ML22027A580

From kanterella
Revision as of 12:40, 2 September 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submittal of Westinghouse January 2022 Updated Integrated Safety Analysis Summary
ML22027A580
Person / Time
Site: Westinghouse
Issue date: 01/27/2022
From: Donnelly P
Westinghouse
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML22027A579 List:
References
LTR-RAC-22-05
Download: ML22027A580 (1)


Text

Westinghouse Non-Proprietary Class 3 8 Westinghouse Page 1 of3 Westinghouse Electric Company LLC Columbia Fuel Site 5801 Bluff Road Hopkins, South Carolina 29061-9121 USA Director, Office of Nuclear Material Safety and Safeguards Directtel: 803-647-1957 U. S. Nuclear Regulatory Commission Document Control Desk e-mail: donnelpb@westinghouse.com 115 5 5 Rockville Pike Your ref:

Rockville, Maryland 20852-2738 Our ref: LTR-RAC-22-05 r-----'---=----------------------, January Security Related Information Notice 27, 2022 Enclosure 1 to this letter contains security related information which is to be withheldfrom public disclosure in accordance with RIS 2005-31. The balance o this letter m be considered blic u on removal o Enclosure 1

SUBJECT:

WESTINGHOUSE JANUARY 2022 UPDATED INTEGRATED SAFETY ANALYSIS (ISA)

SUMMARY

Westinghouse Electric Company LLC (Westinghouse) hereby submits the updated Integrated Safety Analysis (ISA) Summary for the Columbia Fuel Fabrication Facility (CFFF) in accordance with 10CFR70.72(d)(3). This submittal incorporates facility changes and the results of new or revised analyses completed within calendar year 2021 which impacted the ISA Summary. The ISA changes implemented in 2021 did not require Nuclear Regulatory Commission (NRC) pre-approval under the provisions of 10CFR70.72(c).

Table 1 on pages 2 and 3 of this letter provides a listing of the impacted sections of the ISA Summary and a general description of the revisions. Changes in the enclosed ISA summary are identified by revision lines in the left margin.

If you have any questions, please contact me at (803) 647-1957.

rl Patrick Donnelly Acting Regulatory Affairs Manager Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151 License SNM -1107 : January 2022 Updated ISA Summary Cc:

Ms. Jennifer Tobin Mr. Thomas Vukovinsky Mr. Nicholas Peterka

© 2022 Westinghouse Electric Company LLC All Rights Reserved