of an event. Table 9.2.5-1 provides the normal operating level range for the water in the UHS pools. Table 9.2.5-2 shows that the pool water can be lower than the normal level and provides more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of water coverage over the DHRS condensers and supports ECCS operation for a minimum of 30 days. These results indicate the conservatism in the initial inventory of water available in the UHS pools to support containment heat removal.

The Extended Passive Cooling and Reactivity Control methodology report (Reference 6.2-3) describes the LTC Evaluation Model, developed using the evaluation model development and assessment process guidelines given in RG 1.203, to evaluate long-term NPM response during ECCS operation. The LTC analyses results demonstrate that all postulated conditions that could affect the ability of the ECCS to provide adequate LTC are satisfied with respect to collapsed liquid levels, temperatures, and pressures. The results of all cases within these analyses demonstrate that the collapsed liquid level remains above the active fuel at all times, the core remains subcritical, and coolable geometry is maintained. These results demonstrate sufficient LTC capability for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, without operator action, following a DBE with ECCS operation with or without power available. Reference 6.2-3 and Chapter 15 contains further detail.

Sensitivity analysis results also demonstrate that release of non-condensable gases contained within the pressurizer does not adversely impact pool heat transfer and long term cooling conditions.

Section 6.3.2.4 describes the generation of post-accident debris, debris transport, and downstream effects considered in the design.

cale US460 SDAA 6.2-20 Revision 1

2.4 Testing and Inspection Section 6.2.1.6 provides information on the test programs for the CNV for preservice and initial plant testing (preoperational and startup). After startup, inspection in accordance with GDC 39 ensures operability and performance of the passive containment heat removal function. Periodic inservice inspection of the containment heat removal surfaces assesses surface fouling or degradation that could potentially impede heat transfer from the CNV. The inspections ensure the continuing operability of the containment surfaces that perform the heat removal function.

Inspection of the CNV heat removal surfaces is in Section 6.2.1.6.

Testing and inspection of the UHS are in Section 9.2.5.3.

2.5 Instrumentation Requirements Section 6.2.1.7 addresses instrumentation for the CNV; Section 9.2.5.4 addresses instrumentation for the UHS.

3 Secondary Containment Functional Design The NuScale Power Plant is not a dual containment design (i.e., no secondary containment function requirement) facility. Section 3.8.2, Section 6.1, and Section 6.2.1 describes the design of the CNV.

4 Containment Isolation System The RXB has up to six NPMs, and each NPM has a CNTS with a containment boundary that prevents or limits the release of radioactive materials under postulated accident conditions. The CNV and the CIVs form the containment boundary and the passive containment isolation barriers prevent releases through the penetrations in the CNV. Although there is no "containment isolation system", the CIVs for an NPM are similar to such a system for existing light water reactor plants.

Figure 6.2-1 has a cutaway view of an NPM. Figures 6.2-2a and 6.2-2b show the CNV top head and side penetrations, along with showing and listing the penetrations by nozzle number. Figure 6.2-6 is a hydraulic schematic depicting the major components of the CIV actuators. Section 6.2.4.2.2 describes the actuators in more detail.

There are 43 penetration openings in the CNV. There are the following types of penetrations:

  • mechanical penetrations for process fluids or gases - 18 total with 12 on the top head for process flows and six on the side with four penetrations for ECCS valve actuator assemblies and two penetrations for DHRS process flows cale US460 SDAA 6.2-21 Revision 1
  • I&C penetrations for signals: 12 total: four on the top and eight on the side
  • access and inspection port penetrations: nine total with one on the top head and eight on the side Note that in Table 6.2-3, there is no CNV penetration number 21; the opening of the CNV at the main flange is not a penetration opening.

Each of the CNV penetrations has the following type of component(s) forming the containment boundary.

  • Eight mechanical penetrations through the CNV top head have two primary system containment isolation valves (PSCIVs) in series outside of the CNV that stop the flow through a process flow path when the valves are closed. These lines connect to the RCPB or open to the atmosphere inside of a CNV. The reactor cooling component water lines in containment are a closed loop but not designed as a containment barrier.
  • Six mechanical penetrations through the CNV top head have a single secondary system containment isolation valve (SSCIV) on lines outside of the CNV because the piping inside of the CNV is a closed piping system and does not connect to the RCPB or the atmosphere inside of the CNV. These closed piping systems inside of the CNV are part of the containment boundary inside of the CNV, while the CIVs are part of the containment boundary outside of the CNV when the valves are closed.
  • The piping outside of the CNV welded to the two CNV nozzle safe-ends for the main steam system (MSS) lines is part of the containment boundary outside of the CNV. This piping is from the safe-end to an MSIV, an MSIBV, and the two parallel DHRS branch lines.
  • Four of the mechanical penetrations through the side of the CNV have a containment boundary formed by the ECCS valve actuator assembly that includes a sealed valve bonnet for each trip and reset valve.
  • Two of the mechanical penetrations through the side of the CNV have closed DHRS piping outside of the CNV. The piping inside of the CNV is a closed piping system and does not connect to the RCPB or the atmosphere inside of the CNV.

These closed piping systems inside of the CNV are part of the containment boundary inside of the CNV, while the closed DHRS piping is part of the containment boundary outside of the CNV.

  • Twenty-five electrical, I&C, and access penetrations have a flange opening with a bolted connection and use O-ring seals to prevent penetration leakage.

The CIVs provide for the passage of fluids and gases through the CNV penetrations used for process flows while preserving the integrity of the containment boundary and preventing or limiting the release of fission products under postulated accident conditions. Table 6.1-3 lists materials that may be used in fabrication of the CIVs.

The CIVs are in the CNTS and are not part of the various process systems that penetrate the CNV upper head. The valves have labels with the interfacing system cale US460 SDAA 6.2-22 Revision 1

[FWS], and MSS). For example, Figure 9.3.4-1 shows that the CIVs on the CVCS injection line are not part of CVCS. Figure 6.2-3 shows the same system boundary change between the CVCS and CNTS outside of containment, as well as the system boundary changes for the other process systems with lines penetrating the CNV upper head.

Figure 6.2-3 also shows the systems to which the process lines connect inside of containment (e.g., CFDS, RCS, RCCW, and the SGs). Note that the figure shows the DHRS has lines that connect to the MSS lines outside of containment and upstream of the CIVs on the MSS lines. The DHRS also has penetrations through the side of the CNV without CIVs on the line outside of the CNV.

The passive containment isolation barriers are

  • the closed piping in the MSS, FWS, and DHRS inside of the CNV.
  • the piping between a CNV safe-end and an MSIV, and main steam isolation bypass valve (MSIBV).
  • the ECCS valve actuator assemblies.
  • the DHRS closed piping outside of containment.
  • electrical penetration assemblies (EPAs) and instrumentation seal assemblies.
  • CITF covers.

Note that some of these components are not part of the CNTS, but are part of the systems that penetrate the CNV.

4.1 Design Bases The CNTS protects against the release of radioactive material to the environment as a result of an accident. The CNTS accomplishes this based in part on leakage rates being within acceptance criteria for the CIVs and passive containment isolation barriers. In addition, there is automatic actuation and closure of the CIVs when specific defined limits for process variables are exceeded. Periodic inservice inspection and testing of these containment isolation components maintains both of these capabilities. Table 6.2-3 provides a list of the containment penetrations and shows which penetrations are used for which process system fluids or gases. Table 6.2-3 lists the CIV open or closed position for normal and accident conditions.

Table 6.2-4 provides a list of the CIVs. The CIVs consist of PSCIVs and SSCIVs.

Table 6.2-4 shows the valves in each group. The PSCIVs have two valves in series on each line through containment, and the pair of valves meets the intent of GDC 55 or GDC 56. The SSCIVs have a single valve on each line (and bypass line) and meet GDC 57. The bases for meeting the GDC, or the intent of the GDC, are below, as are the exemptions needed from the GDC and their justifications.

cale US460 SDAA 6.2-23 Revision 1

Consistent with GDC 1, design, fabrication, erection, and testing of the CIVs and the passive containment isolation barriers meet the quality standards commensurate with the importance of the required safety functions. Consistent with GDC 2, these containment isolation components are in the RXB, which is designed to withstand the effects of natural phenomena hazards such as earthquakes, winds, tornadoes, and floods. The RXB protects these components from natural phenomena hazards and meet Seismic Category I requirements. A summary discussion of compliance with GDC 1 and GDC 2 is in Section 3.1.1.

Consistent with GDC 4, CIVs and barriers accommodate the effects of and are compatible with the environmental conditions associated with normal operation, maintenance, testing, and postulated accidents (including LOCAs). These CIVs and barriers protect the containment isolation components from the dynamic effects of missiles, pipe whip, and discharging fluids that result from in-plant equipment failure or from events and conditions external to the facility. Additional information addressing design criteria for preventing dynamic effects on CIVs is in Section 3.6.2.1.2. A summary discussion of compliance with GDC 4 is in Section 3.1.1.

Consistent with GDC 5, the CIVs and barriers are independent to one NPM and do not function for the other NPMs at a NuScale Power Plant. A summary discussion of compliance with GDC 5 is in Section 3.1.1.

Consistent with GDC 16, the containment isolation components (valves and barriers) isolate the penetrations and the associated fluid systems, together with the CNV, establishing an essentially leak-tight barrier against the uncontrolled release of radioactive material to the environment for as long as accident conditions require. A summary discussion of compliance with GDC 16 is in Section 3.1.2.

Consistent with GDC 54, the piping systems that penetrate the CNV have leak detection, isolation, and containment capabilities that are redundant and perform reliably considering the requirements for the type of piping described in GDC 55, GDC 56, or GDC 57, and the exemptions for these GDCs that are justified, as described below for each. A summary discussion of compliance with GDC 54 is in Section 3.1.5.

Consistent with GDC 55 except for the location of isolation valves, each line that penetrates the containment boundary and is part of the RCPB has two isolation valves in series. While GDC 55 provides the alternative of an automatic isolation valve inside and an automatic isolation valve outside containment, both automatic CIVs on these lines are outside of the CNV. A summary discussion of compliance with GDC 55 is in Section 3.1.5.

Consistent with GDC 56 except for the location of isolation valves, each line that penetrates the containment boundary and connects directly to the containment atmosphere has two isolation valves in series. While GDC 56 provides the cale US460 SDAA 6.2-24 Revision 1

A summary discussion of compliance with GDC 56 is in Section 3.1.5.

Consistent with GDC 57 except for the DHRS piping, the lines that penetrate the CNV pressure boundary and are neither part of the RCPB nor connected directly to the containment atmosphere have an automatic isolation valve located outside of containment. While GDC 57 requires at least one CIV outside of containment along with closed piping inside of containment, the DHRS containment penetrations have closed loops of MSS, FWS, and DHRS piping inside of the CNV and closed loops of DHRS piping outside of the CNV. The closed piping systems inside of the CNV are part of containment boundary inside of the CNV.

The closed DHRS piping outside of the CNV is part of the containment boundary outside of the CNV and performs this function without the need for valve actuation. A summary discussion of compliance with GDC 57 is in Section 3.1.5.

With the exception of 10 CFR 50.34(f)(2)(xiv)(E) (Section 9.3.6.1 contains the CES exemption), the CIVs, including associated controls, comply with 10 CFR 50.34(f)(2)(xiv). The design conforms to the requirements of RG 1.141 through adherence to ANS N271-1976. The provisions of ANSI/ANS 56.2-1984, Section 3.6.5 apply to penetrations with both CIVs outside containment that serve non-ESF process systems (Table 6.2-3). The design conforms to RG 1.155 station blackout requirements for CIV closure and valve position indication with respect to establishing and maintaining containment integrity and identifying valve closure status. Additional information addressing conformance with the applicable requirements of 10 CFR 50.34 and conformance with RG 1.141 is in Section 1.9.

The CIVs operate hydraulically and fail to the closed position, which is the safe position, on loss of power or loss of hydraulic pressure. Each PSCIV, FWIV and MSIV actuator is equipped with a stored energy device that applies a constant force to close the valve. This force is overcome by hydraulic power supplied by a hydraulic control skid to open the CIV as required for normal power operations.

The actuators require hydraulic fluid pressure to open the valves. On a containment isolation signal, a loss of power, or a manual close signal from the main control room, the CHPU relieves hydraulic pressure, allowing the valve to close. Upon reaching the fail-safe position, the hydraulically operated valves remain in this fail-safe position without power from the actuator until the pressurized hydraulic fluid is restored to the actuator (as depicted by Figure 6.2-6).

The actuators, position indicators, and safety-related devices required to vent the hydraulic pressure are qualified to IEEE-323, IEEE-344, and IEEE-382.

When the PSCIVs are closed, the fluid between the two valves could have heat added from the containment or external environment. Overpressure protection for this condition is incorporated in the dual valve design. The valve closest to the CNV is a single seat uni-directional design such that high pressure between the two valves is passively vented back into the CNV as shown in Figure 6.2-4.

cale US460 SDAA 6.2-25 Revision 1

4.2.1 General Description The containment pressure boundary includes the steel CNV (described in Section 3.8.2 and Section 6.1) and the CIVs and barriers that close the penetrations in the CNV. A schematic of CNV penetrations identified by penetration number is provided by Figures 6.2-2a and 6.2-2b.

The passive containment isolation barriers use the following design features.

The vertically oriented PSCIVs weld directly to their respective containment isolation test fixture (CITF) valves. All PSCIVs close upon de-energizing to isolate the CNV. The PSCIVs are a single assembly design consisting of two valves (fully independent discs, seats and actuators) within a single valve assembly.

Between a CNV and a MSIV of the MS lines, there is a tee to the DHRS piping. Unlike the other CIVs, the MSIVs and bypass valves do not attach via weld to a safe-end on the CNV top head. The tees are leak-tight based on the welded design (as described in Section 3.6.2.2 and as shown in Figure 6.2-5a).

The ECCS valve actuator assemblies attach via weld on the outside of the CNV to a nozzle safe-end. The containment boundary is the body of the valve actuator assembly (valve manifold) and a sealed valve bonnet. Each trip and reset valve assembly has double metal O-ring seals with a port between the seals for periodic seal leak rate testing.

The DHRS closed piping outside of the containment is leak-tight based on the welded design described in Section 5.4.3. The piping design meets ASME BPVC,Section III, Class 2, Subsection NC requirements, and the applicable criteria of Nuclear Regulatory Commission Branch Technical Position 3-4, Revision 2, as described in Section 3.6.2.

The flange connection closures on the CNV are the covers for the access and inspection ports, manways, and electrical penetrations assemblies (EPAs and instrument seal assemblies (ISA)). The closure flanges have double metal O-ring seals with a port between the seals for periodic testing of the seal leakage rate.

The containment isolation components with moving parts are the CIVs, which function to provide a means of isolating process flow paths that are not required for safe shutdown or accident mitigation and that pass through containment penetrations. These valves minimize the release of fission products to the environment during DBEs while allowing process flows into and out of the CNV during normal operations.

The CNTS includes instruments that provide signals, along with the instruments in the various process systems, to the MPS, which has the control logics necessary to generate an actuation signal to isolate the appropriate cale US460 SDAA 6.2-26 Revision 1

Two barriers provide containment isolation of process piping lines. Lines that communicate directly with the RCPB or with the containment atmosphere have two redundant isolation valves. Except for the DHRS, the lines penetrating the containment boundary that are not part of the RCPB or connected directly to the containment atmosphere have one isolation valve outside of the CNV with the closed system piping inside of containment functioning as the inner containment boundary. For the DHRS piping system, the closed loops inside and outside of containment function as the two containment boundaries.

The CNTS components and barriers classification is by safety, quality group, and seismic category. The CIVs, their valve actuators, and their penetration safe-ends are safety-related and Seismic Category I. The CIVs connected to lines that directly contact the reactor coolant are Quality Group A. The other CIVs (i.e., those connected to lines that are open to the containment atmosphere or that form a closed loop inside containment) are SSCIVs and are Quality Group B, as shown in Table 6.2-3. With the exception of the DHRS, neither accident mitigation nor safe shutdown requires the process systems that penetrate the containment pressure boundary. The tertiary isolation valves on the chemical and volume control (CVC) lines outside of the chemical and volume control CIVs are nonsafety-related and Seismic Category I, and are Quality Group C. Table 6.2-4 identifies SSC classifications for CNTS. The CFDS and CVC injection CIVs can be opened from the main control room during an active containment isolation signal for inventory makeup following a beyond design-basis event (BDBE) as discussed in Chapter 19.

Actuation of the isolation function does not require electrical power. The valves close upon de-energization to perform the containment isolation function. In addition, as shown in Table 7.1-4, the MPS actuates the CIVs upon detection of low AC voltage to the battery chargers.

The CIVs are attached to the top head of the CNV and are external to the CNV. The CIVs have position indication available in the main control room.

The PSCIVs consist of the isolation valves that meet the intent of GDC 55 or 56 requirements and justify an exemption from these GDCs. The PSCIVs on the RCS injection (CVCS makeup), RCS (CVCS) pressurizer spray, RCS discharge (CVCS letdown), and RCS (CVCS) high point degasification lines satisfy the intent of GDC 55 for isolation of lines penetrating the containment that are part of the RCPB. Although GDC 55 specifies as an acceptable alternative that one isolation valve needs to be inside and one outside of containment, the design provides two isolation valves in a single valve body outside of containment welded to a CITF, which is welded to a CNV nozzle safe-end. The benefits of this approach includes minimizing piping between valves and between the vessel and the valve. This minimizes RCPB welds outside of containment and precludes a pipe break or piping leakage between cale US460 SDAA 6.2-27 Revision 1

atmosphere in a CNV. These benefits justify an exemption from GDC 55. The vertically oriented PSCIVs are welded directly to their respective containment isolation test fixture (CITF) valves. All PSCIVs close upon de-energizing to isolate the CNV. The PSCIVs are a single assembly design consisting of two valves (fully independent discs, seats and actuators) within a single valve assembly.

The PSCIVs on the CES and CFDS lines also justify an exemption and satisfy the intent of GDC 56 for isolation lines penetrating the containment that are connected directly to the containment atmosphere. Although GDC 56 specifies as an acceptable alternative that one isolation valve needs to be inside and one outside of containment, the design provides two isolation valves in a single valve body outside of containment welded to a CITF which is welded to a CNV nozzle safe-end. The benefits of this approach includes minimizing piping between valves and between the vessel and the valve. This minimizes welds outside of containment and precludes a pipe break or piping leakage between the vessel and a valve. Also, this approach removes a hydraulically-operated valve from inside of containment and keeps the valve out of the post-accident atmosphere in a CNV. These benefits justify an exemption from GDC 56.

The PSCIVs are on the RCCW lines because these lines are not credited as a containment boundary even though the lines form a closed loop inside containment and do not connect to the RCPB and do not open to containment atmosphere. While a single CIV is sufficient for these lines to meet GDC 57, two CIVs in series are provided.

The design configuration for the DHRS satisfies GDC 57 with the exception that closed loop piping provides an isolation barrier outside of containment rather than an isolation valve. The design configuration for DHRS piping does not comply with the GDC 57 criteria for an isolation valve for each containment penetration with a closed piping loop inside of containment. An exemption from GDC 57 is based on the design of the DHRS piping. GDC 57 requires at least one CIV outside of containment along with closed piping inside of containment. For the DHRS containment penetrations, the closed loops of piping inside of containment and closed loops of piping outside of containment justify an exemption from GDC 57.

The SSCIVs consist of the MSIVs, the MSIBVs, and the FWIVs. These CIVs satisfy GDC 57 for isolation of lines penetrating the containment that are not part of the RCPB and are not open to the containment atmosphere.

As shown on Figure 6.2-5a, each line with an MSIV has an MSIBV in a parallel flow arrangement to bypass an MSIV. The MSIBV is a normally open valve that is in a parallel flow path with the larger diameter MSIV. The MSIBV introduce steam for secondary system startup before opening the MSIVs.

General Design Criterion 57 requires closed system isolation valves to be as cale US460 SDAA 6.2-28 Revision 1

As shown on Figure 6.2-5b, a FWIV and FW nozzle check valves are in the same valve body. These valves weld to a CITF which is welded to the CNV nozzle safe-end. The purpose of the FWIV is for containment isolation and to provide a DHRS pressure boundary. The feedwater nozzle check valve closes more rapidly (<1 second) than the FWIV during an FWLB outside containment. The safety function of the check valve is to close quickly to preserve DHRS inventory.

The CNTS design does not include instrument lines containing process fluids penetrating the containment boundary. Pressure, temperature, level, and flow sensors that monitor processes within an NPM are inside the containment pressure boundary with digital or analog signals coupled to equipment outside of the CNV for processing. The design conforms to GDC 55 and 56 and to the guidance of RG 1.11 by restricting the instrumentation process lines to within the containment pressure boundary.

4.2.2 Component Description The valves used to isolate process lines penetrating the containment are of two basic designs. One design consists of a configuration of two valves (obturators) contained within a single valve body used for the PSCIVs. The second design is a single valve design used for SSCIVs.

As shown in Figure 6.2-4, the dual-valve, single-body PSCIV design consists of two valves (fully independent balls, seats, and actuators) within a single valve body welded to a CIFT which is welded to a CNV nozzle safe-end.

In accordance with the regulatory requirements for redundancy, each PSCIV assembly contains two independent balls and actuators. The single body design welded to a CITF places the inboard CIV as close to the CNV as possible and eliminates the potential for a line break between the two valves in series. Independent divisions of the MPS provide the I&C for each valve within a PSCIV assembly.

The PSCIVs connected to lines that directly contact the reactor coolant (i.e.,

GDC 55 lines - RCS injection, RCS discharge, pressurizer PZR spray, and RPV high-point degasification) during normal operation are Quality Group A components with design, fabrication, construction, testing, and inspection in accordance with the ASME BPVC,Section III, Class 1, Subsection NB and Seismic Category I criteria.

The PSCIVs on the RCCW, CES, and CFDS lines connect to lines that directly contact the containment atmosphere (i.e., GDC 56 lines) or to lines that form a closed loop inside the containment (i.e., GDC 57 lines) and are Quality Group B components. These PSCIVs are ASME BPVC Class 2.

cale US460 SDAA 6.2-29 Revision 1

maintenance, repair, or replacement.

The SSCIVs, design, fabrication, construction, testing, and inspection conform with the ASME BPVC,Section III, Class 2, Subsection NC, Quality Group B, and Seismic Category I criteria. The FWIVs, FW check valves, MSIVs, and MSIBVs satisfy these criteria. The MSIVs and MSIBVs attach via weld directly to a CNV top head nozzle safe-end. The FWIVs and FW check valves are in a common valve body and weld to a CITF which is welded to a CNV top head nozzle safe-end. The SSCIV designs include provisions to preclude thermal binding and pressure locking.

When the FWIVs actuate to close, the FW check valves close first. The FWIVs then close and fluid between the FWIVs and FW check valves could heat up.

The dual valve design considers design overpressure for this condition. As the fluid heats up and expands, the pressure relieves passively through a small port in the check valve disk. Section 3.9.6.3.2 addresses check valve exercise testing requirements for this passive overpressure feature. The closed exercise test verifies the valve is within a flow range that verifies that the valve is closed, and that the disk port is clear and is passing fluid.

The PSCIV materials, including weld materials, conform to fabrication, construction, and testing requirements of ASME BPVC,Section III, Subsection NB or NC for the respective class valves. The materials selected for fabrication conform to the applicable material specifications provided in ASME BPVC,Section II and meet the requirements of ASME BPVC,Section III, Article NB-2000 or NC-2000 for the respective class valves. The SSCIV and MS piping materials, including weld materials, conform to fabrication, construction, and testing requirements of ASME BPVC,Section III, Subsection NC. The materials selected for fabrication conform to the applicable material specifications provided in ASME BPVC,Section II and meet the requirements of ASME BPVC,Section III, Article NC-2000. The PSCIVs, SSCIVs, and MS piping are constructed of materials with a proven history in light water reactor environments. Surfaces of pressure retaining parts of the valves, including weld filler materials and bolting material, are corrosion resistant materials such as stainless steel or nickel-based alloy.

Attachment welding of the PSCIVs uses procedures qualified in accordance with the applicable requirements of ASME BPVC,Section III, Subarticle NB-4300 or NC-4300 for the respective class valve and Section IX.

Welding of the SSCIVs and MSIV and MSIBV valve assemblies use procedures qualified in accordance with the applicable requirements of ASME BPVC,Section III, Subarticle NC-4300 and Section IX.

When the PSCIVs close, the fluid between the two valves could heat up. The dual valve design considers design overpressure for this condition is addressed in the valve design. In this manner the PSCIV design includes provisions to preclude pressure locking. Hydraulic-operated valve performance assessment testing in Section 3.9.6 addresses testing cale US460 SDAA 6.2-30 Revision 1

The PSCIV design provides provisions for Appendix J, Type C testing via the use of the CITFs that allow the pressurization of each of the two valves (Figure 6.2-4).

Both PSCIV and SSCIV designs use hydraulic actuators. Each actuator has a hydraulic cylinder applying opening force to the valve and a stored energy device (pneumatic bottle or mechanical spring) applying closing force to the valve. To open the valve, hydraulic pressure increases, exceeding the force applied by the passive stored energy device. To close the valve, pilot valves vent hydraulic fluid, allowing the stored energy device force to exceed the hydraulic pressure force. The PSCIV and SSCIV designs and qualifications require that torque closure provide a sealing that prevents reopening and unseating of each ball valve for the extended time period for the design basis and beyond design basis functions assumed for each individual ball valve.

The hydraulic cylinders are pressurized by a hydraulic skid and vented by redundant safety related pilot valves. The hydraulic skid is safety-related; however, the only safety-related components contained on the skid are the safety-related pilot valves and associated vent path. Testing requirements for hydraulic skid-mounted components are in Section 3.9.6.

The CIV actuators interface with a central hydraulic power unit (CHPU). A simplified hydraulic schematic of the actuator to CHPU interface is provided by Figure 6.2-6. Non-safety related electrical equipment does not prevent the CIVs from opening.

The CIV actuators subassembly contain a separate stored energy device that provides the required motive force to close the valves in the required stroke time, when the hydraulic pressure is removed. Hydraulic pressure is removed either a loss of power to the CHPU solenoids or hydraulic fluid loss such as a hydraulic line break. Electrical power to the actuator is not required to close the CIVs.

The MPS controls the hydraulic pressure venting as described in Chapter 7.

4.2.2.1 Piping Systems Connected to the Reactor Coolant Pressure Boundary A dual valve, single body PSCIV provides isolation of each containment penetration that is part of the RCPB (RCS injection, RCS discharge, RCS high point degasification and pressurizer spray).

When closed, the PSCIVs isolate the reactor coolant in the primary systems that penetrate the CNV from the outside environment. In accordance with regulatory requirements for redundancy, two separate valves are in each single valve body.

cale US460 SDAA 6.2-31 Revision 1

conditions that require containment isolation. These valves also close under loss of power.

The CNTS components also include reverse flow valves on the CVC influent lines. The CVC discharge line contains an air operated isolation valve, located downstream of the CIVs. The CVC injection line and the pressurizer spray line each contain a reverse flow check valve upstream of the CIVs. The RPV high point vent degasification line contains a solenoid valve downstream of the CIVs.

4.2.2.2 Piping Systems Open to the Containment The design includes two systems that penetrate the containment boundary and are open to the containment atmosphere: CES and CFDS.

Isolation of the CES and CFDS lines use the same type of dual valve, single body PSCIV. The PSCIVs on the CES and CFDS lines do not connect to the RCPB; these PSCIVs are ASME BPVC Class 2 valves.

When closed, the PSCIVs isolate the containment atmosphere from the CES and CFDS lines outside of the CNV. In accordance with regulatory requirements for redundancy, two separate valves are in a single body.

Independent divisions of the MPS provide the instrumentation and control for each valve within a dual valve, single body PSCIV. Each PSCIV remotely operates from the main control room and automatically closes upon an isolation signal or loss of power.

4.2.2.3 Piping Systems Closed to Containment and not Connected to the Reactor Coolant Pressure Boundary Each closed piping loop inside of the CNV for a system penetrating the containment boundary that is neither part of the RCPB nor connected directly to the containment atmosphere has an SSCIV that is a single CIV outside of containment or has a closed loop of piping outside of containment. The closed piping loop inside containment serves as one of the two containment boundaries necessary to meet the containment isolation design requirements.

Each of the following systems is a closed piping loop inside of the CNV that penetrates the containment boundary:

  • MSS lines (single SSCIV)
  • FWS lines (single SSCIV)
  • DHRS piping (closed piping loop outside of containment) cale US460 SDAA 6.2-32 Revision 1

flow path for the DHRS.

Each MSIV and MSIBV welds directly to a CNV top head nozzle safe-end.

The closed loop section of the piping inside containment conforms to ASME BPVC,Section III, Class 2, Subsection NC criteria.

The SSCIVs on the MS and FW lines are Seismic Category I, Quality Group B components capable of remote operation from the control room.

The SSCIVs meet the requirements of ASME BPVC,Section III, Class 2, Subsection NC criteria.

Each SSCIV remotely operates from the main control room and automatically closes under accident conditions that require containment isolation. Each valve has remote position indication in the main control room. The valves also close under loss of power.

The RCCW cooling water lines have CIVs that are of the dual valve, single body design. These valves are Quality Group B, ASME BPVC,Section III, Class 2, Subsection NC. The RCCW piping and pressure retaining components inside containment form a closed loop and have design, fabrication, construction, testing, and inspection to ASME BPVC, B31.1 and are part of the CRDS. The CIVs for these RCCW lines are ASME BPVC Class 2 components. The isolation valves weld directly to the CITF which is welded to the CNV top head nozzle safe-end.

When closed, the PSCIVs on the RCCW lines isolate reactor component cooling water system piping to and from the CRDMs.

Each PSCIV on a RCCW line operates remotely from the main control room and automatically closes under accident conditions that require containment isolation. The main control room provides valve position. The valves close under loss of power.

The DHRS is a passive engineered safety system that relies on natural circulation to remove heat from the RCS through the SG and reject heat to the reactor pool. Containment isolation uses closed loop Seismic Category I, Quality Group B, ASME BPVC Class 2 piping inside and outside of the containment boundary.

The DHRS steam side piping branches off each CNV safe-end upstream of an MSIV. Each DHRS steam supply line contains two actuation valves in parallel that are normally closed during operation.

The FWIV assembly includes a safety-related check valve housed in the same valve body as the SSCIV. The FWIV check valve closes more rapidly than the FWIV in the event of an FWLB outside containment to preserve DHRS inventory. Figure 6.2-5b depicts the FWIV assembly.

cale US460 SDAA 6.2-33 Revision 1

The DHRS piping outside of containment performs the isolation function and establishes the containment boundary outside of containment without the need for valve actuation. Section 5.4.3 provides a description of the DHRS.

4.2.3 System Operation The components forming the containment boundary for the containment penetrations in these piping systems provide two independent means of isolating fission products from beyond the outer containment boundary. The designs for the PSCIVs and SSCIVs allow for normal operation of the systems shown in Figure 6.2-3 and automatic isolation of the valves for accident conditions that require containment isolation. Each CIV is fully closed within 10 seconds after power is removed from the actuator. The designs of the CIVs permit periodic operability and leak testing. Section 6.2.4.4 and Section 6.2.6 further discuss testing details.

4.3 Design Evaluation The containment isolation function prevents the release of radioactive materials with an essentially leak-tight barrier. The integrity of the CNV along with isolation of the penetrations for the CNV accomplishes this purpose with consideration of containment isolation actuation and control logic, valve actuation and control features, and valve closure times.

The seismic classification of CNTS components is given in Section 3.7. The CIVs conform to ASME BPVC,Section III and meet Group A or Group B quality standards, as defined in RG 1.26. Components that serve as part of the RCPB meet Group A quality standards. Section 1.9 discusses conformance with RG 1.26.

Section 3.2 describes quality standards applicable to the respective quality groups.

The placement of CIVs within the RXB structure protects them from external hazard effects. Section 3.4 (flooding), Section 3.5 (missiles), Section 3.6 (pipe rupture), Section 3.7 (earthquake), and Section 9.5 (fire) addresses protection from internal hazards. Section 3.11 addresses environmental qualification of CNTS components.

There is redundant containment isolation of the lines penetrating containment.

Two barriers in series provide isolation of each piping penetration; the barriers consist of either two redundant CIVs outside of containment, a CIV outside of containment combined with a closed piping system inside of containment, or a closed piping system outside of containment and a closed piping system inside of containment. With this arrangement, no single active failure prevents containment isolation of a piping penetration. There are redundant containment boundary valves and barrier components; each isolation valve and barrier arrangement cale US460 SDAA 6.2-34 Revision 1

The isolation valve and barrier arrangements satisfy the intent of GDC 54, GDC 55, GDC 56, and GDC 57 and conform to applicable portions of RG 1.141 through adherence with ANS N271-1976. The provisions of ANSI/ANS 56.2-1984, Section 3.6.5 apply to penetrations with two redundant CIVs outside containment that serve non-ESF process systems. Section 1.9 addresses conformance with RG 1.141.

Where a CIV provides the isolation boundary, the valve fails to the safe (isolate) position on loss of hydraulic pressure, loss of signal, or loss of power to the actuator.

Redundant safety-related divisions of MPS power CIV actuator vent solenoid valves. Section 7.1 discusses redundancy in the I&C system for the containment isolation system (CIS).

The fail-safe feature of the CIVs and passive containment cooling design ensures maintenance of containment integrity in the event of a station blackout. The containment isolation function initiates upon loss of power, and the isolation valves remain closed for the duration of DBEs. The passive cooling design of the NPM provides a reliable coping capability that achieves safe shutdown and maintains core cooling and containment integrity for an indefinite duration, independent of AC power sources.

The closed piping systems credited for containment isolation boundaries within the containment withstand CNV design conditions for external design pressure and temperature and the environmental effects resulting from a LOCA. There are protections for the closed piping systems against LOCA effect missiles, pipe whip, and jet forces. The qualification of the closed piping inside containment also considers differential pressure, maximum humidity, a steam-laden atmosphere, and the presence of chemical additives in the atmosphere.

The closed DHRS piping loops outside of containment that do not include an isolation valve, are designed to withstand reactor vessel design pressure and temperature. The piping forms a passive containment isolation barrier located outside of containment and functions under the most adverse anticipated environmental conditions to which the piping may be exposed.

The piping systems that penetrate containment have leak detection, isolation, and containment capability having redundancy, reliability, and performance capabilities commensurate with the containment isolation function. Section 6.2.6 addresses leakage detection capability and the leakage detection test program.

Section 3.9.6 discusses the CIV operability tests. Section 7.1 discusses redundancy and reliability of the CIV actuation system. Taken together, these programs establish the overall reliability of the CIVs.

The containment penetrations associated with systems not required for safe shutdown or accident mitigation isolate automatically upon a containment isolation actuation signal. The isolation signal is an engineered safety features actuation cale US460 SDAA 6.2-35 Revision 1

the operation of the ESF systems, including the initiation of the containment isolation function. Section 7.1 discusses the design-basis of the MPS.

The control systems are able to reset an isolation signal without automatically reopening the valves. Deliberate operator action performs an override control function after actuation signal reset. Reset does not automatically cause any isolation valve to change position. The design precludes the reopening of more than one CIV at a time. Reopening of isolation valves is valve by valve or line by line.

Actuation of the containment isolation function consists of the closure of the CIVs on the MSS, FWS, RCCW system, CVCS, CES, and CFDS lines. As shown in Table 7.1-4, an ESFAS containment system isolation actuation signal initiates on high containment pressure, low pressurizer level, low-low pressurizer level, low AC voltage to the battery chargers, or high under-the-bioshield temperature.

Discussion of the redundancy and diversity of the instrumentation relied upon to initiate the containment isolation function is in Section 7.1.

Closure times for CIVs minimize the release of containment atmosphere to outside of the containment boundary and mitigate offsite radiological consequences by providing a rapid response to a closure signal, in accordance with GDC 54. CIVs close within ten seconds from the time when the power is removed from the actuator. Closure times for the isolation valves are independent of containment back-pressure considerations. Valve closure times consider the instrument delay time, actuation signal setpoint, and time to be in the fully-closed position.

The PSCIVs and SSCIVs actuate to the fully closed position within ten seconds from the time of de-energization.

The PSCIVs stop fully developed pipe break flow for both steam and liquid conditions within the ten second total valve closure time. The basis for these flow conditions bounds the expected range of flows.

The MSIVs stop fully developed pipe break flow for steam conditions within the ten second total valve closure time. These flow conditions bound the expected range of flows. The MSIBV closes within ten seconds of receipt of a closure signal or loss of power.

The FWIVs stop fully developed pipe break flow in both the forward and reverse directions within the ten second total valve closure time.

The main control room provides the open or closed status of CIVs.

Chapter 15 discusses the effects and consequences of events that require the containment isolation function. The containment pressure and temperature cale US460 SDAA 6.2-36 Revision 1

The MPS conforms with 10 CFR 50.34(f)(2)(xiv) in that it provides signal diversity for the containment isolation function.

The PSCIVs, SSCIVs, and safety-related instrumentation that support the containment isolation function ensure that no single failure can result in loss of the protective function.

Section 3.9.6.3 and Section 6.2.6 detail that the design provides the capability to periodically test the CIVs for leakage and functionality.

4.4 Tests and Inspections The CIVs and barrier components permit the required inspections and performance of tests to ensure that functional capability of the components is maintained under DBA conditions.

The PSCIVs connected to lines that directly contact reactor coolant undergo inspection as Class 1 components, and those that directly contact the containment atmosphere or form a closed loop inside containment undergo inspection as Class 2 components. The SSCIVs undergo classification and inspection as Class 2 components. Preservice and ISI requirements associated with the PSCIVs ASME BPVC Class 1 components are in Section 5.2. Preservice and ISI requirements associated with the SSCIVs and MS piping meet the applicable inspection requirements of Reference 6.2-5. The SSCIVs and MS piping components design ensures performance of the ISI requirements of Reference 6.2-5, including the preservice inspections of ASME BPVC Section III.

The periodic inspections and testing programs meet ASME BPVC and Operations and Management (OM) Codes in accordance with 10 CFR 50.55a.

4.4.1 Initial Functional Testing A description of initial test programs, including tests for the CIVs and barriers, is in Chapter 14.

CIVs allow testing through the entire sequence initiated by a containment isolation signal. The CIVs close within ten seconds from the time when the power is removed from the actuator.

4.4.2 Periodic Operability Testing Section 6.2.6 describes the establishment and verification of the leak-tight integrity of the CNV and the isolation valves and barriers. Additional information addressing the IST of containment isolation components is in Section 3.9.6.3.

cale US460 SDAA 6.2-37 Revision 1

Section 6.2.6 and Section 6.6 contain details on testing features that provide for containment leak rate tests according to 10 CFR 50, Appendix J, for the CNV penetrations.

Plant technical specifications specify the periodic leak rate testing and inspection and surveillance testing requirements for the CNV and the CIVs and barriers.

4.5 Instrumentation and Control Instrumentation and controls covering the anticipated range of normal operation, anticipated operational occurrences, and accident conditions for the variables that could affect containment isolation and associated systems ensure adequate safety. The protection system senses operating conditions and automatically initiates the actuation of the CIVs and other components or systems needed for accident mitigation. Section 6.2.1.7 provides details on containment instrumentation and their functions. The I&C system provides manual control capability to mitigate the consequences of faulted conditions at the division level.

The design integrates the safety system parameters and capabilities into the control room design and displays. The CIV position indication is in the main control room. Two redundant MPS divisions that transmit the system information to the safety display and indication system displays provide control room indication. The safety display and indication system provides the continuous indication of system status and supports manual initiation of protective actions, if required.

To satisfy single failure requirements, containment isolation signals actuate by either of two redundant hardwired switches located in the main control room for each module, one per ESFAS signal division. Using two-out-of-four logic, each division actuates one of a pair of redundant isolation valves. The ESFAS signal generates a containment isolation signal on low and low-low pressurizer level, high narrow range containment pressure, low AC voltage, and high under-the-bioshield temperature.

When plant conditions allow, the operator can manually reset the division level actuation signal and reposition the isolation valves. Operator action occurs only after the equipment has fully actuated to the required position by the ESF safety function.

Section 7.1 contains further details on the fundamental design principles of I&C, and Section 7.2.12 for details on automatic and manual control.

5 Combustible Gas Control in the Containment Vessel The NPM design controls combustible gases to prevent hydrogen combustion inside containment following a severe accident. The combustible gas control requirements for future water-cooled reactor designs that have a potential for the production of cale US460 SDAA 6.2-38 Revision 1

5.1 Design Bases In compliance with 10 CFR 50.44(c)(1), the CNV maintains a mixed containment atmosphere during design-basis and significant BDBE. Adequate mixing of the CNV occurs by virtue of temperature differences between the annular and head regions of the CNV and its partially immersed design with no sub-compartments that could facilitate separation, coupled with the dynamic nature of events associated with RCS discharge to the CNV (e.g., LOCA or inadvertent ECCS valve opening events).

The design includes a passive autocatalytic recombiner (PAR) that is non-safety related, seismic Class 2 with augmented requirements. The PAR is designed to survive severe accident conditions and the environment in which the PAR is relied upon to function. The PAR is sized to limit oxygen concentrations to a level that does not support combustion (less than four percent). This results in an inert containment atmosphere, thereby satisfying 10 CFR 50.44(c)(2) and 10 CFR 50.44(c)(3).

The design supports an exemption from the 10 CFR 50.44(c)(4) requirements for monitoring combustible gases during an accident.

The NPM relies on a PAR to maintain the containment atmosphere inert through the continuous consumption of oxygen generated post-accident.

Following a BDBA, the containment is oxygen-limited. The sources of oxygen are from the initial quantities in the reactor coolant system controlled by the Primary Coolant Chemistry Program and through radiolytic decomposition of water.

Inerting is accomplished solely by the PAR recombining oxygen; no inert gas is added to the containment during operations or post-accident. The PAR has adequate capacity to maintain the containment oxygen concentration below four percent by volume.

The design does not rely on hydrogen monitoring to assess core damage. The radiation monitors under the bioshield and core exit thermocouples provide the ability to assess core damage.

The design relies on the PAR to maintain an inert containment atmosphere following a severe accident, therefore an analysis of the effects of combustion on containment integrity is not necessary. The PAR is a reliable passive device that self-actuates to recombine oxygen and hydrogen present in the surrounding environment. The NPM is not susceptible to de-inerting. The PAR is designed to function in the severe accident environment for which it is intended. Section 19.2 evaluates a bounding BDBE case that produces more hydrogen than the 100 percent clad water reaction would and determines that the CNV does not exceed its design pressure. Therefore, the design conforms to the requirements of 10 CFR 50.44(c)(5).

cale US460 SDAA 6.2-39 Revision 1

demonstrate compliance with paragraph (f)(3)(v).

The PAR maintains the containment inert post-accident. The systems and components within the CNV that establish and maintain safe shutdown or support containment structural integrity remain capable of performing their required functions after BDBEs.

Section 6.3 addresses hydrogen generation criteria associated with the ECCS performance criteria requirements of 10 CFR 50.46.

Consistent with GDC 5, the design relies on passive control of combustible gases that does not involve sharing between NPMs.

The PAR maintains the containment inert post-accident. Implementation of the requirements of 10 CFR 50.44, as modified by an exemption, meets the requirement of PDC 41 to provide systems to control, as necessary, the concentration of hydrogen and oxygen to ensure containment integrity.

Section 1.9 addresses compliance with guidance in RG 1.7.

5.2 System Design The CNV is a metal containment, Class MC pressure vessel that undergoes design, analysis, fabrication, inspection, testing, and stamping as an ASME BPVC Class 1 pressure vessel maintained partially immersed in a reactor pool common to other NPMs.

The CNV meets 10 CFR 50.44(c) by safely accommodating the hydrogen generated by the equivalent of up to a 100 percent fuel-cladding metal water reaction. This type of accident is a BDBE in which hydrogen generation could exceed the flammability limits. The CNV is a passive design that relies on a PAR to maintain a containment atmosphere that does not support combustion following a significant BDBE for combustible gas control.

The CES establishes a partial vacuum in the CNV before NPM startup that continues during reactor operation. The initial CNV pressure contributes to calculations that result in the initial combustible gas composition in the CNV based on the initial CNV pressure. Section 9.3.6 addresses the CES.

When RCS discharge to the containment occurs, the dynamic nature of the event creates a mixed atmosphere because of the induced high turbulent condition. As turbulence subsides later in the event, continued mixing occurs through convection and molecular diffusion. There are no partitions or subcompartments to impede these natural mixing forces. Relevant events ensure convective mixing due to decay heat. Section 6.2.5.3 discusses turbulence in the CNV. The analysis shows that turbulent convective mixing exists in the CNV throughout the first 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of a DBE or BDBE.

cale US460 SDAA 6.2-40 Revision 1

equivalent amount of hydrogen generated from a 100 percent fuel clad-coolant reaction, uniformly distributed. The configuration of the containment coupled with the dynamics of the LOCA and mitigating components ensures adequate mixing within the containment volume during and following events that generate and release combustible gases to containment. Section 6.2.5.3 discusses potential methods of gas accumulation. The limited-oxygen environment and mixed atmosphere maintains an inerted containment atmosphere, thereby precluding combustion that could challenge containment structural integrity.

As described in Section 6.2.5.3, there is margin to the containment pressure capacity limit such that there is no need for containment overpressure protection.

Section 6.2.5.5 addresses combustible gas monitoring.

5.3 Design Evaluation The partially immersed design with no sub-compartments that could facilitate separation, coupled with the dynamic nature of events associated with RCS discharge to the CNV (e.g., LOCA or inadvertent ECCS valve opening events) ensure adequate mixing of the CNV. To demonstrate compliance with the 10 CFR 50.44(c) requirement for a well mixed containment, CNV conditions at 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> are evaluated. Conditions earlier than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> are generally more turbulent than conditions afterward. The nondimensional Rayleigh (Ra) number, which represents whether the fluid heat transfer is primarily conductive or convective, evaluates mixing. A transition to bulk turbulent conditions occurs in a tall vertical cavity with a hot surface and a cool surface (in air) somewhere between Ra = 10,000 and Ra = 100,000. At 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in the CNV, post-accident Ra exceeds this transition regime by at least one order of magnitude, thereby demonstrating a well mixed volume.

Safety analyses show that the core does not uncover during a design-basis LOCA and as a result there is no fuel damage or fuel clad-coolant reaction that would result in an associated production and release of hydrogen or fission products.

The risk-informed revision of 10 CFR 50.44 (68 FR 54125) eliminates the design-basis LOCA hydrogen release from the combustible gas control requirements of 10 CFR 50.44.

An evaluation for the potential for combustible gas (hydrogen and oxygen) accumulation in the containment during and following postulated BDBEs was performed. The evaluation considered those BDBEs an intact containment boundary and resulting in varying degrees of core damage. One example of this type of BDBE is a LOCA inside containment with an ECCS failure that prevents the recirculation of coolant from the CNV back into the RPV. This scenario results in uncovering the reactor core with resulting fuel damage. Uncovering the reactor core can result in the production of a significant amount of hydrogen due to high temperature cladding-fuel interaction with additional amounts of hydrogen and oxygen produced from radiolytic decomposition of the reactor coolant that cale US460 SDAA 6.2-41 Revision 1

  • the amount of hydrogen accumulated in the upper region of the RPV (i.e., the pressurizer).

Within the CNV, the design restricts materials that have the potential to yield hydrogen gas because of contact with liquid contents in the CNV (upon ECCS actuation or other condition involving liquid in containment). Section 6.1 identifies any such materials.

Following a BDBE that releases an equivalent amount of hydrogen as would be generated from a 100 percent fuel clad-coolant reaction, the PAR is sized to maintain oxygen at a level (less than four percent) that does not support hydrogen combustion. Therefore, there is no hydrogen combustion, ensuring CNV integrity.

5.4 Inspection and Testing Section 3.8.2.7, Section 6.2.1, Section 6.2.2, Section 6.2.4, Section 6.2.6, Section 6.2.7, Section 6.6, and Section 14.2 describes inspection and testing of the CNV and its components.

5.5 Instrumentation Hydrogen and oxygen analyzers are within the containment sampling system portion of the process sampling system. During normal operation, the containment gas discharge from the CES vacuum pumps routes to the containment sampling system sample panel for online analysis of hydrogen and oxygen concentrations with indication in the main control room.

The CES isolates during DBAs and BDBEs. Because the design precludes a combustible atmosphere, monitoring of hydrogen concentration following a significant BDBE is not necessary for successful combustible gas control in the CNV.

6 Containment Leakage Testing Provisions for containment leakage rate testing (CLRT) permit verification of the leak-tight integrity of the reactor containment. The CIVs on CNV piping penetrations and the passive containment isolation barriers permit the periodic leakage testing described in GDC 53 and GDC 54 ensure that leakage through the CNTS and components does not exceed the allowable leakage rate specified in Technical Specifications. Section 3.1 further describes compliance with GDC 52, GDC 53, and GDC 54. The design supports an exemption from the GDC 52 requirement to design the containment for integrated leak rate testing, as well as from the 10 CFR 50 cale US460 SDAA 6.2-42 Revision 1

The design of containment penetrations supports performance of local leak rate tests (Type B and Type C tests) in accordance with the guidance provided in ANSI/ANS 56.8, RG 1.163, and NEI 94-01, Rev. 3-A. The CLRT is specific to each NPM. The design, in conformance with 10 CFR 50.54(o), accommodates the 10 CFR 50 Appendix J, test frequencies of Option A or Option B, with the exception of a containment integrated leak rate test (Type A test as defined by 10 CFR 50 Appendix J, Sections II.F and III.A).

Type B and C tests occur before initial entry into Mode 4. Subsequent periodic Type B and C tests occur at a baseline frequency of at least once per 30 months until establishment of acceptable performance in accordance with NEI 94-01, Rev 3-A.

Under Option B of 10 CFR 50 Appendix J, extended test intervals are possible for Type B and C penetrations beyond the baseline frequency following the completion of two consecutive periodic as-found Type B tests, if the results of each test are within allowable administrative limits. Elapsed time between the first and last tests in a series of consecutive satisfactory performance tests shall be 24 months or the nominal test interval (e.g., refueling cycle) for the component before implementing Option B of 10 CFR Part 50, Appendix J. Test intervals may increase from greater than once per 30 months (the baseline frequency) up to a maximum of once per 120 months for Type B penetrations and once per 75 months for Type C penetrations, subject to the requirements of NEI 94-01.

L Item 6.2-1: An applicant that references the NuScale Power Plant US460 standard design will verify that the final design of the containment vessel meets the design-basis requirement to maintain flange contact pressure at accident temperature, concurrent with peak accident pressure.

As discussed by Section 6.2.6.5.2, a preservice design pressure leakage test, Type B tests and Type C tests verify the leak tightness of the reactor containment before initial operations. Type B and Type C tests occur periodically thereafter, ensuring that leakage rates through the containment, and the systems or components, that penetrate containment, do not exceed the maximum allowable leak rate.

Section 6.2.6.2 and Section 6.2.6.3 discuss Type B and Type C LLRTs. Penetrations are either ASME BPVC Class 1 flanged joints capable of Type B testing or ASME BPVC Class 1 welded nozzles with isolation valves capable of Type C testing.

An additional Type B test occurs at the main CNV flange. The pipe penetrations with CIVs, with the exception of the GDC 57 MS and FW lines, are subject to Type C testing (Reference 6.2-4).

Section 6.2.6.5 specifies details on the performance of the CNV preservice design pressure leakage test. Flange preload verifications ensure that flange bolting preloading conforms to design requirements.

Table 6.5-1 lists the specified maximum allowable containment leak rate, La, at the calculated peak accident pressure, Pa, identified in Section 6.2.1. Containment leak cale US460 SDAA 6.2-43 Revision 1

6.1 Containment Integrated Leakage Rate Test The design supports an exemption from the GDC 52 requirement to design the containment for integrated leak rate testing, as well as from the 10 CFR 50 Appendix J requirement for preoperational and periodic Type A integrated leak rate testing.

The NuScale Containment Leakage Integrity Assurance, Technical Report (Reference 6.2-4) provides the technical basis for the GDC 52 exemption.

Reference 6.2-4 contains details of the design, testing, and inspection requirements that provide reasonable assurance of continued containment leakage integrity.

6.2 Containment Penetration Leakage Rate Test The CNV supports Type B pneumatic tests (local penetration leak tests) for detecting and measuring leakage across pressure-retaining, leakage-limiting boundaries.

Preoperational and periodic Type B leakage rate testing is in accordance with 10 CFR 50, Appendix J, NEI 94-01, ANSI-56.8, and the plant Technical Specifications within the defined test intervals. The containment penetrations subject to Type B tests are in Reference 6.2-4.

The following containment penetrations are subject to preoperational and periodic Type B leakage rate tests:

  • flange openings with bolted connections
  • ECCS trip/reset valve body-to-bonnet connections CNV bolted closures have dual seals and a testing port between the seals.

CNV flange openings with bolted connections conform to ASME BPVC Class 1.

These openings have identical double seals with a test port to facilitate Type B testing by pressurizing between the seals. The main CNV flange has a similar double seal and test port arrangement. Flanges that are underwater during normal operation shall have the capability to evacuate water between the flange seals before performing any Type B test. Flanges have no excess water between the flange seals before startup.

A containment flange bolting calculation demonstrates that each containment flange, at design bolting preload, maintains flange contact pressure at accident cale US460 SDAA 6.2-44 Revision 1

connection have no separation of the flanges from the inboard seal to the containment inner surface when peak accident pressure is applied to the inside of the CNV. Flange contact provides reasonable assurance that the seal would exhibit similar flange gaps at peak accident pressure as would be shown during the Type B test. Therefore, the leakage rate measured during the Type B test would be representative of leakage at peak accident pressure.

The EPAs use an established glass-to-metal sealing technology that is not vulnerable to thermal or radiation aging, do not require periodic maintenance, and will achieve a less than minimum detectable leak rate. These EPAs are in a CNV penetration that includes a testable flange connection. Installed EPAs comply with local leak rate test acceptance criteria. The design includes the ability to test the double O-ring seals by pressurizing between the seals. An EPA would only be disassembled for modification or if leakage was indicated. The ISA is mechanical seal device for the incore instrumentation (ICI) stringer assembly. The ICI stringer assembly is a stainless steel tube containing several mineral insulated cables with imbedded detectors. When fully inserted and installed within the NPM for normal power operations, the ICI stringer assembly will penetrate both the CNV and RPV pressure boundaries. ISA compression seal fittings are used integral with the ICI stringer assembly. The ISA is a Type B testable boundary and complies with local leak rate test acceptance criteria.

There are four ECCS main actuation valves supported by twelve trip and reset valves for actuation. Each actuation valve has redundant testable seals between the valve body and bonnet. A test port between the seals facilitates Type B testing. Because the actuator valve is both a containment and RCS pressure boundary, there will be a seal test to RCS pressure proving that on the ECCS trip/reset actuator valve seals. Section 5.2.4.1 contains the details of the seal test that is performed.

Type B tests involve local pressurization at containment peak accident pressure, Pa, using either the pressure-decay or flowmeter method of detection. For the pressure-decay method, a test volume pressurizes with air or nitrogen to at least Pa. The monitored rate of decay of pressure in the known test volume allows calculation of a leakage rate using the pressure-decay method. For the flowmeter method, makeup air or nitrogen through a calibrated flowmeter maintains the required test pressure in the test volume. The flowmeter fluid flow rate is the leakage rate from the test volume.

In accordance with 10 CFR 50 Appendix J, Type B tests occur during each reactor shutdown for refueling, or other convenient intervals in accordance with the Technical Specification Containment Leakage Rate Testing Program.

cale US460 SDAA 6.2-45 Revision 1

The CNV and CIVs support Type C pneumatic tests. Preoperational and periodic Type C leakage rate testing of CIVs is in accordance with the 10 CFR 50 Appendix J requirements, the Technical Specifications, and ANSI-56.8.

The CIVs subject to Type C tests are in Reference 6.2-4.

Isolation valve tests use either the pressure decay or flowmeter method. For the pressure decay method, the test volume pressurizes with air or nitrogen. The monitored rate of decay of pressure in the known volume facilitates calculation of the leak rate using the pressure decay method. For the flowmeter method, air or nitrogen supplied through a calibrated flowmeter maintains constant test pressure in the test volume. The measured makeup flow rate is the isolation valve leak rate.

Applied pressure to the CIV is in the same direction as pressure applied when the valve performs its safety function.

The CIVs have a similar wedged, quarter-turn ball type design and do not use a seal system.

Each CIV welds directly to a containment isolation test fixture (CITF) valve. The main functions of the CITF valves are to provide isolation to facilitate testing of their respective CIVs (except for the MSIV and MSIBV) for Appendix J and IST testing and to provide an uninterrupted flow path for their respective process fluid during normal operation.

The CITF valves are single top-entry floating ball valves welded directly to the exterior of the CNV penetration nozzles for each of the fluid process piping lines.

These are manual valves which are locked open during normal operation and closed to allow testing of their respective CIVs. The CITF valves are the same ASME BPVC class as their respective CIVs. The CITF cover seal is a passive isolation barrier that requires an Appendix J Type B leakage test (Reference 6.2-4).

Each CIV subject to Type C testing closes by normal means without any preliminary exercising or adjustment. Piping is drained and vented as needed, and a test volume, when pressurized, produces a differential pressure across the valve. Preparation of the valve for testing is by removing the cover of the upstream CITF and closing the ball valve, then reinstalling the cover to lock the valve in place. The test port on the CITF establishes test pressure in the same direction as the pressure applied when the valve perform its safety function (i.e.,

upstream from CNV). Test equipment is on the CITF test port, and system valves align to establish a vent path downstream of the tested valve. The valve undergoes testing via air or nitrogen using either the pressure decay or flow makeup method as specified in the CLRT program.

When testing of the first CIV in the penetration completes, the test equipment vents and the valves realign. The first CIV opens, and the second CIV closes to cale US460 SDAA 6.2-46 Revision 1

Isolation valves with seat exposure to the containment atmosphere during a LOCA undergo air or nitrogen testing at a pressure not less than Pa.

6.4 Scheduling and Reporting of Periodic Tests Schedules for performance of the periodic Type B and C leak rate tests are in the plant Technical Specifications (Section 5.5.9). Provisions for reporting test results are in the CLRT program.

Type B and C tests may be conducted at any time that plant conditions permit, provided that the time between tests for any individual penetration or valve is less than the maximum allowable interval specified in the CLRT program.

Completion of a Type B or C test results in an update of the overall total leakage rate for required Type B and C tests to reflect the most recent test results. Thus, there is a reliable current summary of containment leak tightness. In accordance with 10 CFR 50 Appendix J, the combined leakage rate limit for penetrations and valves subject to Type B and C tests is less than 0.60 La.

6.5 Special Testing Requirements 6.5.1 Testing Following Major Component Modification or Replacement Major modifications or replacement of components that are part of the containment boundary performed after preoperational leakage rate testing are followed by a Type B or Type C test, as applicable, for the area affected by the modification.

6.5.2 Preservice Design Pressure Leakage Test Each CNV undergoes a preservice design pressure leakage test that tests CNV bolted flange connections under design preload at CNV design pressure.

Reference 6.2-4 describes the Preservice Design Pressure Leakage test.

Each ECCS trip valve and reset valve contains a body-to-bonnet joint that is also subject to Type B test requirements. The body-to-bonnet seal is designed for RCS design pressure. This seal is tested to meet both Type B and RCPB criteria every refueling outage. These body-to-bonnet seals are not considered to be a flanged connection and are not included in the containment flange bolting calculation or preservice design pressure leakage test.

7 Fracture Prevention of Containment Vessel The CNTS encloses the RPV, providing a CNV pressure boundary and an essentially leak-tight final barrier against the release of radioactive fission products resulting from postulated accidents. Section 3.8.2 addresses design of the steel containment. The cale US460 SDAA 6.2-47 Revision 1

is composed of austenitic steels. Table 6.1-1 contains CNV material details.

The CNV system meets the relevant requirements of GDC 1 (Section 3.1.1) with regards to quality standards for design and fabrication, GDC 16 (Section 3.1.2) related to the release of radioactivity, and GDC 51 (Section 3.1.5) related to sufficient design margin for fracture prevention. In meeting the requirements of GDC 1, 16 and 51, the ferritic containment pressure boundary materials satisfy the fracture toughness criteria for ASME BPVC Section III, Subsection NB.

The design, fabrication, and materials of construction for the CNV system includes margin to provide reasonable assurance that the CNV pressure boundary will not undergo brittle fracture, which minimizes the probability of rapidly propagating fracture under operating, maintenance, testing, and postulated accident conditions occurring over its 60-year design life. Section 6.2.1 provides additional detail.

For ferritic materials classified as pressure-retaining components of the RCPB, the requirements of Reference 6.2-5, Appendix G apply.

The ferritic containment pressure boundary conforms to ASME BPVC,Section II material specifications and meets the fracture toughness criteria and testing requirements identified in ASME BPVC Section III, Division 1, NB-2300.

Portions of the lower CNV have 60-year design fluence in excess of 1E+17 neutrons/cm2, E > 1 MeV, with the peak fluence in the lower CNV not exceeding 2.5E+18 neutrons/cm2, E > 1 MeV. The portions of the lower CNV with peak neutron fluence greater that 1E+17 neutrons/cm2, E > 1 MeV, are composed of austenitic stainless steel. Austenitic stainless steels have superior ductility and are less susceptible to the effects of neutron embrittlement than ferritic materials. The peak neutron fluence for the ferritic portion of the CNV is less than the regulatory limit of 1E+17 neutrons/cm2, E > 1 MeV. The material selection for the CNV pressure boundary ensures facture prevention.

8 References 6.2-1 NuScale Power, LLC, "Loss-of-Coolant Accident Evaluation Model,"

TR-0516-49422-P, Revision 3.

6.2-2 NuScale Power, LLC, "Non-Loss-of-Coolant Accident Analysis Methodology Report," TR-0516-49416-P-A, Revision 3.

6.2-3 NuScale Power LLC, Extended Passive Cooling and Reactivity Control Methodology Topical Report TR-124587, Revision 0.

6.2-4 NuScale Power, LLC, "NuScale Containment Leakage Integrity Assurance," TR-123952-P, Rev. 0.

cale US460 SDAA 6.2-48 Revision 1

of Nuclear Components," New York, NY.

cale US460 SDAA 6.2-49 Revision 1

Containment Parameter Value ign Conditions ernal Design Pressure 1200 psia*

ternal Design Pressure 50 psia sign Temperature 600 °F sign Maximum Containment Leakage Table 6.5-1 S Pool Water Temperature (Max Analysis) 212 °F (boiling) mal Operating Conditions (nominal) ernal CNV Pressure less than 1 psia ternal CNV Pressure < 45 psia HS Pool Water Level (Figure 9.1.3-2) Table 9.2.5-1 S Pool Water Volume - from normal operating level to top of weir Section 9.2.5.3 alues listed in Table 9.2.5-1) as shown in Figure 9.1.3-2 HS Pool Water (Avg) Temperature Table 9.2.5-1 nimum allowable operating Temperature 65°F drostatically tested at 1500 psig (at highest point of test boundary)/70°F (minimum) to 140°F (maximum) dditional RXB design temperature information is provided in Section 9.4 cale US460 SDAA 6.2-50 Revision 1

Event Description Case Description CNV Pressure CNV Wall Temperature (psia) (°F)

Discharge Line Break Base Case 910 531 Discharge Line Break Limiting Sensitivity Case Results 9371 5332 Injection Line Break Base Case 890 529 Injection Line Break Limiting Sensitivity Case Results 909 531 High Point Vent Degasification Base Case 807 517 Break High Point Vent Degasification Limiting Sensitivity Case Results 877 525 Break vertent RVV Actuation Base Case 822 519 vertent RVV Actuation Limiting Sensitivity Case Results 876 525 vertent RRV Actuation Base Case 906 530 vertent RRV Actuation Limiting Sensitivity Case Results 925 5332 vertent ECCS Actuation Base Case 852 522 vertent ECCS Actuation Limiting Sensitivity Case Results 889 527 B Limiting Results 900 530 B Limiting Results 886 526 miting NPM primary/secondary release event peak pressure.

miting NPM primary/secondary release event peak temperature.

cale US460 SDAA 6.2-51 Revision 1

Scale Final Safety Analysis Report ontainment Description System Quality Appendix J Piping Penetration Regulatory Penetration Group Type B/C Test Reference/ Compliance CNV1 FW Line 1 B TS, DHRS operability, Note 4 Meets GDC 57 CNV2 FW Line 2 B TS, DHRS operability, Note 4 Meets GDC 57 CNV3 MS Line 1 B TS, DHRS operability Meets intent of GDC 57 CNV4 MS Line 2 B TS, DHRS operability Meets intent of GDC 57 CNV5 RCCW Return B B, C, Note 3 Meets the intent of GDC 56 Exemption justified - Note 2 CNV6 RCS Injection A B, C, Note 3 Meets the intent of GDC 55 Exemption justified - Note 2 CNV7 Pressurizer Spray A B, C, Note 3 Meets the intent of GDC 55 Exemption justified - Note 2 CNV8 I&C Division 1 B B N/A CNV9 I&C Division 2 B B N/A CNV10 CES B B, C, Note 3 Meets the intent of GDC 56 Exemption justified - Note 2 CNV11 Containment Flood and Drain System B B, C, Note 3 Meets the intent of GDC 56 Exemption justified - Note 2 CNV12 RCCW Supply B B, C, Note 3 Meets the intent of GDC 56 Exemption justified - Note 2 CNV13 CNTS CVC Discharge A B, C, Note 3 Meets the intent of GDC 55 Exemption justified - Note 2 CNV14 RPV High Point Degasification A B, C, Note 3 Meets the intent of GDC 55 Exemption justified - Note 2 CNV15 Pressurizer Heater Power (Elect-1) B B N/A CNV16 Pressurizer Heater Power (Elect-2) B B N/A CNV17 ICI Channel A B B N/A CNV18 ICI Channel C B B N/A CNV19 ICI Channel B B B N/A CNV20 ICI Channel D B B N/A CNV22 Decay Heat Removal 1 B N/A Meets the intent of GDC 57 Containment Systems Exemption justified - Note 1 CNV23 Decay Heat Removal 2 B N/A Meets the intent of GDC 57 Exemption justified - Note 1 CNV24 CNV Manway Access Port 1 B B N/A CNV25 CRDM Access Opening B B N/A CNV26 CNV Manway Access Port 2 B B N/A CNV27 SG Access Port 1 B B N/A

Scale Final Safety Analysis Report ontainment Description System Quality Appendix J Piping Penetration Regulatory Penetration Group Type B/C Test Reference/ Compliance CNV28 SG Access Port 2 B B N/A CNV29 SG Access Port 3 B B N/A CNV30 SG Access Port 4 B B N/A CNV31 Pressurizer Heater Access Port 1 B B N/A CNV32 Pressurizer Heater Access Port 2 B B N/A CNV33 RVV Trip/Reset A B B N/A CNV34 RVV Trip/Reset B B B N/A CNV35 RRV Trip/Reset A B B N/A CNV36 RRV Trip/Reset B B B N/A CNV37 CRDM Power 1 B B N/A CNV38 RPI Group 1 B B N/A CNV39 RPI Group 2 B B N/A CNV40 I&C Separation Group A B B NA CNV41 I&C Separation Group B B B NA CNV42 I&C separation Group C B B NA CNV43 I&C separation Group D B B NA CNV44 CRDM Power 2 B B N/A CNV45 Decay Heat Removal 1 B N/A Meets the intent of GDC 57 Exemption justified - Note 1 CNV46 Decay Heat Removal 2 B N/A Meets the intent of GDC 57 Exemption justified - Note 1

- Main CNV Flange B B N/A s:

xemption allows the use of a closed piping system (DHRS) outside of the containment vessel rather than providing an isolation valve.

xemption allows placement of both CIVs outside of the containment boundary.

e CITF attached to each PSCIV is a passive isolation barrier that requires a 10 CFR Part 50, Appendix J Type B leakage test.

e CITF attached to the FWIV is exempt from TS, DHRS operability.

Containment Systems

NuScale Final Safety Analysis Report Containment Systems Table 6.2-4: Containment Isolation Valve Information Containment Valve Location Penetration Primary Actuation Secondary Actuation Mode Valve Position Valve Position Power Failure Position Isolation Valve2, 3, 4 Inside/Outside Mode Norm/ Shutdown Post-Accident/ Power Failure Motive/Control Containment CVC-HOV-0331 Outside CNV6 Auto Remote Manual Open/Closed Closed/Closed Open/Closed Note 1 CVC-HOV-0330 Outside CNV6 Auto Remote Manual Open/Closed Closed/Closed Open/Closed Note 1 CVC-HOV-0325 Outside CNV7 Auto Remote Manual Open/Closed Closed/Closed Open/Closed Note 1 CVC-HOV-0324 Outside CNV7 Auto Remote Manual Open/Closed Closed/Closed Open/Closed Note 1 CVC-HOV-0335 Outside CNV13 Auto Remote Manual Open/Closed Closed/Closed Open/Closed Note 1 CVC-HOV-0334 Outside CNV13 Auto Remote Manual Open/Closed Closed/Closed Open/Closed Note 1 CVC-HOV-0402 Outside CNV14 Auto Remote Manual Closed/Closed Closed/Closed Open/Closed Note 1 CVC-HOV-0401 Outside CNV14 Auto Remote Manual Closed/Closed Closed/Closed Open/Closed Note 1 CE-HOV-0001 Outside CNV10 Auto Remote Manual Open/Closed Closed/Closed Open/Closed Note 1 CE-HOV-0002 Outside CNV10 Auto Remote Manual Open/Closed Closed/Closed Open/Closed Note 1 CFD-HOV-0022 Outside CNV11 Auto Remote Manual Closed/Closed Closed/Closed Open/Closed Note 1 CFD-HOV-0021 Outside CNV11 Auto Remote Manual Closed/Closed Closed/Closed Open/Closed Note 1 RCCW-HOV-0185 Outside CNV12 Auto Remote Manual Open/Closed Closed/Closed Open/Closed Note 1 RCCW-HOV-0184 Outside CNV12 Auto Remote Manual Open/Closed Closed/Closed Open/Closed Note 1 RCCW-HOV-0190 Outside CNV5 Auto Remote Manual Open/Closed Closed/Closed Open/Closed Note 1 RCCW-HOV-0191 Outside CNV5 Auto Remote Manual Open/Closed Closed/Closed Open/Closed Note 1 FW-HOV-0137 Outside CNV1 Auto Remote Manual Open/Closed Closed/Closed Open/Closed FW-HOV-0237 Outside CNV2 Auto Remote Manual Open/Closed Closed/Closed Open/Closed MS-HOV-0101 Outside CNV3 Auto Remote Manual Open/Closed Closed/Closed Open/Closed MS-HOV-0103 Outside CNV3 Remote Manual Auto Closed/Closed Closed/Closed Open/Closed MS-HOV-0201 Outside CNV4 Auto Remote Manual Open/Closed Closed/Closed Open/Closed MS-HOV-0203 Outside CNV4 Remote Manual Auto Closed/Closed Closed/Closed Open/Closed Notes:

1. Exemption as discussed by Section 6.2.4.1 allows placement of both CIVs outside of the containment boundary.
2. Each ball valve CIV closes using a stored energy device within 10 seconds. The closure time is the total required isolation time from receipt of a closure signal generated by the MPS to the time when the valve is fully closed. Isolation signal delays are listed by Table 7.1-6.
3. Each CIV closes on a containment isolation system signal. Table 7.1-4 identifies the parameters monitored by the MPS to generate a containment isolation system signal.
4. All with the exception of the CE CIVs have an internal design pressure of at least 2100 psia and a design temperature of 650 °F, the CE CIVs have an internal design pressure of at least 1200 psia and a design temperature of 600 °F.

NuScale US460 SDAA 6.2-54 Revision 1

NuScale Final Safety Analysis Report Containment Systems Table 6.2-5: Failure Modes and Effects Analysis Containment System Component Identification Function Failure Mode Failure Mechanism Effect on CNTS Method of Failure Detection Remarks Effect on Interfacing System Isolation Valves: 1) Isolate the CVCS lines from A) Spurious closure Electrical/I&C No adverse effect on the CNTS CVCS pump trip Valve open signals are routed from a nonsafety RCS Discharge the CNV to maintain containment Operator error Low flow in affected line(s) control system through the MPS to a single valve at a CVC-HOV-0334 integrity Mechanical Valve position indication time. Nonsafety control must first be enabled before CVC-HOV-0335 an operator can remotely reopen a CIV, and RCS Injection B) Spurious opening when Electrical/I&C No adverse effect on the CNTS - redundant CIV is Valve position indication nonsafety control is blocked under certain conditions CVC-HOV-0331 containment is isolated Operator error closed. Leak rate testing (e.g., if conditions requiring containment isolation are CVC-HOV-0330 C) Failure to close or partial Mechanical reestablished), reducing the likelihood an operator will PZR Spray Supply closure erroneously open a CIV.

CVC-HOV-0325 D) Valve seat leakage CVC-HOV-0324 RPV High Point Degasification CVC-HOV-0401 CVC-HOV-0402 CES Isolation Valves 1) Isolate the CES lines from the A) Spurious closure Electrical/I&C No adverse effect on the CNTS. Valve position indication CE-HOV-0001 CNV to maintain containment Operator error Containment pressure CE-HOV-0002 integrity Mechanical B) Spurious opening when Electrical/I&C No adverse effect on the CNTS - redundant CIV is Valve position indication Valve open signals are routed from a nonsafety containment is isolated Operator error closed. Leak rate testing control system through the MPS to a single valve at a C) Failure to close or partial Mechanical time. Nonsafety control must first be enabled before closure an operator can remotely reopen a CIV, and D) Valve seat leakage nonsafety control is blocked under certain conditions (e.g., if conditions requiring containment isolation are reestablished), reducing the likelihood an operator will erroneously open a CIV.

CFD Isolation Valves 1) Isolate the CFDS lines from A) Spurious closure Electrical/I&C No adverse effect on the CNTS. Valve position indication Valve open signals are routed from a nonsafety CFD-HOV-0021 the CNV to maintain containment Operator error CFDS line pressure or flow control system through the MPS to a single valve at a CFD-HOV-0022 integrity Mechanical indication time. Nonsafety control must first be enabled before an operator can remotely reopen a CIV, and nonsafety control is blocked under certain conditions (e.g., if conditions requiring containment isolation are reestablished), reducing the likelihood an operator will erroneously open a CIV.

B) Spurious opening when Electrical/I&C No adverse effect on the CNTS - redundant CIV is Valve position indication containment is isolated Operator error closed. Leak rate testing C) Failure to close or partial Mechanical closure D) Valve seat leakage RCCWS Supply Isolation Valves 1) Isolate the RCCWS lines from A) Spurious closure Electrical/I&C No adverse effect on the CNTS. Valve position indication Valve open signals are routed from a nonsafety RCCW-HOV-0184 the CNV to maintain containment Operator error RCCWS line flow indication control system through the MPS to a single valve at a RCCW-HOV-0185 integrity Mechanical CRDM temperature indication time. Nonsafety control must first be enabled before an operator can remotely reopen a CIV, and RCCWS Return Isolation Valves nonsafety control is blocked under certain conditions RCCW-HOV-0190 (e.g., if conditions requiring containment isolation are RCCW-HOV-0191 reestablished), reducing the likelihood an operator will erroneously open a CIV.

B) Spurious opening when Electrical/I&C No adverse effect on the CNTS - redundant CIV is Valve position indication containment is isolated Operator error closed. Leak rate testing C) Failure to close or partial Mechanical closure D) Valve seat leakage NuScale US460 SDAA 6.2-55 Revision 1

NuScale Final Safety Analysis Report Containment Systems Table 6.2-5: Failure Modes and Effects Analysis Containment System (Continued)

Component Identification Function Failure Mode Failure Mechanism Effect on CNTS Method of Failure Detection Remarks Effect on Interfacing System FWS Isolation Valves 1) Isolate the FWS lines from the A) Spurious closure Electrical/I&C No adverse effect on the CNTS. Valve position indication Nonsafety backup feed water isolation valves are FW-HOV-0137 CNV to maintain containment Operator error FWS, MSS, or RCS pressure located in the RXB near the CNV. One secondary integrity Mechanical or flow indication FWIV is provided for each of the two feed water lines exiting the CNV and downstream of the FWIV. The FW-HOV-0237 secondary isolation valves are nonsafety-related.

The actuators for the secondary FWIVs close on a loss of motive force to the actuator or a loss of the control signal. The secondary FWIVs are remotely operated valves that serve to isolate the portion of the FWS outside the CNV.

B) Spurious opening when Electrical/I&C No adverse effect on the CNTS - The pressure Valve position indication containment is isolated Operator error boundary of the secondary side maintains Leak rate testing C) Failure to close or partial Mechanical containment integrity.

closure D) Valve seat leakage MSS Isolation Valves 1) Isolate the MSS lines from the A) Spurious closure Electrical/I&C No adverse effect on the CNTS. Valve position indication Nonsafety secondary MSIVs are located in the RXB MS-HOV-0101 CNV to maintain containment Operator error FWS, MSS, or RCS pressure near the CNV. One secondary MSIV is provided for integrity Mechanical or flow indication each of the two steam lines exiting the CNV and downstream of the MSIV. The secondary isolation MS-HOV-0201 valves are nonsafety-related, however, they will serve as backup if the MSIVs fail.

The actuators for the secondary MSIVs close on a loss of motive force to the actuator or a loss of the control signal. The secondary MSIVs are remotely operated valves that isolate the portion of the MSS outside the CNV.

B) Spurious opening when Electrical/I&C No adverse effect on the CNTS - The pressure Valve position indication containment is isolated Operator error boundary of the secondary side maintains Leak rate testing C) Failure to close or partial Mechanical containment integrity.

closure No adverse effect on the DHRS- redundant train of D) Valve seat leakage DHRS and SG performs cooling function.

MSS Bypass Valves 1) Isolate the MSS lines from the A) Spurious closure Electrical/I&C No adverse effect on the CNTS. Valve position indication MS-HOV-0103 CNV to maintain containment Operator error FWS, MSS, or RCS pressure integrity or flow indication MS-HOV-0203 B) Spurious opening when Electrical/I&C No adverse effect on the CNTS - The pressure Valve position indication containment is isolated Operator error boundary of the secondary side maintains Leak rate testing C) Failure to close or partial Mechanical containment integrity.

closure D) Valve seat leakage NuScale US460 SDAA 6.2-56 Revision 1

Temperature Case Event Time (s) sient initiated by a RCS discharge line break into the CNV 0 CNV pressure signal is reached 0.7 ctor trip DHRS actuation and CNV isolation 2.7 RCS level signal is reached 87 S valve opening 147 k CNV wall temperature is reached (for peak pressure case) 168 k CNV internal pressure is reached (937 psia) 170 pressure drops to less than 50% of peak pressure Approximately 3200 cale US460 SDAA 6.2-57 Revision 1

Scale Final Safety Analysis Report SSC Location SSC Augmented Quality Group/Safety Seismic Classification (Note 1) Classification Design Classification (Ref. RG 1.29 or RG 1.143)

(A1, A2, B1, B2)

Requirements (Ref RG 1.26 or RG 1.143) (Note 4)

(Note 2) (Note 3)

CNTS, Containment System omponents (except as listed below)- RXB A1 None B I Vs (CVC PZR spray, RPV high point RXB A1 None A I gasification, CVC injection & discharge)

TFs (CVC PZR spray, RVP high point gasification, CVC injection & discharge)

V stored energy device pressure transmitters RXB A1 None N/A I SIV, FWIV, RCCW CIVs, CVC high point gasification CIVs, PZR spray CIVs, CVC ection & discharge CIVs, CFD CIVs, CE CIVS) ntainment pressure instrumentation (narrow nge) ntainment level instrumentation S temperature sensors osed and open position indicators for FWIVs PU skid A & B pply/vent hydraulic lines from CHPU to CIVs draulic manifolds between CHPU and CIVs dwater isolation check valves RXB A2 None B I V-RPV support ledge RXB A2 None N/A I V CRDM support frame pply/vent hydraulic lines from CHPU to DHRS tuation valves V high point degas solenoid valve RXB B1

  • Subject to in- C I C discharge air operated valve service testing C injection and PZR spray flow check valves (Note 2) ping from PZR spray CIVs to class 3 CVC PRZ ray check valve (outside CNV) ping from CVC injection CIVs to class 3 CVC Containment Systems ection check valve (outside CNV) ping from CVC discharge CIVs to class 3 CVC charge isolation valve (outside CNV) ping from CVC RPV high point degasification Vs to class 3 RPV high point degasification lation valve (outside CNV)

Scale Final Safety Analysis Report SSC Location SSC Augmented Quality Group/Safety Seismic Classification (Note 1) Classification Design Classification (Ref. RG 1.29 or RG 1.143)

(A1, A2, B1, B2) Requirements (Ref RG 1.26 or RG 1.143) (Note 4)

(Note 2) (Note 3) ping from CE CIVs to disconnect flange RXB B2 None D I utside CNV) ping from MSIV and FWIV to disconnect flange utside CNV) ping from (CFDS and RCCWS) CIVs to RXB B2 None D II connect flange (outside CNV) ping from class 3 CVC valves to disconnect nge (outside CNV)

D piping (inside CNV)

V test line A and B ntainment top support structure RXB B2 None N/A I edwater temperature sensors ntainment pressure instrumentation (wide RXB B2 IEEE 497-2016 N/A I nge) (Note 5) osed and open position indicators (MSIV, SIBV, RCCWS CIVs, RPV high point gasification CIVs, PZR spray CIVs, CVC ection & discharge CIVs, CFD CIVs, CE CIVs)

RXB B2 RG 1.7 N/A II osed and open position indicators (RPV high RXB B2 None N/A II int degasification solenoid valve, CVC charge AOV) ushing hydraulic line from CHPU to inboard &

tboard CIVs and DHR actuation valves tainment air temperature sensors RXB B2 None N/A III 1: Acronyms used in this table are listed in Table 1.1-1 2: Additional augmented design requirements, such as the application of a Quality Group, Radwaste safety, or seismic classification, to nonsafety-related SSC are reflected in the columns Quality Group / Safety Classification and Seismic Classification, where applicable. Environmental Qualifications for SSC are identified in Table 3.11-1.

Containment Systems 3: Section 3.2.2.1 through Section 3.2.2.4 provides the applicable codes and standards for each RG 1.26 Quality Group designation (A, B, C, and D). A Quality Group classification per RG 1.26 is not applicable to supports or instrumentation that do not serve a pressure boundary function. Section 3.2.1.4 provides a description of RG 1.143 classification for RW-IIa, RW-IIb, and RW-IIc.

4: Where SSC (or portions thereof) as determined in the as-built plant that are identified as Seismic Category III in this table could, as the result of a seismic event, adversely affect Seismic Category I SSC or result in incapacitating injury to occupants of the control room, they are categorized as Seismic Category II consistent with Section 3.2.1.2 and analyzed as described in Section 3.7.3.8.

5: IEEE Std 497-2016 as endorsed by RG 1.97 and implemented as described in Table 1.9-2

Energy Release Rates Time Total Mass Flow Rate Total Energy Release (s) (lbm/s) (BTU/s) 0 0.0 0 0.01 376.1 175886 0.05 366.7 170311 0.1 357.8 166461 0.5 338.5 157780 1 324.4 151852 1.5 303.6 143133 2 297.4 140613 3 294.0 139833 4 292.7 140710 5 291.2 141192 6 290.3 141593 7 289.2 141697 8 288.0 141680 9 286.7 141606 10 285.3 141496 20 270.2 142243 30 253.6 143092 40 241.9 139004 50 233.3 134040 60 227.3 130032 64 225.4 129737 70 214.0 124410 80 193.1 113455 90 179.0 105707 100 172.0 101479 120 165.8 97109 140 164.4 95628 142 164.2 95414 144 163.9 95185 146 163.6 94929 148 668.3 595761 150 609.3 548483 152 525.9 489975 154 487.8 463585 156 478.6 456964 158 540.3 418976 160 583.0 454524 162 606.2 449793 164 355.6 298316 166 224.1 194508 168 135.7 117110 170 51.8 54503 172 43.6 45258 174 41.2 42070 176 38.1 38087 178 36.0 35598 180 33.9 33300 190 31.9 28791 cale US460 SDAA 6.2-60 Revision 1

Time Total Mass Flow Rate Total Energy Release (s) (lbm/s) (BTU/s) 200 37.6 31004 250 44.4 32003 300 47.3 31641 330 50.7 32522 350 47.5 30425 400 41.5 26523 450 34.2 22263 500 28.9 19333 550 25.3 17288 600 21.2 15089 650 16.9 12807 700 12.1 10288 730 8.4 8434 750 3.6 6090 800 1.2 4866 850 0.3 4392 900 -0.1 4162 950 -0.3 4052 1000 -0.5 3931 1500 -0.6 3635 2000 -0.5 3434 2500 -0.5 3228 3000 -0.4 3118 3194 -0.4 3063 cale US460 SDAA 6.2-61 Revision 1

NuScale US460 SDAA NuScale Final Safety Analysis Report Figure 6.2-1: Containment System CRDM ACCESS PORT TOP OF CNV CNV LUG MANWAY REACTOR WATER POOL LEVEL RVV TRIP/RESET STEAM GENERATOR ACCESS RPV SUPPORT LEDGE UPPER CNV 6.2-62 RRV TRIP/RESET DECAY HEAT REMOVAL SYSTEM NOZZLE CNV CLOSURE FLANGE RPV LOWER CNV CNV SUPPORT SKIRT BOTTOM OF CNV Containment Systems Revision 1

NuScale Final Safety Analysis Report Containment Systems Figure 6.2-2a: Containment Vessel Assembly NuScale US460 SDAA 6.2-63 Revision 1

NuScale Final Safety Analysis Report Containment Systems Figure 6.2-2b: Containment Vessel Assembly NuScale US460 SDAA 6.2-64 Revision 1

NuScale Final Safety Analysis Report Containment Systems Figure 6.2-3: Containment System Piping and Instrumentation Diagram NuScale US460 SDAA 6.2-65 Revision 1

Design cale US460 SDAA 6.2-66 Revision 1

Scale Final Safety Analysis Report Containment Systems Scale Final Safety Analysis Report Containment Systems Scale Final Safety Analysis Report Containment Systems Scale Final Safety Analysis Report



Containment Systems

Scale Final Safety Analysis Report Containment Vessel Pressure Case Integrated Break and ECCS Mass Release Rate (lbm)

Containment Systems Time (sec)

Scale Final Safety Analysis Report Containment Vessel Pressure Case Integrated Break and ECCS Energy Release Rate (MJ)

Containment Systems Time (sec)

Scale Final Safety Analysis Report Max CNV Wall Temperature

(°F)

Containment Systems

Scale Final Safety Analysis Report Containment Vessel Temperature Case (lbm])

Containment Systems

Scale Final Safety Analysis Report Figure 6.2-12: Integrated Break and Emergency Core Cooling System Energy Release Rate - Peak Containment Vessel Temperature Case (MJ)

Containment Systems

Scale Final Safety Analysis Report Case

(

Containment Systems

Scale Final Safety Analysis Report Case



Containment Systems

The emergency core cooling system (ECCS) provides core cooling during and after anticipated operational occurrences and postulated accidents, including loss-of-coolant accidents (LOCAs). The ECCS is an important NuScale Power Plant safety system in its safety-related response to LOCAs and as a component of both the reactor coolant and containment vessel (CNV) pressure boundaries. In conjunction with the containment heat removal function of containment, the ECCS provides core decay heat removal in the event of a LOCA. The ECCS does not provide replacement or addition of primary inventory from an external source.

The ECCS consists of two reactor vent valves (RVVs) mounted on the upper head of the reactor pressure vessel (RPV), two reactor recirculation valves (RRVs) mounted on the side of the RPV, and associated actuators located on the upper CNV as shown in Figure 6.3-1. The RVVs and RRVs are closed during normal plant operation and open to actuate the system during applicable accident conditions. When actuated, the RVVs vent steam from the RPV into the CNV, where the steam condenses and liquid condensate collects in the bottom of the containment. The RRVs allow the accumulated coolant to reenter the RPV for recirculation and cooling of the reactor core. Placement of the RRV penetrations on the side of the RPV is such that when the system actuates, the coolant level in the RPV remains above the core and the fuel remains covered. The cooling function of the ECCS is entirely passive, with heat conducted through the CNV wall to the reactor pool.

The ECCS is a passive system that does not include long lengths of piping or holding tanks. The system is made up of the valves described above, which allow recirculation of the reactor coolant between the RPV and the CNV. The valves stay in the closed position during normal plant operation and receive an actuation signal upon predetermined event conditions (listed in Table 6.3-1) to open, depressurizing the RPV and allowing flow of reactor coolant between the CNV and the RPV. In events that result in rapid equalization of pressure between the reactor coolant system (RCS) and the CNV before reaching the low riser level ECCS actuation setpoint, such as an inadvertent RVV opening, the ECCS valves open on low differential pressure before an ECCS actuation signal is received.

The ECCS includes a passive ECCS supplemental boron (ESB) feature. The ESB dissolvers contain solid boron oxide that dissolves into condensate during ECCS operation for recirculation into the core to maintain subcriticality. Mixing tube components in the lower containment vessel transport condensate to mix with liquid in the bottom of containment.

Passive design provisions ensure retention of sufficient coolant inventory in the module to maintain a covered and cooled core following a LOCA and valve opening event. Makeup (i.e., addition) of reactor coolant inventory is not necessary or relied upon to protect against the effects of breaks. Reactor coolant inventory released from the reactor vessel during an in-containment unisolable LOCA collects and remains within the CNV.

Actuating the ECCS ensures that the core remains covered and that RCS temperature and pressure decrease for all design-basis LOCAs. The analyzed loss-of-coolant events do not result in periods of refill or reflood, and the design does not require forced circulation. Actuation and operation of the ECCS passively establishes a natural circulation path whereby coolant heated in the core leaves as steam or vapor through the RVVs and condenses in the CNV, where it is collects and remains for return to the RPV.

cale US460 SDAA 6.3-1 Revision 1

(accident conditions) shows the locations of the ECCS valves.

The ECCS valves actuate by stored energy and have no reliance on power or nonsafety-related support systems for actuation (i.e., opening the valves). After actuation, the valves do not require a subsequent change of state nor availability of power to maintain the intended safety function position.

1 Design Basis The ECCS serves three fundamental purposes. The system is normally in a standby state in which the RVVs and RRVs are closed and function as part of the reactor coolant pressure boundary (RCPB). The principal function of the ECCS is to cool the reactor core in situations when it cannot be cooled by other means, such as during a LOCA inside the CNV. In addition, the ECCS provides low temperature overpressure protection (LTOP) for the RPV.

The ECCS design provides fuel protection during postulated LOCAs. The system provides core cooling following the LOCA at a rate such that clad-metal water reactions are limited to negligible amounts thereby preventing fuel and cladding damage that could interfere with long-term effective core cooling. The ECCS provides adequate core cooling with one RVV and one RRV in the open position. The cooling and associated depressurization functions use safety-related equipment.

The postulated LOCA conditions satisfy the functional requirements and system performance requirements of 10 CFR 50.46. Section 6.3.3 describes the 10 CFR 50.46 requirements in more detail.

No credible single failure event prevents the ECCS from performing its safety function including electrical power (normal alternating current [AC] or augmented direct current power system [EDAS] power availability, busses, electrical and mechanical parts, cabinets, and wiring), initiation logic, and single active or passive component failure.

Section 5.2 discusses that LTOP, provided by the ECCS, does not exceed the RPV pressure-temperature limits.

Section 6.2 discusses long-term cooling requirements that call for the removal of decay heat via the passive containment heat removal function. The ECCS is designed as a passive system and is able to perform its safety function for at least seven days after a design basis event without support from a non-safety system.

The ECCS meets General Design Criterion (GDC) 2 requirements related to the seismic design of structures, systems, and components (SSC) whose failure could cause an unacceptable reduction in the capability of the system to perform its design safety function. Seismic design information is in Section 3.7, Section 1.9 addresses conformance with Regulatory Guide (RG) 1.29, Revision 6. The ECCS withstands the effects of natural phenomena and is structurally robust, ensuring a preserved safety function in the event of a safe shutdown earthquake. Installation inside the containment pressure boundary protects components of the ECCS are protected from cale US460 SDAA 6.3-2 Revision 1

The ECCS meets GDC 3 requirements. Their physical location within the CNV protects the RVVs and RRVs from fire. The valve actuators are on the exterior surface of the CNV shell (underwater). Neither environment is susceptible to fires, being protected by the reactor pool or the CNV.

The ECCS meets GDC 4 with respect to the environmental and dynamic effects associated with the normal operation, maintenance, testing, and postulated accidents. All ECCS components are designed against the loads caused by the dynamic effects resulting from valve discharge or equipment failures inside containment. The physical location within the containment pressure boundary provides protection from the dynamic effects of events and conditions outside the NuScale Power Module (NPM). Environmental qualifications of the ECCS components are discussed in Section 3.11.

The ECCS meets the regulatory requirements of GDC 5 because ECCS components are not shared between NPMs. The ultimate heat sink is common to all NPMs and Section 9.2 describes its compliance with GDC 5.

The ECCS meets the regulatory requirements of GDC 14 in that design, fabrication, and testing of those portions of the ECCS that are part of the RCPB ensures an extremely low probability of abnormal leakage, rapidly propagating failure, or gross failure. Chapter 3 discusses compliance with GDC 14.

The ECCS design does not require AC or EDAS power to effectively cool the core.

The ECCS is a safety-related passive system designed to maintain core cooling and containment integrity independent of AC or EDAS power sources, by requiring structures, systems, and components to transition to their safety state upon loss of control power or motive power. Because the electric power systems do not perform a safety function in the facility design, the design supports an exemption from GDC 17 (Section 3.1.2.8).

Section 6.3.2 describes that the ECCS meets the requirements of GDC 27 with the ECCS supplemental boron function.

The ECCS meets the regulatory requirements of GDC 30 and 31 for those portions of the ECCS that are part of the RCPB in that design, fabrication and testing meet the highest quality standards practicable, and components are designed with sufficient margin to ensure that the RCPB behaves in a non-brittle manner. Therefore, the design minimizes the probability of a rapidly propagating failure. Section 6.3.2 discusses component descriptions with the applicable design codes and classifications.

The design supports an exemption from GDC 33 and Section 3.1.4 addresses this exemption.

The module protection system (MPS) and containment system isolates postulated leaks that occur outside the containment, thereby preserving the remaining inventory cale US460 SDAA 6.3-3 Revision 1

ECCS supplemental boron function assure that reactivity control is maintained prior to and after ECCS actuation.

The ECCS setpoints ensure automatic actuation of ECCS valves in response to design-basis LOCA events or 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a loss of AC power, LTOP function, or if needed to maintain subcriticality during extended passive cooling. ECCS valves also automatically actuate at a RCS pressure or RCS temperature conditions that could occur during beyond-design-basis event conditions, to provide defense in depth RPV and CNV over-pressure protection. Table 7.1-4 provides analytical limits used in analyses for ECCS actuation. The RPV and CNV design, in conjunction with the passive design and operation of ECCS and containment isolation, ensure that the core remains covered and ensures maintenance of adequate core cooling if a break occurs in the RCPB.

There is no safety-related coolant makeup system for coolant for protection against small breaks in the RCPB. The CVCS provides reactor coolant makeup during normal operation for small leaks in the RCPB, but is not relied upon during a design-basis event. The RPV and CNV design retain sufficient coolant inventory that, in conjunction with safety actuation setpoints to isolate CVCS from the RCS and operation of ECCS, adequate cooling is maintained and the SAFDLs are not exceeded in the event of a small break in the RCPB.Therefore, the ECCS design does not require a reactor makeup system and satisfies the underlying purpose of GDC 33.

Facility design meets the regulatory requirements of principal design criterion 35, and GDC 36 and GDC 37 as they relate to the ECCS providing sufficient core cooling to transfer heat from the core at a rate such that fuel and cladding damage does not interfere with or prevent long-term core cooling, permit appropriate periodic inspection of important components, and provide for appropriate periodic testing. Redundancy of ECCS components, features, and capabilities ensures the system safety functions assuming the single failure criteria.

Section 7.2.15 discusses that the MPS provides the capability to perform periodic functional testing of the ECCS, which ensures operability and performance of system components.

The ECCS meets the regulatory requirements of GDC 50, GDC 51, GDC 52, and GDC 53 for those portions of the ECCS that are part of the containment pressure boundary in that the components can accommodate, without exceeding the design leakage rate and with sufficient margin, the calculated pressure and temperature conditions that result from any LOCA. The ECCS component design reflects consideration of service temperatures and the uncertainties in material properties, stresses (residual, steady state and transient), and flaw size. The components accommodate the required containment integrated leakage rate and periodic inspection, surveillance, and penetration testing requirements. Section 6.2.5 discusses compliance with 10CFR 50.44.

cale US460 SDAA 6.3-4 Revision 1

manual operator action to ensure adequate core cooling for any design basis event.

The ECCS does not require operator action or nonsafety-related system support for operation although manual actuation is possible from the control room.

Section 3.11 addresses environmental qualification information for the ECCS.

The ECCS passive and simple design satisfies the minimization of contamination requirements of 10 CFR 20.1406. The system does not extend beyond the CNV boundary, which precludes the possibility of contaminating the facility or environment.

By design, limiting operation of ECCS to the RPV and CNV components minimizes the generation of radioactive waste facilitating facility decommissioning.

Facility design meets 10 CFR 50.34(f)(2)(xi) (Three Mile Island Action Plan NUREG 0737, Item II.D.3) in that the control room provides valve position indication for the ECCS valves and trip and reset actuator valves. In addition, the control room provides solenoid power indication for the ECCS trip and reset valves.

Facility design meets 10 CFR 50.34(f)(2)(xviii) (Three Mile Island Action Plan II.NUREG 0737, Item.II.D.3). Adequate core cooling is ensured by RPV design considerations that limit the location of vessel penetrations to above the top of active fuel in the reactor core, which eliminates the possibility of process system failures that could potentially drain vessel coolant inventory to levels below the top of fuel. Control room indication for a diverse selection of monitored parameters ensures unambiguous identification of conditions indicative of inadequate core cooling.

Parameters monitored include core inlet and exit temperatures, RPV water level and pressure, and degree of subcooling. Section 7.2 describes control room indication and instrumentation.

The LOCA Evaluation Model (EM) (Reference 6.3-1) satisfies the requirements of 10 CFR 50, Appendix K. The ECCS performance analysis results demonstrate that the ECCS meets the 10 CFR 50.46 acceptance criteria (Table 15.0-4). The NPM design complies with 10 CFR 50.46 in that cooling performance is in accordance with an acceptable EM. The EM satisfies 10 CFR 50 Appendix K requirements.

2 System Design 2.1 Schematic Piping and Instrumentation Diagrams Figure 6.3-1 shows a schematic of the ECCS configuration.

2.2 Equipment and Component Descriptions The ECCS consists of independent RVVs and RRVs with associated actuator assemblies, instrumentation, and controls (I&C). Figure 6.3-3 shows a typical RVV. Figure 6.3-4 shows a typical RRV. The flanged RVVs and RRVs are bolted to the RPV by mating bolted penetrations which are integral to the vessel shell.

Each main valve is a solenoid pilot-operated relief valve that is hydraulically cale US460 SDAA 6.3-5 Revision 1

The ECCS main valves are part of the RCPB and allow flow between the RPV and CNV when opened. The valves actuate automatically by a safety function signal from the MPS, by operator action that de-energizes the actuator trip valve solenoids, or by loss of power from the EDAS.

During power operations, the ECCS maintains a standby condition with the main valve disks held closed against spring force by a pressurized control chamber.

The main valve initially closes (resets) by operator action that supplies CVCS water to pressurize the control chamber and to close the valve against spring pressure. Once closed, the valve maintains closure by a pressurized control chamber. Reactor pressure ported through an internal orifice located in the body of the main valve disk maintains control chamber pressure during normal operation.

The main valve opens by depressurizing the control chamber (venting to containment). Depressurizing the control chamber allows spring pressure, assisted by reactor coolant pressure, to reposition the main valve disk open.

Each main valve has an associated ECCS actuator assembly that contains three pilot valves: two trip valves and a reset valve, each with an associated solenoid as shown in Figure 6.3-3 and Figure 6.3-4. Each ECCS actuator assembly attaches to the exterior of the containment pressure vessel shell with a nozzle and safe end configuration. The body of the actuator assembly serves as both a CNV pressure boundary and the RCPB. Valve bonnet seals on each pilot valve establish the pressure boundaries internal to the valve assembly body. The ECCS trip/reset assemblies are submerged in the reactor pool.

Each reset pilot valve controls a hydraulic line that supplies coolant from the CVCS to its associated main valve control chamber. The reset pilot valve is an energize-to-open, normally closed, fail closed direct current solenoid-operated valve. Energizing the reset pilot valve solenoid ports CVCS (RCS coolant) to the main valve to pressurize the control chamber and to close the main valve against spring pressure. When reactor pressure is sufficient to maintain control chamber pressure against main valve spring pressure, the pilot valve solenoid de-energizes to close the reset valve.

Each of the trip pilot valves controls a hydraulic line that vents the main valve control chamber into the CNV, allowing spring force and RCS pressure to open the main valves. The trip pilot valves are de-energize-to-open, normally closed, fail open direct current solenoid-operated valves. A loss of direct current power to the actuator solenoid results in the opening of the actuator trip valves.

Each RRV main valve includes an inadvertent actuation block (IAB) feature designed to reduce the frequency of inadvertent operation (opening) of the main valve during power operations. The IAB also delays the RRVs from opening immediately with the RVVs until a lower differential pressure is reached between the RCS and containment. The IAB is in the path from the RRV control chamber to cale US460 SDAA 6.3-6 Revision 1

chamber when the RPV to CNV differential pressure is above a predetermined threshold. When differential pressure across the block valve lowers to below the IAB release pressure, the spring retracts the block valve to open the control chamber vent path.

The threshold pressure for operation of the IAB to prevent spurious opening of the RRV is 900 psid. Therefore, the IAB prevents RRV opening for all reactor pressures 900 psid and greater with respect to containment. Given an initial IAB block, the IAB releases at 450 psid +/- 50 psi once reactor pressure reduces. The IAB does not prevent RRV opening for initial pressures of 400 psid and below.

If the RRV trip valves inadvertently open (vented to containment) while the reactor is at normal operating pressure, the IAB valve seats to prevent the RRV main valve control chamber from depressurizing and the main valve from opening.

The RVVs are nominal pipe size 5 solenoid pilot-operated relief valves attached to the reactor vessel head and connected directly to the pressurizer steam space of the RPV.

The RRVs are nominal pipe size 2, solenoid pilot-operated relief valves attached to the upper shell section of the RPV, above the main closure flange above the top of the reactor core. The valves connect directly to the downcomer space of the RPV and maintain a minimum flow coefficient of 55. For ECCS demands, where reactor pressures are below the IAB functional range, the RRVs fully open within 10 seconds after trip valve solenoid power removal.

The ECCS valves perform their safety function under postulated events in compliance with GDC 27. Table 6.1-1 provides additional information describing the ECCS main valve, tubing, and actuator valve materials of construction.

Stainless steel bolt-on flow diffusers are mounted on the discharge of the RVVs to diffuse the high pressure steam and water flow discharged to the CNV. RRVs do not require diffusers because they are smaller and more distant from equipment requiring protection. The RVV and diffuser, as a combined unit, have a minimum flow coefficient of 375 and minimum terminal pressure drop ratio (Xt) of 0.62. For ECCS demands, the RVVs fully open within 10 seconds after trip valve solenoid power removal.

A venturi is in the inlet of each RVV and RRV between the RPV and the RRV and the RVV and is inserted internal to the main valve body. Each venturi throat diameter is sufficiently small to limit (choked) blowdown flow during postulated inadvertent reactor valve actuation events when there is a high differential pressure between the RPV and CNV to slow the depressurization rate. The venturi size and orientation maintains sufficient flow capacity through the RVV and RRV when there is lower differential pressure for recirculation conditions (unchoked flow) and long-term cooling and maintains margins for precluding the potential for flow blockage due to debris.

cale US460 SDAA 6.3-7 Revision 1

CNV provides conductive and convective heat transfer to the reactor pool.

Section 6.2 describes the CNV with additional information on the heat removal function in Section 6.2.2.

The capability for containment heat removal through ECCS operation occurs without operator action for at least 7 days. Section 9.2.5 describes the reactor pool (ultimate heat sink).

Upon a sensed loss of AC power to the EDAS power system battery chargers, the MPS initiates reactor trip, decay heat removal actuation, demineralized water system isolation, and containment isolation to reduce battery load. In addition, three 24-hour digital timers in each division of the MPS start. If AC power cannot be restored within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the timers initiate the ECCS by de-energizing the engineered safety features actuation system (ESFAS) MPS divisions.

This ECCS hold mode maintains energized ECCS trip valve solenoids without an actuation signal, but sheds the load at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ensuring sufficient battery power for post-accident monitoring for at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The ECCS immediately initiates upon receipt of an ECCS actuation signal as listed in Table 6.3-1 during the 24-hour timing period. An automatic ECCS actuation after an automatic or manual reactor trip allows the ECCS supplemental boron to recirculate into the reactor core region before xenon decays from the core, to passively ensure subcriticality without requiring operator actions. Operators may manually bypass the actuation upon confirmation of subcriticality at cold conditions.

2.2.1 ECCS Core Cooling System Supplemental Boron Upon actuation of ECCS, an ECCS supplemental boron (ESB) feature provides additional boron concentration to ensure that the reactor remains subcritical for at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following an event. Thus for DBEs, the combined reactivity of the control rod assemblies and ESB ensures reactivty is controlled in accordance with GDC 27, as demonstrated in Section 15.0.5.

The ESB provides sufficient boron to ensure core subcriticality and that the reactor core boron concentration remains below precipitation limits. The ESB and its components are not part of the RCPB and accordingly are not required to be designed to Quality Group A requirements. They are designed to remain operable following a design basis seismic event.

The two ESB dissolvers add boron to the ECCS recirculating coolant for reactivity control to maintain subcriticality following some design basis events (Figure 6.3-2). The dissolvers maintain subcriticality when the highest-worth control rod is stuck in a fully withdrawn position during long term cooling to prevent an overcooling return to power. Although the boron added by the dissolvers is not necessary during all design basis events to maintain subcriticality, the dissolvers are passive and respond to design basis accidents and transients that result in ECCS actuation where condensate forms on the inner containment surfaces. The dissolvers are fed by hoppers cale US460 SDAA 6.3-8 Revision 1

The dissolvers are located inside the CNV. The dissolvers contain solid boron oxide that is loaded during startup and remains unused during normal plant operations, without ECCS actuation. Two condensate channels extend outwards and upwards along the CNV inner wall. The dissolvers are located below the reactor pool level to ensure that sufficient condensate is generated above the channels. The condensate that is generated on the CNV wall during ECCS actuation is directed towards the dissolvers which dissolve the boron oxide creating a boric acid solution. This solution subsequently exits the dissolver and is added to the ECCS recirculating coolant in the CNV and enters the RPV through the RRVs.

Two lower mixing tubes are located on the inside wall of containment below the CNV flange. These mixing tubes are designed to force condensate flow to the bottom of containment. During ECCS actuation a portion of condensate generated on the CNV inner wall is captured by condensate channels and redirected through the lower mixing tubes. This collected condensate creates a water column in the lower mixing tubes, which is used to passively mix the collected condensate with the colder or more highly borated liquid in the bottom of containment. This mixing ensures the colder and potentially higher boron concentration coolant is not sequestered below the RPV flange and is sufficiently mixed and recirculated into the core through the RRVs.

2.3 Applicable Codes and Classifications The pressure boundary components of the ECCS (valves, hydraulic lines, and actuator assemblies) are Quality Group A, Seismic Category I components constructed to the requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC),Section III, Subsection NB, 2017 Edition. Safety related components of the ECCS Supplemental Boron feature are Seismic Category I and accordingly designed to maintain structural integrity to perform their safety function during the SSE. The safety related ESB components are constructed of ASME BPVC Section II austenitic stainless steel materials, which are compatible with the coolant and boric oxide chemistry during normal operation and post-accident conditions. The ESB components are nonstructural attachments inside the CNV. Table 6.3-4 identifies SSC classifications for ECCS and ESB. Additional information addressing compliance with the applicable codes and classification of ECCS components is in Section 1.9 and Section 3.2. Valve position indication for the ECCS is qualified for seismic loads in accordance with Institute of Electronics and Electrical Engineers Std. 344.

Section 7.1 addresses the Institute of Electronics and Electrical Engineers standards applicable to the controls and power supplies.

2.4 System Reliability Redundant valves are remotely and separately actuated by two divisions of the ESFAS function of the MPS to provide reliability of the ECCS. Separate divisions cale US460 SDAA 6.3-9 Revision 1

The ECCS main valves do not rely on power or nonsafety-related systems for actuation (i.e., opening the valves) because they are capable of actuation with stored energy. Following actuation, the valves do not require a subsequent change of state or the availability of power to continue to perform their intended safety functions. Two trip valves are provided in series to reduce the probability of inadvertent opening of the main valve.

The safety related components of the ESB do not rely on power or non-safety systems to perform their function. The safety related components of the ESB perform their function passively by collecting and diverting condensate already present during ECCS operation. A change of state or the availability of power is not needed to continue to perform their intended safety functions.

No single active or passive failure prevents ECCS initiation or the capability of the system from performing its core cooling or LTOP safety function. Section 6.3.3 provides a performance evaluation of the ECCS, and Table 6.3-3 provides the failure modes and effects analysis.

The ECCS main valves, which are attached to the RPV, are not susceptible to water hammer. The system design includes no pumps or piping, which precludes the susceptibility to water hammer mechanisms. The ECCS actuator lines and trip reset valves are also not susceptible to water hammer. The design and operation of the ECCS valve actuator lines and trip reset valves precludes susceptibility to water hammer mechanisms. The ECCS venturis are also not susceptible to any known form of water hammer, nor do they add susceptibility to any surrounding ECCS component.

The design partially complies with the regulatory positions of RG 1.82. The design complies with the RG 1.82 regulatory positions that address the design criteria, performance standards, and analysis methods related to water sources for long-term cooling.

The design does not comply with regulatory position C1.1, with the exception that the design does comply with the following regulatory positions.

  • Position C1.1.1.9 (assessment of the possibility of downstream clogging), and position C1.1.1.10 (buildup of debris and chemical reaction products downstream).
  • Position C.1.1.2 (minimization of debris source term, cleanliness programs, monitoring/sampling for latent debris, insulation selection, restriction on coatings and cladding of carbon steel).
  • Positions C1.1.3 and C1.1.4 are not applicable because the design does not rely on operator action to mitigate the consequences of debris accumulation and does not include active devices or systems to prevent debris accumulation.

cale US460 SDAA 6.3-10 Revision 1

The design complies with regulatory position C.1.3 (evaluation of long term recirculation capability as applicable to the design), with the exception of the following:

  • Position C.1.3.1 (net positive suction head).
  • Portions of position C.1.3.2 that are not consistent with the design.

The design does not comply with regulatory positions C1.3.7 (upstream effects) or C.1.3.9 (strainer structural integrity).

The design does not comply with regulatory position C1.3.12 (prototypical head loss testing).

The design does not comply with regulatory position C.2, with the exception of meeting chemical reaction effects (position 2.2).

The design does not comply with regulatory position C.3.

Analyses evaluate the impact on ECCS and long-term core cooling operation of the generation of post-LOCA or high-energy line break debris and the presence of latent debris. Based upon the design and cleanliness requirements, there is minimal debris generation and accumulation expected, and it does not adversely impact the ability of ECCS to perform its required functions. Debris limits address generic safety issue GSI-191. The results of an evaluation of the effects of fibrous, particulate, and chemical debris in the reactor coolant on the long-term cooling capability demonstrate that long-term core cooling is not adversely impacted.

Evaluations assess the debris impact on ECCS components, the fuel, and the core. Section 6.3.3.1 provides further information.

Latent debris is the basis for evaluating debris because insulation, paint, and coatings used in typical pressurized water reactors are not used or allowed in the CNV. Latent debris (defined as unintended dirt, dust, paint chips, fibers, pieces of paper, plastic, tape, etc.) is the expected source of debris in the CNV and has both fibrous and particulate constituents.

Protective coatings are not used or allowed within the CNV. Susceptible components (e.g., cables) withstand the fluid jets and conditions associated with a LOCA or high-energy line break. The ECCS design does not include pumps, piping, trash racks, debris interceptors, or sump screens.

The impact areas for potential debris effects include the RRVs and reactor core.

The amount of latent debris (debris limits provided in Section 6.3.3.1) does not adversely affect the ability of the ECCS to provide adequate core cooling. The RRVs are not prone to flow blockage as a result of latent debris within the ECCS flowpath.

cale US460 SDAA 6.3-11 Revision 1

containment. The program should contain the following elements:

  • Maintenance activity controls, including temporary changes, that confirm the emergency core cooling system function is not reduced by changes to analytical inputs or assumptions or other activities that could introduce debris or potential debris sources into containment.
  • Controls that prohibit the introduction of coating materials into containment.
  • An inspection program to confirm containment vessel cleanliness before closing for normal power operation.

2.5 Protection Provisions The design provides protection against missiles, pipe whip, flooding, thermal stresses, LOCA loading, and seismic effects. The reactor building, NPM bio-shield, and CNV wall protect the ECCS main valves from external missiles.

There is no rotating equipment beneath the bio-shields or in the CNV that could malfunction and generate a missile.

Section 3.6.1 describes protection of the ECCS against the effects of missiles, pipe whip (that might result from piping failures), jet impingement, and environment changes (wetting and temperature change). Section 3.6.1 describes protection from the direct dynamic effects of pipe breaks and from loads applied by the impinging fluid released for safety-related structures, systems, and components, including the ECCS. Protection against environmental changes (wetting and temperature) are in the design requirements of the individual components. Section 3.6.2 provides additional discussion of pipe break location selection and dynamic effects.

Section 3.10 contains seismic qualification of equipment, Section 3.5 for missile protection, Section 3.6 for protection against dynamic effects, Section 9.5 for fire protection, Section 3.11 for environmental qualifications, and Section 3.9 for thermal and displacement stresses.

Flow diffusers are on the outlets of the RVVs to protect plant cables and other components from jet impingement when the RVVs open.

2.6 Provisions for Performance Testing and Inspection The general installation and design of the ECCS provides accessibility for testing and inspection. There is no insulation, so all surfaces and welds are normally accessible for testing and inspection. The ECCS valves accommodate the preservice and inservice testing and inspection requirements of IWC-2500 and ISTC-3100 of the ASME BPVC with the valves in place. Section 3.9.6 provides additional discussion.

cale US460 SDAA 6.3-12 Revision 1

during NPM outages. Because the CNV interior is inaccessible during normal operation, the required maintenance and inspections occur during outages.

The ECCS valves are power-actuated relief valves (ASME Operations and Maintenance Code Category B/C) with an open/close safety function. The main valve and associated pilot actuators are exercised and fail-safe tested as a single valve in accordance with ISTC-3521, -3560 and -3630 and I-3320 criteria. Valve position testing is in accordance with ISTC-3700 criteria.

Functional testing of ECCS valves under conditions similar to design conditions is only possible with a differential pressure established between the RPV and the CNV because the main valve control chamber must vent to the CNV. These tests occur under conditions that are colder than would exist for a required actuation of the ECCS valves and at a lower differential pressure.

Leak tightness and leakage rate of the containment boundary testing is in accordance with ISTC-3630 and Appendix J, Type B criteria. The requirements of Section XI, Subsection IWB of the ASME BPVC apply to all pressure-retaining (RCPB and containment pressure boundary) ECCS components.

Section 3.9 describes inservice testing of ECCS valves.

2.7 Manual Actions There is possible manual actuation of the ECCS from the control room, but operator action is not credited or required for design basis events, including those that involve active failures of the ECCS. If a valve fails to change to its safety position on command, there is an operator alert. An alert generates when the position instrumentation on an ECCS valve differs from the MPS demand position.

There is no operator action requirement because suitable redundancy is in the design of the ECCS to accommodate such a failure. To restore capability, the operator can change the position of the malfunctioning valve to its demand position.

The ESFAS design prohibits manual override or interruption of an ECCS actuation while a valid safety system armed or active signal exists. The MPS seals in the ECCS actuation signal, ensuring completion of ECCS actuation (Section 7.2).

3 Performance Evaluations The ECCS performance evaluation under accident conditions is in Chapter 15. The conditions that result in actuation of the passive ECCS discussed in Chapters 15 and 19 include the range of LOCAs, inadvertent RPV valve opening events, inadvertent ECCS actuation event, or other design basis event where loss of DC power supply or ECCS actuation occurs.

cale US460 SDAA 6.3-13 Revision 1

for the spectrum of postulated break sizes. The LOCA EM (Reference 6.3-1) is based on the guidelines in RG 1.203.

The LOCA analyses demonstrate that no fuel clad melting occurs for any design-basis LOCAs. Peak cladding temperature (PCT) is maintained within the regulatory acceptance criterion of 1,204 degrees C (2,200 degrees F). Critical heat flux does not occur for any of the cases assessed in the break spectrum. LOCA analysis results are in Section 15.6.

The LOCA EM evaluates a break spectrum as specified by Appendix K to 10 CFR 50 to provide identification of the most severe postulated LOCA. The LOCA analyses are in Section 15.6.

The long-term cooling capability following ECCS operation is analyzed using the extended passive cooling EM (Reference 6.3-2). Results of long-term ECCS cooling are in Section 15.0.

Table 15.0-4 shows the applicable ECCS performance acceptance criteria taken from 10 CFR 50.46.

The technical specifications define the minimum ECCS operational capabilities with respect to inoperable components and maximum allowable time period for components to be out of service.

The fuel parameters conform to the 10 CFR 50.46 acceptance criteria for postulated accidents. The acceptance criteria for local oxidation, metal-water reaction (hydrogen generation), and core geometry are inferred by demonstration that water level remains above the top of the active core in all cases.

Calculation results as described in Section 15.0 demonstrate that the ESB feature of the ECCS provides sufficient dissolution and recirculation of boron into the core region to maintain subcriticality during long-term ECCS cooling, accounting for the highest worth control rod stuck out of the core. Calculations demonstrate that maximum boron concentrations in the core region following actuation of the ECCS do not result in boron precipitation to the extent that there is an interruption of natural circulation flow in the core and long-term cooling capability. The calculation established a boron concentration maximum in the core region and an associated boric acid solubility temperature (Reference 6.3-2). As discussed in Section 15.0, the maximum boron concentration in the core region remains below the boric acid solubility limit for the coolant temperature.

The design provides containment cooling by natural convection on the exterior of the CNV, with the reactor pool serving as the heat sink. Containment heat removal provides for heat transfer from the CNV to the reactor pool. The system is completely passive and does not include any means of forced circulation.

Containment cooling provides sufficient capacity to reduce pressure to less than 50 percent of design pressure within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a design basis event.

cale US460 SDAA 6.3-14 Revision 1

Section 15.0 shows that the ultimate heat sink provides sufficient cooling in the event of an accident in one NPM and permits the simultaneous safe shutdown and cooldown of the remaining NPMs, then maintains them in a safe shutdown condition.

Active systems are not necessary in order to show continued containment heat removal. The reactor pool volume at normal pool level and temperature provides adequate heat transfer from the spent fuel in the spent fuel pool and from each of the shutdown NPMs for more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of post-accident cooling.

3.1 Debris Generation and Impact Evaluation An evaluation of debris accumulation and effects on long-term ECCS capability has been performed. Specifically, there is an evaluation of the effects of fibrous, particulate, and chemical species or precipitates on long-term core cooling, including the potential for debris accumulation at the RRVs, core inlet, and in the heated core region.

Separately applied acceptance criteria determine the associated fiber and particulate limits with each debris type evaluated individually at each RPV location. The minimum acceptable value for each debris type defines the maximum allowable debris limit for that debris type. The following acceptance criteria, which include the acceptance criteria in approved WCAP-16793-NP-A, Revision 2, are applied:

  • Fuel rod scale thickness.
  • Peak cladding temperature.
  • Excessive pressure drop due to debris.

A conservative limit on debris deposition on any fuel rod that precludes two adjacent fuel rods from touching and reducing convective heat removal from the rods is established. The limit includes clad oxide, crud layer, and debris deposition. The fuel assembly dimensions within the fuel design informs the calculation of the minimum clearance between adjacent fuel rods. The calculated pin-to-pin distance that is determined provides a conservative margin to the debris deposition limit.

Peak cladding temperature is limited to 800 degrees F to preclude occurrences of rapid nodular corrosion and accelerated hydrogen pickup rates that can reduce cladding performance.

Analysis assumptions include:

  • Chemical species take the form of aluminum oxyhydroxide. and precipitate out of solution.
  • The decay heat level during the initial portion of the transient applies for the entire event to maximize energy removal requirements.

cale US460 SDAA 6.3-15 Revision 1

  • 120 percent of the American Nuclear Society 1971 decay heat standard.

The design minimizes debris generation by restricting the use of insulation, paint, and coatings within containment. Restrictions on the use of debris-generating materials (e.g., insulation, paint, coatings, etc.) and components within containment that can withstand accident conditions limit debris generation to less than the amount needed to block or restrict long-term cooling flowpaths.

An evaluation of the latent debris data in current operating plants informed an estimate of the amount of debris present in a NPM. The use of operating plant information as the basis for a latent-debris source term establishes a conservative estimate because the design does not have the large containment with machinery, insulation, and personnel traffic during outages typical of a traditional operating plant.

The fiber content of the latent debris consists of a particulate and fibrous component. The evaluation assumes the maximum fractions of the particulate and fibrous components. The assumption of maximum fractions of fiber and particulate adds additional conservatism to further overestimate the debris source term.

Given the potential challenge to core cooling, the total amount of chemical species is also evaluated. Aluminum is not present in significant quantities in the NPM, nevertheless this is the chemical species evaluated as there are no other detrimental species present in significant levels to evaluate.

Chemical species are not expected to form in the design. Boron controls reactivity and buffering agents are not added to containment. Stainless steel fabricated or stainless steel clad form containment and components within containment, which precludes the production of corrosion components. In addition, the maintenance of a rigorous cleanliness program minimizes the collection of material that could react with boric acid to form other chemical species.

Conditions associated with an inadvertent opening of a RRV form the basis for the evaluated debris accumulation. The inadvertent opening results in discharge of RCS coolant into the CNV that collects in the bottom of the CNV. Discharged reactor coolant that flashes to steam condenses on the CNV walls and washes down the CNV walls, collecting latent debris as it flows to the bottom of the CNV.

The event results in conditions that initiate the ECCS which opens the remaining ECCS valves. The ECCS actuation results in the release of additional steam for condensation and collection of additional latent debris retained in the condensed coolant solution. When sufficient condensation raises containment coolant level to above the RRVs, fluid from the CNV re-enters the RPV for recirculation through the core and subsequent boil off for discharge as steam through the RVVs.

Debris transport into and through the core depends on the nature of the debris and the flow field in the containment and RPV. The evaluation assumes the earliest arrival of debris to the core. The fiber and particulate collected in the cale US460 SDAA 6.3-16 Revision 1

buoyant and all fiber approaches the core inlet in proportion to the ECCS flow.

The flow rate through the RPV and the CNV liquid volume determines the time it takes to introduce all debris from containment into the RPV. Once the debris enters the RPV, it concentrates because only steam exits through the RVVs. The evaluation conservatively assumes approximately half the debris mass is delivered to the core initially and 99 percent is delivered in less than five hours.

The evaluation assumes that debris that approaches the core inlet and ends up on the lower end fittings or structural grid is a single debris bed. As fibrous debris transports to the fuel, the potential exists for fiber to collect and reduce the effective opening size. The potential effect builds on itself and, if enough fibers are present, a thin fiber bed forms with openings small enough to begin to collect particulate debris. A fiber bed must accumulate to capture the particulate because particulates and precipitates are too small for capture without fibrous debris accumulating first.

Fuel assembly testing demonstrates that fiber loads of up to 7.5g/FA generate acceptable head loss. The results conclude that an accumulation of up to as much as 7.5g/FA of fiber at the core inlet would have no effect on long-term cooling capability. This amount of fiber (7.5g/FA) is not sufficient to establish an effective filtering bed, so the limiting mass of particulates and chemical species cannot be defined by accumulation at the core inlet. The limiting mass of particulate and chemical species is therefore defined by the amount that can be tolerated within the heated core.

Because of the size and nature of debris that reaches the RPV, it may not accumulate at the core inlet. Instead, some or all of the debris may pass through the core inlet and reach the heated core region. While energy from the boiling process precludes debris buildup at the leading edge of a spacer grid, it may force debris into internal grid locations and form localized blockages. Although complete blockage of a fluid sub-channel around a single rod resulting from debris buildup is improbable, the evaluation demonstrates that the requirements of 10 CFR 50.46 are met under this circumstance. The debris plug is completely insulated with heat removal only by axial conduction through the cladding. The peak cladding temperature is below the acceptance criteria of 800 degrees F.

Because of the natural heat generation decrease over time, the assumed decay heat is conservatively based on what would be generated early in the event. In an actual event, the decay heat load and temperature at the center of the plug decreases as time progresses.

The particulate and chemical precipitate calculation demonstrates that the analysis limit amount of particulate and chemical species can be tolerated in the core without affecting core heat transfer. The total debris mass estimate used in the evaluation provides for a conservative design limit.

cale US460 SDAA 6.3-17 Revision 1

deposition analysis model examined the associated effects. The model incorporates the deposition and heat transfer calculations to determine the effect of fibrous, particulate, and chemical debris that deposit on the fuel rods. The model assumes that oxide and crud layers exist on the fuel surfaces before the event with deposition occurring as impurities transport into the crud deposit through large pores. Small particulate and formed precipitates draw into and merge with the growing scale. The analysis shows that the analysis assumed amount of fiber and of particulate in addition to the analysis assumed amount of aluminum deposited on the fuel rods meets the acceptance criteria with additional margin.

Analyses demonstrate adequate design margin with respect to the defined acceptance criteria. Adequate core cooling is ensured at debris levels of up to 7.5gm/FA (fiber), 30 lbm (particulate) and 194.5 lbm (aluminum). The following debris limits are established: 7.5 gm/FA (fiber), 30 lbm (particulate) and 194.5 lbm (aluminum).

4 Tests and Inspections Preoperational testing of the ECCS function ensures that the specified design functions are met during any condition of normal operation, AOOs, or postulated accident conditions. Section 14.2 provides a description of initial plant testing requirements. The applicable guidance of RG 1.79, Revision 2, is in the preoperational testing described in Section 14.2.

Section 3.9.6 and Section 6.6 describe the preservice and inservice testing and inspection programs. The ECCS operational surveillance requirements are addressed in technical specifications.

Chapter 14.3 provides the methodology for the ECCS-related inspections, tests, analyses and acceptance criteria.

5 Instrumentation Requirements The MPS provides for the control of the valves and monitoring instruments required for ECCS actuation. Post-accident monitoring information is in the main control room through the safety display indication system and the module control system that includes ECCS valve position. Section 7.2 addresses the ECCS-related instrumentation.

The ECCS has automatic actuation signals for emergency core cooling and LTOP from the ESFAS portion of the MPS, which also provides for manual actuation of the RVVs and RRVs by manual actuation switches in the main control room.

Automatic actuation signals for the ECCS are from independent and redundant sensors. The ECCS automatically actuates and requires no operator action during the first 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> following event initiation. Table 6.3-1 lists ECCS actuation values.

cale US460 SDAA 6.3-18 Revision 1

groups. The separation groups supply signals to two independent divisions of ESFAS that use two-out-of-four voting so that a single failure of an initiation signal cannot prevent a valid actuation or initiate an invalid actuation.

The EDAS supplies power to the actuators for the ECCS solenoid valves and ECCS valve position indications. This power may not necessarily be available during an accident, and valve closure is not required during an accident. Position indication cabling conforms with Institute of Electronics and Electrical Engineers Std. 323-1974 for the design conditions (temperature, humidity, submergence, pressure, radiation) of containment.

The MPS instrumentation accomplishes the ECCS performance monitoring for RPV riser and CNV water level, temperature, and pressure; reactor pool temperature and level; and valve positions for the ECCS valves, actuators, and containment isolation valves.

The MPS monitors wide range RCS cold temperature and wide range RCS pressure parameters that provide the signal to initiate LTOP (opening of the RVVs). The MCS provides for the control and monitoring instruments of the ECCS Supplemental Boron components.

6 References 6.3-1 NuScale Power, LLC, "Loss-of-Coolant Accident Evaluation Model,"

TR-0516-49422-P, Revision 3.

6.3-2 NuScale Power, LLC, "Extended Passive Cooling and Reactivity Control Methodology," TR-124587-P, Revision 0.

cale US460 SDAA 6.3-19 Revision 1

Parameter(2) Value(1)

Low RPV Riser Level Table 7.1-4 Low low Riser Level Table 7.1-4 RPV low temperature & high pressure (LTOP) actuation The LTOP pressure setpoint is a function of the RCS cold temperature (Table 5.2-5 and Figure 5.2-3).

Low AC Voltage timer Table 7.1-4 ECCS actuation delay after reactor trip Table 7.1-4 High high RCS pressure3 Table 7.1-4 High high RCS average temperature3 Table 7.1-4 1: Additional information for ECCS actuation values is provided in Table 7.1-4.

2: Interlocks for these signals are described in FSAR Table 7.1-5.

3: ECCS actuation provides defense in depth.

cale US460 SDAA 6.3-20 Revision 1

and Operating Parameters vice Condition Parameter RRV RVV Valve Actuators sign conditions Internal design pressure 2200 psia 2200 psia 2200 psia External design pressure 1200 psia 1200 psia 34 psia Design temperature 650°F 650°F 650°F rmal operating Internal pressure 2000 psia 2000 psia 2000 psia conditions External pressure <1 psia <1 psia 14.7 - 28 psia Fluid temperature 486°F 636°F 40 to 160°F Valve external Note 1 Note 1 100°F temperature ident conditions Design temperature <650°F <650°F <650°F Internal pressure <2200 psia <2200 psia <2200 psia 1: Not temperature controlled. At vacuum.

cale US460 SDAA 6.3-21 Revision 1

Scale Final Safety Analysis Report Component Function Failure Mode Failure Effect on System Method of Failure Detection entification Mechanism ctor Vent Valve 1) Maintain Closed A) Spurious opening Mechanical The function of maintaining a closed position

  • Reactor trip (if critical at the time Position Electrical/I&C has failed, and RPV coolant is released intoof failure) mally closed, the CNV. The rest of the ECCS is actuated
  • Valve position indication pen) when the RPV water level reaches the ECCS
  • Pressurizer pressure monitoring actuation setpoint.
  • Pressurizer level monitoring
  • RPV riser level monitoring
  • RPV pressure monitoring
  • CNV pressure monitoring
  • RPV temperature monitoring
  • CNV temperature monitoring B) Leakage in excess Mechanical There is little short-term effect on the system
  • Containment pressure of technical for minor leakage (on the order of the monitoring specification limits technical specification leakage rate limit)
  • Pressurizer level monitoring unless leakage is sufficient to depressurize
  • Monitoring of leakage removed (passive failure) the chamber holding the main valve closed, from CNV by containment which could result in a spurious valve opening evacuation system (CES)

(Spurious Opening above).

  • Monitoring of radioactive gaseous discharge removed from CNV by containment evacuation system (CES)
  • Valve inspection and testing during outages
2) Vent steam to A) Fail to open Mechanical Venting limited to redundant RVVs to ensure
  • Valve position indication CNV for emergency Electrical/I&C the core cooling function of ECCS is
  • Valve inspection and testing core cooling maintained. during outages Emergency Core Cooling System A mechanical failure may cause a single valve to fail to open when actuated. A divisional electrical I&C failure may cause one RVV (and one RRV) to fail to open.

B) Slow opening Mechanical Greater portion of ECCS vent flow rate is

  • Valve position indication Electrical/I&C through the redundant RVV until affected
  • Valve inspection and testing (extended stroke time valve opens completely. In the meantime, the during outages or delayed actuation) redundant RVV ensures the core cooling safety function of the ECCS is not compromised.

Scale Final Safety Analysis Report Component Function Failure Mode Failure Effect on System Method of Failure Detection entification Mechanism C) Spurious closure Mechanical ECCS vented steam flow is exclusively

  • Valve position indication Electrical/I&C through the redundant RVV. Redundant
  • RPV temperature monitoring Operator error RVVs ensures adequate venting and thus (systemic only) successful completion of the ECCS safety
  • RPV pressure monitoring function of core cooling. (systemic only)
  • Valve inspection and testing Spurious closure may be an indication of a during outages systemic issue through Electrical/I&C failure or Operator error and may lead to both RVVs being closed and the ECCS system not providing a flow path for recirculation.

Spurious closure of both valves is not considered credible due to MPS design.

D) Flow blockage Mechanical Reduced or nonexistent flow through affected

  • RPV temperature monitoring valve(s). Redundant RVVs ensures adequate (systemic only)

(passive failure) venting and thus successful completion of the

  • RPV pressure monitoring ECCS safety function of core cooling. (systemic only)
  • Valve inspection and testing Flow blockage may be an indication of a during outages systemic issue and may lead to both valves being blocked. Flow blockage would lead to the ECCS system not providing a flow path for recirculation. Systemic flow blockage of both valves is not consideration credible, Section 6.3.3.1.
3) Depressurize A) Fail to open Mechanical Reduced or nonexistent flow through affected
  • Valve position indication RPV for low Electrical/I&C valve but adequate depressurization rate is
  • Valve inspection and testing Emergency Core Cooling System temperature B) Slow opening Mechanical maintained by redundant RVV, thus ensuring during outages overpressure Electrical/I&C protection of the RPV.

protection (LTOP) (extended stroke time or delayed actuation)

Scale Final Safety Analysis Report Component Function Failure Mode Failure Effect on System Method of Failure Detection entification Mechanism C) Spurious closure Mechanical Reduced or nonexistent flow through affected

  • Valve position indication Electrical/I&C valve(s). Redundant RVVs ensures adequate
  • RPV temperature monitoring Operator error depressurization rate is maintained by (systemic only) redundant RVV, thus ensuring protection of
  • RPV pressure monitoring the RPV. (systemic only)
  • Valve inspection and testing Spurious closure may be an indication of a during outages systemic issue through Electrical/I&C failure or Operator error and may lead to both valves being closed and the ECCS system not providing a flow path for recirculation.

Spurious closure of both valves is not considered credible due to MPS design.

D) Flow blockage Mechanical Reduced or nonexistent flow through affected

  • RPV temperature monitoring valve(s). Redundant RVVs ensures adequate (systemic only)

(passive failure) venting and thus successful completion of the

  • RPV pressure monitoring ECCS safety function of core cooling. (systemic only)
  • Valve inspection and testing Flow blockage may be an indication of a during outages systemic issue and may lead to both valves being blocked. Flow blockage would lead to the ECCS system not providing LTOP relief.

Systemic flow blockage of both valves is not consideration credible, Section 6.3.3.1.

Emergency Core Cooling System

Scale Final Safety Analysis Report Component Function Failure Mode Failure Effect on System Method of Failure Detection entification Mechanism ctor 1) Maintain Closed A) Spurious opening Mechanical The function of maintaining a closed position

  • Reactor trip (if critical at the time rculation Valve Position Electrical/I&C has failed, and RPV coolant is released into of failure) the CNV. The rest of the ECCS is actuated
  • Valve position indication mally closed, when the RPV water level reaches the ECCS
  • Pressurizer pressure monitoring pen) actuation setpoint.
  • Pressurizer level monitoring
  • RPV riser level monitoring
  • RPV pressure monitoring
  • CNV pressure monitoring
  • RPV temperature monitoring
  • CNV temperature monitoring B) Leakage in excess Mechanical There is little short-term effect on the system
  • Containment pressure of technical for minor leakage (on the order of the monitoring specification limits technical specification leakage rate limit)
  • Pressurizer level monitoring unless leakage is sufficient to depressurize
  • Monitoring of leakage removed (passive failure) the chamber holding the main valve closed, from CNV by containment which could result in a spurious valve opening evacuation system (Spurious Opening above).
  • Monitoring of radioactive gaseous discharge removed from CNV by containment evacuation system

Scale Final Safety Analysis Report Component Function Failure Mode Failure Effect on System Method of Failure Detection entification Mechanism

2) Provide flow path A) Fail to open Mechanical Coolant return flow to the RPV is exclusively
  • Valve position indication for condensed Electrical/I&C through the redundant RRV. Core cooling
  • Valve inspection and testing steam to reenter function of ECCS is not compromised. during outages RPV from CNV A mechanical failure may cause a single valve to fail to open when actuated. A divisional electrical/I&C failure may cause one RRV (and one RVV) to fail to open.

B) Slow opening Mechanical Greater portion of ECCS recirculated flow is Electrical/I&C through redundant RRV until affected valve (extended stroke time opens completely. In the meantime, the or delayed actuation) redundant RRV ensures the core cooling safety function of the ECCS is not compromised.

C) Spurious closure Mechanical ECCS recirculation flow is exclusively through

  • Valve position indication Electrical/I&C redundant RRV. In the meantime, the
  • RPV temperature monitoring Operator error redundant RRV ensures the core cooling (systemic only) safety function of the ECCS is not
  • Valve inspection and testing compromised. during outages Spurious closure may be an indication of a systemic issue through Electrical/I&C failure or Operator error and may lead to both valves being closed and the ECCS system not providing a flow path for recirculation.

Spurious closure of both valves is not considered credible due to MPS design.

Emergency Core Cooling System D) Flow blockage Mechanical Reduced or nonexistent flow through affected

  • RPV temperature monitoring valve(s). In the meantime, the redundant RRV (systemic only)

(passive failure) ensures the core cooling safety function of the

  • Valve inspection and testing ECCS is not compromised. during outages Flow blockage may be an indication of a systemic issue and may lead to both valves being blocked. Flow blockage would lead to the ECCS system not providing a flow path for recirculation. Systemic flow blockage of both valves is not consideration credible, Section 6.3.3.1.

Scale Final Safety Analysis Report Component Function Failure Mode Failure Effect on System Method of Failure Detection entification Mechanism S valves 1) Maintain Closed A) Spurious opening Electrical/I&C The core cooling safety function is

  • Reactor trip (if critical at the time rolled by one Position Operator error maintained. The affected RVV would open of failure)

AS division immediately, but the RRV is blocked from

  • Valve position indication e RVV and one opening by the IAB. This failure then
  • Pressurizer pressure monitoring V controlled by proceeds similarly to the spurious opening of
  • Pressurizer level monitoring same division. a single RVV. The IAB keeps the RRV closed
  • RPV riser level monitoring until the differential pressure between the
  • RPV pressure monitoring mally closed, RPV and CNV drops below the IAB release
  • CNV pressure monitoring pen) pressure setting. If a second failure occurs
  • RPV temperature monitoring and the IAB fails to block the spurious
  • CNV temperature monitoring opening of the RRV through additional mechanical failure, then the RRV opens immediately.

The rest of the ECCS is actuated when the RPV water level reaches the ECCS actuation setpoint.

S valves with 1) Maintain Closed A) Spurious opening Mechanical The core cooling safety function is

  • Reactor trip (if critical at the time re of shared Position maintained. The affected RVVs would open of failure) injection line immediately, but the RRVs are blocked from
  • Valve position indication VVs and all opening by the IAB. This failure then
  • Pressurizer pressure monitoring s proceeds with a spurious opening of both
  • Pressurizer level monitoring RVVs. The IAB keeps the RRVs closed until
  • RPV riser level monitoring mally closed, the differential pressure between the RPV
  • RPV pressure monitoring pen) and CNV drops below the IAB release
  • CNV pressure monitoring pressure setting. If a second failure occurs
  • RPV temperature monitoring and the IAB fails to block the spurious
  • CNV temperature monitoring Emergency Core Cooling System opening of an RRV through additional mechanical failure, then the affected RRV is opens immediately.

Scale Final Safety Analysis Report Component Function Failure Mode Failure Effect on System Method of Failure Detection entification Mechanism er Mixing Tube 1) Collect and A) Flow blockage Mechanical CNV mixing tube does not transport

  • ICI neutron flux monitoring transport (passive) condensate to the bottom of containment for
  • ICI temperature monitoring condensate to the B) Breach in fluid Mechanical mixing. Colder borated coolant remains in the
  • NMS excore neutron flux bottom of boundary (passive) lower containment and is not recirculated monitoring containment for through the RRV for reactivity control. Failure
  • RPV temperature monitoring recirculating coolant to maintain subcriticality during long term
  • RPV pressure monitoring mixing during ECCS cooling following some design basis events.

actuation. Blockage and structural failure of either lower mixing tube is not considered credible with passive design of the lower mixing tube.

plemental 1) Dissolve boric A) Flow blockage Mechanical Full blockage of flow into the dissolver

  • ICI neutron monitoring n Dissolver oxide for boron (passive) prevents dissolution and boron addition.
  • ICI core temperature monitoring addition into ECCS Partial blockage of flow may not allow
  • NMS excore neutron monitoring recirculating coolant dissolution to meet the needed boron
  • RPV temperature monitoring concentration increase within the time
  • RPV pressure monitoring required.

Failure to increase the boron concentration in the ECCS recirculating coolant within the time required to maintain subcriticality following some design basis events. Blockage of either supplemental boron dissolver is not considered credible with passive design of the supplemental boron dissolver.

B) Breach in fluid Mechanical Breach in fluid boundary prevents condensate boundary (passive) flow from performing dissolution to meet the needed boron concentration increase within Emergency Core Cooling System the time required.

Failure to increase the boron concentration in the ECCS recirculating coolant within the time required to maintain subcriticality during long term cooling following some design basis events. Structural failure of either supplemental boron dissolver is not considered credible with passive design of the supplemental boron dissolver.

Scale Final Safety Analysis Report SSC Location SSC Augmented Quality Group/Safety Seismic Classification (Note 1) Classification Design Classification (Ref. RG 1.29 or RG 1.143)

(A1, A2, B1, B2)

Requirements (Ref RG 1.26 or RG 1.143) (Note 4)

(Note 2) (Note 3)

ECCS, Emergency Core Cooling System omponents (except those listed below)- RXB A1 None A I set valve RXB A2 None A I set lines p lines plemental boron lower mixing tube and RXB A2 None N/A I olver V position indication RXB B2

  • IEEE 497-2016 N/A I V position indication (Note 5) p valve position indication set valve position indication RXB B2 None N/A II pplemental boron dissolver indication ssolver loading hopper 1: Acronyms used in this table are listed in Table 1.1-1 2: Additional augmented design requirements, such as the application of a Quality Group, Radwaste safety, or seismic classification, to nonsafety-related SSC are reflected in the columns Quality Group / Safety Classification and Seismic Classification, where applicable. Environmental Qualifications of SSC are identified in Table 3.11-1.

3: Section 3.2.2.1 through Section 3.2.2.4 provides the applicable codes and standards for each RG 1.26 Quality Group designation (A, B, C, and D). A Quality Group classification per RG 1.26 is not applicable to supports or instrumentation that do not serve a pressure boundary function. Section 3.2.1.4 provides a description of RG 1.143 classification for RW-IIa, RW-IIb, and RW-IIc.

4: Where SSC (or portions thereof) as determined in the as-built plant that are identified as Seismic Category III in this table could, as the result of a seismic event, adversely affect Seismic Category I SSC or result in incapacitating injury to occupants of the control room, they are categorized as Seismic Category II consistent with Section 3.2.1.2 and analyzed as described in Section 3.7.3.8.

5: IEEE Std 497-2016 as endorsed by RG 1.97 and implemented as described in Table 1.9-2 Emergency Core Cooling System

Scale Final Safety Analysis Report CONTAINMENT VESSEL FROM RCS 5(6(79$/9( 5(6(79$/9(

ZSC ZSO ZSO ZSC S FC FC S 75,39$/9( 75,39$/9(

ZSC ZSO ZSO ZSC S FO FO S ZSC ZSO REACTOR PRESSURE ZSO ZSC P VESSEL P FO FO 75,39$/9( FROM RCS FROM RCS 75,39$/9(

ZSC ZSO 5($&7259(179$/9( 5($&7259(179$/9(

ZSO ZSC S FO TO CNV TO CNV FO S TO CNV DISSOLVER DISSOLVER LOADING HOPPER 1 LOADING HOPPER 2 TO CNV TO CNV 75,39$/9( 75,39$/9(

ZSC ZSO SUPPLEMENTAL SUPPLEMENTAL ZSO ZSC S FO FO S BORON BORON LS LS DISSOLVER 2 LS LS DISSOLVER 1 TO CNV TO CNV 75,39$/9( 75,39$/9(

ZSC ZSO ZSO ZSC S FO FO S IAB P P IAB 5(6(79$/9( 5(6(79$/9(

ZSC ZSO FO RPV1 RPV2 FO ZSO ZSC S FC FROM RCS FROM RCS FC S ZSC ZSO 5($&7255(&,5&8/$7,219$/9( 5($&7255(&,5&8/$7,219$/9( ZSO ZSC TO CNV TO CNV CNV LOWER CNV LOWER MIXING TUBE 1 MIXING TUBE 2 Emergency Core Cooling System TO CNV

Reactor Vent Valves Containment Vessel Reactor Vessel Hopper Pressurizer Hopper Dissolver Dissolver Steam Generator Mixing Mixing Tube Tube Reactor Reactor Recirculation Recirculation Valve Valve Reactor Core cale US460 SDAA 6.3-31 Revision 1

Scale Final Safety Analysis Report Valve Tubing Safe-end S Reset Valve Reset Supply (from CVCS)

Tubing Valve P

RVV S S Trip Valves Valve Vessel Valve Vessel CNV RPV Emergency Core Cooling System

Scale Final Safety Analysis Report Safe-end S Reset Valve Reset Supply RRV (from CVCS)

RPV P IAB Tubing Valve Valve Tubing S S Trip Valves CNV Vessel Valve Vessel Valve Emergency Core Cooling System

Control room habitability refers to the conditions required for life support and safe, effective operation of the plant during normal conditions and following an accident. These conditions include adequate lighting, food, water, air, and climate control. Systems and equipment provide habitability functions to protect the operators against postulated releases such as radioactive materials and smoke. Control room habitability functions include:

  • missile protection (Section 3.5)
  • radiation shielding (Chapter 12, Radiation Protection)
  • normal pressurization, air filtration, and air conditioning (Section 9.4.1)
  • fire protection (Section 9.5.1)
  • radiation monitoring (Section 9.4.1 and Section 11.5)
  • smoke detection (Section 9.4.1)
  • lighting (Section 9.5.3)

This section describes the control room habitability system (CRHS), which provides breathable air to the control room for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> without reliance on electrical power if the normal control room HVAC system (CRVS) is unavailable. After 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, the CRVS, if restored, provides filtered heating, ventilation, and air conditioning (HVAC) service to the control building (CRB) for the remainder of an event recovery period (the CRVS is described in Section 9.4.1).

1 Design Bases The CRHS is a nonsafety-related system that provides emergency breathing air to the control room envelope (CRE) and maintains a positive control room pressure for habitability and control of radioactivity when conditions prohibit the CRVS from fulfilling these functions.

General Design Criterion 4 is considered in the design of the CRHS. The CRHS is designed to be compatible with the environmental conditions associated with normal operation, maintenance, testing, and postulated accidents. The CRHS components are located in the CRB, which provides protection from potential adverse environmental conditions. The CRHS air bottle racks are designed to ensure that the air bottles do not become missiles within the CRB.

General Design Criterion 5 is considered in the design of the CRHS. The CRHS services the control room that contains the controls for up to six NuScale Power Modules and is designed such that a failure of one portion of the system does not impair the ability to perform its regulatory required functions including, in the event of an accident in one module, an orderly shutdown and cooldown of the remaining module(s).

The CRHS, in conjunction with the CRVS, provides compliance with Principal Design Criterion (PDC) 19, as it relates to maintaining the control room in a safe condition cale US460 SDAA 6.4-1 Revision 1

described in Section 9.4.1. Upon detection of smoke in the outside air duct, the plant control system closes the outside air isolation dampers to isolate the CRB from the environment. The CRB is not pressurized under these conditions.

In conjunction with the CRVS, the design of the CRHS satisfies 10 CFR 50.34(f)(2)(xxviii), in that it provides assurance that, in the event of an accident, radiation doses to operators do not exceed acceptable limits and do not prevent operators from performing control functions.

2 System Design The CRE includes the main control room (MCR), reference room, shift manager's office, shift turnover room, office space, and other areas to support MCR operation.

These areas are either frequently or continuously occupied. The CRE includes air locks for ingress and egress.

The CRVS provides normal HVAC service to the CRE. The CRVS includes redundant isolation dampers that close to isolate the CRE. The supply of breathing air from the CRHS limits the concentration of carbon dioxide in the CRE to the value given in Table 6.4-1 for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after the CRE is isolated.

The major components of the CRHS include:

  • high pressure air compressor
  • high pressure air storage bottles
  • air bottle racks
  • eductor
  • silencers
  • piping, valves, and instrumentation The CRHS design includes an external air supply connection so that the air bottles can be replenished from an offsite source in the event that the compressor is unavailable or local air is contaminated.

2.1 High Pressure Air Compressor An air compressor charges the emergency air storage bottles. The compressor uses intake filtration to provide breathing quality air that meets the standards of Compressed Gas Association G-7.1 Level D (Reference 6.4-1).

2.2 Air Bottles The CRHS air storage bottles are located on an elevation below the CRE.

Table 6.4-1 provides the design parameter for the number of personnel assumed in the CRE. The CRHS includes a sufficient number of bottles to maintain the cale US460 SDAA 6.4-2 Revision 1

2.3 Valves Compressed air supply lines contain pressure regulating valves located downstream of the common supply header. The outlet pressure of the regulating valves is set to function with a downstream orifice to maintain pressure within the CRE.

Two normally closed air supply isolation valves in parallel in the main supply line maintain the pressure boundary of the common supply header. These solenoid operated valves operate remotely and are located within the CRE pressure boundary downstream of the pressure regulating valves and orifice. These valves initiate breathing air flow to the CRE upon receipt of a signal to open.

The alternate air delivery flowpath contains a normally closed, manually operated valve, located within the CRE pressure boundary. This valve provides a means of manually activating the alternate air delivery flowpath in the event the main air delivery flowpath is inoperable. This alternative flowpath has separate pressure regulating equipment and is capable of supplying air to the CRE at the required flow rate.

Two redundant pressure relief solenoid valves in parallel allow air to exit the CRE during CRHS operation to maintain the CRE at the desired pressure. A manual balancing valve is provided downstream of the solenoid valves.

3 System Operation 3.1 Normal Operation The CRHS is in standby mode during normal plant operation, with the air bottles pressurized and available to provide breathing air and CRE pressurization when actuated.

3.2 Off-Normal Operation The plant protection system generates a signal to actuate the CRHS on the following conditions:

  • high radiation detected in the CRE supply duct
  • loss of power to both CRVS air handling units, after a ten-minute delay
  • loss of power to the common augmented direct current (DC) power system battery chargers, after a ten-minute delay When one of the conditions listed above occurs, the following actions occur:
  • The isolation dampers in the CRVS ducts that penetrate the CRE close, isolating the CRE from its surroundings.

cale US460 SDAA 6.4-3 Revision 1

  • The CRHS pressure relief isolation valves open, allowing air to discharge from the CRE to the surroundings.
  • The CRVS outside air isolation dampers close and the operating supply air handling unit and general exhaust fan stop.

These actions provide CRE occupants with clean breathing air under conditions in which the normal air supply may be contaminated. The ten-minute delay allows operators time to restore power if possible and prevent an unnecessary initiation of the CRHS.

A loss of DC power from the common augmented DC power system to either division of the plant protection system actuates the CRHS.

Operators in the MCR can monitor the differential pressure between the CRE and the surrounding area to ensure that a positive pressure is maintained in the control room with respect to its surroundings. Alarms in the MCR alert the operators to both low and high CRE differential pressure conditions. Operators can manually adjust the CRE balancing valves as needed to restore the desired pressure.

4 Design Evaluation As noted in Section 15.0 (Transient and Accident Analyses), no operator actions are required or credited to mitigate the consequences of design basis events. As such, the operators perform no safety-related functions, as defined in 10 CFR 50.2.

Therefore, although a habitable control room is provided for the operators to perform other important nonsafety-related functions, the CRE and supporting habitability systems and components, including the CRHS, are not safety-related.

The air bottles and racks, supply piping and associated valves, and pressure relief solenoid valves are designated as Seismic Category I per Regulatory Guide (RG) 1.29. The air compressor and piping up to the isolation valves between the compressor and the air bottles are designed to Seismic Category III standards.

Table 6.4-4 identifies SSC classifications for CHRS.

The CRHS does not serve the technical support center (TSC), and therefore does not provide pressurization air to the TSC in the event the CRVS is unavailable. If the CRVS is not able to provide air of acceptable quality for pressurization of the TSC, the TSC is considered uninhabitable and is evacuated. The TSC function is then transferred to another location in accordance with the emergency plan.

4.1 Radiological Protection In the presence of significant airborne radiation in the CRE supply duct, the CRVS radiation monitors generate a signal that results in isolation of the CRE, securing CRVS operation, and initiating CRHS operation. The integrated design of the CRE, the CRVS, and the CRHS prevents radioactive materials from entering the cale US460 SDAA 6.4-4 Revision 1

radioactive materials.

With the CRHS in operation, the CRE is maintained at a positive pressure of at least 1/8-inch water column with respect to its surroundings. Table 6.4-1 summarizes the flow requirements to maintain this pressurization, as well as the flow requirements to maintain the level of carbon dioxide in the CRE below the acceptable limit.

Section 15.0, Transient and Accident Analyses, discusses the radiological consequences of postulated accidents. Analysis shows that the sum of radiation doses to control room personnel from all sources is less than 5 rem for the duration of a postulated accident. These results demonstrate compliance with 10 CFR 50.34(f)(2)(xxviii).

4.2 Toxic Gas Protection L Item 6.4-1: An applicant that references the NuScale Power Plant US460 standard design will comply with Regulatory Guide 1.78 Revision 2, "Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release."

4.3 Other Habitability Considerations When normal HVAC service from the CRVS is not available, the thermal mass of the CRB and its contents limit the temperature increase as shown in Table 6.4-2.

The analysis uses the conservative assumption that control room equipment powered by the normal DC power system remains powered for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. After 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, the CRVS, if available, provides cooling to the CRE.

The MCR has adequate lighting for safe operation of the plant during accidents and all modes of operation. Section 9.5.3 provides information on the plant lighting system.

The CRE includes access to procedures, drawings, and other technical resources useful for mitigating accident conditions. The CRE includes lavatories, kitchen facilities, and break areas.

5 Testing and Inspection Section 14.2 provides information regarding preoperational testing.

Inservice testing includes demonstration of the integrity of the CRE in accordance with RG 1.197 and evaluation of the CRHS in accordance with RG 1.196 as specified in Table 6.4-3.

Controls over the availability and reliability of the CRHS and the CRE will be included in the owner-controlled requirements manual.

cale US460 SDAA 6.4-5 Revision 1

6.4-1 Compressed Gas Association Inc., Commodity Specification for Air, CGA G-7.1-2018, Sixth Edition, Chantilly, VA.

cale US460 SDAA 6.4-6 Revision 1

Table 6.4-1: Control Room Habitability System Design Parameters Parameter Value onnel assumed present in control room envelope 20 people ation of supply air for breathing and pressurization 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> surization At least 1/8-inch water gauge with respect to adjacent areas. This requires at least 60 scfm based on estimated CRE leakage.

thing air supply flow rate At least 89.4 scfm in order to maintain acceptable levels of CO2, but not greater than 107 scfm in order to ensure a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> supply of air.

bon dioxide level in main control room 5000 ppm maximum trol room envelope unfiltered inleakage with the 10* cfm plus 5 cfm assumed for air lock operation.

S pressurizing the control room envelope to at least nch water gauge with respect to surrounding areas cause the CRE is pressurized, the unfiltered inleakage is expected to be 0 cfm. However, the dose analysis nservatively assumes 10 cfm of unfiltered inleakage.

cale US460 SDAA 6.4-7 Revision 1

Table 6.4-2: Main Control Room Temperature under Passive Cooling Conditions e after loss of normal Dry Bulb Temperature Relative Humidity Wet Bulb Globe cooling (ºF) (%) Temperature (hours) (ºF) 0 78.0 60.0 67.3 1 97.8 39.7 76.1 2 102 34.1 76.3 3 104 29.9 75.5 4 99.9 31.7 73.7 8 99.7 28.6 71.9 24 100 24.4 70.1 48 102 23.0 70.2 72 103 22.2 70.5 cale US460 SDAA 6.4-8 Revision 1

Parameter Acceptance Criteria pressure with CRHS in service 1/8 inch water gauge S flow rate from storage bottles to CRE via actuated 89.4 scfm and 107 scfm path S flow rate from storage bottles to CRE via manual 89.4 scfm and 107 scfm path isolation dampers required for CRHS operation close on CRHS actuation signal S stored air quality (oxygen, carbon dioxide, carbon CGA G-7.1 Level D oxide, oil, dew point) supplied by the CRHS air pressor S available air inventory 37,900 lbm S supply actuation valves and CRE pressure relief Stroke open on CRHS actuation signal es operation S pressure regulating valves operation Within pressure specifications cale US460 SDAA 6.4-9 Revision 1

Scale Final Safety Analysis Report SSC Location SSC Augmented Quality Group/Safety Seismic Classification (Note 1) Classification Design Classification (Ref. RG 1.29 or RG 1.143)

(A1, A2, B1, B2)

Requirements (Ref RG 1.26 or RG 1.143) (Note 4)

(Note 2) (Note 3)

CRHS, Control Room Habitability System omponents (except those listed below): CRB B2 Environmentally N/A I Qualified supply solenoid isolation valves CRB B2 IEEE 497-2016 N/A I E solenoid vent relief valve (Note 5) supply solenoid isolation valve position ication E solenoid vent relief valve position indication Control Room Habitability

Scale Final Safety Analysis Report SSC Location SSC Augmented Quality Group/Safety Seismic Classification (Note 1) Classification Design Classification (Ref. RG 1.29 or RG 1.143)

(A1, A2, B1, B2) Requirements (Ref RG 1.26 or RG 1.143) (Note 4)

(Note 2) (Note 3) eathing air compressor and associated check, CRB B2 None N/A III ain, and isolation valves ter-dryer assembly ow element root valves yer drain valve xiliary supply hand valves d pressure instrumentation root valves RH-HV-044A and B, CRH-HV-0031, H-HV-0032, and CRH-HV-0033) st branch isolation valves (CRH-HV-0034 ough CRH-HV-0037 and CRH-HV-0039 ough CRH-HV-0042) d Bottle skid isolation relief valves pply header common bottle pressure trumentation tomatic supply & manual bypass line pressure trumentation ternal air supply carbon monoxide trumentation 1: Acronyms used in this table are listed in Table 1.1-1 2: Additional augmented design requirements, such as the application of a Quality Group, Radwaste safety, or seismic classification, to nonsafety-related SSC are reflected in the columns Quality Group / Safety Classification and Seismic Classification, where applicable. Environmental Qualifications of SSC are identified in Table 3.11-1.

3: Section 3.2.2.1 through Section 3.2.2.4 provides the applicable codes and standards for each RG 1.26 Quality Group designation (A, B, C, and D). A Quality Group classification per RG 1.26 is not applicable to supports or instrumentation. Section 3.2.1.4 provides a description of RG 1.143 classification for RW-IIa, RW-IIb, and RW-IIc.

4: Where SSC (or portions thereof) as determined in the as-built plant that are identified as Seismic Category III in this table could, as the result of a seismic Control Room Habitability event, adversely affect Seismic Category I SSC or result in incapacitating injury to occupants of the control room, they are categorized as Seismic Category II consistent with Section 3.2.1.2 and analyzed as described in Section 3.7.3.8.

5: IEEE Std 497-2016 as endorsed by RG 1.97 and implemented as described in Table 1.9-2

1 Engineered Safety Features Filter Systems The design does not use engineered safety feature (ESF) filter systems or ESF ventilation systems to mitigate the consequences of a design basis accident (DBA).

The design incorporates the nonsafety-related reactor building heating ventilation and air conditioning system that includes filtering, which is not credited in the dose analysis.

2 Containment Spray Systems The design does not use ESF containment spray systems to mitigate the consequences of a DBA.

3 Fission Product Control Systems There are no design basis events that result in significant core damage in the design.

Core damage occurs only as a result of multiple coincident postulated failures. The only ESF fission product control systems credited to mitigate the consequences of a DBA or a beyond-design-basis core damage event (described in Chapter 15) in the design are the containment vessel (CNV) in conjunction with the containment isolation system. Meeting regulatory requirements does not require active fission product removal systems in the design. The containment design includes inherent natural aerosol removal mechanisms, such as thermophoresis, diffusiophoresis, hygroscopicity, and sedimentation. Chapter 15 discusses these passive removal processes, which deplete elemental iodine and particulates in the containment atmosphere. The limited containment leakage and these natural fission product control mechanisms result in offsite doses that are less than regulatory limits, thus satisfying the fission product control requirement of principal design criterion 41.

General Design Criterion (GDC) 42 and GDC 43 do not apply to the design because the design does not include containment cleanup systems that would be subject to those GDCs.

3.1 Primary Containment An ESF function of the containment provides a barrier to fission product migration to the environment in the event of a release of core fission products to the containment atmosphere. Table 6.5-1 provides the CNV key attributes.

Chapter 15 addresses the fission product control by the CNV and containment isolation system.

3.2 Secondary Containments The design does not use a secondary containment to mitigate the consequences of a DBA. The Reactor Building delays releases to the environment and allows fission products to deposit on its surfaces in the event of a severe accident; however, this is not credited in the dose analysis associated with the design.

cale US460 SDAA 6.5-1 Revision 1

The design does not use an ice condenser to mitigate the consequences of a DBA.

5 Pressure Suppression Pool as a Fission Product Cleanup System The design does not utilize a suppression pool to mitigate the consequences of a DBA.

cale US460 SDAA 6.5-2 Revision 1

Parameter Value ign-basis containment leak rate (La) 0.2 wt% per day ign-basis containment leak rate after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0.1 wt% per day tainment minimum free volume 6000 cu ft cale US460 SDAA 6.5-3 Revision 1

In accordance with General Design Criterion 1, Class 2 and 3 components and systems undergo inspection and testing to quality standards commensurate with their safety functions. Generally recognized codes and standards undergo evaluation for applicability and adequacy. If necessary, these requirements undergo modification to assure quality commensurate with the required safety function. The description of the Quality Assurance Program, which governs the quality standards for the inservice inspection (ISI) program and supporting documentation, is in Chapter 17.

The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC)Section XI defines the ISI Program requirements for Class 2 and Class 3 systems and components.

The basis for the ISI program for Class 2 and 3 components is 10 CFR 50.55a(g)(3),

which requires that ASME BPVC Class components allow for the inspections detailed in Reference 6.6-1.

The initial ISI program incorporates an edition of the ASME BPVC approved in 10 CFR 50.55a(b). The ISI of components and system pressure tests conducted during successive 120-month inspection intervals comply with the requirements of the of the ASME BPVC incorporated by reference in 10 CFR 50.55a(b) subject to the conditions listed in 10 CFR 50.55a(b). In addition, the optional ASME BPVC cases listed in Regulatory Guide (RG) 1.147 may be used. The ASME BPVC includes requirements for system leakage tests for active components. The ASME BPVC Section XI, Article IWC-5220 for Class 2 pressure retaining components defines the requirements for system leakage tests and ASME BPVC Section XI, Article IWD-5220 for Class 3 pressure retaining components defines the requirements for system leakage tests. These tests verify the pressure boundary integrity in conjunction with ISI.

The Preservice Inspection Program (non-destructive baseline examination) includes the selection of areas subject to inspection, non-destructive examination methods, and the extent of preservice inspections and frequency of inspections.

There are no exemptions to the ISI requirements for Class 2 and 3 systems, structures, and components. There are no relief requests necessary for preservice inspection and first interval ISI examinations for Class 2 and 3 components.

The inservice testing program meets the requirements set forth in Reference 6.6-3, as stipulated in 10 CFR 50.55a(f). Section 3.9.6 provides details of the Inservice Testing Program.

Section 3.13.2 describes the ISI requirements for Class 1, 2, and 3 threaded fasteners.

Technical Specifications provide the administrative controls and surveillance requirements specified by 10 CFR 50.36.

L Item 6.6-1: An applicant that references the NuScale Power Plant US460 standard design will develop Preservice Inspection and Inservice Inspection Program plans in accordance with Section XI of the American Society of Mechanical Engineers cale US460 SDAA 6.6-1 Revision 1

the American Society of Mechanical Engineers Boiler and Pressure Vessel Code used in the program plan consistent with the requirements of 10 CFR 50.55a. The applicant will, if needed, address the use of a single Inservice Inspection Program for multiple NuScale Power Modules, including any alternative to the code that may be necessary to implement such an Inservice Inspection Program.

1 Components Subject to Examination The ASME BPVC Class 2 and 3 components undergo preservice inspection and ISI in accordance with Reference 6.6-1. These components are RG 1.26, Quality Group B and C components, respectively. Section 3.2.2 describes the ASME BPVC Class 2 boundaries, based on RG 1.26 for Quality Group B. Section 3.2.2 describes the ASME Class 3 boundaries, based on RG 1.26 for Quality Group C. ASME Class boundaries for piping penetrating the CNV are depicted by Figure 6.6-1.

The ASME BPVC Class 2 and 3 pressure-retaining components and supports subject to examination include pressure vessels, piping, valves, and their bolting.

Section 3.13.2 describes the preservice inspection and ISI of threaded fasteners, in accordance with the requirements and the criteria of ASME BPVC,Section XI for bolting and mechanical joints used in ASME BPVC Class 2 systems.

Examination of the ASME BPVC Class 2 pressure retaining components and integral attachments is in accordance with the requirements of ASME BPVC Section XI Article IWC-2500.

Examination of the ASME BPVC Class 3 pressure retaining components and integral attachments is in accordance with the requirements of ASME BPVC Section XI, Article IWD-2500.

2 Accessibility In accordance with 10 CFR 50.55a(g)(3), Class 2 and Class 3 systems and components (including supports) have access to enable the performance of inservice examinations.

The design and layout of the Code Class 2 and 3 systems allows for the performance of the ISI requirements contained in ASME BPVC Section XI, Articles IWC-2000 and IWD-2000, and as defined in the ISI program.

Design, materials, and geometry do not restrict inspections required by ASME BPVC Section XI. The piping arrangement allows for adequate separation of piping welds so that there is space available to perform ISI. Sections of straight pipe of sufficient length to conduct inspections of separate adjacent welds are provided. The location of welds in piping that passes through walls is away from the wall as required by ASME BPVC Section XI. Component nozzles, tees, elbows, valves, branch cale US460 SDAA 6.6-2 Revision 1

In accordance with ASME BPVC Section XI, Article IWA-1500(d), there is space for examinations alternative to those specified, in the event that there are structural defects or modifications requiring alternative examinations. In accordance with ASME BPVC Section XI, Article IWA-1500(e), there is space for necessary operations associated with repair or replacement activities.

Piping and pipe support locations, insulation, hangers, and stops do not interfere with the inspection equipment and personnel. Where this cannot be done, the components are removable.

The Nuscale Power Plant ensures accessibility of welds and other areas requiring periodic inspection. Reinforcing pads, supports, piping, and equipment do not obstruct welds. Removable insulating materials above the containment vessel provide accessibility for ISI.

Areas requiring inspection and servicing of valves provide working platforms.

Temporary or permanent working platforms, walkways, scaffolding, and ladders facilitate access to piping and component welds. The components and welds requiring ISI allow for the application of the required ISI methods. Such design features include sufficient clearances for personnel and equipment, maximized examination surface distances, access, favorable materials, weld-joint simplicity, elimination of geometrical interferences, and proper weld surface preparation.

Some ASME BPVC Class 2 and 3 components are in modules fabricated offsite and shipped to the site. The modules design and engineering provides access for preservice inspections, ISI, and maintenance activities.

3 Examination Techniques and Procedures The ISI examination techniques include visual, surface, and volumetric examination methods. The examination procedures describe the examination equipment, inspection techniques, operator qualifications, calibration standards, flaw evaluation methods, and records. The techniques and procedures meet the requirements of ASME BPVC Section XI, Articles IWA-2000, IWC-2000 and IWD-2000. Preservice inspection and subsequent ISI use equivalent equipment and techniques.

Preservice inspections occur once, in accordance with ASME BPVC,Section XI, Article IWC-2000 and Article IWD-2000.

Qualification of ultrasonic examination equipment, and procedures is in accordance with ASME BPVC,Section XI.

The ASME BPVC Case N-849, In Situ VT-3 Examination of Removable Core Support Structure Without Removal meets the conditions in NRC Regulatory Guide 1.147.

Alternate examination methods are not used.

cale US460 SDAA 6.6-3 Revision 1

For inside containment piping, the inspection intervals for Class 2 examinations in the ISI Program follow ASME BPVC Section XI, Articles IWA-2400 and IWC-2400. ASME BPVC Section XI, Article IWC-2500, Examination Category C-F-1 requires volumetric and surface examination of Class 2 piping welds larger than nominal pipe size (NPS) 4 and equal to or greater than 3/8 inch thick, and for piping welds NPS 2 or larger greater than 1/5 inch thick. However, ASME BPVC Section XI, Article IWC-1220 exempts most Class 2 piping NPS 4 and smaller from ISI. The exceptions are high pressure injection systems and auxiliary feedwater systems, which do not exist in the design. For pipe break exclusion zone considerations, welds in the main steam, feedwater, and decay heat removal system piping undergo volumetric examination.

For outside containment pipe break exclusion considerations, welds from the containment vessel nozzles to the isolation valves undergo volumetric examinations.

This includes pressurizer (PZR) spray, chemical and volume control (CVC) injection and discharge, reactor pressure vessel (RPV) high point degasification, and main steam and feedwater piping. These piping systems range from NPS 2 to NPS 12.

Piping beyond the containment isolation valves is ASME BPVC Section III, Class 3, or ASME BPVC B31.1. The ASME BPVC Section XI, Class 3 piping requires a VT-2 examination during system leakage testing. Welded attachments that perform a component support function require a visual/VT-1 examination. Piping constructed to ASME BPVC B31.1 is outside the scope of ASME BPVC Section XI.

The inspection intervals for Class 3 examinations in the ISI Program are in accordance with ASME BPVC Section XI, Article IWD-2400 and Article IWF-2400.

Piping beyond the containment isolation valves is ASME BPVC Section III, Class 3, or ASME BPVC B31.1. The ASME BPVC Section XI, Class 3 piping requires a VT-2 examination during system leakage testing. Welded attachments that perform a component support function require a visual/VT-1 examination. Piping constructed to ASME BPVC B31.1 is outside the scope of ASME BPVC Section XI.

The Examination Program for the 120-month inspection interval is described in the ISI Program. The Initial Inservice Inspection Program incorporates the ASME BPVC approved in 10 CFR 50.55a(b) prior to initial fuel load, as specified in 10 CFR 50.55a.

The ISI of components and system pressure tests occur during successive 120-month inspection intervals and comply with the requirements of the ASME BPVC incorporated by reference in 10 CFR 50.55a(b), subject to the conditions listed in 10 CFR 50.55a(b).

5 Examination Categories and Requirements Examination categories and requirements for Class 2 systems and components are in accordance with ASME BPVC Section XI, Article IWC-2500 and Table IWC-2500-1.

For Class 3 systems and components, the examination categories and requirements are in conformance with ASME BPVC Section XI, Article IWD-2500 and Table IWD-2500-1.

cale US460 SDAA 6.6-4 Revision 1

IWF-1200.

Examination categories for ASME BPVC Class 2 pressure retaining components include C-F-1 (pressure retaining welds in austenitic stainless steel or high alloy piping) and F-A (component supports).

Examination categories for ASME BPVC Class 3 pressure retaining components include D-A (welded attachments for vessels, piping, pumps, and valves) and F-A (component supports).

6 Evaluation of Examination Results Performance of evaluations of Class 2 examination results are in accordance with ASME BPVC Section XI, Articles IWA-3000 and IWC-3000.

Performance of evaluations of Class 3 examination results are in accordance with ASME BPVC Section XI, Articles IWA-3000 and IWD-3000.

Documentation of the results of the examinations and evaluations are in accordance with ASME BPVC Section XI, Article IWA-6000.

The procedures for repair and replacement of Class 2 and 3 components are in accordance with ASME BPVC Section XI, Article IWA-4000.

7 System Pressure Tests Performance of system pressure tests of Class 2 systems are in accordance with ASME BPVC Section XI, Articles IWA-5000 and IWC-5000 and Table IWC-2500-1.

Performance of system pressure tests of Class 3 systems are in accordance with ASME BPVC Section XI, Articles IWA-5000 and IWD-5000 and Table IWD-2500-1.

8 Augmented Inservice Inspection to Protect Against Postulated Piping Failures The Class 2 and Class 3 ISI program includes augmented ISI to protect against postulated piping failures. These inspections provide reasonable assurance of the structural integrity of cold-worked austenitic stainless steel components (Section 6.1.1).

Section 3.6.2 defines high-energy piping systems as fluid systems that, during normal plant conditions, are either in operation or maintain pressurization under conditions where either the maximum operating temperature exceeds 200 degrees or the maximum operating pressure exceeds 275 psig.

The examination areas include the high-energy fluid piping systems described in Section 3.6.1 and Section 3.6.2.

cale US460 SDAA 6.6-5 Revision 1

vessel safe-end and nozzle welds connected to piping or containment isolation valves within containment penetration areas.

9 References 6.6-1 American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, 2017 edition,Section XI, Division 1, "Rules for Inservice Inspection of Nuclear Components," New York, NY.

6.6-2 American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, 2017 edition,Section III, Division 1, "Rules for Construction of Nuclear Facility Components," New York, NY.

6.6-3 American Society of Mechanical Engineers, Operation and Maintenance of Nuclear Power Plants, ASME OM-2017, New York, NY.

cale US460 SDAA 6.6-6 Revision 1

ASME CLASS 1 ASME CLASS 2 Containment Containment ASME CLASS 3 Inside ASME B31.1 System Vessel Head Containment (CNT)

Open to NPS 4 Containment CNV 10 ASME B31.1 Evacuation Containment CNT Flood and Drain NPS 2 Containment NPS 2 ASME Class 2 CNV 11 ASME B31.1 Flood & Drain NPS 2 RCS Injection NPS 2 CVC NPS 2 RPV 11 CNV 6 ASME RCS Injection NPS 2 ASME CL 1 ASME CL 3 ASME B31.1 B31.1 RCS Discharge NPS 2 NPS 2 RPV 12 NPS 2 ASME CL 1 CNV 13 ASME RCS Discharge ASME CL 3 B31.1 RPV/PZR NPS 1/2 RCS High Point Vent NPS 2 NPS 1/2 CVC NPS 1/2 PZR High CNV 14 ASME RPV 20 NPS 2 ASME CL 1 ASME CL 3 ASME CL 3 ASME B31.1 Point Vent B31.1 RPV/PZR NPS 2 NPS 2 RCS PRZ Spray NPS 2 CVC NPS 2 CNV 7 ASME PZR Spray RPV 14 & 15 NPS 2 NPS 2 ASME CL 1 ASME CL 3 ASME B31.1 B31.1 CRDS Cooling NPS 2 CRDM Cooling CNV 12 NPS 2 ASME B31.1 ASME B31.1 Supply CRDM Heat CRDS Cooling CNV 5 NPS 2 CRDM Cooling Exchangers NPS 2 ASME B31.1 ASME B31.1 Return SGS Steam NPS 12 NPS 12 RPV 8 CNV 3 Steam ASME CL 2 ASME B31.1 NPS 8 RPV 10 NPS 4 SGS Feed NPS 5 NPS 4 ASME CL 2 CNV 1 Feedwater RPV 3 ASME B31.1 NPS 4 DHR NPS 4 Steam Generator 1 RPV 5 ASME CL 2 DHR HX A DHR Cond. DHR NPS 2 CNV 22 NPS 2 ASME CL 2 ASME CL 2 ASME CL 2 SGS Steam NPS 12 NPS 12 RPV 7 CNV 4 Steam ASME CL 2 ASME B31.1 NPS 8 RPV 9 NPS 4 SGS Feed NPS 5 CNV 2 NPS 4 ASME CL 2 Feedwater RPV 4 ASME B31.1 Steam Generator 2 NPS 4 RPV 6 DHR HX B DHR Cond. CNV 23 DHR NPS 2 NPS 2 ASME CL 2 ASME CL 2 ASME CL 2 Inservice Inspection and Testing of Class 2 and 3 Systems and Scale Final Safety Analysis Report Components

The main steamline isolation valve leakage control system is applicable to boiling water reactor designs. The NuScale Power Plant design is a pressurized water reactor.

Therefore, this section is not applicable to the NuScale Power Plant application for design certification.

cale US460 SDAA 6.7-1 Revision 1